12SPEC18R0006-Amendment_1.pdf
PDF 463 KB Posted
- Solicitation number
- 12SPEC18R0006
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment_2.pdf | ||
| 12SPEC18R0006_-_Solicitation_Package.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
12SPEC18R0006
x x
4 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT
THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
NRCS-LA-127217
LAFAYETTE LA 70506
646 CAJUNDOME BLVD SUITE 180
USDA-NRCS-LOUISIANA STATE OFFICE
WASHINGTON DC 20250
NRCS-HQ-12SPEC
ROOM 6801-S
1400 INDEPENDENCE AVENUE, SW
USDA-NRCS SPECIALIZED CONTRACTING T
NRCS-HQ-12SPEC
05/24/20180001
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
05/01/2018
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
The purpose of this amendment is provide for the participant Site Showing Sign In sheet, coordinate points and locations of areas staked in the field for site showing purposes, and
Appendix A to the solicitation package.
The coordinates and color scheme utilized to mark the stakes in the field at the site showing are as follows:
1. Yellow - east site double row planting centerlines - labels 1062-1068, 1039, 1070-1073, 1090-1095, 1110-1113
2. Green - west site double row planting centerlines - labels 1000-1005, 1018-1021, 1114-1117
Continued ...
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
VICKI SUPLER
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
NSN 7540-01-152-8070
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 2
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
12SPEC18R0006/0001
3. Blue - west site planting areas - labels
1030-0133, 1037-1040, 1049-1052, 1118
Attached please find the Attachment A to the solicitation package that was omitted during transmission to FBO.gov. Also attached is the
Site Showing Sign In Sheet from the site showing conducted on May 22, 2018.
All other terms and conditions of the solicitation remain unchanged and in full force and effect.
Period of Performance: 06/25/2018 to 06/24/2023
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
a.
(1) TITLE AND LOCATION (City and State) (2) DATES OF PROJECT
START DATE END DATE
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.)
(4) SPECIFIC ROLE (5) EMPLOYER (6) PHONE NUMBER
b.
START DATE END DATE
(4) SPECIFIC ROLE (5) EMPLOYER (6) PHONE NUMBER
c.
START DATE END DATE
(4) SPECIFIC ROLE (6) PHONE NUMBER
d.
START DATE END DATE
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.)
(4) SPECIFIC ROLE (5) EMPLOYER (6) PHONE NUMBER
(1) TITLE AND LOCATION (City and State) (2) DATES OF PROJECT
START DATE END DATE
(4) SPECIFIC ROLE (5) EMPLOYER (6) PHONE NUMBER
ATTACHMENT
RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
COMPLETE ONE FOR EACH KEY PERSON
1. NAME 2. ROLE IN THIS CONTRACT 3. YEARS EXPERIENCE
a. TOTAL b. W ITH CURRENT COMPANY
4. COMPANY NAME AND LOCATION (City and State)
5. EDUCATION (DEGREE AND SPECIALIZATION)
6. OTHER QUALIFICATIONS (SAFETY, QC TRAINING, AW ARDS, ETC.)
7. RELEVANT EXPERIENCE
(5) EMPLOYER
e.
TOTAL
W/ CURRENT
COMPANY
EXPERIENCE IN YEARS
NAME OF KEY PERSONNEL PRIME CONTRACTOR SUB-CONTRACTOR
SUMMARIES OF KEY PERSONNEL
NAME OF PROJECTS FROM RESUME OF WHICH
PERSONNEL PERFORMED THIS ROLE SPECIFIC ROLE TO BE PERFORMED
dustin.perron Cross-Out
| Key Personnel.pdf |
| Sheet1 |
| Resume Form.pdf |
| Key Personnel.pdf |
| Sheet1 |
| ATTACHMENT: A |
| 1 NAME: |
| 2 ROLE IN THIS CONTRACT: |
| a TOTAL: |
| b WITH CURRENT COMPANY: |
| 5 EDUCATION DEGREE AND SPECIALIZATION: |
| 6 OTHER QUALIFICATIONS SAFETY QC TRAINING AWARDS ETC: |
| 7 RELEVANT EXPERIENCE: |
| 0: |
| START DATE: |
| END DATE: |
| 4 SPECIFIC ROLE 5 EMPLOYER: |
| 6 PHONE NUMBER: |
| 1 TITLE AND LOCATION City and State_2: |
| START DATE_2: |
| END DATE_2: |
| 3 BRIEF DESCRIPTION Brief scope size cost etc_2: |
| 4 SPECIFIC ROLE 5 EMPLOYER_2: |
| 1 TITLE AND LOCATION City and State_3: |
| 6 PHONE NUMBER_2: |
| START DATE_3: |
| END DATE_3: |
| 3 BRIEF DESCRIPTION Brief scope size cost etc_3: |
| 4 SPECIFIC ROLE 5 EMPLOYER_3: |
| 6 PHONE NUMBER_3: |
| 1 TITLE AND LOCATION City and State_4: |
| START DATE_4: |
| END DATE_4: |
| 3 BRIEF DESCRIPTION Brief scope size cost etc_4: |
| 4 SPECIFIC ROLE 5 EMPLOYER_4: |
| 6 PHONE NUMBER_4: |
| 1 TITLE AND LOCATION City and State_5: |
| 5 EMPLOYERD: |
| START DATE_5: |
| END DATE_5: |
| 3 BRIEF DESCRIPTION Brief scope size cost etc_5: |
| 4 SPECIFIC ROLE: |
| 5 EMPLOYERA: |
| 5 EMPLOYERB: |
| 5 EMPLOYERC: |
| 5 EMPLOYERE: |
| 6 PHONE NUMBER_5: |
| 1 TITLE AND LOCATION City and State: |
| 3 BRIEF DESCRIPTION Brief scope size cost etc: |
| NAME OF KEY PERSONNEL 1: |
| 1: |
| CURRow1: |
| NAME OF KEY PERSONNEL 2: |
| NAME OF KEY PERSONNEL 3: |
| NAME OF KEY PERSONNEL 4: |
| NAME OF KEY PERSONNEL 5: |
| NAME OF KEY PERSONNEL 6: |
| NAME OF KEY PERSONNEL 7: |
| NAME OF KEY PERSONNEL 8: |
| NAME OF KEY PERSONNEL 9: |
| NAME OF KEY PERSONNEL 10: |
| NAME OF KEY PERSONNEL 11: |
| NAME OF KEY PERSONNEL 12: |
| NAME OF KEY PERSONNEL 13: |
| NAME OF KEY PERSONNEL 14: |
| NAME OF KEY PERSONNEL 15: |
| CURRow2: |
| CURRow3: |
| CURRow4: |
| CURRow5: |
| CURRow6: |
| CURRow7: |
| CURRow8: |
| Prime: Off |
| 2: |
| 3: |
| 4: |
| 5: |
| 6: |
| 7: |
| 8: |
| 9: |
| 10: |
| 11: |
| 12: |
| 13: |
| 14: |
| 15: |
| TOTALRow1: |
| NAME OF PROJECTS FROM RESUME OF WHICH PERSONNEL PERFORMED THIS ROLERow1: |
| TOTALRow2: |
| NAME OF PROJECTS FROM RESUME OF WHICH PERSONNEL PERFORMED THIS ROLERow2: |
| TOTALRow3: |
| NAME OF PROJECTS FROM RESUME OF WHICH PERSONNEL PERFORMED THIS ROLERow3: |
| TOTALRow4: |
| NAME OF PROJECTS FROM RESUME OF WHICH PERSONNEL PERFORMED THIS ROLERow4: |
| TOTALRow5: |
| NAME OF PROJECTS FROM RESUME OF WHICH PERSONNEL PERFORMED THIS ROLERow5: |
| TOTALRow6: |
| NAME OF PROJECTS FROM RESUME OF WHICH PERSONNEL PERFORMED THIS ROLERow6: |
| TOTALRow7: |
| NAME OF PROJECTS FROM RESUME OF WHICH PERSONNEL PERFORMED THIS ROLERow7: |
| TOTALRow8: |
| NAME OF PROJECTS FROM RESUME OF WHICH PERSONNEL PERFORMED THIS ROLERow8: |
| TOTALRow9: |
| CURRow9: |
| NAME OF PROJECTS FROM RESUME OF WHICH PERSONNEL PERFORMED THIS ROLERow9: |
| TOTALRow10: |
| CUROW10: |
| NAME OF PROJECTS FROM RESUME OF WHICH PERSONNEL PERFORMED THIS ROLERow10: |
| TOTALRow11: |
| CURRow11: |
| NAME OF PROJECTS FROM RESUME OF WHICH PERSONNEL PERFORMED THIS ROLERow11: |
| TOTALRow12: |
| CURRow12: |
| NAME OF PROJECTS FROM RESUME OF WHICH PERSONNEL PERFORMED THIS ROLERow12: |
| TOTALRow13: |
| CURRow13: |
| NAME OF PROJECTS FROM RESUME OF WHICH PERSONNEL PERFORMED THIS ROLERow13: |
| TOTALRow14: |
| CURRow14: |
| NAME OF PROJECTS FROM RESUME OF WHICH PERSONNEL PERFORMED THIS ROLERow14: |
| CURRow15: |
| 16: |
| TOTALRow15: |
| NAME OF PROJECTS FROM RESUME OF WHICH PERSONNEL PERFORMED THIS ROLERow15: |
| NAME OF KEY PERSONNEL 16: |
| Check Box3: Off |
| Check Box4: Off |
| Check Box5: Off |
| Check Box6: Off |
| Check Box7: Off |
| Check Box8: Off |
| Check Box9: Off |
| Check Box10: Off |
| Check Box11: Off |
| Check Box12: Off |
| Check Box13: Off |
| Check Box14: Off |
| Check Box15: Off |
| Check Box16: Off |
| Check Box33: Off |
| Sub: Off |
| Check Box17: Off |
| Check Box18: Off |
| Check Box19: Off |
| Check Box20: Off |
| Check Box21: Off |
| Check Box22: Off |
| Check Box23: Off |
| Check Box24: Off |
| Check Box25: Off |
| Check Box26: Off |
| Check Box27: Off |
| Check Box28: Off |
| Check Box29: Off |
| Check Box30: Off |
| Check Box34: Off |
| TOTALRow16: |
| CURRow16: |
| NAME OF PROJECTS FROM RESUME OF WHICH PERSONNEL PERFORMED THIS ROLERow16: |
File details come from the government source that posted it.