12RADZ21R0001_Amd_0001.pdf
PDF 96 KB Posted
- Attached to
- MFH Pilot Inspection Program Federal contract opportunity
- Solicitation number
- 12RADZ21R0001
About this file
This document includes a request for proposal and related questions and answers regarding a multifamily housing inspection pilot program. The United States Department of Agriculture Rural Development Procurement Management Office seeks to award a contract to develop and implement a multifamily housing inspection pilot program to test using a new inspection protocol based on the industry standard used by Fannie Mae. The pilot program will test conducting inspections of federally assisted rural housing using qualified third-party inspectors and the standard MBA inspection form along with the Fannie Mae rating scale. The objectives of the pilot include defining the purpose, goals, establishing success criteria, outlining benefits and risks, defining an evaluation strategy, and establishing monitoring of inspection quality. The North American Industry Classification System code is 541611 and the small business size standard is $16.5 million. The solicitation number is 12RADZ21R0001 and questions are due by August 13, 2021.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 20768_CMF_Property_Inspection_Reference_Guide(0)(1).pdf | ||
| 12RADZ21R0001 Solicitation.pdf | ||
| past_performance_questionaire.docx | DOCX document | |
| Statement of Work.pdf | ||
| FannieMae Inspection Guide.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
12RADZ21R0001
x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
WASHINGTON DC 20250
RD-31ME
1400 INDEPENDENCE AVE, SW
RURAL DEVELOPMENT BUSINESS CENTER
PROCUREMENT MANAGEMENT OFFICE
USDA, RURAL DEVELOPMENT
08/05/20210001
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
08/05/2021
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Response to Questions on Physical Inspection Pilot Plan Solicitation
1. Since the MBA guide is dated 2019 and the Fannie Mae 2020, and due to COVID, would
Remote Video Inspections (RVI) be considered an option to still photography for the MFH pilot program?
The solicitation assumes that restrictions on conducting inspections will be lifted by the time the pilot is ready to be launched. The main goal of the pilot plan should be to test whether using the MBA inspection form and Fannie Mae rating system will provide objective, accurate and replicable results using third party inspectors while conducting inspections of federally assisted housing in rural areas.
Continued ...
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
DORI M. TURNER
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 4
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
12RADZ21R0001/0001
Since the pandemic may preclude conducting inspections at some projects in early fiscal year
2022, RD will consider including a contingency for doing some RVI inspections using the MBA form and Fannie Mae Rating system if an award is made.
2. Would USDA consider incorporating some of the newer National Standards for the Physical
Inspection of Real Estate (NSPIRE) protocol into the Pilot Program, in addition to the MBA and
Fannie Mae guidelines?
The main goal of the pilot plan should be to test whether using the MBA form and Fannie Mae rating system will provide objective, accurate and replicable results using third party inspectors conducting inspections of federally assisted housing in rural areas. However, RD would be open to discussing what parts of the NSPIRE protocol would fit with using the MBA/Fannie Mae protocol.
3. How many rural sites are there to determine the number of inspections that should be performed to validate the new protocol?
There are approximately 13,269 projects
(comprising approximately 412,753 units) that would be subject to the new inspection protocol.
The majority of projects are located in the South and Midwest Regions. The South Region has approximately 5,072 projects and the Midwest has approximately 4,272 projects. The Northeast
Region contains about 2,074 projects and the West
Region has about 1,851 projects. Each of the four regions is comprised of the states noted below:
South Region (AL, AR, FL, GA, KY, LA, MS, NC, OK, PR, SC, TN, TX, VI)
Midwest Region (IA, IL, IN, KS, MI, MN, MO, ND, NE, OH, SD, WI)
Northwest Region (CT, DE, MA, MD, ME, NH, NJ, NY, PA, RI, VA, VT, WV)
West Region (AK, AZ, CA, CO, HI, ID, MT, NM, NV, OR, UT, WA, WY)
4. Does USDA have any urban sites with an existing protocol and if so, how many?
Continued ...
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
3 4
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
12RADZ21R0001/0001
RD will use the new protocol at all projects subject to inspection. USDA RD provides competitive financing for affordable multi-family rental housing for low-income, elderly, or disabled individuals and families in eligible rural areas. New construction section 515 loans will be made only in designated places selected by the Agency in accordance with the requirements of §3560.57 The definition of an eligible rural area is found in §3560.11.
Over the years some RD projects that were originally financed in eligible rural areas have grown to the point where they no longer meet the definition of a rural area and are located in areas considered peri-urban or urban. However, all Agency servicing requirements remain and the same inspection protocol will be used for these projects.
5. Should the sample be determined based on the total number of properties in a state or based on the population density?
The project plan to test the proof of concept of using the new protocol should determine this.
6. Is one of the pilot programs goals to align the physical inspection with the National
Physical Inspection Alignment Program?
The main goal of the pilot plan should be to test whether using the MBA form and Fannie Mae rating system will provide objective, accurate and replicable results using third party inspectors conducting inspections of federally assisted USDA housing. USDA already partners with HUD and other participants on the National Physical Inspection
Alignment Program.
7. Is the awarded bidder for this procurement precluded from being able to bid on any future procurement for actually performing the inspections?
No, however the product developed shall be written in a manner that anyone, including RD itself, can use the documents.
8. If bidding under a Joint Venture that is a
Continued ...
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
4 4
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
12RADZ21R0001/0001
small business, will past performance for both entities count?
Yes, past performance shall be reviewed for all entities.
9. Can the bidder list past performance for a
Tier 1 subcontractor? Yes, however the most recent and most relevant shall also be considered.
10. Please confirm that there is not a separate pricing document, that all pricing is inserted on the SF1449.
The overall pricing shall be included on the
1449. However, it is strongly encouraged to breakdown in detail on a separate pricing volume.
11. Is there a page limit in the RFP response for Technical Factor 1 ¿ Technical Acceptability?
There is no page limit regarding Technical Factor
1.
12. Could you please tell me if the Combined
Synopsis/Solicitation posted as solicitation number 12RADZ21R0001 will be a follow-on requirement to any work performed currently or in the past, or will this be a new requirement?
This is not a follow-on requirement.
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
File details come from the government source that posted it. Updated .