S01 - Amendment 001 - Solicitation 12FPC425Q0072.pdf

PDF 85 KB Posted

Attached to
USDA NRCS WRE Tree Planting Kentucky Federal contract opportunity
Solicitation number
12FPC425Q0072
Issued by
Department of Agriculture Under Secretary for Farm Production and Conservation

About this file

This document is a Questions and Answers amendment for Solicitation 12FPC425Q0072, dated September 10, 2025, from the Natural Resources Conservation Service (NRCS). The document addresses several key contractor inquiries regarding a tree planting and site preparation project, including billing terms, site preparation timelines, species substitutions, and specific plant/bareroot specifications. NRCS indicates flexibility in project timelines, allowing site preparation and wheat nurse crop planting variances, with a requested November 15th planting deadline and encouragement for the awarded contractor to discuss specific timelines after contract signing.

The amendment provides detailed bareroot tree specifications for multiple species, including Big Shellbark Hickory, Shagbark Hickory, Pecan, and various oak species. Each species has precise requirements for minimum and maximum height, root collar diameter, and root length/pruning. The document also confirms that maps and shapefiles for planting areas will be provided, and suggests potential flexibility in species quantities if certain tree types are unavailable, subject to NRCS case-by-case evaluation. Contractors are advised to contact NRCS promptly after contract document signing to coordinate project-specific details.

View the file

Other files for this federal contract opportunity

Other files attached to USDA NRCS WRE Tree Planting Kentucky, newest first.
File Type Posted
S01 - Sol_12FPC425Q0072_Amd_0003.pdf PDF
S01 - Amendment 003- Q and A 12FPC425Q0072 Kentucky Tree Planting 9.16.25.pdf PDF
S01 - Sol_12FPC425Q0072_Amd_0002.pdf PDF
S01 - Sol_12FPC425Q0072_Amd_0001.pdf PDF
S01 - Amendment 002 - Swain LLC 1801MS4 Location Map revised.pdf PDF
S01 - Amendment 002 - WRE Tree Planting KY SOW Rev 02 _ 9.15.25.pdf PDF
S01 - Attachment 5 - Pricing Sheet REVISED Site 5_ 9.15.25.pdf PDF
S01 - Amendment 002- Q and A 12FPC425Q0072 Kentucky Tree Planting.pdf PDF
S01 - Amendment 001 - Heine 2201W6M Tree Plantng Map.pdf PDF
S01 - Amendment 001 - Grogan_2101VD8_Tree Planting Map.pdf PDF
S01 - Amendment 001 - Davis Farms 2101QRL Tree Planting Map.pdf PDF
S01 - Amendment 001 - Brown_Gayle_2101WGK_Tree Planting Map.pdf PDF
S01 - Amendment 001 - Hunter_holdings_22001XQ6_Tree Planting Map.pdf PDF
S01 - Amendment 001 - Swain LLC 1801MS4 Tree Replanting Map.pdf PDF
S01 - Amendment 001 - Pictures of Jeff Sole Site.pdf PDF
S01 - Amendment 001 - Weddle_2101RLJ_Tree Planting Map.pdf PDF
S01 - Amendment 001 - Wells 2201W33 Tree Planting Map.pdf PDF
S01 - Amendment 001 - WRE Tree Planting KY SOW Rev 01 _ 9.5.2025.pdf PDF
S01 - Amendment 001 - Clauses.pdf PDF
S01 - Amendment 001 - Thompson 2201QW8 Tree Planting Map.pdf PDF
S01 - Amendment 001 - Mercer 2101W1T Tree Map.pdf PDF
S01 - Amendment 001 - Swain LLC 1801MS4 Location Map revised.pdf PDF
S01 - Amendment 001 - Driver_Walker_2101QWB Tree Planting Map.pdf PDF
S01 - Amendment 001 - Wright_Shelton 2101WHM Tree planting map.pdf PDF
S01 - Amendment 001 - Danny Kelly 2201M7M tree Planting Map.pdf PDF
S01 - Attachment 5 - Pricing Sheet.pdf PDF
S01 - Attachment 4 - Conservation Practice Standard Tree Shrub Establishment (612).pdf PDF
S01 - Attachment 3 - Wage Determinations.pdf PDF
S01 - RFQ 12FPC425Q0072 WRE TREE PLANTING KENTUCKY Final 8.19.2025.pdf PDF
S01 - Attachment 1 - USDA NRCS SOW.pdf PDF
S01 - Attachment 2 - Location Maps.pdf PDF
Show all 31

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation 12FPC425Q0072 Amendment 0001 Questions and Answers

September 10, 2025

• Is it possible to bill for a portion of the total amount per job after the site preparation is done? Yes

• Is the time period for the site preparation absolute? For example, Swain, LLC WRE

Site states that site preparation will consist of mowing a total of 173.7 acres within 14 days of contract award followed with a chemical application of Roundup no earlier than 2 weeks after mowing, but before October 1. Since the bid closes on September 15, this would mean that we would need to finish mowing on the 15'th in order for the 2 weeks to pass before spraying it before October 1'st. We would like some clarification on that. NRCS will allow some variance on site preparation due to the contract being awarded so late. We will allow for the wheat nurse crop to be planted up to Nov. 15th. The mowing and spraying will have some variances as well and NRCS will do the best we can to modify the site preparation to be able to get completed. However, NRCS is requesting the contractor that gets awarded the project contact NRCS to discuss timelines as soon as they sign all contract documents.

• Are species substitutions allowed, and if not, could the densities be changed in order to keep the total amount of trees the same if the total number of a certain species is unavailable. (Ex. if 8,000 Swamp Chestnut Oak is needed, but we are only able to get 6,000, could we raise the numbers of another species to make up for the 2,00 missing from Swamp Chestnut Oak?) Potentially but NRCS will evaluate on a case by case basis.

• Will maps/shapefiles of the total planting/site preparation area be provided? I believe the location maps in Attachment 2 show the entire easement as the acreages do not match to the planting site details. NRCS can provide all necessary maps to show all areas to be planted for each site.

• There is also no map for Swain, though, there is a map for a Miles Farms. Not sure if there was a name change or if it is just a mistake. Will attach map with updated name change.

• Are the size specification for the bareroots all of the dimensions listed, or is that an "or" statement, where they would need to be 10" tall OR root collar diameter be at least ¼ inch?

Below are the specific requirements and it’s not OR The following plant species: Big Shellbark Hickory and Shagbark Hickory shall have the following dimensions;

- Minimum height of 8” inches and a maximum height of 36 inches

- Diameter at the root collar of at least 1/4 inch

- Roots shall be at least 5 inches in length and MUST be pruned to 10 inches, as necessary;

8. The following plant species: Pecan shall have the following dimensions;

- Minimum height of 10” inches and a maximum height of 36 inches

- Diameter at the root collar of at least 1/4 inch

- Roots shall be at least 5 inches in length and MUST be pruned to 10 inches, as necessary;

9. The following plant species: Overcup Oak, Swamp White Oak, Swamp Chestnut Oak, Bur Oak, Nutall Oak, Willow Oak, Pin Oak, Cherrybark Oak, Shumard Oak, Black Walnut, Persimmon, Silky Dogwood, and Bald Cypress, shall have the following dimensions;

- Minimum height of 14 inches and a maximum height of 48 inches

- Diameter at the root collar of at least 1/4 inch

- Roots shall be at least 5 inches in length and MUST be pruned to 10 inches, as necessary

File details come from the government source that posted it. Updated .