QA for RFQ 12FPC326Q0021 NRCS-OH WRE Restoration Project.docx
DOCX document 16 KB Posted
- Solicitation number
- 12FPC326Q0021
About this file
This is a Questions and Answers document for RFQ 12FPC326Q0021, a NRCS-Ohio Wetland Reserve Easement (WRE) Restoration Project. The Q&A addresses key clarifications from the site visit showing and covers nine primary topics: permit responsibilities assigned to the contractor per Delaware County flood damage prevention regulations; site access locations at the new construction parking area and at the corner of Monkey Hollow Road and Patrick Road with requirements to remain within easement boundaries; confirmation that the topographic surveyor does not need to be licensed; an 80 actual working day period of performance; sediment control specifications to follow industry standard Best Management Practices (BMPs) rather than NRCS-specific requirements; CAD file availability upon request; NRCS responsibility for construction layout, oversight, and as-built documentation; confirmation that vegetation work is excluded as a separate contract; and drainage tile decommissioning procedures requiring NRCS determination of whether tile is functioning and draining off-easement land before destruction is permitted.
The associated RFQ solicits quotations for wetland restoration services including H&H modeling and floodplain permitting, 700 linear feet of tile searching, 3,430 cubic yards of wetland excavation, and 18.15 tons of Type C rip rap installation. This is a Total Small Business Set-Aside with a magnitude of requirement between $25,000 and $100,000 under NAICS Code 237990. Quotations are due July 8, 2026 at 5:00 PM ET, submitted to amy.smith2@usda.gov. The project is located in Porter Township, Delaware County, Ohio, and must comply with NRCS policy, the NRCS Field Office Technical Guide, National Engineering Handbook, and National Engineering Manual References.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
QUESTIONS AND ANSWERS
RFQ 12FPC326Q0021
NRCS-OH WRE Restoration Project
1. Who is responsible for permits? The contractor is responsible for following the Delaware County flood damage prevention regulations and obtaining any permits necessary.
2. Where is access? Access is located where we are parked at the site for the new construction. Access for the existing wetland repair is located at the corner of Monkey Hollow Rd and Patrick Rd. Contractor will ensure they are within easement boundary as shown on plans.
3. Does the surveyor completing the topo survey have to be a licensed surveyor? No
4. What is the timeline/ period of performance? 80 actual working days
5. What are the specifications for the sediment control? NRCS does not have specific specifications. The contractor will use the industry standard BMPs.
6. Will NRCS provide a CAD file? Yes, upon request.
7. Who is responsible for construction layout, oversight, and as-built? NRCS is responsible for these items.
8. Is the veg work part of this contract? No, the veg work will be a separate contract.
9. If drainage tile is found during the tile search, can it be destroyed? Before the contractor can decommission the tile, NRCS will determine if the tile is functioning and draining any land off-easement.