Blythe WRE site showing Questions.pdf
PDF 78 KB Posted
- Solicitation number
- 12FPC326B0001
About this file
This is a Questions and Answers document for the Blythe Water Reclamation and Ecosystem (WRE) site project. The document does not address required products or services, pricing terms, response dates, or award dates, but rather provides clarifications on seven technical and operational questions submitted by contractors regarding project specifications and requirements.
Key clarifications provided by the Contracting Officer include: work hours may be scheduled six days per week at ten hours per day, provided non-continuous inspection items are completed when inspector and COR are not on-site; stripped topsoil can be incorporated into the top six inches of berm construction, with excess material returned to the pool area at specified tolerances of +/- 0.5 feet; the contractor is responsible for verifying county road weight load limits per the mobilization specification; pipe end protection must use internal or external fittings (not rubber caps or plugs) with a lifespan exceeding 15 years; fertilizer and lime require application and incorporation to a minimum three-inch depth separate from seed application at one-quarter to one-half inch maximum depth; mulch is not required on berms per the seeding specification; and riprap specifications require RR3 sizing only, with no RR4 sizing applicable to the project.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Blythe WRE site showing Questions
1. Can the time period for work hours be 6 days a week, 10hr days?
a. CO will provide answer, Yes time period for work hours may be six (6) days a week, 10 hour days. We are fine with this as long as non-continuous inspection items can be done during that time as inspector and COR cannot be on site.
2. Can the stripping of ground under footprint of berms be used in berm?
a. The stripped topsoil can be used in the top 6” of berm construction as specified on drawings. Excess stripping from berm and pool areas will go back into pool after excavated to grade with specified tolerance of +/- 0.5ft
3. What about weight of loads on county roads?
a. Per mobilization spec it is the responsibility if contractor to ensure roads are not damaged and its contractor’s responsibility to check with county highway engineer about equipment loads on county roads. Refer to the mobilization spec for more details
4. Drawings say cap or wire cage on upstream end of pipe, can a plug be used?
a. A cap of internal or external fitting can be used if proper fitment and is removal and have lifespan greater than 15 years. No rubber caps or plugs
5. Does fertilizer need to be a separate pass from seeding?
a. Reference the seeding spec – fertilizer and lime must be applied and incorporated a min of 3” depth, where seed ¼”- ½” max depth.
6. Is there mulch required on berm?
a. No reference the seeding spec items of work
7. The riprap has RR3 and RR4 referenced, which size
a. RR3 is the correct size – no RR4