This document contains an amendment to a federal solicitation for demolition and removal services. The solicitation is being issued by the Department of Agriculture to demolish and remove the Boise Master Radio Station for the National Climate & Water Center. The amendment provides answers to thirteen questions from potential offerors. It clarifies that no property survey, electric power, telephone service, job trailers, or on-site radios are required. It also states that all concrete must be removed from the site. A storage trailer may be left on site while demolition is occurring. The amendment does not change the response date.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

12FPC323Q0073

x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

FPAC-HQ-12FPC3

FPAC-HQ-12FPC3@usda.gov Western Section USDA FPAC Business Center

09/19/20230001

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

08/31/2023

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Master Station Removal in Boise, ID

The purpose of this amendment is to transmit Q&A notes.

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

LAUREEN M. EIPP

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

Demoli�on and Removal of the Boise Master Radio Sta�on for the Na�onal Climate & Water Center

(NWCC)

12FPC323Q0073 - Ques�ons and Answers

1. Do we have to provide a property survey, is this a requirement of this SOW?

There is no need for a property survey.

2. Is Electric Power and Light a requirement for this project?

No requirement; Look to the regula�ons cited in Sec�on 5.2 of the Statement of Work .

3. If power is needed, we will u�lize a building power?

You can use building power.

4 - Is Telephone service a requirement for this project?

Not required per the Statement of Work.

5 - Are JOB trailers required?

Not required per the Statement of Work.

6 - Will we be required to provide on-site hand-held radios?

Not required per the Statement of Work.

7- Is Bonding a requirement for this project?

Payment Bond

8- Will the proposal date be pushed for RFI responses?

No

9- Is a CDL required for Contractor to have when ren�ng equipment?

Need to comply with state and local guidance.

10- Does all concrete need to be taken out or is digging down 2-3� suffice with proper backfill?

All concrete must be removed. No concrete is to be left behind or buried on site.

11- Is contractor to have someone come out with a bushog for grass and weeds or with that be on the

NWCC?

The contractor is responsible for site safety, and fire mi�ga�on.

12- Will a storage trailer be permited to be le� on site with materials and tools or will it need to be packed up and removed daily?

a. If permited to be le� on site, may it be le� for the dura�on of work?

A storage trailer is permitted to be left at the site while demo is occurring.

13 - Whats the project magnitude?

The magnitude is only required to be disclosed on a construc�on. This is being solicited as service contract.

12FPC323Q0073
Amendment 1 Questions and Answers