Amendment_0001_Bid Schedule.pdf
PDF 414 KB Posted
- Solicitation number
- 12FPC322B0003
About this file
This document contains an invitation for bid for construction services. The United States Department of Agriculture intends to issue an IFB on behalf of the Natural Resources Conservation Service for repairs to Lakeview Watershed Structure Site 1 in Donley County, Texas. Work will include installing a 14,820 square foot soil-bentonite slurry cutoff wall, excavating 6,123 cubic yards of material, placing 5,360 cubic yards of earthfill, installing 175 linear feet of fencing, and establishing vegetation across 2.5 acres. The anticipated period of performance is 118 calendar days from notice to proceed. Bids are due by a small business set-aside and firms must be registered in SAM to be eligible for award. Interested parties should contact the specified contracting officer by the stated deadline with any questions.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Updated thru FAC 2022-02 dated January 14, 2022 Page 4 of 49
Solicitation No. 12FPC322B0003 - REVISED BID SCHEDULE - Amendment_0001
PART I – THE SCHEDULE
LAKEVIEW WATERSHED SITE 1 SEEPAGE REPAIR DONLEY COUNTY, TX
B - SUPPLIES OR SERVICES AND PRICES
This solicitation requires bidding on all line items, failure to do so will disqualify the bid.
Item No.
Supplies/Services Spec.
No.
Quantity Unit Unit Price Amount
1 Structure Removal, Existing Fence
3 1-Job Lump Sum $
2 Pollution Control 5 1-Job Lump Sum $
3 Vegetation Establishment 6 2.5 Acre $ $
4 Construction Surveys 7 1-Job Lump Sum $
5 Mobilization & Demobilization 8 1-Job Lump Sum $
6 Excavation 21 6,123 Cu. Yd.* $ $
7 Earthfill 23 5,360.00 Cu. Yd. * $ $
8 Topsoil 26 330.0 Sq. Yd.* $ $
9 Field Fence 92 175 Lin. Ft.* $ $
10 Contractor Quality Control 94 1-Job Lump Sum $
11 Soil—Bentonite Wall 416 14,820 Sq. Ft.* $ $
TOTAL BID: $____________________________
SUBMITTED BY:___________________________________DUNS#____________________
52.211-18 Variation in Estimated Quantity. (Apr 1984) If the quantity of a unit-priced item in this contract is an estimated quantity and the actual quantity of the unit-priced item varies more than 15 percent above or below the estimated quantity, an equitable adjustment in the contract price shall be made upon demand of either party. The equitable adjustment shall be based upon any increase or decrease in costs due solely to the variation above 115 percent or below 85 percent of the estimated quantity. If the quantity variation is such as to cause an increase in the time necessary for completion, the Contractor may request, in writing, an extension of time, to be received by the Contracting Officer within 10 days from the beginning of the delay, or within such further