S01 Attachment 2 Amendment 001 12FPC321Q0032-rev.pdf
PDF 344 KB Posted
- Solicitation number
- 12FPC321Q0032
View the file
Other files
| File | Type | Posted |
|---|---|---|
| S01 SF 30 Amendment 001.pdf | ||
| S01 Attachment 1 Amendment 001 12FPC321Q0032-rev.pdf | ||
| S01 Solicitation Packet Amendment 001 12FPC321Q0032.pdf | ||
| Site Showing Sign-in Sheet.pdf | ||
| file1-41.jpeg | JPEG file | |
| file2-24.jpeg | JPEG file | |
| S01 1442 and Solicitation Packet 12FPC321Q0032.pdf | ||
| file4-13.jpeg | JPEG file | |
| IMG_4174-1.mov | MOV file | |
| file3-17.jpeg | JPEG file | |
| file-92.jpeg | JPEG file | |
| S01 Attachment 2 12FPC321Q0032.pdf | ||
| S01 Attachment 1 12FPC321Q0032.pdf | ||
| S01 Attachment 3 12FPC321Q0032.pdf | ||
| S01 1442 and Solicitation Packet 12FPC321Q0032.pdf |
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
-L ,<I l , .J L,_
I,.[" l ti' ✓,
r. J
L
- r lr
1~ i I
VICINITY MAP
Pat
E n7 erg ency
Eubanks Site
Watershed Protection
George County, Mississippi
U.S. Department of Agriculture Natural Resources Conservation Service
ITEM
Protective Cover Earthfill, Class C (offsite) Rock Riorao Geotextile Concrete Grout
Mobilization & Demobilization
L.S. = Lump Sum
PAGE
NO.
QUANTITIES
CONTRACT FINAL PAY
ESTIMATE UNIT UNIT
PRICE
AMOUNT AMOUNT $
1 L.S.
1.500 C.Y.
350 Tons 600 S.Y.
55 C.Y.
1 L.S.
TOTAL
INDEX OF DRAWINGS
DESCRIPTION
Cover Sheet
Pat Eubanks Road Plan
REVISIONS
DOLLARS
0 0 0 N N N I I I o 0 0 0 0 � � �
C
CJ1 CJ1 rn
C C L
(].) 0 0 0 C)
U1 0...
U1 z
"'O Q) u
C Q)
C -""-CJ1 � u
"in Q)
L
Q) ..c
0..
L
C u
_J
�I') l J
, i::
::z r.n =>ll
File No.
Drawing No.
1---+-----+------1 Sheet 1 of 2
L
C
CJ1
C w
C U1 o:::;;:
Oc 2: 0 OJ rn rn cU oo u--:, Q) U1 +-'U .8 O:'.
U1 Z u
L
0.. Q)
<( 1-=
Q) u L
Q) U1
C
L
Q) rn
C u rn
Q) u L rn
Q) O:'.
L z
Install 24" CMP (30' Section) 1 L.S.
Notes:
Alignment, Ii m its and placement of rock riprop bank stabilization and CMP will be as directed in the field by the C0R.
Work Limits shall be 100 LF upstream and downstream of rock placement limits and 75 ft left and rig ht of centerline excluding buildings.
:JIJ2NOVII
FENCE
42" RCP
ROCK RIPRAP GRADATION CHART
"'-- GRADATION NO. 1 / GRADATION NO. 2
STONE CUMULATIVE STON�
WEIGHT
c�
�ERCENT GHTER WEIGHT PERCENT LIGHTER
POUNDS
2o/
/5
BY EIGHT POUNDS BY WEIGHT
/'---... 100 200 100
/ 5 O'----- 85 80 50 - 85
15 - 5Q. 40 15 - 50
0 - 15 "'-- 10 0 - 15 Note: Spoils and rock dust that will pass a
3" sieve shall consist of not more than 5% by weight.
POWER
POLE
Y)C) i j I i i i i i r i.
PAT EUBANKS ROAD
25' DEEP
GULLY
FLOW
i i i i
I ,.
I
I
I
I i j i
--1 --1 --1
--1 --1 --1
--1 --1 --1 --1
--1 --1 --1
--1 --1
EXISTING 24" CMP
TO BE REMOVED
10'
CONCRETE
POWER
LINE
DESCRIPTION OF WORK
PROTECT ROAD AND POWER
POLE WITH EARTHFILL AND
GROUTED ROCK RIPRAP ON
SOUTH BANK. REPLACE 30'
OF 24" CMP (CMP FURNISHED
BY THE COUNTY)
ESTIMATED OU AN Tl Tl ES
EXCAVATION 300 CY
EARTHFILL 1500 CY ROCK
RIPRAP 350 TONS
GEOTEXTILE 600 SY
CONCRETE GROUT 55 CY
SITE LOCATION
N=30-59-03.39 W= 88-28-15. 60
DSR#28-04-20-5294-317
REVISIONS
(/) oS I 0:: a! z
"D Q)
-0
C Q)
C .,< 0, 3: u
"iii Q) a Q) L ..c
0 0 u
File No.
Drawing No.
t---+-----+-------1 Sheet 2 of 2
"D Q)
L o._ o._ a L
::J ...., a z
Q) ....,
| 1 |
| 2 |
File details come from the government source that posted it. Updated .