About this file
Statement of Work
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment_4_-_314_Buckthorn_Fact_Sheet.pdf | ||
| Adendum_52.212-1_Instructions_to_Offers.pdf | ||
| Attachment_3_-_314_Practice_Standard.pdf | ||
| SF1449_12FPC319Q0053.pdf | ||
| Attachment_5_-_Wage_Determination.pdf | ||
| Attachment_2_-_314_Implementation_Requirements.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MN WRP and Brush Management Project Supporting Documentation:
• Total Brush Management Quantity is 6,500 acres
• Length of contract 5 years ending September 30th, 2024
• Maximum number of Acres/Yr=1300
• Brush removal will not occur if snow depth on site exceeds 12”
• COR, Caroline Clarin, Wetland Restoration Engineer
Attachments:
1. Statement of Work
2. 314 Implementation Requirements
3. 314 Practice Standard
4. 314 Buckthorn Fact Sheet
5. Wage Determination
Statement of Work Brush Management
Minnesota WRP Easements
Government Furnished Documents
Project area boundary and access map
GIS shape file of easement boundary, work area boundary, and sensitive areas boundary
For each Easement #, a MN‐Implementation Requirements Document (314_MN_IR_XXXXX) in fillable PDF electronic file (attachment)
a) with Landowner, Location, Easement #, Contract Number and County filled out on page 1.
b) Unit, Acres, Target Species on page 2
Technical Direction
Technical direction for projects will be provided by an NRCS representative. Each task order award will indicate a specific designated NRCS representative and contact information. The contractor and NRCS representatives will meet in November of 2019 and develop a strategy to address all the parcels identified in the project area within the 5‐year time frame of the contract.
The objective of tree & brush removal is to remove all woody vegetation from the defined areas within the easement as specified in the plan for each easement. Tree & brush removal is to be completed with the following parameters:
1) Mechanical Treatment
a) Trees greater than 12 inches Diameter Breast Height (DBH) may be ground, cut with a stump height less than 15 inches from natural ground and removed from the site or girdled and basal truck treated with an appropriate herbicide (for example trycloper or as recommended by manufacturer/distributer).
i) Trees 2 to 12 inches DBH will be cut or ground with a stumpage height of less than 2 inches and will be:
ii) removed from the easement
iii) or ground/chipped with fragment sizes < 6" in length and width and spread to a depth of 6" or less
iv) or burned on‐site with the ash pile being removed or disposed of as shown in the plans.
v) stumps may be treated as described in the plans with a chemical treatment to prevent re‐ sprouts
Trees 2” DBH or smaller are mowed or cut with stumpage height less than 6”
No mechanical brush control will occur in snow with a depth greater than 12”
2) Foliar Chemical Treatment for Sprout growth on cut and ground brush/trees
a) Vegetation/Regrowth Control shall consist of chemically treating tree sprouts in August/September of the first summer season after cutting/grinding
b) Chemical techniques; Foliar herbicide appropriate for site will be applied according to manufacturer's label.
c) Vegetation/regrowth control shall be considered successfully completed when the regrowth sprouts are killed and will succumb to fire from a prescribed burn.
The contractor is responsible for re‐seeding any surface vegetation destroyed during the brush control process.
Task 1: Preparation for Tree & Brush Removal, Stump TreatmenT and/or Re‐growth Control
The contractor will complete pages 2 and 3 of the 314_MN_Implementation Requirements document and a map identifying the work unit(s) and the treatment(s) planned for each unit for each easement identified in the task order and submit it to the designated NRCS representative in electronic copy format for review and acceptance prior to work authorization. Targeted outcomes will be identified and will include residual stubble height, disposal methods for debris, chemicals & timing to be used for re‐growth control. Tree removal shall be prepared for the designated areas at assigned locations according to NRCS Standards and
Specifications Brush Management Code‐314 (Attachment).
Task 1 shall be submitted to the designated NRCS representative for review and approval before Task 2 is initiated.
Task 1 shall be completed within 30 days of receipt of a signed task order award.
Task 2: Application of Tree & Brush Removal
The application of tree & brush removal shall be performed in accordance with the implementation requirements developed in Task 1.
The contractor is responsible for informing the designated NRCS Representative of the schedule of activity on the easement with at least 2 weeks’ notice. The contractor is responsible for protecting sensitive areas and areas outside the work areas from disturbance. Sensitive areas and work areas will be will be identified on the map of the parcel.
Task 2 shall be completed within one year of receipt of a signed task order award.
Upon the completion of the initial treatment, the effectiveness of the treatment will be assessed and reported to NRCS.
The contractor will assess the effects or removal activities immediately after conducting the work and send an electronic report to NRCS.
Task 2 shall be completed within 18 months of receipt of a signed task order award.
Contractor's Responsibility
c) Safety. The contractor shall be cognizant of and comply with all applicable local, State & Federal laws and regulations.
d) Liability. The contractor shall assume all liability for any damages resulting directly or indirectly from work performed in this contract.
e) Completion of 314_MN_IR_XXXXX.pdg for each easement. The Implementation
Requirements for each easement will be reviewed by NRCS staff to ensure compliance with contract requirements prior to the commencement of work.
f) Obtaining all required permits and authorizations.
g) All landowners will be contacted 2 weeks prior to equipment being moved to the site and work being performed on the easement.
The Contractor shall be responsible for the safety, professional quality and technical accuracy of all work performed and documentation submitted. The Contractor shall, without additional compensation, correct or revise any errors or deficiencies in submittals including drawings, maps, etc.
Deliverables
The Contractor will notify NRCS upon commencement and completion of work. Contractor will submit one hard copy and one electronic copy of a report that includes: the completed 314_MN_IR_XXXXX.pdf including but not limited to the timing of the work, equipment used, areas where work was completed, application method, product and rate applied of herbicide to the designated NRCS representative. The contractor shall 1 photo per 50 acres of the completed work. All pictures and maps will be submitted in a hard copy and electronic format. The deliverables will be presented in the following formats:
1. Photos photos, etc.: Microsoft Word document
2. Maps and 314_MN_IR_XXXXX ‐ PDF document.
Inspection and Acceptance of Deliverables
The designated NRCS representative will accept or reject the deliverables in writing. If deliverables are rejected, specific reason(s) for rejection will be provided by the designated NRCS representative. The
Contactor shall have seven working days to correct and resubmit all rejected deliverables.
St. Louis MN137Itasca
MN061
Beltrami
MN007
Cass
MN021
Lake
MN075
Polk
MN119
Aitkin
MN001
Koochiching
MN071
Otter Tail
MN111
Cook
MN031
Roseau
MN135
Marshall
MN089
Pine
MN115
Becker
MN005
Stearns
MN145
Kittson
MN069
Clay
MN027
Todd MN153 Morrison
MN097
Renville
MN129
Carlton
MN017
Hubbard
MN057
Norman
MN107
Fillmore
MN045
Swift
MN151
Wilkin
MN167
Martin
MN091
Nobles
MN105
Lyon
MN083
Murray
MN101
Pope
MN121
Wright
MN171
Mower
MN099
Redwood
MN127
Douglas
MN041
Jackson
MN063
Meeker
MN093
Brown
MN015
Goodhue
MN049
Winona
MN169
Faribault
MN043
Dakota
MN037
Grant
MN051
Freeborn
MN047
Olmsted
MN109
Lincoln
MN081
Blue Earth
MN013
Rice
MN131
Stevens
MN149
Houston
MN055
Rock
MN133
McLeod
MN085
Dodge
MN039
Steele
MN147
Benton
MN009
Pennington
MN113
Cottonwood
MN033
Red Lake
MN125
Crow Wing
MN035
Lake of the Woods
MN077
Clearwater
MN029
Kandiyohi
MN067
Sibley
MN143
Mille Lacs MN095Traverse
MN155
Wadena
MN159
Nicollet
MN103
Hennepin
MN053
Isanti
MN059
Anoka
MN003
Kanabec
MN065
Chippewa
MN023
Wabasha
MN157
Lac Qui Parle
MN073
Big Stone
MN011
Waseca
MN161
Chisago
MN025
Mahnomen
MN087
Le Sueur
MN079
Carver
MN019
Scott
MN139
Yellow Medicine
MN173
Pipestone
MN117
Sherburne
MN141
Watonwan
MN165
Washington
MN163
Area of work for Brush Managment (314) Statement of Work
.0 50 10025 Miles
1 inch = 50 miles 1:3,168,000Easement Locations Project boundary
NAIP 2017
Counties Becker Big Stone Blue Earth Brown Carver Chippewa Clay Cottonwood Douglas Faribault Freeborn Grant Hennepin Houston Jackson Kandiyohi Kittson Lake of the Woods Le Sueur Lyon Mahnomen Marshall McLeod Meeker Mower Nicollet Norman Otter Tail Polk Pope Redwood Renville Rice Roseau Scott Sherburne Sibley Stearns Steele Stevens Swift Traverse Waseca Wilkin Wright Yellow Medicine
File details come from the government source that posted it.