Amendment to provide revised drawing sheet 3 of 8, sign in sheet, and response to questions from site showing

View the file

Other files

File Type Posted
EWP_monroe_rd_final_signed_drawings.pdf PDF
Wage_Determination_OH1900001.pdf PDF
Solicitation_RFQ_12FPC219Q0035.pdf PDF
Monroe_Spc.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

12FPC219Q0035

x x copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT

THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

SYRACUSE NY 13202

NRCS-NY-122C31

SUITE 354, ROOM 520

441 S. SALINA STREET

Operation Branch-Section 2 FPAC Acquisition Division

WASHINGTON DC 20250

FPAC-HQ-12FPC2

RM 6801-S

1400 INDEPENDENCE AVE SW

Operations Branch-Section 2 FPAC Acquisition Division

06/28/20190001

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

06/14/2019

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

EWP - STREAMBANK STABILIZATION - MONROE ROAD SITE - FAIRFIELD TOWNSHIP, HIGHLAND COUNTY, OHIO

This amendment is to provide a revised drawing sheet 3 of 8, which corrects the pipe size of the abutment footer drain as well as provide responses to questions asked at the site showing.

Period of Performance: 07/22/2019 to 08/22/2019

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

LAUREEN M. EIPP

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

NSN 7540-01-152-8070

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

Monroe Road EWP 25 June 2019

Site showing begins: 10:00am

Reviewed Solicitation Document.

Reviewed Job Specifications.

Q: Can we have equipment in the stream to move dirt from the planned excavation area?

A: We must prevent erosion which could muddy the stream. Also, liquids such as oil and diesel fuel from the equipment cannot enter the stream. Could potentially use the existing rubble from stream bank to make a crossing to minimize equipment in the stream. Any movement in the stream must be approved beforehand.

Q: Would using the rubble like you said need prior approval?

A: Yes. We could discuss it at a preconstruction meeting.

Q: Most of the soil in the planned excavation area is sandy material, would we need to dry it before compacting?

A: The top 4 or 5 feet of the borrow area is typically above the water level, so it should be mostly dry already. If it is not, then it would need dried enough for compaction.

Q: If while we are working a storm rips out part of the work we have already done are we paid for that or only the final product?

A: Only the final product.

Q: Is hydro seeding acceptable?

A: Yes, as long as it meets the seeding requirements.

Q: Are the #57s and #1s added into the paid quantities for Bid Item 3, Rock Riprap?

A: No, on Bid Item 3 you are only paid for the cubic yards of riprap. The #57 and #1 drainfill is a subsidiary item explained on specification 24 on the Construction and Material Specifications.

Reviewed Drawings.

Q: How far into the northeastern road ditch/drainage do we need to grade for drainage into the surface swale?

A: Grading extends about 50 to 70 feet past the edge of the rock.

Q: The abutment footer drain is 6” not 4” like shown in the plans.

A: We will correct it in the documentation, but it will still be a 10’ stick.

Q: Can we get a surface model/ electronic AutoCAD file?

A: Yes we could. It will need to be submitted in writing that you are asking for it. We also do not guarantee the files to be free of errors, checking the file for accuracy is still your responsibility.

What is shown in the drawings is part of the contract and will supersede any information within the file.

Q: Do you allow bids to go over the magnitude of construction by 10 or 15% without being rejected?

A: You are able to propose what you determine the cost to be. This is a request for quotes and not a bid. Please refer to Section M of the solicitation package - quotes may be rejected if they are materially imbalanced, or unrealistically low; but they will not be rejected solely because they are a particular percentage over the magnitude of construction stated.

Q: When was the cost estimate for the project made?

A: Last September.

Q: Why aren’t you using geotextile underneath the rock riprap?

A: Our State Construction Engineer prefers to use drainfill instead of geotextile for drainage purposes.

Q: Are we placing any rock under the bridge abutment?

A: The planned rock riprap will end directly below the upstream edge of the bridge deck. To match the cross sections in the plans, rock will need to be placed under and around the bridge abutment. The planned riprap keyway is just upstream of the abutment, as shown in the plans.

Keyways are planned near both ends of rock riprap, which is where the riprap is 5 foot thick rather than 30 inches.

Q: Is there access from the road to the planned excavation area on right bank?

A: Yes, there is some space within the work limit to get around the guardrail on that side. Plan view should be used to measure the width of the access. The area is a drainage/ road ditch so it may not be suited for large amounts of traffic.

Q: Will the planned rock riprap be going past the existing concrete rubble on the left bank?

A: The planned rock riprap will come near the edge of the concrete rubble, but will not extend all the way to the existing concrete block. It is encouraged to use the plan view on the drawings to measure how far off the road it is to the end of the planned rock riprap.

Q: Will we be removing the existing concrete rubble to place the drainfill?

A: Only in areas where the existing concrete rubble is inside the planned riprap/drainfill limits as shown in the cross sections on pages 6 through 8 in the plans. If it is outside of the planned excavation it can be left. Planned drainfill and/or earthfill can be placed on top of the existing concrete rubble.

Site showing ended: 10:55am