S01 Attachment D - Conservation Practice Standard Tree-Shrub Site Preparation (Code 490).pdf
PDF 309 KB Posted
- Solicitation number
- 12FPC125Q0060
About this file
This document is a Conservation Practice Standard (CPS) for Tree-Shrub Site Preparation issued by the Natural Resources Conservation Service (NRCS) in Illinois in October 2021. The standard provides detailed guidelines for preparing land to enhance the success of natural or artificial regeneration of desired trees and shrubs. Key purposes include managing soil conditions, modifying habitats to reduce pest and disease pressure, and facilitating tree and shrub establishment. The document outlines specific criteria for site preparation, which can involve mechanical, chemical, or prescribed burning methods, and provides recommendations for different land types such as cropland, grassland, and forestland. Preparation techniques vary based on existing vegetation cover and may include exposing mineral soil, controlling competing vegetation, and managing water conditions. The standard emphasizes environmental considerations like erosion control, wildlife habitat protection, and compliance with water quality regulations.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
-CPS-1490
NRCS, IL
October 2021
NRCS reviews and periodically updates conservation practice standards. To obtain the current version of this standard, contact your Natural Resources Conservation Service State office or visit the Field Office Technical Guide online by going to the NRCS website at https://www.nrcs.usda.gov/ and type FOTG in the search field.
USDA is an equal opportunity provider, employer, and lender.
Natural Resources Conservation Service
CONSERVATION PRACTICE STANDARD
TREE-SHRUB SITE PREPARATION
CODE 490
(ac)
DEFINITION
Treatment of sites to enhance the success of natural or artificial regeneration of desired trees and/or shrubs.
PURPOSE
This practice is used to accomplish one or more of the following purposes:
Manage soil conditions, naturally available water, and seasonally high water to favor tree and• shrub establishment, survival, and growth
Modify the habitat of weeds, pests, and diseases to reduce pressure on naturally or artificially• regenerated trees and shrubs
Facilitate the establishment, survival, and growth of tree and shrub species•
CONDITIONS WHERE PRACTICE APPLIES
On all lands suited to growing woody plants where current site conditions are not suitable for the natural or artificial establishment of desired trees and shrubs.
CRITERIA
General Criteria
• Use mechanical, chemical, or prescribed burning methods either alone or in combination to alter woody residue, vegetation, ground cover, soil, or microsite conditions to prepare the site for planting, seeding, or natural regeneration of desired tree and shrub species.
• Expose mineral soil as needed to achieve the desired distribution of plants to be established by seed for tree and shrub species that require mineral soil for germination and establishment.
• Determine method(s), intensity, and timing of site preparation activities depending on topography, and on soil and site conditions. Schedule silviculture and site preparation activities so they are completed at the optimal time prior to the commencement of planting or seeding activities, or to the initiation of natural regeneration.
• Leave woody residue in place to provide soil protection and wildlife habitat, retain soil moisture and organic matter, and protect the soil surface from temperature extremes—except where it will pose a fire hazard, increase the risk of pest damage, or interfere with management activities.
• Use NRCS CPS Prescribed Burning (Code 338) when using fire to prepare a site.
• On soils prone to compaction or rut formation, use low ground-pressure equipment or nonmechanized site preparation methods. When preparing compacted cropland or pasture sites https://www.nrcs.usda.gov/ for tree planting, chisel, rip, and/or subsoil to mitigate compacted soil layers, as needed. Use criteria in NRCS CPS Deep Tillage (Code 324).
Retain desirable surface and canopy cover to protect soil and site conditions. Alternatively use•
NRCS CPS Cover Crop (Code 340) or Critical Area Planting (Code 342) and/or other measures as needed to control erosion, runoff, and displacement from typical rainfall events.
Do not use wheeled and tracked equipment on slopes where operability causes safety concerns or• adverse impacts on soil conditions. Perform ground-disturbing site preparation activities on the contour where feasible. Restrict the use of wheeled and tracked equipment to periods when the soil is either frozen or unsaturated. Use designated trails or establish a trail system as appropriate and feasible. Use NRCS CPS Forest Trails and Landings (Code 655).
Mitigate site preparation activities near wetlands, water bodies, and in or near riparian areas to• reduce negative water quality impacts.
Fence out livestock to prevent damage to site preparation areas and woody plants.•
Follow State’s best management practices for water quality. See Foresty Best Management•
Practices for Illinois in REFERENCES.
Additional Criteria for Reducing Habitat for Harmful Pests and Diseases of Woody Plants
Remove vegetation infected with transmittable disease (e.g., mistletoe and certain root rots).•
Consult a professional forester to aid in identifying sanitation measures.
Treat slash and woody debris so that it does not create habitat for, or harbor, harmful levels of• pests. Refer to criteria in NRCS CPS Woody Residue Treatment (Code 384).
Clean equipment and gear before and after site preparation activities where risk of spread and• potential impact from invasive species or harmful pathogens is likely.
Additional Criteria for Ponding, Flooding, and Seasonally High Water
On sites where a seasonal excess of surface water restricts the establishment or regeneration of• desired and adapted trees or shrubs, use temporary water management techniques as allowable by regulation, laws, and policy as needed.
Where temporary water management is used, limit the depth, spacing, and number of channels to• the minimum amount needed to remove excess surface water for tree/shrub establishment or regeneration.
Temporary water management channels must empty into areas where runoff will be diffused and• filtered by vegetation and soils before reaching a natural water body.
Apply water management activities, including spoil placement, in compliance with the Clean Water•
Act, Food Security Act, and NRCS Wetland Compliance.
CONSIDERATIONS
To reduce problems associated with insects in logging debris and the reestablishment of undesirable species, consider doing site preparation within one year after logging, followed promptly by planting or natural regeneration.
To reduce negative impacts on wildlife species and their habitat, consider the timing of site preparation to minimize actions that disturb seasonal wildlife activities.
Particulates, smoke, dust, and other air pollutants generated by site preparation may have negative effects on air quality. Consider proximity to populated areas, roads, and visually sensitive areas when planning method and timing of site preparation activities.
Where site preparation requires treatment of competing vegetation, consider alternatives to chemical treatments such as thermal applications, mulching, or solarization. Use other emerging technologies when applicable.
-CPS-2
NRCS, IL
October 2021
Where plow pans or compacted soils exist, but may or may not warrant deep tillage mitigations, consider planting tillage radishes and other deep rooted cover crops in advance of tree planting and other site preparation activities to promote healthy plan root systems.
When preparing sites located in cropland fields, consider the effect carry-over herbicide residue will have on planted tree species.
For complex sites, consult a professional forester for assistance.
PLANS AND SPECIFICATIONS
Prepare plans and specifications for site preparation in accordance with this standard. Clearly describe the requirements for applying the practice to achieve its intended purpose. As a minimum, include the following in the implementation requirements document or other acceptable planning documentation:
Maps, drawings, and narratives, showing areas to be treated, and showing details of the layout of• site preparation activities relative to streams, wetlands, or water bodies, underground or overhead utilities, existing access or other infrastructure, etc., as applicable.
Description of existing land use and vegetative cover.•
Description of site preparation methods to be used and application dates.•
Description of mitigations for compaction, erosion, soil organic matter removal, and any other• anticipated site impacts.
State whether site preparation is for natural or artificial regeneration. If artificial, provide the planned• date for tree planting, timed appropriately relative to site preparation.
Details on undesirable plant species to be treated and control methods to be used.•
Description of contingency plans in case of flooding or other disturbances that impact• implementation schedules or mitigations.
References to other conservation practice specifications, if applicable.•
OPERATION AND MAINTENANCE
Operation
Site preparation operations will comply with all local, State, and Federal laws and ordinances, and with
State’s forestry best management practices for water quality.
For site preparation using herbicides, the operator will develop a safety plan for individuals exposed to chemicals, including telephone numbers and addresses of emergency treatment centers and the telephone number for the nearest poison control center. The National Pesticide Information Center (NPIC) telephone number in Corvallis, Oregon, may also be given for nonemergency information: 1-800-858-
7384, Monday to Friday, 6:30 a.m. to 4:30 p.m. Pacific Time. The national Chemical Transportation
Emergency Center (CHEMTRAC) telephone number is 1-800-424-9300.
Follow label requirements for mixing/loading setbacks from wells, intermittent streams, and rivers,• natural or impounded ponds and lakes, and reservoirs.
Post signs, according to label directions and/or Federal, State, Tribal, and local laws, around fields• that have been treated. Follow restricted entry intervals.
Dispose of herbicides and herbicide containers in accordance with label directions and adhere to•
Federal, State, Tribal, and local regulations.
Read and follow label directions and maintain appropriate material safety data sheets.•
Calibrate application equipment according to recommendations before each seasonal use and with• each major chemical and site change.
Replace worn nozzle tips, cracked hoses, and faulty gauges on spray equipment.•
Herbicide application records shall be kept in accordance with USDA Agricultural Marketing•
-CPS-3
NRCS, IL
Service’s Pesticide Recordkeeping Program and State-specific requirements.
Determine the success of the practice by evaluating post-treatment conditions and verifying that they are suitable for the establishment of desired trees and shrubs.
Maintenance
Following initial application, some regrowth, sprouting, or reoccurrence of undesirable plants may be expected. Spot treatment of individual plants or areas needing retreatment should be completed as needed while woody vegetation is small and can be most successfully treated, during the lifespan of this practice. This includes maintaining erosion control measures as necessary and controlling access by vehicles, wildlife, or livestock, to support successful establishment of this practice.
Control plant species on the Federal and State invasive species and noxious weed list.
-CPS-4
NRCS, IL
Natural Resources Conservation Service Tree/Shrub Site Preparation Illinois Conservation Practice 490 - Implementation Requirements
TREE/SHRUB SITE PREPARATION (490) IR September 2021
Landowner: Diana Roth Trust WRE 1RXQ Farm #: 3800 Tract #: 6090 Field(s): WRE Acres: 45(approximately) Soil Map Unit(s): 3107, 3074, 8396, 134B County: Christian
Designed By: CGN ESJAA Level: III Approved By: CGN ESJAA Level: IV Signature:
Date: 02/2024 Date:
DEFINITION: Treatment of sites to enhance the success of natural or artificial regeneration of desired trees and/or shrubs.
PURPOSE (check all that apply)
Manage soil conditions, naturally available water, and seasonally high hater to favor tree and shrub establishment, survival, and growth.
Modify the habitat of weeds, pests, and diseases to reduce pressure on naturally or artificially regenerated trees and shrubs.
Facilitate the establishment, survival, and growth of tree and shrub species.
PLANNED TREE/SHRUB ESTABLISHMENT METHOD
Artificial (Planned planting date following site preparation: within 45 days ) Natural Regeneration
SPECIFICATIONS
• Provide brief description of land use and existing vegetative over: Field was retired from row-crop production, enrolled as a warm season grass planting via CRP for approximately 15 years. Some native grasses exist, Reed Canary grasses will be found in the wettest area, small trees(softwoods) have been allowed to grow.
Cropland/Grassland [Residue cover < 50% may not require site preparation. Residue > 50%, use one or more of the following methods:]
Mechanical: Expose mineral soil. Limit tillage to no more than 2 months prior to planting or seeding. Till earlier if flooding is a possibility. Fall tillage is permissible for early spring planting. Use contour strip tilling on slopes greater than 3 percent. Planting strip widths should be greater than 3 feet in width with inter-widths of 5 feet or greater.
Subsoiling or ripping may be necessary to improve compacted soils or break-up restrictive plow pans.
Chemical: Mark planting rows with durable markers and apply appropriate chemicals in 4-foot bands over projected planting rows. If slopes exceed 3 percent, apply treatment on contour. If planting locations are not in rows, apply appropriate chemicals in 4-foot diameter circles at each plant location. Adhere to all application setbacks directed by chemical label for use in proximity to water bodies and other environmentally sensitive areas. Use low volatile formations. Some chemicals need extended time to work successfully. Consider applying chemicals in the fall or early spring prior to tree planting or direct seeding. Some sod-forming grasses may need to be mowed or tilled, allowed to regrow, and then treated with appropriate chemical to achieve a good kill. Always follow label instructions.
Prescribed Fire: Refer to practice standard PRESCRIBED BURNING (338). Conduct burning only under controlled, predetermined conditions as documented in IL Implementation Requirement 338 or equivalent plan format.
To control competing vegetation, refer to Fire Effects Information System database, https://www.feis-crs.org/feis/ (Enter the name of the plant species to be controlled to determine best time to burn.)
https://www.feis-crs.org/feis/
VEGETATIVE COVER: If either a temporary or permanent cover is needed or desired after site preparation, use and complete Table 1 to indicate species at the specified rate to control potential erosion or weed competition between planting zones.
Table 1. [Indicate vegetative cover needs by % of Mixture and equivalent lbs PLS/Acre]
PERMANENT COVER
Species % Mixture by Weight [Range Allowed]
Seeding Rate (lbs PLS/Acre) [Pure Stand]
PLANNED RATE
% Mixture Lbs PLS/Acre
Kentucky bluegrass 0-100 1 lbs Redtop 0-100 1 lbs Timothy 0-100 2 lbs Orchardgrass 0-100 3.2 lbs Virginia wild rye 0-100 15 lbs Ladino clover 0-50 2 lbs Alsike clover 0-50 2.5 lbs Annual lespedeza 0-50 7.5 lbs
TEMPORARY COVER
Species % Mixture by Weight
[Range Allowed] Seeding Rate (lbs PLS/Acre)
[Pure Stand]
PLANNED RATE
Wheat 100 20 lbs Rye 100 15 lbs Oats 100 15 lbs Forage Radish 100 5 lbs Note: Seeding rates are minimums designed to establish cover with limited competition to trees. Increased seeding rates may be used to accommodate specific site conditions and objectives when designed by the resource planner.
Forestland
Reforestation [Harvest any merchantable material, then use one or more of the following site preparation methods:]
Mechanical: Remove remaining cover to expose mineral soil. Pile debris in windrows. On slopes greater than 3 percent, operations should be on the contour. On land that is gullied, some additional grading may be necessary.
Chemical: Mark planting rows with durable markers and apply appropriate chemicals (see References) in 4-foot bands over projected planting rows. If slopes exceed 3 percent, apply on contour. If planting locations are not in rows, apply appropriate chemicals in 4-foot diameter circles at each plant location. Adhere to all application setbacks directed by the chemical label for use in proximity to water bodies and other environmentally sensitive areas. Use low volatile formations. Some chemicals need extended time to work successfully. Consider applying chemicals in the fall or early spring prior to tree planting or direct seeding. Always follow label instructions.
Prescribed Fire: Refer to practice standard PRESCRIBED BURNING (338). Conduct burning only under controlled, predetermined conditions as documented in IL Implementation Requirement 338 or equivalent plan format. To reduce surface leaf litter, burn after leaf fall in late November or early December. To control competing vegetation, refer to Fire Effects Information System database, https://www.feis-crs.org/feis/ (Enter the name of the plant species to be controlled to determine best time to burn.)
Underplanting [Planting and establishment of desirable species of trees under the canopy of existing trees]
• Reduce the overstory to a 50-70% stocking (30-50% full sunlight) through a harvest cut or thinning, leaving a well-spaced fairly uniform overstory canopy. No cutting is necessary if the stand is already below 70 percent stocked.
• Control woody plants greater than 2 inches DBH that directly interfere with the planted trees ability to capture secondary light.
• Reduce competition from woody plants less than 2 inches DBH and herbaceous competitors by appropriate method(s) identified in Table 2.
• Mark planting locations/rows with durable markers to facilitate site preparation and planting.
• Create a minimum of 2 feet competition free zone in all directions of each planted stock or planting location.
• Remaining overstory may be removed during the dormant season after 3 to 5 years or when planted trees are fully established.
https://www.feis-crs.org/feis/
TREE SHRUB SITE PREPARATION (490) IR September 2021
Table 2. [Use the site preparation method(s) circled below:]
SITE TYPE ESTABLISHMENT METHODS
Cover Direct Seeding Natural Regeneration Seedling/Container Cropland SITE PREPARATION OPTIONS
<50 % Cover C-N C-N C-N
>50% Cover C-M-MC C-M-MC C-M-MC
Grassland C-M-CB-MC C-M-CB-MC C-M-CB-MC
Forestland C-M-MC-B-MB-CMB C-M-MC-B-MB-CMB C-M-MC-B-MB-CMB
M - Mechanical C - Chemical B - Burning N - Not necessary
MB - Mechanical and burning MC - Mechanical and chemical CB - Chemical and burning CMB - Chemical, mechanical and burning
DESCRIBE ANY MITIGATIONS NEEDED FOR COMPACTION, EROSION, FLODDING OR OTHER SITE
IMPACTS:
OPERATION AND MAINTENANCE:
• Repair/maintain erosion control measures as necessary to ensure proper function.
• Control plant species on the Federal and State invasive species and noxious weed list.
• Access by vehicles or equipment during or after site preparation (i.e. before adequate tree and shrub establishment occurs) shall be controlled to minimize erosion, compaction and other site impacts. Refer to conservation practice standard ACCESS CONTROL (Practice Code - 472).
• Tree/Shrub Site Preparation carries a maintenance life of 1 year.
CERTIFICATION
Extent of Practice Applied: Treatment Acres:
Date of Application: Location of Practice:
Document actual preparation measures used and applied:
(Note any alterations between design specifications and installation)
I certify that this practice, as implemented, meets NRCS standards and specifications.
Signature: _________________________________________ Date: _____________________
ESJAA Level:
No Site prep is necessary in the excavated wetland area or spoil deposits from that excavation. AVOID planting on overhead transmission lines easements (100' wide span)
USDA is an equal opportunity provider and employer.
| Federal Tree Planting Contract Pkg Roth_555A122001RXQ_Christian Co |
| Federal Grass Planting Contract Pkg Cox_545A122001RP4_Scott Co.pdf |
| Federal Grass Planting Contract Pkg Cox_545A122001RP4_Scott Co |
| Federal Grass Planting Contract Pkg Cox_545A122001RP4_Scott Co.pdf |
| Federal Grass Planting Contract Pkg Cox_545A122001RP4_Scott Co.pdf |
| Federal Tree Planting Contract Pkg Cox_545A122001RP4_Scott Co.pdf |
| Federal Tree Planting Contract Pkg Cox_545A122001RP4_Scott Co.pdf |
| Specifications_Cory Jones_Tree Planting |
| 490_IL_IR_Tree-Shrub_Site_Preparation_2021 |
| PURPOSE (check all that apply) |
| PLANNED TREE/SHRUB ESTABLISHMENT METHOD |
| Artificial (Planned planting date following site preparation: within 45 days ) |
| 612_IL_IR_Tree-Shrub_Est-Seedlings |
| PURPOSES (check all that apply) |
| CONDITION WHERE PRACTICE APPLIES |
| 3 Adjusted and designed for width of maintenance equipment |
| 4 (Total Stems/Acre X Species % of Planting) X (Acres to be Planted) = Total Plants / Species |
| Roth Tree Planting_final plan map |
| 1RXQ_Plat_Map_Roth |
File details come from the government source that posted it. Updated .