12FPC119Q0052_Amendment_001_SF_30.pdf

PDF 89 KB Posted

Attached to
Site Preparation and Tree Plantinig for the State of Tennessee, USDA NRCS
Solicitation number
12FPC119Q0052
Issued by

About this file

Amendment 001 SF 30

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

12FPC119Q0052

x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT

THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

NRCS-TX-TEMPLE

TEMPLE TX 76501

101 SOUTH MAIN ST.

USDA-NCRS-TEXAS STATE OFFICE

WASHINGTON DC 20250

FPAC-HQ-12FPC1

RM 6801-S

1400 INDEPENDENCE AVE SW

Operations Branch-Section 1 FPAC Acquisition Division

09/10/20190001

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

09/10/2019

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

TN Tree Planting & Site Preparation - Betty Cherry, 5447411601LQ1 - Obion County

I. This amendment add a REVISED Price Schedule, Terms and Conditions, Clauses, and

Provision, dated 09.17.2019.

1. Adds one addition line item, line item 18 to the Price Schedule:

Koko Farms - 5447411601LBQ - Haywood County

r. Site Preparation: Mowing

2. Adds Plan Map - Koko Farms - Haywood County, 5447411601LBQ

Continued ...

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

NSN 7540-01-152-8070

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

2 2

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

12FPC119Q0052/0001

II. Adds the Site Visit Questions and Answers, to include list of attendees, which was conducted

September 17, 2019, 8:45 am Central.

1. Questions and Answers (Q&A)

(a) Q - Did we mean for white oak on Jolley

Springs or Swamp White Oak?

A - It should be Swamp White Oak

(b) Q - What does "Optional Base on-Site

Conditions and Approval from COR" mean?

A - on price items with this statement it will be determined by NRCS, during the contract time listed for chemical application, if this price item is needed based on site conditions,

(c) Q - Will there be a requirement to go to different nurseries or will the contract change due to availability at one nursery"

A - Contract requirements will not change and all contractor's will be expected to provide adequate seedlings by size and species as specified in the contract documents.

2. List of Attendees:

(a) Rick Stutts, Contractor

(b) Chris Moyers, Contractor

(c) Derrick Brasher, COR, NRCS

Contractor shall acknowledge this amendment in blocks 15a, 15b, and 15c and return one signed copy with your quote submission, September 23, 2019, 2:00 pm Central

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110