Construction Specification 8—Mobilization and Demobilization
1. Scope The work consists of the mobilization and demobilization of the contractor's forces and equipment necessary for performing the work required under the contract. It does not include mobilization and demobilization for specific items of work for which payment is provided elsewhere in the contract. Mobilization will not be considered as work in fulfilling the contract requirements for commencement of work.
2. Equipment and material Mobilization shall include all activities and associated costs for transportation of contractor's personnel, equipment, and operating supplies to the site; establishment of offices, buildings, and other necessary general facilities for the contractor's operations at the site; premiums paid for performance and payment bonds including coinsurance and reinsurance agreements as applicable; and other items specified in section 4 of this specification.
Demobilization shall include all activities and costs for transportation of personnel, equipment, and supplies not required or included in the contract from the site; including the disassembly, removal, and site cleanup of offices, buildings, and other facilities assembled on the site specifically for this contract.
This work includes mobilization and demobilization required by the contract at the time of award. If additional mobilization and demobilization activities and costs are required during the performance of the contract as a result of changed, deleted, or added items of work for which the contractor is entitled to an adjustment in contract price, compensation for such costs will be included in the price adjustment for the item or items of work changed or added.
3. Payment Payment will be made as the work proceeds, after presentation of paid invoices or documentation of direct costs by the contractor showing specific mobilization and demobilization costs and supporting evidence of the charges of suppliers, subcontractors, and others. When the total of such payments is less than the lump sum contract price, the balance remaining will be included in the final contract payment. Payment of the lump sum contract price for mobilization and demobilization will constitute full compensation for completion of the work.
Payment will not be made under this item for the purchase costs of materials having a residual value, the purchase costs of materials to be incorporated in the project, or the purchase costs of operating supplies.
4. Items of work and construction details
(210-VI-NEH, May 2001)
4. Items of work to be performed in conformance with this specification and the construction details therefore are:
a) This item shall include obtaining all work to move equipment and supplies onto and from the site. It is the contractor’s responsibility to comply with all local, state, and federal requirements related to the completion of this work.
b) This item shall also include constructing, maintaining, and removing any access roads which are needed to construct and inspect the project. The site is to be access by a Right-of-Way located at the end of State Drive. The contractor is responsible for staying within the construction limits and regrading all access areas to original condition upon departure. The contractor is also responsible for repairing any areas outside of the construction limits back to original conditions which may have been damaged by the contractor during access.
c) A small wooden barricade and barbed wire fence will need to be removed to access the ROW. These items shall be replaced back to their original or better condition upon completion of the project.
d) The access from the ROW will utilize an existing trail approximately 0.25 miles long to the proposed construction site. Minimal tree and brush removal will be needed as the existing trail will be utilized. In some locations along the trail is standing water and saturated conditions. Upon completion of the project the trial shall be graded and seeded back to it’s original condition.
e) Necessary clearing of access areas shall be the minimum deemed necessary in order to safely move machinery to the work locations. This may include the felling of trees and removal of stumps within the construction limits. Any removed materials shall be piled along either side of the lane. Clearing of the access route shall be limited to a width of 20ft.
f) The Contractor shall comply with PA One-Call requirements at least three days prior to any construction activities.
g) Payment for this work item will be lump sum upon successful completion and removal of all equipment and materials from the site. A signed Certificate of Conformance from the contractor, referencing this project and the work items indicated in the Bid Schedule must be provided to the inspector prior to final payment.