12a - STATEMENT OF WORK.pdf

PDF 7 MB Posted

Attached to
STA MILWAUKEE ASBESTOS ABATEMENT
Solicitation number
37240PR2300003
Issued by

View the file

Other files

File Type Posted
12a - FAR MATRIX SERVICE .pdf PDF
7d - WAGE DETERMINATION.pdf PDF
12a - PAST PERFORMANCE EVALUATION.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

P/N 19855042

PAGE 1/8

STATEMENT OF WORK (SOW)

FOR

USCG Station Milwaukee Abate Asbestos and Replace Flooring

Coast Guard Station Milwaukee, P/N: 19855042

1.0 GENERAL

The United States Coast Guard (USCG) is seeking a qualified contractor to perform an asbestos abatement and flooring replacement project at USCG Station Milwaukee located at 2420 South Lincoln Memorial Drive, Milwaukee, Wisconsin. Station Milwaukee is a working Coast Guard Station and will remain in operation during the project.

Bidders are responsible for visiting the site to field verify existing conditions and determine actual dimensions and the nature of the work required. Failure to visit the site does not relinquish the bidder from determining the extent and scope of the work required and estimating the difficulty and cost to complete the project.

The USCG Sector Lake Michigan Facility Engineering Officer will be the USCG’s Onsite Representative for this project. Arrange pre-bid site visits to verify existing conditions by sending an email to: Jason.M.Smith@uscg.mil

2.0 BACKGROUND

The USCG Station Milwaukee building (RPUID 47094) was built in 1969 with an addition added in 1981. There is asbestos containing floor tile and mastic in various spaces and corridors on both the first and second floor of the building, and many of the floor tiles are damaged or missing.

3.0 OBJECTIVE

Abate asbestos floor tile and mastic, prepare sub-floor, and install replacement finished flooring at USCG Station Milwaukee.

4.0 DOCUMENTATION

Enclosure (1) Floor plans of Station Milwaukee with areas included in this project highlighted.

Enclosure (2) Asbestos Inspection Report of 13 APR 2021 Enclosure (3) Asbestos Inspection Report of 27 JAN 2021

5.0 SCOPE

This project is to abate the asbestos containing tile flooring and mastic at USCG Station Milwaukee. This project also includes the installation of new luxury vinyl tile or luxury vinyl plank (LVT/LVP) flooring in all areas where flooring is removed as part of the abatement.

Incidental work items not listed in this scope, but necessary to complete the project shall be included. Examples include, but are not limited to: removal, replacement, and installation of cove base, moldings, doorway thresholds, stair noses, etc.

file://hqnas/SHARED/G-A/G-ACS/CAAT%20Team/TOOLBOX/SCOPE%20PARAGRAPHS.doc

PAGE 2/8

Spaces where asbestos abatement and new floor installation are to take place are shown by the highlighted areas on the building floor plans in enclosure (1). The approximate area is 2,300 square feet (this is a rough estimate and shall be field verified by Contractor). The following spaces are included in this project:

• First Floor: Lobby, PWAY 01, PWAY 02, Stairwell ST03, Stairwell ST04, Storage closet 1J1. This project does include the carpeted area and stairs in the lobby.

• Second Floor: PWAY 06, PWAY 07, Room 205 (Laundry), PWAY 08, PWAY 09, Stairwell ST03, Stairwell ST04, Storage closet 2J1.

5.1 PROJECT PHASING

USCG Station Milwaukee is an active Coast Guard Small Boat Station that is manned 24-hours a day. The station will remain in operation for the duration of this project; therefore, portions of the project will need to be coordinated with USCG personnel to minimize interference with unit operations. Coordinate timing between successive phases with Coast Guard personnel to allow for necessary relocations.

The station crew conducts daily operations in passageway 04 and the adjacent office spaces, which are not part of this project. There are multiple entrances to the building, and at least one entrance to this area must always remain available.

The south wing of the building is used as barracks and sleeping quarters for on-duty crew members. One floor of the barracks must always remain available for use by the USCG i.e., if the first floor is secured due to abatement activities, the crew shall still have access to and be able to use the rooms on the second floor, and vice-versa.

5.2 HAZARDOUS MATERIAL ABATEMENT

Remove the Asbestos Containing Materials (ACM) identified in the Asbestos Inspection Reports (See enclosures 2 and 3) in the areas listed in section 5.0 and indicated by the highlighted areas in enclosure (1). Materials identified as ACM within the structure include: 12” VCT/VAT floor tile and associated mastics in corridors and other selected areas. The stair treads were not tested for asbestos, but they are assumed to be positive, and shall be abated as well. The carpet in the lobby was not tested for asbestos, but it is to be replaced with new LVP/LVT flooring as part of this project and there may be asbestos tile beneath the carpet.

Proper containment of the abatement areas shall be installed as required to prevent any asbestos from entering areas within the station building that do not have ACM.

Mastic removing solvent must be nonflammable and must not contain methylene chloride, glycol ether, or halogenated hydrocarbons. Solvents used on site must have a flash point greater than 140 degrees F.

Unacceptable Practices: The following work practices shall not be used:

a. High-speed abrasive disc saws that are not equipped with point of cut ventilator or enclosures with HEPA filtered exhaust air.

PAGE 3/8

b. Compressed air used to remove asbestos containing materials, unless the compressed air is used in conjunction with an enclosed ventilation system designed to capture the dust cloud created by the compressed air.

c. Dry sweeping, shoveling, or other dry clean up.

d. Employee rotation as a means of reducing employee exposure to asbestos.

Contractor shall ensure that all work is executed in accordance with all required local, State, and Federal codes. Prior to the start of work, obtain necessary permits and licenses in conjunction with asbestos removal, encapsulation, hauling, and disposition, and furnish notification of such actions required by Federal, State, regional, and local authorities. Notify the Regional Office of the United States Environmental Protection Agency (USEPA) Wisconsin environmental protection agency/Department of Natural Resources, and the Contracting Officer in writing 10 working days prior to commencement of work in accordance with 40 CFR 61-SUBPART M.

Submit copies of all notifications to the Contracting Officer.

All asbestos workers must have a current State of Wisconsin asbestos worker's license. Submit copies of all asbestos workers license/certification to the Contracting Officer.

The Contractor shall ensure that all hazardous waste generated by this project is disposed of in accordance with all local, state, and federal laws and regulations. The Contractor is responsible for preparing all disposal and shipping documentation/manifests, and container labeling, and shall provide copies of this documentation to the Contracting Officer.

5.3 SUB-FLOOR PREPARATION

Contractor assumes all responsibility for preparation of flooring, including any inspections, skim coat layers, bead blasts, scarification, etc. of the exposed subfloor, and any preparations required as a result of the use of solvent mastic removers; on concrete porous surfaces, mastic removing products can leave an oily surface that tends to prevent new mastics from adhering properly, and Contractor shall be responsible for ensuring appropriate floor preparation and condition of the subfloor prior to installation of new flooring products.

Do not install new flooring on surfaces that are unsuitable and will prevent a proper installation.

All substrate to receive new flooring shall be clean and dry and free of any compromising conditions that would prevent or hinder the installation of the flooring. Prepare subfloor in accordance with flooring manufacturer's, mastic manufacturer’s, and adhesive manufacturer’s recommended instructions to ensure the proper installation of the new finished flooring. Repair holes, cracks, depressions, or rough areas using material recommended by the flooring or adhesive manufacturer. Free floor of any foreign materials and clean. Submit one copy of the manufacturer's printed Installation instructions for the flooring, including surface preparation, and recommended adhesives to the Contracting Officer.

5.4 NEW FLOORING INSTALLATION

Provide the Onsite Representative with a selection of samples of new LVT/LVP flooring for the USCG to choose from. Selection samples shall include manufacturer’s cut sheets, literature, and product specifications. Flooring used in this project shall be from a nationally recognized US manufacturer’s running line offerings and shall be low-VOC, commercial grade, waterproof, dimensionally stable, with a wear layer of at least 30 mil. The flooring manufacturer must have

PAGE 4/8

at least 10 years of experience in the production of the type of flooring material specified, be financially sound, have technical support for their products and the installation of them, and be capable of producing and delivering the product on time and without defects of any kind.

Install new LVT/LVP flooring selected by USCG from Contractor-provided samples in the areas listed in section 5.0 and indicated by the highlighted areas in enclosure (1). The flooring installation method must be suitable for commercial grade applications i.e., flooring must be glue-down for commercial grade installations vs. floating installation for light-commercial or residential installations.

Isolate area of installation from rest of building. Perform all work by manufacturer's approved installers, in accordance with the manufacturer's printed instructions.

Quality Assurance: Contractor shall assure the product is appropriate for the application and environment in which it is to be installed, and that the product is merchantable for service, free of any visible and latent defects, and will perform for the purpose for which it is intended without compromise. New flooring will be brought on site and allowed to acclimate in accordance with manufacturer’s recommendations prior to installation.

If practicable reuse any removed baseboards and cove base. Damaged baseboards and cove base will be replaced, and color matched by Contractor. The joint between the new finished floor and new or existing baseboards or cove base shall be joint-tight with no gaps.

New flooring shall be installed as soon as practicable following completion and clean up-of the asbestos abatement portion of this project i.e., long delays due to supply chain, scheduling, or other issues are not acceptable; do not proceed with the asbestos abatement until all materials are on hand to complete the flooring installation.

Attic Stock: Contractor shall provide a minimum of 5% total quantity of new flooring to the local maintenance staff for future replacement or patching. Attic stock shall be from the same lot and in original packaging with exact matching type, size, pattern, and color.

Maintenance: Contractor shall provide manufacturer’s maintenance materials, information, and guidelines for product after installation.

6.0 SAFETY PROGRAM

The Contractor is wholly responsible for work site safety. The Contractor shall implement a safety program that protects the lives and health of personnel in the construction area and adjacent areas, prevents damage to property, and avoids work interruptions. The Contractor shall provide appropriate safety barricades, signs, signal lights, etc. as well as complying with the requirements of all applicable Federal, State and Local safety laws, rules, and regulations.

7.0 WASTE DISPOSAL

Upon completion of work Contractor shall guarantee site is cleaned and ready for final inspection before turning site back over to USCG personnel. All ACM that is removed, and debris caused from the project shall be removed from government property and disposed of at the Contractor’s expense in accordance with all local, State, and Federal regulations. The Contractor shall not use Coast Guard dumpsters or any waste receptacles for disposal of debris.

PAGE 5/8

The Contractor shall comply with all local, State, and Federal environmental regulations dealing with the generation, management, storage, and disposal of solid, toxic, and hazardous wastes.

The Contractor shall ensure that all wastes are properly containerized, labeled & placarded, managed, tested, stored, documented/manifested, transported, and disposed of in accordance with all applicable regulations.

The Contractor shall provide the Contracting Officer with signed and fully executed originals of all hazardous waste profiles, test results, hazardous waste manifests and/or other shipping papers, asbestos disposal documents, and all other required documentation.

8.0 LANDFILL APPROVAL

The Contractor shall provide the Contracting Officer with evidence that the landfill is approved for asbestos disposal by the U.S. Environmental Protection Agency, Region 5 and local regulatory agencies.

Submit a copy of the waste shipment records within one day of the shipment leaving the project site.

Within three working days after delivery, submit detailed delivery tickets, prepared, signed, and dated by an agent of the landfill, certifying the amount of asbestos materials delivered to the landfill.

9.0 TRANSPORTER CERTIFICATION

The Contractor shall provide the Contracting Officer with written evidence that the transporter is approved to transport asbestos waste in accordance with the DOT requirements of 49 CFR 171, 49 CFR 172 and 49 CFR 173 as well as registration requirements of 49 CFR 107 and all other local, State, and Federal regulatory agency requirements.

10.0 SUBMITTALS

a) The Contractor shall provide the Contracting Officer with copies of all US/Wisconsin

EPA/Wisconsin DNR notifications 10 working days prior to commencement of work.

b) The Contractor shall provide the Contracting Officer with copies of all asbestos workers Wisconsin license/certifications.

c) The Contractor shall provide the Contracting Officer with signed and fully executed originals of all hazardous waste profiles, test results, hazardous waste manifests and/or other shipping papers, asbestos disposal documents and all other required documentation.

d) The Contractor shall submit a copy of the waste shipment records within one day of the shipment leaving the project site.

e) The Contractor shall provide the Contracting Officer with evidence that the landfill is approved for asbestos disposal by the U.S. Environmental Protection Agency, Region 5 and local regulatory agencies. Within three working days after delivery, submit detailed

PAGE 6/8

delivery tickets, prepared, signed, and dated by an agent of the landfill, certifying the amount of asbestos materials delivered to the landfill.

f) The Contractor shall provide the Contracting Officer with written evidence that the transporter is approved to transport asbestos waste in accordance with the DOT requirements of 49 CFR 171, 49 CFR 172 and 49 CFR 173 as well as registration requirements of 49 CFR 107 and all other State and local regulatory agency requirements.

g) The Contractor shall provide the Contracting Officer with one copy of the manufacturer's printed Installation instructions for the flooring, including surface preparation, and recommended adhesives to the Contracting Officer.

h) The Contractor shall provide the Onsite Representative with a selection of samples of new LVT/LVP flooring for the USCG to choose from. Selection samples shall include manufacturer’s cut sheets, literature, and product specifications.

i) Attic Stock: Contractor shall provide a minimum of 5% total quantity of new flooring to the local maintenance staff for future replacement or patching. Attic stock shall be from the same lot and in original packaging with exact matching type, size, pattern, and color.

j) The Contractor shall provide the Contracting Officer with manufacturer’s maintenance materials, information, and guidelines for product after installation.

11.0 WARRANTY

Provide manufacturer's standard performance guarantees or warranties including minimum ten-year wear warranty, and two-year material and workmanship. In addition to any manufacturer’s warranty for the flooring, the Contractor shall provide a warranty for all parts and labor for a period of 24 months from the date of project completion/USCG acceptance of work. The Contractor shall, at no additional cost, make necessary replacements and/or repairs due to defective installation or unsatisfactory workmanship that becomes apparent within 24 months of the installation completion date.

12.0 CONTRACTOR PERSONNEL

Contractor shall provide a list of names of all on-site workers to the USCG for access to the facility. All Contractor personnel shall present valid ID to the watch stander at the entrance to the base.

13.0 QUALIFIED PERSONNEL

The Contractor shall provide qualified personnel to perform all requirements specified in this

SOW.

All asbestos abatement activities shall be performed by Contractor personnel who have been trained and certified to perform asbestos removal by the State of Wisconsin. All asbestos workers must have a current State of Wisconsin asbestos worker's license.

The flooring installer must have a minimum of 10 years’ experience in the installation of commercial flooring products, be financially sound, have references and a sound history, and

PAGE 7/8

provide on-site project manager supervision. The flooring must be installed in strict compliance with the manufacturer’s installation guidelines and industry standards. The flooring installer shall be certified to install the type of flooring used in this project by either the manufacturer of the flooring or a nationally recognized certification agency e.g., International Standards & Training Alliance, International Certified Flooring Installers, etc.

14.0 CONTINUITY OF SUPPORT

The Contractor shall ensure that the contractually required level of support for this requirement is maintained at all times. The Contractor shall ensure that all contract support personnel are present for all hours of the workday. If for any reason the Contractor staffing levels are not maintained due to vacation, leave, appointments, etc., and replacement personnel will not be provided, the Contractor shall provide e-mail notification to the Onsite Representative prior to employee absence. Otherwise, the Contractor shall provide a fully qualified replacement.

15.0 EMPLOYEE CONDUCT

There shall be NO SMOKING in any Coast Guard building.

Contractor’s employees shall comply with all applicable Government regulations, policies, and procedures (e.g., fire, safety, sanitation, environmental protection, security, “off limits” areas, wearing of parts of DHS uniforms, and possession of weapons) when visiting or working at Government facilities. The Contractor shall ensure Contractor employees always present a professional appearance and that their conduct shall not reflect discredit on the United States or the Department of Homeland Security. The Project Manager shall ensure Contractor employees understand and abide by Department of Homeland Security established rules, regulations and policies concerning safety and security.

16.0 REMOVING EMPLOYEES FOR MISCONDUCT OR SECURITY REASONS

The Government may, at its sole discretion (via the Contracting Officer*), direct the Contractor to remove any Contractor employee from DHS facilities for misconduct or security reasons.

Removal does not relieve the Contractor of the responsibility to continue providing the services required under the contract. The Contracting Officer will provide the Contractor with a written explanation to support any request to remove an employee.

17.0 Period of Performance

The period of performance for this contract shall not exceed 90 calendar days from the date of award, unless otherwise approved by the Contracting Officer.

18.0 PLACE OF PERFORMANCE

The primary place of performance will be:

USCG Station Milwaukee 2420 South Lincoln Memorial Dr.

Milwaukee, WI 53207

PAGE 8/8

19.0 HOURS OF OPERATION

Contractor employees shall generally perform all work between the hours of 7:00 am and 4:30 pm, Monday through Friday (except Federal holidays) unless otherwise approved by the coast guard.

SATURDAY, SUNDAY AND HOLIDAYS: The Contractor shall provide the Onsite Representative at least forty-eight hours advance notice prior to working on weekends or Federal holidays. The Government may reject any such request without impacting the completion time of the contract.

20.0 GOVERNMENT FURNISHED RESOURCES

The Government will not furnish any resources to the Contractor in support of this contract.

21.0 CONTRACTOR FURNISHED PROPERTY

The Contractor shall furnish all materials, equipment, and services necessary to fulfill the requirements of this contract.

22.0 GOVERNMENT ACCEPTANCE PERIOD

The Onsite Representative will review deliverables prior to acceptance and provide the Contractor with an e-mail that provides documented reasons for non-acceptance. If the deliverable is acceptable, the Onsite Representative will send an e-mail to the Contractor notifying it that the deliverable has been accepted.

The Onsite Representative will have the right to reject or require correction of any deficiencies found in the deliverables that are contrary to the information contained in the Contractor’s accepted proposal. In the event of a rejected deliverable, the Contractor will be notified in writing by the Onsite Representative of the specific reasons for rejection. The Contractor may have an opportunity to correct the rejected deliverable and return it per delivery instructions.

The Contractor shall have 10 business days to make corrections and redeliver.

STATION MILWAUKEE - FIRST FLOOR PLAN

Enclosure (1)

AutoCAD SHX Text

UP

AutoCAD SHX Text

UP

AutoCAD SHX Text

UP

AutoCAD SHX Text

UP

AutoCAD SHX Text

WET ROOM

AutoCAD SHX Text

MECHANICAL

AutoCAD SHX Text

DINING

AutoCAD SHX Text

COOK'S

AutoCAD SHX Text

KITCHEN

AutoCAD SHX Text

EQUIPMENT

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

STORAGE

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

CREW

AutoCAD SHX Text

LOUNGE

AutoCAD SHX Text

WATCH RM

AutoCAD SHX Text

GEAR LOCKER

AutoCAD SHX Text F

AutoCAD SHX Text R

AutoCAD SHX Text

PANTRY

AutoCAD SHX Text

STOR.

AutoCAD SHX Text

BEDROOM

AutoCAD SHX Text

MENS

AutoCAD SHX Text

LADIES

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

DINING

AutoCAD SHX Text

OOD

AutoCAD SHX Text

ARMORY

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 1M1

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

KITCHEN

AutoCAD SHX Text 103A

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 108A

AutoCAD SHX Text

AutoCAD SHX Text 1R2

AutoCAD SHX Text 1R1

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 112A

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

BEDROOM

AutoCAD SHX Text

AutoCAD SHX Text

BEDROOM

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

PWAY01

AutoCAD SHX Text

PWAY 02

AutoCAD SHX Text

PWAY04

AutoCAD SHX Text

PWAY 05

AutoCAD SHX Text

LOBBY

AutoCAD SHX Text

ST01

AutoCAD SHX Text

ST02

AutoCAD SHX Text

ST04

AutoCAD SHX Text

ST03

AutoCAD SHX Text

VESTIBULE

AutoCAD SHX Text N

AutoCAD SHX Text 0'

AutoCAD SHX Text 8'

AutoCAD SHX Text

SCALE

AutoCAD SHX Text 4'

AutoCAD SHX Text 16'

AutoCAD SHX Text 130A

AutoCAD SHX Text 126A

AutoCAD SHX Text 118A

AutoCAD SHX Text 1J1

AutoCAD SHX Text

PWAY03

JMSmith1 Polygon

JMSmith1 Polygon

JMSmith1 Polygon

JMSmith1 Polygon

STATION MILWAUKEE - SECOND FLOOR PLAN

Enclosure (1)

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

BEDROOM

AutoCAD SHX Text

BEDROOM

AutoCAD SHX Text

BEDROOM

AutoCAD SHX Text

BEDROOM

AutoCAD SHX Text

BEDROOM

AutoCAD SHX Text

BEDROOM

AutoCAD SHX Text

BEDROOM

AutoCAD SHX Text

DN

AutoCAD SHX Text

HEAD

AutoCAD SHX Text

DN

AutoCAD SHX Text

DN

AutoCAD SHX Text

DN

AutoCAD SHX Text

STORAGE

AutoCAD SHX Text

BEDROOM

AutoCAD SHX Text

CONFERENCE

AutoCAD SHX Text

ROOM

AutoCAD SHX Text

LAUNDRY

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

ROOF OVER DINING & KITCHEN

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

AutoCAD SHX Text

ST01

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 2R1

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

PWAY06

AutoCAD SHX Text

PWAY07

AutoCAD SHX Text

PWAY 09

AutoCAD SHX Text

ST02

AutoCAD SHX Text

ST04

AutoCAD SHX Text

ST03

AutoCAD SHX Text

PWAY08

AutoCAD SHX Text 2J2

AutoCAD SHX Text N

AutoCAD SHX Text 0'

AutoCAD SHX Text 8'

AutoCAD SHX Text

SCALE

AutoCAD SHX Text 4'

AutoCAD SHX Text 16'

AutoCAD SHX Text N

AutoCAD SHX Text 0'

AutoCAD SHX Text 8'

AutoCAD SHX Text

SCALE

AutoCAD SHX Text 4'

AutoCAD SHX Text 16'

AutoCAD SHX Text 230A

AutoCAD SHX Text 226A

AutoCAD SHX Text 218A

AutoCAD SHX Text 2J1

Polygon

Enclosure (2)

JMSmith1 Highlight

JMSmith1 Highlight

JMSmith1 Highlight

JMSmith1 Highlight

JMSmith1 Highlight

JMSmith1 Highlight

Highlight

JMSmith1 Highlight

JMSmith1 Highlight

JMSmith1 Highlight

JMSmith1 Highlight

JMSmith1 Highlight

JMSmith1 Highlight

Highlight

01/27/21

LIMITED

ASBESTOS

INSPECTION REPORT

Job Site:

2nd Floor Living Quarters Hallway 2420 S. Lincoln Memorial Drive

Milwaukee, WI 53207

For:

United States Coast Guard (USCG)

Report No.: WT21-1044

Enclosure (3)

TABLE OF CONTENTS

I. Introduction

II. Building Survey

III. The Laboratory

IV. Method of Analysis

V. Summary

VI. Exclusion

VII. Limitations

I. INTRODUCTION

Wing Three Inc. was retained by USCG to conduct an inspection for asbestos containing materials located in limited areas at:

2nd Floor Living Quarters Hallway 2420 S. Lincoln Memorial Drive

Milwaukee, WI 53207

The sampling inspection included all suspect building materials to determine if asbestos containing materials were present within the space as required by US EPA NESHAPS regulations 40 CFR 61 Subpart M.

II. BUILDING SURVEY

On date of test, Wing Three Inc. conducted sampling of all visible suspect building materials present located in proposed renovation area at:

2nd Floor Living Quarters Hallway 2420 S. Lincoln Memorial Drive

Milwaukee, WI 53207 The visible inspection was comprised of two elements:

1. A visual determination as to the extent of suspect materials within the building.

2. Sampling and documentation of observable suspect materials.

The results of the survey integrated with the Polarized Light Microscopy with Dispersion Staining (PLM/DS) analysis of bulk samples taken are outlined in this document. If you have any questions, please contact Wing Three Inc. @ 262-832-1194.

III. THE LABORATORY

Haye Microbial Consulting 3005 E. Boundary Terrace, Suite F.

Midlothian, VA 23112 804-562-3435 contact@hayesmicrobial.com

IV. METHOD OF ANALYSIS

Analysis is performed by using the bulk samples for visual observation and slide preparation(s) for microscopical examination and identification. The slides are analyzed for asbestos (chrysotile, amosite, crocidolite, anthophyllite, and actinolite/tremolite), fibrous non-asbestos constituents (mineral wool, paper, etc.), and nonfibrous constituents. Asbestos is identified by refractive indices (obtained by using dispersion staining), morphology, color, pleochroism, birefringence, extinction characteristics, and signs of elongation. The same characteristics are used to identify the non-asbestos constituents.

The microscopist visually estimates relative amounts of each constituent using a stereoscope if necessary.

The test results are based on a visual determination of relative volume of the bulk sample components.

The results are valid only for the item tested. Current US EPA NESHAP regulations state asbestos materials means material containing more than 1% asbestos as determined using the method specified in Appendix E, Subpart E, 40 CFR Part 763 Section I, Polarized Light Microscopy. Refer to 29 CFR 1926.1101 Construction) and 29 CFR 1910.1001 (General Industry) for specific OSHA requirements.

V. SUMMARY

The following materials were found to contain asbestos:

RESULTS HERE:

01 - Floor Tile 2nd Floor Living Quarters Hallway Tile / Tan None Detected 02 - Floor Tile 2nd Floor Living Quarters Hallway Tile / Tan None Detected 03 - Floor Tile 2nd Floor Living Quarters Hallway Tile / Tan None Detected 04 - Mastic 2nd Floor Living Quarters Hallway Mastic / Black 4% Chrysotile

05 - Mastic 2nd Floor Living Quarters Hallway Mastic / Black ( Not Analyzed, Positive Stop ) 06 - Mastic 2nd Floor Living Quarters Hallway Mastic / Black ( Not Analyzed, Positive Stop )

*Please see attached lab analysis and log sheets (PRO Lab Code: 21002760

During a renovation if this material would need to be removed or disturbed that would need to be done by a certified and licensed asbestos contractor.

VI. EXCLUSIONS

No visible areas were excluded from the interior in this scope of work. Wing Three Inc. is not and shall not represent the building owner as its agent or representative for the purpose of the USEPA/NESHAP and/or the WDNR/NR447 regulations, as owner/operator.

This report represents the condition of the building and its visible/accessible suspect asbestos containing materials at the date and the times of the onsite inspection. Hidden materials or those materials that could be present at the point of demolition, over and above those stated in the inspection report, are the responsibility of the building owner and the demolition contractor. It is the owner/operator’s responsibility to have an asbestos trained competent person onsite during the demolition to stop the demolition and take appropriate corrective action should any previously unknown suspect asbestos containing materials present themselves.

Wing Three Inc. is not responsible for client non-disclosure.

VII. LIMITATIONS

The care and skill given to our procedures insures the most reliable test results possible. Wing Three Inc.

utilizes CEI Labs, for our Polarized Light Microscopy, unless otherwise specified by the client. The findings and conclusions of Wing Three Inc. represent our professional opinions extrapolated from limited data. Significant limited data is gathered during the course of the preliminary asbestos specific site assessment. No other warranty is expressed or implied. Prior to any abatement or demolition/renovation activities, it is recommended that Wing Three Inc. be provided the opportunity to review such plans in order that the inspection and assessments contained herein are properly interpreted and implemented.

This report and the information contained herein are prepared for the sole and exclusive use and possession of USCG . No other person or entity may rely on this report or any information contained herein. Any dissemination of the Report or any information contained herein is strictly prohibited without prior written authorization from Wing Three Inc.

1/27/2021 Hayes Microbial - Report file:///tmp/amberjob_210027602.html 1/3

#21002760

Analysis Report prepared for

Wing Three WI, Inc.

1111 S West Ave

Waukesha, WI 53186

Phone: (262) 832-1194

WT21-1044

USCG

2420 S. Lincoln Memorial Drive Milwaukee, WI 53207

Collected: January 22, 2021 Received: January 26, 2021 Reported: January 27, 2021

We would like to thank you for trusting Hayes Microbial for your analytical needs!

We received 6 samples by FedEx in good condition for this project on January 26th, 2021.

The results in this analysis pertain only to this job, collected on the stated date, and should not be used in the interpretation of any other job. This report may not be duplicated, except in full, without the written consent of Hayes Microbial Consulting, LLC..

This laboratory bears no responsibility for sample collection activities, analytical method limitations, or your use of the test results. Interpretation and use of test results are your responsibility. Any reference to health effects or interpretation of mold levels is strictly the opinion of Hayes Microbial. In no event, shall Hayes Microbial or any of its employees be liable for lost profits or any special, incidental or consequential damages arising out of the use of these test results.

Steve Hayes, BSMT(ASCP) Laboratory Director Hayes Microbial Consulting, LLC.

EPA Laboratory ID: VA01419 Lab ID: #188863 DPH License: #PH-0198

Hayes Microbial Consulting, LLC. 3005 East Boundary Terrace, Suite F. Midlothian, VA. 23112 (804) 562-3435 contact@hayesmicrobial.com Page: 1 of 3 file:///tmp/amberjob_210027602.html 2/3

# Sample Material Description Non-Asbestos Fibers Asbestos Fibers

1 01 - Floor Tile 2nd Floor Living Quarters Hallway Tile / Tan None Detected

2 02 - Floor Tile 2nd Floor Living Quarters Hallway Tile / Tan None Detected

3 03 - Floor Tile 2nd Floor Living Quarters Hallway Tile / Tan None Detected

4 04 - Mastic 2nd Floor Living Quarters Hallway Mastic / Black 4% Chrysotile

5 05 - Mastic 2nd Floor Living Quarters Hallway Mastic / Black ( Not Analyzed, Positive Stop )

6 06 - Mastic 2nd Floor Living Quarters Hallway Mastic / Black ( Not Analyzed, Positive Stop )

Bob Richards Wing Three WI, Inc.

1111 S West Ave Waukesha, WI 53186

(262) 832-1194

WT21-1044

USCG

2420 S. Lincoln Memorial Drive Milwaukee, WI 53207

#21002760

Asbestos PLM Bulk

EPA 600/R-93, M-4/82-020

Project Analyst:

Meivis Sanchez, Date:

01 - 27 - 2021 Reviewed By:

Steve Hayes, BSMT

Date:

01 - 27 - 2021

Collected:Jan 22, 2021 Received: Jan 26, 2021 Reported: Jan 27, 2021 Revision: 2

3005 East Boundary Terrace, Suite F. Midlothian, VA. 23112 (804) 562-3435 contact@hayesmicrobial.com Page: 2 of 3 file:///tmp/amberjob_210027602.html 3/3

Analysis Details All samples were received in acceptable condition unless otherwise noted on the report. This report must not be used by the client to claim product certification, approval, or endorsement by AIHA, NIST, NVLAP, NY ELAP, or any agency. The results relate only to the items tested. Hayes Microbial Consulting reserves the right to dispose of all samples after a period of 60 days in compliance with state and federal guidelines.

PLM Analysis All Polarized Light Microscopy (PLM) results include an inherent uncertainty of measurement associated with estimating percentages by PLM.

Materials with interfering matrix, low asbestos content, or small fiber size may require additional analysis via TEM Analysis.

TEM Analysis Analysis by TEM is capable of providing positive identification of asbestos type(s) and semi-quantitation of asbestos content.

Definitions 'None Detected' - Below the detected reporting limit of 1% unless point counting is performed, then the detected reporting limit is .25%.

New York ELAP Per NY ELAP198.6 (NOB), TEM is the only reliable method to declare an NOB material as Non-Asbestos Containing.

Any NY ELAP samples that are subcontracted to another laboratory will display the name and ELAP Lab Identification number in the report page heading of those samples. The original report provided to Hayes Microbial Consulting is available upon request.

Bob Richards Wing Three WI, Inc.

1111 S West Ave Waukesha, WI 53186

(262) 832-1194

WT21-1044

USCG

2420 S. Lincoln Memorial Drive Milwaukee, WI 53207

#21002760

Asbestos Analysis Information

3005 East Boundary Terrace, Suite F. Midlothian, VA. 23112 (804) 562-3435 contact@hayesmicrobial.com Page: 3 of 3

19855042_Abate Asbestos and Replace Flooring STA MKE_SOW
1.0 GENERAL
2.0 BACKGROUND
3.0 OBJECTIVE
4.0 DOCUMENTATION
5.0 SCOPE
5.1 PROJECT PHASING
5.2 HAZARDOUS MATERIAL ABATEMENT
5.3 SUB-FLOOR PREPARATION
5.4 NEW FLOORING INSTALLATION
6.0 SAFETY PROGRAM
7.0 WASTE DISPOSAL
8.0 LANDFILL APPROVAL
9.0 TRANSPORTER CERTIFICATION
10.0 SUBMITTALS
11.0 WARRANTY
12.0 CONTRACTOR PERSONNEL
13.0 QUALIFIED PERSONNEL
14.0 CONTINUITY OF SUPPORT
15.0 EMPLOYEE CONDUCT
16.0 REMOVING EMPLOYEES FOR MISCONDUCT OR SECURITY REASONS
17.0 Period of Performance
18.0 PLACE OF PERFORMANCE
19.0 HOURS OF OPERATION
20.0 GOVERNMENT FURNISHED RESOURCES
21.0 CONTRACTOR FURNISHED PROPERTY
22.0 GOVERNMENT ACCEPTANCE PERIOD
Station Milwaukee_1st Fl_13JAN22
Sheets and Views
Model
Station Milwaukee_2nd Fl_13JAN22
Sheets and Views
Model
Asbestos Inspection Report STA Milwaukee 13APR2021
Asbestos Inspection Report STA Milwaukee 27JAN2021

File details come from the government source that posted it. Updated .