LGVTRAILBRIDGE3-20-2018.pdf
PDF 3 MB Posted
- Solicitation number
- 129JGPQ180047
About this file
Drawings
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Specifications.docx | DOCX document | |
| RFQApr18.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ITEM NO. DESCRIPTION UNIT QUANTITY
15101 Mobilization LS 1.
15204 Construction Surveying and Staking LS 1.
15713 Soil Erosion and Pollution Control & Dewatering LS 1.
20102 Clearing and Grubbing LS 1.
20801 Structural Excavation LS 1.
20803 Structural Backfill LS 1.
55601 Timber Bridge Railing LF 48.
55703 Treated Structural Timber and Lumber MFBM 1.25 55705 Treated Structural Timber, Glued Laminated MFBM .57 62501 Seeding Dry Method ACRE 1.
62507 Mulching, hand spread, Straw Bales, Certified Weed Free EA 10.
GRUBBING. GRUB DEEP ENOUGH TO REMOVE STUMPS, ROOTS, BARRIED LOGS, MOSS, TURF, OR
OTHER VEGETATIVE DEBRIS AS FOLLOWS
File details come from the government source that posted it.