Amendment 01 Revised schedule of Items
View the file
Other files
| File | Type | Posted |
|---|---|---|
| D51_Fences_MapPage2_v2.pdf | ||
| Site_Visit_Sign_In_Sheet.pdf | ||
| Attach_06_2012_FINALPAL_Fire_Plan_080212.doc | DOC document | |
| Attach_07_Walk_through_gate_detail.tif | TIF image | |
| Attach_02_D51_Fences_2018_v2_Maps.pdf | ||
| Attach_03_Staple_installation_Spec.tif | TIF image | |
| Attach_04_Water_Gap_Example.tif | TIF image | |
| Attach_05_Wire_Gate_Example.tif | TIF image | |
| 129JGP19Q0038_Duckwall_Ridge_Fence_Solicitation.doc | DOC document | |
| Attach_01_Wage_Determination_Letter.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PART 1, SCHEDULE OF ITEMS, SECTION B
SUPPLIES OR SERVICES, AND PRICES/COSTS
PROJECT Duckwall Ridge Fence
UNIT Stanislaus National Forest
SOL. # 129JGP19Q0038
ITEM NO. DESCRIPTION UNIT QUANTITY
UNIT
PRICE TOTAL PRICE
1 Fence dismantlization 2.55 Miles $ $
2 Fence line clearing prep 22,704 Ft $ $
3 Fence construction 22,704 Ft $ $
4 Corner or brace construction 36 Ea $ $
5 Gates construction 10 Ea $ $
6 Walk Through Gate 2 EA $ $
7 Smooth Wire 22,704 Ft $ $
8 Barbed Wire 45,408 Ft $ $
9 Wire Clips 8 Case $ $
10 Posts, oil pipe/treated wood 120 Ea $ $
11 Steel T posts 5.5 ft 1691 Ea $ $
12 Water gab construction 1 Ea $ $
13 Cleanup / demobilization 1 Ea $ $
TOTAL $
NOTES:
1. Offeror/bidder must price each item to be considered for award. Offers/bids for quantities less than those listed may be rejected.
2. If award is made in excess of $35,000, bonds will be required. (See Section I.)
3. If offer/bid exceeds $150,000, a bid bond equal to 20% of the offered total price is required.
(5) Following are abbreviation definitions from FP-03, Section 109 that may appear in the “Unit” column of the Schedule of Items; AC=Acre, CQ=Contract Quantity, CY= Cubic Yard, EA=Each, GAL=Gallon, HR=Hour, LF=Linear Foot, LS=Lump Sum, MI=Mile, LB=Pound, SF=Square Foot, SY=Square yard, ST=Station, TON=Ton. CQ and LS will be measured and paid as stated in FP-03, Section 109-02. All other Units will be paid according to FAR clause 52.211-18, Variation in Estimated Quantity.