Specifications_-_Drawings_-_Amendment_0004.pdf
PDF 5 MB Posted
- Attached to
- Butterfly Twain Watershed Improvements Federal contract opportunity
- Solicitation number
- 129JGP18R0023
About this file
Specifications - Drawings - Amendment 0004
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 129JGP18R0023_Amendment_0004.pdf | ||
| 129JGP18R0023_Amendment_0003.pdf | ||
| 129JGP18R0023_Amendment_0002.pdf | ||
| 129JGP18R0023_Amendment_0001.pdf | ||
| 03_Wage_Determination.pdf | ||
| 02_Mandatory_FSSS.PDF | ||
| Solicitation_129JGP18R0023.pdf | ||
| 01_Specifications_-_Drawings.pdf | ||
| 04_Fire_Plan.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NOTES:
LOCATIONS OF WORK TO BE DONE WILL BE STAKED ON THE GROUND BY THE FOREST SERVICE.
COMMERCIAL ROCK SOURCES - AGGREGATE SHALL BE OBTAINED FROM AN APPROVED SOURCE, CERTIFIED WEED FREE AND CERTIFIED TO CONTAIN NO MORE THAN 0.25 % ASBESTOS TO BE IN COMPLIANCE WITH CALIFORNIA HEALTH
AND SAFETY CODE SECTIONS 93105 AND 93106.
CONTRACTOR IS RESPONSIBLE FOR PLACING CONSTRUCTION SIGNS ON ROADS WHEN OPERATING EQUIPMENT ON THIS PROJECT.
ALL STAGING AREAS MUST BE APPROVED BY THE CONTRACTING OFFICER.
WATER SOURCES ARE SCARCE AND ARE SUBJECT TO CHANGE. SEE THE ATTACHED MAPS FOR APPROVED WATER SOURCES. THE DEVELOPMENT OF WATER SOURCES IS INCIDENTAL TO THE WORK.
ANY TIMBER THAT HAS TO BE CUT TO PERFORM THIS CONTRACT SHALL BE DECKED AT LOCATIONS APPROVED BY THE CONTRACTING OFFICER. ANY TREE CUT AS PART OF THIS PROJECT IS THE PROPERTY OF THE FOREST SERVICE AND
MAY NOT BE REMOVED BY THE CONTRACTOR FSSS 201.06
CULVERT REMOVAL IS INCIDENTAL TO COST. BEDDING MATERIAL FOR INSTALLATION OF CULVERT IS INCIDENTAL TO COST OF NEW CULVERT ..
THE GEOTEXTILE COST IS INCLUDED IN THE PAY ITEM 20420C DRAINAGE EXCAVATION TYPE; LOW WATER CROSSING DIMENSION A
ALL CONSTRUCTION WORK IN THE SCHEDULE OF ITEMS, SHALL RELATE TO THE STANDARD SPECIFICATIONS FOR CONSTRUCTION OF ROADS AND BRIDGES ON FEDERAL HIGHWAY PROJECTS (FP-03).
SUBMITTALS WILL BE REQUIRED FOR ALL MATERIALS PRIOR TO INSTALLATION, INCLUDING AGGREGATE AND RIPRAP.
APPLICABLE USDA FOREST SERVICE WATER QUALITY BEST MANAGEMENT PRACTICES (BMP'S) SHALL BE ADHERED TO. BMP'S CAN BE FOUND AT THE FOLLOWING URL:
HTTPS://WWW.FS.FED.US/BIOLOGY/RESOURCES/PUBS/WATERSHED/FS_NATIONAL_CORE_BMPS_APRIL2012.PDF
PROJECT Butterfly Twain Watershed Improvements UNIT Plumas National Forest
ITEM NO. DESCRIPTION
15101 MOBILIZATION
15713 SOIL EROSION AND POLLUTION PREVENTION
20103 CLEARING & GRUBBING
30307a ROADWAY RECONDITIONING; RECONSTRUCT ROLLING DIP 30307b ROADWAY RECONDITIONING; NEW ROLLING DIP 30307c ROADWAY RECONDITIONING;LOW WATER CROSSING
21101 ROADWAY OBLITERATION method 2
21205 LI NEAR GRADING
25102A PLACE RIPRAP, CLASS 2
251028 PLACE RIPRAP, CLASS 3
25102C PLACE RIPRAP, CLASS 4
30101 AGGREGATE ROAD SURFACING 3/4" COMPACTION METHOD B
30303 ROAD RECONDITIONING, CLEAN DITCH & INLET
62503 SEEDING DRY METHOD
63501 TEMPORARY TRAFFIC CONTROL
60201A CORRUGATED STEEL PIPE 12 GUAGE 48"X 40'
602018 CORRUGATED STEEL PIPE 12 GUAGE 18"X 30'
U.S. DEPARTMENT OF AGRICULTURE
FOREST SERVICE BUTTERFLY TWAIN
WATERSHED IMPROVEMENTS
PROJECT NOTES/
QUANTITY SHEET PLUMAS NATIONAL FOREST
QUINCY, CA
UNIT QUANTITY
LUMP SUM
LUMP SUM
MILE
EA
EA
EA
MILE
MILE
CY
CY
EA
TON
EA
LUMP SUM
LUMP SUM
FT
FT
' DESIGNED: ..i;.F .w,RIC__..Q ___ _
DRAWN: -E -BIC-P ___ _
CHECKED: ....,p.....,Hp..._pK.,..IN..._s __ _
� REVIEWED: I HQFFMAN
1.
1.
1.45 32.
9.
3.
1.31 2.27 56.
118.
8.
1,204.
22.
1.
3o.l
DATE
I
EVlSION
---1
BY------l�(
FILEN
":�RFLY/IWAIN.OWG
DATE: JlSL2.lll.1_, _ • • -( SHEET 3 OF 10 )DATE: lll.l2.ll.18-. _ _
WORK LIST 1
��--------�-------=2=..::5:.....;_N=-=1-=-i3 .'---=2::........:.4..:.....:,N-=--86=-..L,. 24N79 ,U3007. & U3004 quantity Milepost Notes
RD25N13 Worklist
0.00
0.05
0.13
0.21
0.31 0.37 0.45 0.45
0.45
0.49 0.53 0.54
0.57 0.61 0.79
0.84 0.85 0.85
24N86
Mobilization Road Intersects with 25N12 begin clearing/ grubbing and grading
Reconstruct rolling dip Reconstruct rolling dip
Reconstruct rolling dip & begin 3/4" aggregate placement Reconstruct rolling dip Reconstruct rolling dip End grading
End clearing/grubbing
Reconstruct rolling dip
Beging clearing/grubbing and grading
Reconstruct rolling dip Reconstruct rolling dip Reconstruct rolling dip, Begin 3/4" aggregate placement.
Reconstruct rolling dip Reconstruct rolling dip End grading End Clearing/grubbing
Reconstruct rolling dip
Reconstruct rolling dip & begin grading Reconstruct rolling dip, Begin grading Reconstruct rolling dip Reconstruct rolling dip Construct low water crossing With 20 CY type 3 ripra p with Construct low water crossing outlet appron and type 2 geotextile Reconstruct rolling dip Reconstruct rolling dip End 3/4" aggregate Placement End 3/4" Aggregate Placement Reconstruct armored rolling dip with 3 cy type 2 riprap Reconstruct armored rolling dip
Reconstruct rolling dip Reconstruct rolling dip End grading End grading End project
Milepost Notes
Worklist
0.00 Road Intersects with25N83, add 4 class 4 Begin roadway obliteration method 2 and
Rip Rap barrier bolders seeding and mulching dry method, add 4 class 4 Rip Rap barrier bolders
0.29 spur right
0.56 End seeding and mulching dry method.
0.56 End roadway obliteration method 2
End Project
End seeding and mulching dry method.
End roadway obliteration method 2 e U.S. DEPARTMENT OF AGRICULTURE
FOREST SERVICE
PLUMAS NATIONAL FOREST
QUINCY,CA
r
BUTTERFLY TWAIN
WATERSHED IMPROVEMENTS [
order unit
1 EA
1 EA
1 EA
1 EA
1 EA
1 EA
0.451 Mile
0.451 Mile
1 EA
1 EA
1 EA
1 EA
1 EA
406 TON
1 EA
1 EA
0.35 Mile
Quantity order unit
4 EA
1 LS
0.56 mile
WORK LIST 1
RD24N79
B2!ll! Milepost .ti2te§ quantity
Worklist order unit
24N7S 0.00 Road Intersects with PC420
U3007
U3004
0.02 Y Spur right
0.03 Y Spur left
0.08 Reconstruct Rolling Dip
0.17 Existing 18" CMP Needs to be removed and
Reconstruct Rolling Dip hauled away from forest service land, Construct Remove Existing 18" CMP, Construct
0.20 0.24
0.30
Low water crossing with 20 cy of riprap type 3 Dimension A low water crossing with type 2 geotextile and outlet appron Reconstruct rolling dip Reconstruct rolling dip
Reconstruct rolling dip Reconstruct rolling dip Reconstruct rolling dip Reconstruct rolling dip
0.36 Reconstruct rolling dip Reconstruct rolling dip
0.40 Intersects with 25N63
End project
Milepost Notes
0.00 Road Intersects with 24N86
0.50 End seeding and mulching dry method.
a.so
End roadway obliteration method 2
End Project
Milepost Notes
End project
Worklist
Begin roaclv,tay obliteration method 2 and seeding and mulching dry method
End seeding and mulching dry method.
End roaclv,tay obliteration method 2
1 EA
1 EA
1 EA
1 EA
1 EA
1 EA
Quantity order unit
1 LS
0.50 mile
Quantity order unit
0.00 Road Intersects with 24N86
0.25 End seeding and mulching dry method.
0.25 End roadway obliteration method 2
End Project
J /' DESIGNED: E BICQ
DRAWN: E BICQ
CHECKED: ,..Q...,H,..Q""PK .. IN""S..__ __ _
REVIEWED: I HQffMAN
DATE: llSL2.CllL
DATE: llSL2.CllL
DATE: Jl.lL201lL
DATE: Jl.lL201lL
Worklist
Begin roaclv,tay obliteration method 2 and seeding and mulching dry method.
End seeding and mulching dry method.
End roadway obliteration method 2
1 LS
0.25 mile
-V' I •_EVJstON ----t-------11 •
--::.m,,-
1-t--+:-----------;:---,j( SHEET 4 OF 10
U.S. DEPARTMENT OF AGRICULTURE
FOREST SERVICE
PLUMAS NATIONAL FOREST
QUINCY,CA
ROAD OBLITERATION, METHOD 2 COMPLETE RECONTOUR-GS-3
NOTES:
1. REMOVE SUFFICIENT AMOUNT OF ROAD EMBANKMENT AND PLACE AS FILL ON IN-SLOPE SIDE OF ROAD TO ACHIEVE POSITIVE DRAINAGE ACROSS ENTIRE ROAD PRISM.
2. SEED ALL DISTURBED AREAS WITH LOCAL SEED MIX. COR WILL SPECIFY SEED MIX AT THE PRE-WORK MEETING.
3. PLACE EXCAVATED OR EXISTING SLASH ONTO RECONTOURED SLOPE.
4. PLACE 4 TYPE 4 RIP RAP BOULDERS AT THE BEGINING OF ROAD 24N86 AT 2' ON CENTER
Q __ Q_
EXISTING ROADWAY
TYPE 4 RIPRAP AT 2' ON CENTER
BUTTERFLY TWAIN
WATERSHED IMPROVEMENTS
PLACE LOOSE FILL
ROADWAY
DESIGNED:
DRAWN:
OBLITERATION DETAIL CHECKED:
REVIEWED:
E BICC
E BICC
ll 1:1aeKIIIIS I l:IQfEMAIII
15'
LOWER LIMIT OF WORK
BLEND WITH ADJACENT NATURAL GROUND
DATE: llSL2ll1L r ,- DATE: llSL2ll1L
DATE: Jl1L2lWL DATE: Jl1L2lWL ----, f--
+1-•Y
-l�('""':'� •• --f--
-+: ---1j( SHEET 10 OF 10