Specifications_-_Drawings_-_Amendment_0004.pdf

PDF 5 MB Posted

Attached to
Butterfly Twain Watershed Improvements Federal contract opportunity
Solicitation number
129JGP18R0023
Issued by
Department of Agriculture Forest Service R5-Pacific Southwest Region

About this file

Specifications - Drawings - Amendment 0004

View the file

Other files for this federal contract opportunity

Other files attached to Butterfly Twain Watershed Improvements, newest first.
File Type Posted
129JGP18R0023_Amendment_0004.pdf PDF
129JGP18R0023_Amendment_0003.pdf PDF
129JGP18R0023_Amendment_0002.pdf PDF
129JGP18R0023_Amendment_0001.pdf PDF
03_Wage_Determination.pdf PDF
02_Mandatory_FSSS.PDF PDF
Solicitation_129JGP18R0023.pdf PDF
01_Specifications_-_Drawings.pdf PDF
04_Fire_Plan.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NOTES:

LOCATIONS OF WORK TO BE DONE WILL BE STAKED ON THE GROUND BY THE FOREST SERVICE.

COMMERCIAL ROCK SOURCES - AGGREGATE SHALL BE OBTAINED FROM AN APPROVED SOURCE, CERTIFIED WEED FREE AND CERTIFIED TO CONTAIN NO MORE THAN 0.25 % ASBESTOS TO BE IN COMPLIANCE WITH CALIFORNIA HEALTH

AND SAFETY CODE SECTIONS 93105 AND 93106.

CONTRACTOR IS RESPONSIBLE FOR PLACING CONSTRUCTION SIGNS ON ROADS WHEN OPERATING EQUIPMENT ON THIS PROJECT.

ALL STAGING AREAS MUST BE APPROVED BY THE CONTRACTING OFFICER.

WATER SOURCES ARE SCARCE AND ARE SUBJECT TO CHANGE. SEE THE ATTACHED MAPS FOR APPROVED WATER SOURCES. THE DEVELOPMENT OF WATER SOURCES IS INCIDENTAL TO THE WORK.

ANY TIMBER THAT HAS TO BE CUT TO PERFORM THIS CONTRACT SHALL BE DECKED AT LOCATIONS APPROVED BY THE CONTRACTING OFFICER. ANY TREE CUT AS PART OF THIS PROJECT IS THE PROPERTY OF THE FOREST SERVICE AND

MAY NOT BE REMOVED BY THE CONTRACTOR FSSS 201.06

CULVERT REMOVAL IS INCIDENTAL TO COST. BEDDING MATERIAL FOR INSTALLATION OF CULVERT IS INCIDENTAL TO COST OF NEW CULVERT ..

THE GEOTEXTILE COST IS INCLUDED IN THE PAY ITEM 20420C DRAINAGE EXCAVATION TYPE; LOW WATER CROSSING DIMENSION A

ALL CONSTRUCTION WORK IN THE SCHEDULE OF ITEMS, SHALL RELATE TO THE STANDARD SPECIFICATIONS FOR CONSTRUCTION OF ROADS AND BRIDGES ON FEDERAL HIGHWAY PROJECTS (FP-03).

SUBMITTALS WILL BE REQUIRED FOR ALL MATERIALS PRIOR TO INSTALLATION, INCLUDING AGGREGATE AND RIPRAP.

APPLICABLE USDA FOREST SERVICE WATER QUALITY BEST MANAGEMENT PRACTICES (BMP'S) SHALL BE ADHERED TO. BMP'S CAN BE FOUND AT THE FOLLOWING URL:

HTTPS://WWW.FS.FED.US/BIOLOGY/RESOURCES/PUBS/WATERSHED/FS_NATIONAL_CORE_BMPS_APRIL2012.PDF

PROJECT Butterfly Twain Watershed Improvements UNIT Plumas National Forest

ITEM NO. DESCRIPTION

15101 MOBILIZATION

15713 SOIL EROSION AND POLLUTION PREVENTION

20103 CLEARING & GRUBBING

30307a ROADWAY RECONDITIONING; RECONSTRUCT ROLLING DIP 30307b ROADWAY RECONDITIONING; NEW ROLLING DIP 30307c ROADWAY RECONDITIONING;LOW WATER CROSSING

21101 ROADWAY OBLITERATION method 2

21205 LI NEAR GRADING

25102A PLACE RIPRAP, CLASS 2

251028 PLACE RIPRAP, CLASS 3

25102C PLACE RIPRAP, CLASS 4

30101 AGGREGATE ROAD SURFACING 3/4" COMPACTION METHOD B

30303 ROAD RECONDITIONING, CLEAN DITCH & INLET

62503 SEEDING DRY METHOD

63501 TEMPORARY TRAFFIC CONTROL

60201A CORRUGATED STEEL PIPE 12 GUAGE 48"X 40'

602018 CORRUGATED STEEL PIPE 12 GUAGE 18"X 30'

U.S. DEPARTMENT OF AGRICULTURE

FOREST SERVICE BUTTERFLY TWAIN

WATERSHED IMPROVEMENTS

PROJECT NOTES/

QUANTITY SHEET PLUMAS NATIONAL FOREST

QUINCY, CA

UNIT QUANTITY

LUMP SUM

LUMP SUM

MILE

EA

EA

EA

MILE

MILE

CY

CY

EA

TON

EA

LUMP SUM

LUMP SUM

FT

FT

' DESIGNED: ..i;.F .w,RIC__..Q ___ _

DRAWN: -E -BIC-P ___ _

CHECKED: ....,p.....,Hp..._pK.,..IN..._s __ _

� REVIEWED: I HQFFMAN

1.

1.

1.45 32.

9.

3.

1.31 2.27 56.

118.

8.

1,204.

22.

1.

3o.l

DATE

I

EVlSION

---1

BY------l�(

FILEN

":�RFLY/IWAIN.OWG

DATE: JlSL2.lll.1_, _ • • -( SHEET 3 OF 10 )DATE: lll.l2.ll.18-. _ _

WORK LIST 1

��--------�-------=2=..::5:.....;_N=-=1-=-i3 .'---=2::........:.4..:.....:,N-=--86=-..L,. 24N79 ,U3007. & U3004 quantity Milepost Notes

RD25N13 Worklist

0.00

0.05

0.13

0.21

0.31 0.37 0.45 0.45

0.45

0.49 0.53 0.54

0.57 0.61 0.79

0.84 0.85 0.85

24N86

Mobilization Road Intersects with 25N12 begin clearing/ grubbing and grading

Reconstruct rolling dip Reconstruct rolling dip

Reconstruct rolling dip & begin 3/4" aggregate placement Reconstruct rolling dip Reconstruct rolling dip End grading

End clearing/grubbing

Reconstruct rolling dip

Beging clearing/grubbing and grading

Reconstruct rolling dip Reconstruct rolling dip Reconstruct rolling dip, Begin 3/4" aggregate placement.

Reconstruct rolling dip Reconstruct rolling dip End grading End Clearing/grubbing

Reconstruct rolling dip

Reconstruct rolling dip & begin grading Reconstruct rolling dip, Begin grading Reconstruct rolling dip Reconstruct rolling dip Construct low water crossing With 20 CY type 3 ripra p with Construct low water crossing outlet appron and type 2 geotextile Reconstruct rolling dip Reconstruct rolling dip End 3/4" aggregate Placement End 3/4" Aggregate Placement Reconstruct armored rolling dip with 3 cy type 2 riprap Reconstruct armored rolling dip

Reconstruct rolling dip Reconstruct rolling dip End grading End grading End project

Milepost Notes

Worklist

0.00 Road Intersects with25N83, add 4 class 4 Begin roadway obliteration method 2 and

Rip Rap barrier bolders seeding and mulching dry method, add 4 class 4 Rip Rap barrier bolders

0.29 spur right

0.56 End seeding and mulching dry method.

0.56 End roadway obliteration method 2

End Project

End seeding and mulching dry method.

End roadway obliteration method 2 e U.S. DEPARTMENT OF AGRICULTURE

FOREST SERVICE

PLUMAS NATIONAL FOREST

QUINCY,CA

r

BUTTERFLY TWAIN

WATERSHED IMPROVEMENTS [

order unit

1 EA

1 EA

1 EA

1 EA

1 EA

1 EA

0.451 Mile

0.451 Mile

1 EA

1 EA

1 EA

1 EA

1 EA

406 TON

1 EA

1 EA

0.35 Mile

Quantity order unit

4 EA

1 LS

0.56 mile

WORK LIST 1

RD24N79

B2!ll! Milepost .ti2te§ quantity

Worklist order unit

24N7S 0.00 Road Intersects with PC420

U3007

U3004

0.02 Y Spur right

0.03 Y Spur left

0.08 Reconstruct Rolling Dip

0.17 Existing 18" CMP Needs to be removed and

Reconstruct Rolling Dip hauled away from forest service land, Construct Remove Existing 18" CMP, Construct

0.20 0.24

0.30

Low water crossing with 20 cy of riprap type 3 Dimension A low water crossing with type 2 geotextile and outlet appron Reconstruct rolling dip Reconstruct rolling dip

Reconstruct rolling dip Reconstruct rolling dip Reconstruct rolling dip Reconstruct rolling dip

0.36 Reconstruct rolling dip Reconstruct rolling dip

0.40 Intersects with 25N63

End project

Milepost Notes

0.00 Road Intersects with 24N86

0.50 End seeding and mulching dry method.

a.so

End roadway obliteration method 2

End Project

Milepost Notes

End project

Worklist

Begin roaclv,tay obliteration method 2 and seeding and mulching dry method

End seeding and mulching dry method.

End roaclv,tay obliteration method 2

1 EA

1 EA

1 EA

1 EA

1 EA

1 EA

Quantity order unit

1 LS

0.50 mile

Quantity order unit

0.00 Road Intersects with 24N86

0.25 End seeding and mulching dry method.

0.25 End roadway obliteration method 2

End Project

J /' DESIGNED: E BICQ

DRAWN: E BICQ

CHECKED: ,..Q...,H,..Q""PK .. IN""S..__ __ _

REVIEWED: I HQffMAN

DATE: llSL2.CllL

DATE: llSL2.CllL

DATE: Jl.lL201lL

DATE: Jl.lL201lL

Worklist

Begin roaclv,tay obliteration method 2 and seeding and mulching dry method.

End seeding and mulching dry method.

End roadway obliteration method 2

1 LS

0.25 mile

-V' I •_EVJstON ----t-------11 •

--::.m,,-

1-t--+:-----------;:---,j( SHEET 4 OF 10

U.S. DEPARTMENT OF AGRICULTURE

FOREST SERVICE

PLUMAS NATIONAL FOREST

QUINCY,CA

ROAD OBLITERATION, METHOD 2 COMPLETE RECONTOUR-GS-3

NOTES:

1. REMOVE SUFFICIENT AMOUNT OF ROAD EMBANKMENT AND PLACE AS FILL ON IN-SLOPE SIDE OF ROAD TO ACHIEVE POSITIVE DRAINAGE ACROSS ENTIRE ROAD PRISM.

2. SEED ALL DISTURBED AREAS WITH LOCAL SEED MIX. COR WILL SPECIFY SEED MIX AT THE PRE-WORK MEETING.

3. PLACE EXCAVATED OR EXISTING SLASH ONTO RECONTOURED SLOPE.

4. PLACE 4 TYPE 4 RIP RAP BOULDERS AT THE BEGINING OF ROAD 24N86 AT 2' ON CENTER

Q __ Q_

EXISTING ROADWAY

TYPE 4 RIPRAP AT 2' ON CENTER

BUTTERFLY TWAIN

WATERSHED IMPROVEMENTS

PLACE LOOSE FILL

ROADWAY

DESIGNED:

DRAWN:

OBLITERATION DETAIL CHECKED:

REVIEWED:

E BICC

E BICC

ll 1:1aeKIIIIS I l:IQfEMAIII

15'

LOWER LIMIT OF WORK

BLEND WITH ADJACENT NATURAL GROUND

DATE: llSL2ll1L r ,- DATE: llSL2ll1L

DATE: Jl1L2lWL DATE: Jl1L2lWL ----, f--

+1-•Y

-l�('""':'� •• --f--

-+: ---1j( SHEET 10 OF 10