129AC720Q0026 Critical Water.pdf
PDF 549 KB Posted
- Attached to
- Critical Water System Repair
- Solicitation number
- 129AC7
- Issued by
-
Department of Agriculture Forest Service
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
129AC720Q0026
1. REQUEST NO.
5a. ISSUED BY
NAME
a. NAME
c. STREET ADDRESS
d. CITY
10. PLEASE FURNISH QUOTATIONS TO
THE ISSUING OFFICE IN BLOCK 5a ON
OR BEFORE CLOSE OF BUSINESS (Date)
2. DATE ISSUED 3. REQUISITION/PURCHASE REQUEST NO. 4. CERT. FOR NAT. DEF.
UNDER BDSA REG. 2
AND/OR DMS REG.1
RATING
6. DELIVERY BY (Date)
7. DELIVERY
9. DESTINATION
a. NAME OF CONSIGNEE
b. STREET ADDRESS
PAGE OF PAGES
5b. FOR INFORMATION CALL: (No collect calls)
TELEPHONE NUMBER
AREA CODE
SM.FS.NCASAINBOX@usda.gov
8. TO:
b. COMPANY
e. STATE f. ZIP CODE
c. CITY
d. STATE e. ZIP CODE
IMPORTANT: This is a request for information, and quotations furnished are not offers. If you are unable to quote, please so indicate on this form and return it to the address in Block 5a. This request does not commit the Government to pay any costs incurred in the preparation of the submission of this quotation or to contract for supplies or services. Supplies are of domestic origin unless otherwise indicated by quoter. Any representations and/or certifications attached to this Request for Quotations must be completed by the quoter.
11. SCHEDULE (Include applicable Federal, State and local taxes)
THIS RFQ
REQUEST FOR QUOTATION
(THIS IS NOT AN ORDER)
IS IS NOT A SMALL BUSINESS SET ASIDEX
02/28/2020 988896
1 30
R5 NO-CAL ACQ SERVICE AREA NCASA
3644 AVTECH PARKWAY SUITE 180
REDDING CA 96002
USDA FOREST SERVICE
07/31/2020
USDA FOREST SERVICE
SHASTA TRINITY NATIONAL FOREST
3644 AVTECH PARKWAY
REDDING
CA 96002
PAUL WOOD
03/31/2020 1300 PD
FOB DESTINATION
OTHER
(See Schedule)X
ITEM NO.
(a)
SUPPLIES/SERVICES
(b)
QUANTITY
(c)
UNIT
(d)
UNIT PRICE
(e)
AMOUNT
(f)
Critical Water System Repairs - Phase 1 Shasta-Trinity National Forest
NAICS: 237990
Product Service Code: Z2PA Size Standard: $39.5 Million Set Aside: Total Small Business
DUNS: ____________________________
Email: ___________________________
Period of Performance: 05/01/2020 to 07/31/2020
0001 0597 - FC14 - R5 Multi-Forest Critical Water Continued ...
12. DISCOUNT FOR PROMPT PAYMENT
a. 10 CALENDAR DAYS (%) b. 20 CALENDAR DAYS (%) c. 30 CALENDAR DAYS (%) d. CALENDAR DAYS
NUMBER PERCENTAGE
NOTE: Additional provisions and representations
13. NAME AND ADDRESS OF QUOTER
b. STREET ADDRESS
c. COUNTY
d. CITY e. STATE f. ZIP CODE
14. SIGNATURE OF PERSON AUTHORIZED TO
SIGN QUOTATION
16. SIGNER
a. NAME (Type or print)
c. TITLE (Type or print)
a. NAME OF QUOTER
AREA CODE
NUMBER
15. DATE OF QUOTATION
b. TELEPHONE are are not attached
AUTHORIZED FOR LOCAL REPRODUCTION
Previous edition not usable
STANDARD FORM 18 (REV. 6-95)
Prescribed by GSA - FAR (48 CFR) 53.215-1(a)
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 30
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
129AC720Q0026
System Repair Phase I (K.Nolan).
Product/Service Code: Z2PA
Product/Service Description: REPAIR OR ALTERATION
OF RECREATION FACILITIES (NON-BUILDING)
Delivery: 07/31/2020
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
CONSTRUCTION RFQ
Critical Water Systems Repairs – PH 1 Shasta-Trinity National Forest
129AC720Q0026
Table of Contents
PART 1—THE SCHEDULE……………………………………………………………………………………. 4
SECTION B - SUPPLIES OR SERVICES AND PRICES
SECTION C – DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK
SECTION D--PACKAGING AND MARKING
SECTION E--INSPECTION AND ACCEPTANCE
SECTION F--DELIVERIES OR PERFORMANCE
SECTION G--CONTRACT ADMINISTRATION DATA
SECTION H--SPECIAL CONTRACT REQUIREMENTS
PART II--CONTRACT CLAUSES
SECTION I--CONTRACT CLAUSES ...................................................................................... 14 - 19
SECTION J--LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS……………… 20
SECTION K ANNUAL REPRESENTATIONS AND CERTIFICATIONS
SECTION L--INSTRUCTIONS, CONDITIONS, AND NOTICES TO QUOTERS
SECTION M--EVALUATION FACTORS FOR AWARD
Shasta-Trinity National Forest
129AC720Q0026
PART I - SCHEDULE OF ITEMS
SECTION B - Supplies or Services and Prices
Shasta-Trinity NF Critical Water Systems Repairs – PH 1 Shasta-Trinity National Forest
ITEM
NO. DESCRIPTION UNIT QUANTITY UNIT
PRICE AMOUNT
Ackerman Campground Water Improvements
1A Mobilization LS 1 $ ___________ $ ___________
2A Demo & Remove Existing Dump Station, Pump Exist Septic Tanks & Prepare Site
LS 1 $ ___________ $ ___________
3A Furnish/Install 2500 Gal Septic Tank, Waste Line Plumbing, Connections, & Dump Hatch
LS 1 $ ___________ $ ___________
4A Furnish/Install Hydrant Tower & Related Plumbing LS 1 $ ___________ $ ___________
5A Furnish/Install Reinforced Conc Pad, Curbing & Related Concrete LS 1 $ ___________ $ ___________
6A Furnish/Install Yard Water Faucet & System Drain (3 Locations) LS 1 $ ___________ $ ___________
7A Furnish/Install ½” Brass Paddle Valve EA 12 $ ___________ $ ___________
8A Furnish/Install 6” Dia GSP Bollard Proctection EA 5 $ ___________ $ ___________
9A Disinfect, Sample & Test Potable Water System LS 1 $ ___________ $ ___________
Subtotal Price: $ ___________
Tannery Gulch Campground Water System Improvements
1B Mobilization LS 1 $ ___________ $ ___________
2B Furnish/Install Three (3) – 2” Brass Ball Valves & 24”X36” Valve Box
LS 1 $ ___________ $ ___________
3B Furnish/Install 2” Parallel Water Supply Line LS 1 $ ___________ $ ___________
4B Furnish/Install 2” Nutating Disc Flow Meter & Meter Box LS 1 $ ___________ $ ___________
5B Furnish/Install Yard Water Faucet & System Drain LS 1 $ ___________ $ ___________
6B Furnish/Install 2” Brass Ball Valve & Valve Box EA 3 $ ___________ $ ___________
7B Disinfect, Sample & Test Potable Water System LS 1 $ ___________ $ ___________
Subtotal Price: $____________
Shasta-Trinity National Forest
129AC720Q0026
ITEM
NO. DESCRIPTION UNIT QUANTITY UNIT
PRICE AMOUNT
Clark Springs Campground Spring Box Protection
1C Mobilization LS 1 $ ___________ $ ___________
2C Furnish/Place Clean Fill (Estimated 25 CYs) LS 1 $ ___________ $ ___________
3C Furnish/Place Clean 1” Crushed Stone (Estimated 10 CYs) LS 1 $ ___________ $ ___________
4C Furnish/Install 6’ CL Fence & Gates w/3-Strand Barb Wire LS 1 $ ___________ $ ___________
5C Furnish/Install Three (3) ½” – ¾ Ton Boulders LS 1 $ ___________ $ ___________
Subtotal Price: $ ___________
Stoney Point Campground 2.5” GSP Water Line Repair
1D Mobilization LS 1 $ ___________ $ ___________
2D Furnish/Install/Operate/Maintain Caltrans Traffic Control System on State Hwy. 3
LS 1 $ ___________ $ ___________
3D Locate, Remove & Install 2.5 “ Water Line Repair LS 1 $ ___________ $ ___________
4D Disinfect, Sample & Test Potable Water System LS 1 $ ___________ $ ___________
Subtotal Price: $ ___________
TOTAL $____________
B.1 NOTE REGARDING BOND PREMIUMS:
Payment for bond premiums in accordance with Clause 52.232-5, Payments under Fixed- Price Construction Contracts, shall not be in addition to the contract price. Include bond payments under Mobilization.
Shasta-Trinity National Forest
129AC720Q0026
SECTION C – DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK
C.1 SCOPE OF WORK
Contractor shall furnish all material, labor, equipment, documentation, communication, notifications, and transportation as required to furnish and install the improvements described herein, as shown on the Project Plans, and as otherwise required by the Contract. All demolition and improvements described herein, as required by the Caltrans Encroachment Permit and as shown on the Project Plans and Caltrans Standard Plans are the responsibility of the Contractor. Project scope of work generally includes, but is not necessarily limited to, the following:
A) Ackerman Campground Water Improvements
a. Remove and dispose interfering portions of the RV waste dump station associated with the work to be done, including pavement, concrete, piping and incidental materials.
b. Pump out existing septic tank to remain and snake existing 6” waste line system. Pump out and abandon separate existing septic tank.
c. Removal and dispose portions of existing asbestos cement pipe (ACP).
d. Remove and dispose interfering portions of existing water systems associated with the work to be installed.
e. Excavate, bed and backfill for waste and potable water lines as described herein and on the Project Plans.
f. Furnish and install 2,500 gallon concrete septic tank (two chamber) and risers, sand bedding and backfill, as well as all associated waste drain and vent piping, fittings, transitions and connections.
g. Furnish, place and finish all concrete pads, curbs, and concrete reinforcement.
h. Furnish and install new ¾” hydrant tower wash-down system, including all new piping, valves and valve boxes, pipe fittings, transitions, and connections.
i. Furnish and Install RV Dump Station Warning, Instructional and Non-Potable Water signage.
j. Furnish and install new yard water hydrants & water system drains.
k. Furnish and install brass paddle valves at yard riser locations.
l. Furnish and install 6” diameter galvanized steel pipe protection bollard, concrete set and filled, with yellow reflective warning tape.
m. Disinfect, sample and test water system for bacterial contamination until results indicate absence of Total Coliform and E. Coli. Repeat as necessary.
B) Tannery Gulch Campground Water System Improvements
a. Remove and dispose interfering portions of existing water system associated with the work to be installed.
b. Excavate, bed and backfill for potable water line as described herein and on the
Project Plans.
c. Furnish and install new 2” brass ball valves, valve boxes, piping, fittings, transitions and connections to existing water system,
d. Furnish and install new 2” nutating disc flow meter for potable water, including meter box, piping, fittings, transitions and connections to existing water system.
e. Furnish and install 2” parallel PVC Sch 80 water line including valve boxes, piping, fittings, transitions and connections to existing water system
f. Furnish and install new yard water hydrants & water system drains.
g. Disinfect, sample and test water system for bacterial contamination until results indicate absence of Total Coliform and E.Coli. Repeat as necessary.
Shasta-Trinity National Forest
129AC720Q0026
C) Clark Springs Campground Spring Box Protection
a. Furnish and install approximately 36 lineal feet of 6-foot chain link (CL) fence plus 3-strand barbwire atop 6’ CL fence,
b. Furnish and install two 6-foot high CL fence gates: 10-foot wide double gate and 8-foot wide double gate plus 3-strand barbwire atop 6-foot high chain link gates.
c. Fencing and gates shall be as described herein, and as shown on plan and per
Caltrans Standard Plans A85, A85A and A85B.
d. Connect to existing gate system with hot dipped galvanized hardware, including bracing rails, stretcher bars, truss tighteners, couplers, strapping, and tensioning wires.
e. Furnish and place approximately 25 cubic yards of clean dirt fill, certified weed free, behind and around existing spring box with fill slope surface no greater than 2.5:1. Contractor to provide vendor certification of weed free fill to Gov’t representative for inspection prior to placement.
f. Furnish and place approximately 10 cubic yards of clean and weed free, 1” crushed stone around side and front of spring box and along gate entry area.
Contractor to provide vendor certification of weed free fill to Gov’t representative for inspection prior to placement.
g. Furnish and place three (3) one-half ton (minimum), but no greater than three quarter ton boulders where shown on plan. Contractor to coordinate with Gov’t representative for boulder placement.
D) Stoney Point Campground 2.5” GSP Water Line Repair
a. The Government is the permittee for the Caltrans Encroachment Permit.
Contractor shall be responsible, as permittee’s authorized agent, for being thoroughly familiar with all aspects of the encroachment permit and implementing all requirements therefore. This includes a ten days advanced notification to Caltrans Permit Inspector of any lane closure or traffic control system.
Notify Permit Inspector Steve Veatch at 530-949-7759 for all advanced notifications, scheduling pre-construction meetings, inspections and approvals.
b. Permit activities includes but not necessarily limited to, pre-construction meeting with Caltrans Inspector; advanced notifications to Caltrans Inspector of upcoming actions within the Caltrans Right-of-Way; furnishing, installing, and maintaining traffic control systems for advanced traffic signage notifications, lane closures and flagger systems; excavations, trenching, pipe repairs, bedding, cement slurry backfilling, trench resurfacing; pavement saw-cutting and replacement, all as required by the encroachment permit and associated permit provisions. If there is a conflict between notes or construction details on the Project Plans and the Caltrans Encroachment Permit requirements, the Caltrans requirements will take precedence.
c. Furnish, place, operate and maintain traffic control system for lane closure on State Highway 3 in accordance with Caltrans Standard Plans T9, T13, EP1, & EP2 and as required by the Caltrans Encroachment Permit and Permit Inspector for this project.
d. Locate, remove and install 2.5” GSP water line repair with standard 2.5” GSP water pipe and dresser couplings.
e. Excavate, bed and backfill the repair for potable water line, including surface finishing as described herein, on the Project Plans, and as required by the Caltrans encroachment permit.
f. Disinfect, sample and test water system for bacterial contamination until results indicate absence of Total Coliform and E. Coli. Repeat as necessary.
Shasta-Trinity National Forest
129AC720Q0026
C.2 LOCATION OF PROJECT
There are four campground locations where work will be accomplished. Tannery Gulch, Stoney Point and Clark Springs Campgrounds are located along State Highway 3, around the Stuart Fork Arm of Trinity Lake, in Trinity County, CA. Ackerman Campground is located along Lewiston Lake, on Trinity Dam Boulevard, approximately ½ mile south of Trinity Lake Dam, in Trinity County, CA.
Tannery Gulch, Stoney Point and Clark Springs Campgrounds:
From Redding, CA, take Hwy 299 west for 44 miles to Weaverville. Take Hwy 3 from Weaverville to the west side of Trinity Lake. Tannery Gulch Campground is located approximately 13 miles north of Weaverville, CA, follow road signs into campground from Hwy 3. Stoney Point Campground/Stoney Swim Area is located approximately 14 miles north of Weaverville, CA and the work is located along the shoulder of southbound Hwy 3 near the Stoney Swim Area parking lot. Clark Springs Campground is located approximately 18 miles north of Weaverville, CA on Hwy 3. Follow road signs into campground from Hwy 3.
Ackerman Campground:
From Redding, CA, take Hwy 299 west for 28 miles to Trinity Dam Blvd, then 12 miles north on Trinity Dam Blvd to Ackerman Campground.
C.3 OPERATING SEASON
There are no seasonal restrictions other than what is noted below.
After October 15th, wet weather operation restrictions shall apply to all roads and work shall be tightly controlled and monitored for erosion control and preventative measures. At Forest Service discretion, work may be suspended for winter weather when conditions warrant.
C.4 OTHER REQUIREMENTS
Camping Requirements - Before any camp, storage, or service area is operated on National Forest lands or lands administered by the Forest Service, written permission shall be obtained through the Forest Service. See District office for camping permit form and terms. A camp is interpreted to include the campsite or trailer parking area of any employee working on the project for the Contractor. Contractors and their employees shall comply with the rules and regulations governing the operation of the premises of which they occupy.
C.5 UTILITIES
The Contractor shall be responsible for locating and protecting above and below ground utilities in the project area.
Shasta-Trinity National Forest
129AC720Q0026
C.6 USE OF UTILITIES
The Contractor may use electric power at the site if exterior receptacles available, otherwise the contractor should plan for alternative power sources. If system is operational, water will be made available at the site, subject to the work to be done. Contractor to coordinate with Government representative for specific water system operations. Sanitary facilities will be the responsibility of the contractor.
C.7 PROTECTION of EXISTING IMPROVEMENTS
Pavement, buildings, landscaping and other improvements shall be protected by the Contractor.
The Contractor shall be responsible for repairing any damage to existing improvements.
C.8 DISPOSAL
All excess and waste material shall be properly and legally disposed of off government land.
C.9 AGAR 452.211-73 ATTACHMENTS TO STATEMENT OF WORK/SPECIFICATIONS (FEB
1988) The attachments to the Statement of Work/Specifications listed in Section J are hereby made a part of this solicitation and any resultant contract.
Shasta-Trinity National Forest
129AC720Q0026
SECTION D--PACKAGING AND MARKING
D.1 Government Furnished Items
Government may make available a designated laydown area and overnight accommodation at Ackerman Campground if desired by the Contractor. All security aspects associated with contractor owned equipment and materials are not the responsibility of the Government. The Government assumes no liability whatsoever for Contractor use of designated laydown/overnight area. Contractor is solely responsible for the security of his/her possessions related to this project.
SECTION E--INSPECTION AND ACCEPTANCE
FAR 52.252-2 Clauses Incorporated By Reference (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):
FAR: https://www.acquisition.gov/far AGAR: http://www.dm.usda.gov/procurement/policy/agar.html
FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES
INCORPORATED BY REFERENCE
FAR 52.246-1 Contractor Inspection Requirements (APR 1984) FAR 52.246-12 Inspection of Construction (AUG 1996)
SECTION F--DELIVERIES OR PERFORMANCE
FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES
INCORPORATED BY REFERENCE
FAR 52.242-14 Suspension of Work (APR 1984)
FAR 52.211-10 Commencement, Prosecution, and Completion of Work (APR 1984)
The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives Notice to Proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than July 31, 2020 after receipt of Notice to Proceed. The time stated for completion shall include final cleanup of the premises.
https://acquisition.gov/far/current/html/52_248_253.html#wp1120047 https://www.acquisition.gov/far http://www.dm.usda.gov/procurement/policy/agar.html http://acquisition.gov/far/current/html/52_246.html#wp1118709 https://acquisition.gov/far/current/html/52_246.html#wp1118901 https://acquisition.gov/far/current/html/52_241_244.html#wp1128875 https://acquisition.gov/far/current/html/52_207_211.html#wp1141217
Shasta-Trinity National Forest
129AC720Q0026
SECTION G--CONTRACT ADMINISTRATION DATA
G.1 Postaward Conference, AGAR 452.215-73 (NOV 1996) A post award conference with the successful offeror may be required. The conference will be held at a mutually agreeable time and location.
G.2 Payment and Invoices
(a) All invoices shall be submitted via the Department of Treasury's Invoice Processing Platform (IPP). Paper copies of invoices will no longer be accepted. This is a mandatory requirement initiated by the U.S. Department of Agriculture. Failure to comply with this direction may result in late or delayed payments.
(b) Invoice Processing Platform (IPP) (Invoice Submission Procedures) The "Submit Invoice-to" address for invoices on USDA orders is the Department of Treasury's Invoice Processing Platform (IPP). All invoices for work performed under this contract shall be submitted via the electronic Invoice Processing Platform. This platform is managed by the U.S.
Department of Treasury and additional information is available at this website:
https://www.ipp.gov/index.htm.
After award of a contract, please make sure your company registers promptly at https://www.ipp.gov/vendors/enrollment-vendors.htm to establish an account, there is no pre-award registration. PRIOR to starting the IPP enrollment process, please verify that the point of contact’s (POC’s) email address is current in the System for Award Management (SAM) account for your company (www.sam.gov). Recent update(s) to a SAM registration need time to process from a “Pending” to in an “Active” status on the SAM account. The one-time enrollment in IPP means a series of emails will be sent to the POC identified in the SAM account. For assistance with questions on the IPP enrollment process, creating invoices, or uploading attachments to IPP please contact the IPP help desk phone number is 1-866-973-3131.
Invoices in IPP are the official request for payment. Supporting information is required for all construction progress payments and shall be attached to the IPP invoice.
• The payment certification required in FAR 52.232-5 Payments under Fixed-Price
Construction Contracts must be signed and submitted for each progress payment requested,
• A breakdown of billing, based on the pricing schedule along with the progress schedule, must be included as attachments to the IPP invoice.
• When requesting final payment, attach contract release of claims to final invoice.
Additionally, the government will verify the contractor’s compliance with the submission of certified payrolls for the invoiced timeframe as required in FAR Clause 52.222-8 Payrolls and Basic Records. The Contractor shall submit payrolls weekly for each week in which any contract work is performed by the prime or any subcontractors. The copies shall be sent to the COR. Payrolls submitted shall set out accurately and completely all of the information required in the contract clause (form WH-347 is an optional form compliant with the requirement and is available for download at www.dol.gov). State or County government forms lack the specific certification requirement and are not acceptable without supplementation of the certification statement.
https://www.ipp.gov/index.htm https://www.ipp.gov/vendors/enrollment-vendors.htm http://www.sam.gov/ http://www.dol.gov/
Shasta-Trinity National Forest
129AC720Q0026
SECTION H--SPECIAL CONTRACT REQUIREMENTS
H.1 Emergency Response, AGAR 452.236-77 (NOV 1996)
(a) Contractor's Responsibility for Fire Fighting. (1) The Contractor, under the provisions of FAR clause 52.236-9, PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES, AND IMPROVEMENTS, shall immediately extinguish all fires on the work site other than those fires in use as a part of the work. (2) The Contractor may be held liable for all damages and for all costs incurred by the Government for labor, subsistence, equipment, supplies, and transportation deemed necessary to control or suppress a fire set or caused by the Contractor or the Contractor's agents or employees.
(b) Contractor's Responsibility for Notification in Case of Fire. The Contractor shall immediately notify the Government of any fires sighted on or in the vicinity of the work site.
(c) Contractor's Responsibility for Responding to Emergencies. When directed by the Contracting Officer, the Contractor shall allow the Government to temporarily use employees and equipment from the work site for emergency work (anticipated to be restricted to firefighting). An equitable adjustment for the temporary use of employees and equipment will be made under the CHANGES clause, FAR 52.243-4.
H.2 Superintendence by Contractor
In addition to Clause 52.236-6, the following applies: The name and the specific authorities of the foreman or superintendent must be designated in writing to the Contracting Officer. The Contractor may use his/her own prepared letterhead stationery or a "Designation of Contractor's Representative" form available from the Contracting Officer. If the Contractor or the designee is not present when work is being performed on the contract, a Suspend Work Order may be issued with contract time continuing to run. The Contractor shall have a person on-site that is fully conversant in the English language.
H.3 Loss, Damage or Destruction
Equipment Furnished with Operator:
The Government shall not be liable for loss, damage, or destruction of equipment furnished under this contract except for such loss, damage, or destruction resulting from the negligent or wrongful act(s) of Government employee(s) while acting within the scope of their employment.
Other:
Even though this contract may provide for performing services at the direction of Government personnel, the contract is not for personal services, and neither the Contractor nor his or her personnel are Government employees. The Government assumes no liability for injury occurring to Contractor personnel or to third parties, or for loss, damage, or destruction involving third parties' property as a result of the Contractor's operation. Except that the Government is liable for such loss, damage, or destruction resulting from the negligent or wrongful act(s) of Government employee(s) acting within the scope of their employment.
Shasta-Trinity National Forest
129AC720Q0026
H.4 Archaeological and Historic Sites Location of known archaeological, historic, or pre-historic materials--such as Amerind artifacts and/or historic mining, logging, or fur trapping remains protected by the American Antiquities Act (l6 USC 433)-- will be identified for the contractor before work commences.
If any new cultural resources or archeological sites are discovered during implementation, all work shall halt until the Contracting Officer and Heritage Program Manager is notified and clearance to continue work is approved. Should inadvertent effects to or unanticipated discoveries of human remains be made on Region 5 lands, the County Coroner [California Health and Safety Code 7050.5(b)] shall be notified immediately. If the remains are determined to be Native American or if Native American (Indian) cultural items pursuant to NAGPRA are uncovered, the provisions of NAGPRA and its regulations at 43 CFR 10 and ARPA at 43 CFR 7 shall be followed on federal lands.
H.5 Equipment Cleaning All off-road equipment used on this project shall be washed before moving into the project area so that the equipment is free of soil, seeds, vegetative material, or other debris that could contain or hold seeds of noxious weeds. “Off-road equipment” includes all logging and construction equipment and such brushing equipment as brush hogs, masticators, and chippers; it does not include log trucks, chip vans, service vehicles, water trucks, pickup trucks, and similar vehicles not intended for off-road use.
Equipment will be considered clean when visual inspection does not reveal soil, seeds, plant material, or other such debris. Disassembly of equipment components or specialized inspection equipment is not required. Contractor shall notify the Contracting Officer at least five days in advance of moving equipment in so that arrangements can be made for inspection.
If the project area is known to contain noxious weeds, the equipment shall be cleaned before moving to other Forest Service system lands which do not contain noxious weeds.
H.6 Worker’s Compensation Insurance
The Contractor shall provide evidence of Worker's Compensation Insurance or a written explanation as to why the Contractor is exempt from the requirement. NOTE: The Contractor working alone as an owner/operator is not required to carry the insurance.
H.7 Contractor License Requirements
Contractor shall be l icensed in the State of California as a:
A - General Engineering Contractor
Business & Professions Code Division 3, Chapter 9. Contractors, Article 4. Classifications
7056. A general engineering contractor is a contractor whose principal contracting business is in connection with fixed works requiring specialized engineering knowledge and skill, including the following divisions or subjects: irrigation, drainage, water power, water supply, flood control, inland waterways, harbors, docks and wharves, shipyards and ports, dams and hydroelectric projects, levees, river control and reclamation works, railroads, highways, streets and roads, tunnels, airports and airways, sewers and sewage disposal plants and systems, waste reduction plants, bridges, overpasses, underpasses and other similar works, pipelines and other systems for the transmission of petroleum and other liquid or gaseous substances, parks, playgrounds and other recreational works, refineries, chemical plants and similar industrial plants requiring specialized
Shasta-Trinity National Forest
129AC720Q0026
engineering knowledge and skill, powerhouses, power plants and other utility plants and installations, mines and metallurgical plants, land leveling and earthmoving projects, excavating, grading, trenching, paving and surfacing work and cement and concrete works in connection with the above mentioned fixed works.
H.8 Permits
Contractor will need to obtain appropriate permits (referenced in Section J, List of Documents, Exhibits, and Other Attachments. See Attachment Number 4 thru 4d.
H.9 Warranty
Contractor will provide standard 1 year warranty on labor and parts. Contractor must be able to respond to warranty issue within 24 hours of being notified.
Shasta-Trinity National Forest
129AC720Q0026
PART II--CONTRACT CLAUSES
SECTION I--CONTRACT CLAUSES
I-1. FAR 52.252-2 Clauses Incorporated by Reference (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):
FAR: www.acquisition.gov/far AGAR: https://www.dm.usda.gov/procurement/policy/agar.html
52.204-7 System for Award Management (OCT 2018) 52.219-6 Notice of Total Small Business Set-Aside (NOV 2011) 52.222-3 Convict Labor (JUN 2003) 52.222-5 Construction Wage Rate Requirements—Secondary Site of the Work (MAY 2014) 52.222-6 Construction Wage Requirements (MAY 2014) 52.222-7 Withholding of Funds (MAY 2014) 52.222-8 Payrolls and Basic Records (AUG 2018) 52.222-9 Apprentices and Trainees (JUL 2005) 52.222-10 Compliance with Copeland Act Requirements (FEB 1988) 52.222-11 Subcontracts (Labor Standards) (MAY 2014) 52.222-12 Contract Termination - Debarment (MAY 2014) 52.222-13 Compliance with Davis-Bacon and Related Act Regulations (MAY 2014) 52.222-14 Disputes Concerning Labor Standards (FEB 1988) 52.222-15 Certification of Eligibility (MAY 2014) 52.222-20 Contracts for Materials, Supplies, Articles, and Equipment Exceeding $15,000 (MAY
2014) 52.222-21 Prohibition of Segregated Facilities (APR 2015) 52.222-26 Equal Opportunity (SEP 2016) 52.222-27 Affirmative Action Compliance Requirements for Construction (APR 2015) 52.222-36 Equal Opportunity for Workers with Disabilities (JUL 2014) 52.222-50 Combating Trafficking in Persons (JAN 2019) 52.222-55 Minimum Wages under Executive Order 13658 (DEC 2015)
52.223-6 Drug-Free Workplace (MAY 2001) (Applicable if contract is awarded to an individual) 52.223-15 Energy Efficient in Energy Consuming Products (Dec 2007) 52.225-13 Restrictions on Certain Foreign Purchases (JUN 2008) 52.227-4 Patent Indemnity -- Construction Contracts (DEC 2007) 52.232-5 Payments under Fixed-Price Construction Contracts (MAY 2014) 52.232-23 Assignment of Claims (MAY 2014) 52.232-27 Prompt Payment for Construction Contracts (OCT 2018) 52.232-33 Payment by Electronic Funds Transfer – System for Award Management (JUL 2013) 52.233-1 Disputes (MAY 2014) 52.233-3 Protest after Award (AUG 1996) 52.233-4 Applicable Law for Breach of Contract Claim (OCT 2004) 52.236-2 Differing Site Conditions (APR 1984) 52.236-3 Site Investigation and Conditions Affecting the Work (APR 1984) 52.236-5 Material and Workmanship (APR 1984) 52.236-7 Permits and Responsibilities (NOV 1991) 52.236-10 Operations and Storage Areas (APR 1984) 52.236-11 Use and Possession Prior to Completion (APR 1984) https://acquisition.gov/far/current/html/52_248_253.html#wp1120047 http://www.acquisition.gov/far https://www.dm.usda.gov/procurement/policy/agar.htm https://acquisition.gov/far/current/html/52_200_206.html#wp1137850 https://acquisition.gov/far/current/html/52_217_221.html#wp1136004 https://acquisition.gov/far/current/html/52_222.html#wp1147479 https://acquisition.gov/far/current/html/52_222.html#wp1150718 https://acquisition.gov/far/current/html/52_222.html#wp1147505 https://acquisition.gov/far/current/html/52_222.html#wp1147521 https://acquisition.gov/far/current/html/52_222.html#wp1147526 https://acquisition.gov/far/current/html/52_222.html#wp1147541 https://acquisition.gov/far/current/html/52_222.html#wp1147548 https://acquisition.gov/far/current/html/52_222.html#wp1147560 https://acquisition.gov/far/current/html/52_222.html#wp1147565 https://acquisition.gov/far/current/html/52_222.html#wp1147570 https://acquisition.gov/far/current/html/52_222.html#wp1147575 https://acquisition.gov/far/current/html/52_222.html#wp1147649 https://acquisition.gov/far/current/html/52_222.html#wp1147656 https://acquisition.gov/far/current/html/52_222.html#wp1147711 https://acquisition.gov/far/current/html/52_222.html#wp1147739 https://acquisition.gov/far/current/html/52_222.html#wp1162802 https://acquisition.gov/far/current/html/52_222.html#wp1151848 http://acquisition.gov/far/current/html/52_222.html#wp1163045 https://acquisition.gov/far/current/html/52_223_226.html#wp1168850 https://acquisition.gov/far/current/html/52_223_226.html#wp1169608 https://acquisition.gov/far/current/html/52_227.html#wp1139101 https://acquisition.gov/far/current/html/52_232.html#wp1152507 https://acquisition.gov/far/current/html/52_232.html#wp1152984 https://acquisition.gov/far/current/html/52_232.html#wp1153110 https://acquisition.gov/far/current/html/52_232.html#wp1153351 https://acquisition.gov/far/current/html/52_233_240.html#wp1113304 https://acquisition.gov/far/current/html/52_233_240.html#wp1113329 https://acquisition.gov/far/current/html/52_233_240.html#wp1113344 https://acquisition.gov/far/current/html/52_233_240.html#wp1113365 https://acquisition.gov/far/current/html/52_233_240.html#wp1113375 https://acquisition.gov/far/current/html/52_233_240.html#wp1113390 https://acquisition.gov/far/current/html/52_233_240.html#wp1113402 https://acquisition.gov/far/current/html/52_233_240.html#wp1113418 https://acquisition.gov/far/current/html/52_233_240.html#wp1113425
Shasta-Trinity National Forest
129AC720Q0026
52.236-12 Cleaning Up (APR 1984) 52.236-13 Accident Prevention (NOV 1991) 52.236-15 Schedules for Construction Contracts (APR 1984) 52.236-17 Layout of Work (APR 1984) 52.236-21 Specifications and Drawings for Construction (FEB 1997) 52.236-26 Preconstruction Conference (FEB 1995) 52.243-5 Changes and Changed Conditions (APR 1984) 52.244-6 Subcontracts for Commercial Items (AUG 2019) 52.246-21 Warranty of Construction (MAR 1994) 52.249-1 Termination for Convenience of the Government (Fixed-Price) (Short From) (APR 1984) 52.249-10 Default (Fixed-Price Construction) (APR 1984) 52.253-1 Computer Generated Forms (JAN 1991)
AGRICULTURE ACQUISITION REGULATION (48 CFR CHAPTER 4) CLAUSES
INCORPORATED BY REFERENCE
452.236-72 Use of Premises (NOV 1996) 452.236-73 Archeological or Historic Sites (FEB 1988) 452.236-76 Samples and Certificates (FEB 1988)
I.2 52.219-28 Post-Award Small Business Program Rerepresentation. (Jul 2013)
(a) Definitions. As used in this clause- Long-term contract means a contract of more than five years in duration, including options.
However, the term does not include contracts that exceed five years in duration because the period of performance has been extended for a cumulative period not to exceed six months under the clause at 52.217-8, Option to Extend Services, or other appropriate authority.
Small business concern means a concern, including its affiliates, that is independently owned and operated, not dominant in the field of operation in which it is bidding on Government contracts, and qualified as a small business under the criteria in 13 CFR part 121 and the size standard in paragraph (c) of this clause. Such a concern is “not dominant in its field of operation” when it does not exercise a controlling or major influence on a national basis in a kind of business activity in which a number of business concerns are primarily engaged. In determining whether dominance exists, consideration shall be given to all appropriate factors, including volume of business, number of employees, financial resources, competitive status or position, ownership or control of materials, processes, patents, license agreements, facilities, sales territory, and nature of business activity.
(b) If the Contractor represented that it was a small business concern prior to award of this contract, the Contractor shall rerepresent its size status according to paragraph (e) of this clause or, if applicable, paragraph (g) of this clause, upon the occurrence of any of the following:
(1) Within 30 days after execution of a novation agreement or within 30 days after modification of the contract to include this clause, if the novation agreement was executed prior to inclusion of this clause in the contract.
(2) Within 30 days after a merger or acquisition that does not require a novation or within 30 days after modification of the contract to include this clause, if the merger or acquisition occurred prior to inclusion of this clause in the contract.
(3) For long-term contracts-
(i) Within 60 to 120 days prior to the end of the fifth year of the contract; and
(ii) Within 60 to 120 days prior to the date specified in the contract for exercising any option thereafter.
(c) The Contractor shall rerepresent its size status in accordance with the size standard in effect at the time of this rerepresentation that corresponds to the North American Industry Classification System https://acquisition.gov/far/current/html/52_233_240.html#wp1113431 https://acquisition.gov/far/current/html/52_233_240.html#wp1113436 https://acquisition.gov/far/current/html/52_233_240.html#wp1113461 https://acquisition.gov/far/current/html/52_233_240.html#wp1113477 https://acquisition.gov/far/current/html/52_233_240.html#wp1113494 https://acquisition.gov/far/current/html/52_233_240.html#wp1113534 https://acquisition.gov/far/current/html/52_241_244.html#wp1129035 https://acquisition.gov/far/current/html/52_241_244.html#wp1129139 https://acquisition.gov/far/current/html/52_246.html#wp1119079 https://acquisition.gov/far/current/html/52_248_253.html#wp1119604 https://acquisition.gov/far/current/html/52_248_253.html#wp1119885 https://acquisition.gov/far/current/html/52_248_253.html#wp1120078 http://www.dm.usda.gov/procurement/policy/agar_x/agar04/subchaph.html#23672 http://www.dm.usda.gov/procurement/policy/agar_x/agar04/subchaph.html#23673 http://www.dm.usda.gov/procurement/policy/agar_x/agar04/subchaph.html#23676
Shasta-Trinity National Forest
129AC720Q0026
(NAICS) code assigned to this contract. The small business size standard corresponding to this NAICS code can be found at http://www.sba.gov/content/table-small-business-size-standards.
(d) The small business size standard for a Contractor providing a product which it does not manufacture itself, for a contract other than a construction or service contract, is 500 employees.
(e) Except as provided in paragraph (g) of this clause, the Contractor shall make the representation required by paragraph (b) of this clause by validating or updating all its representations in the Representations and Certifications section of the System for Award Management (SAM) and its other data in SAM, as necessary, to ensure that they reflect the Contractor's current status. The Contractor shall notify the contracting office in writing within the timeframes specified in paragraph (b) of this clause that the data have been validated or updated, and provide the date of the validation or update.
(f) If the Contractor represented that it was other than a small business concern prior to award of this contract, the Contractor may, but is not required to, take the actions required by paragraphs (e) or
(g) of this clause.
(g) If the Contractor does not have representations and certifications in SAM, or does not have a representation in SAM for the NAICS code applicable to this contract, the Contractor is required to complete the following rerepresentation and submit it to the contracting office, along with the contract number and the date on which the rerepresentation was completed:
The Contractor represents that it is, is not a small business concern under NAICS Code ______________ assigned to contract number ______________.
[Contractor to sign and date and insert authorized signer’s name and title].
I.3 FAR 52.222-23 Notice of Requirement For Affirmative Action to Ensure Equal Employment Opportunity for Construction (FEB 1999)
(a) The offeror's attention is called to the Equal Opportunity clause and the Affirmative Action Compliance Requirements for Construction clause of this solicitation.
(b) The goals for minority and female participation, expressed in percentage terms for the Contractor's aggregate workforce in each trade on all construction work in the covered are, are as follows:
Goals for minority participation for each trade: 6.8% Goals for female participation for each trade: 6.9%
These goals are applicable to all the Contractor's construction work performed in the covered area. If the Contractor performs construction work in a geographical area located outside of the covered area, the Contractor shall apply the goals established for the geographical area where the work is actually performed. Goals are published periodically in the Federal Register in notice form, and these notices may be obtained from any Office of Federal Contract Compliance Programs office.
(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1) its implementation of the Equal Opportunity clause, (2) specific affirmative actions obligations required by the clause entitled "Affirmative Action Compliance Requirements for Construction," and (3) its efforts to meet the goals. The hours of minority and female employment and training must be substantially uniform throughout the length of the contract, and in each trade. The Contractor shall make a good faith effort to employ minorities and women evenly on each of its projects. The transfer of minority or female employees or trainees from Contractor to Contractor, or from project to project, for the sole purpose of meeting the Contractor's goals shall be a violation of the contract, Executive Order 11246, as amended, and the regulations in 41 CFR 60-4.
Compliance with the goals will be measured against the total work hours performed.
http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://acquisition.gov/far/current/html/52_222.html#wp1147671
Shasta-Trinity National Forest
129AC720Q0026
(d) The Contractor shall provide written notification to the Deputy Assistant Secretary for Federal Contract Compliance, U. S. Department of Labor, within 10 working days following award of any construction subcontract in excess of $10,000 at any tier for construction work under the contract resulting from this solicitation. The notification shall list the--
(1) Name, address, and telephone number of the subcontractor;
(2) Employer's identification number of the subcontractor;
(3) Estimated dollar amount of the subcontract;
(4) Estimated starting and completion dates of the subcontract; and
(5) Geographical area in which the subcontract is to be performed.
(e) As used in this Notice, and in any contract resulting from this solicitation, the "covered area" is Shasta County, California.
I.4 FAR 52.223-2 Affirmative Procurement of Biobased Products under Service and Construction Contracts (SEP 2013)
(a) In the performance of this contract, the contractor shall make maximum use of biobased products that are United States Department of Agriculture (USDA)-designated items unless—
(1) The product cannot be acquired—
(i) Competitively within a time frame providing for compliance with the contract performance schedule;
(ii) Meeting contract performance requirements; or
(iii) At a reasonable price.
(2) The product is to be used in an application covered by a USDA categorical exemption (see 7 CFR 3201.3(e)). For example, all USDA-designated items are exempt from the preferred procurement requirement for the following:
(i) Spacecraft system and launch support equipment.
(ii) Military equipment, i.e., a product or system designed or procured for combat or combat-related missions.
(b) Information about this requirement and these products is available at http://www.biopreferred.gov.
(c) In the performance of this contract, the Contractor shall—
(1) Report to http://www.sam.gov, with a copy to the Contracting Officer, on the product types and dollar value of any USDA-designated biobased products purchased by the Contractor during the previous Government fiscal year, between October 1 and September 30; and
(2) Submit this report no later than—
(i) October 31 of each year during contract performance; and
(ii) At the end of contract performance.
I.5 FAR 52.223-17 Affirmative Procurement of EPA-Designated Items in Service and Construction Contracts (AUG 2018)
(a) In the performance of this contract, the Contractor shall make maximum use of products containing recovered materials that are EPA-designated items unless the product cannot be acquired—
(1) Competitively within a timeframe providing for compliance with the contract performance schedule; (2) Meeting contract performance requirements; or
(3) At a reasonable price.
(b) Information about this requirement is available at EPA’s Comprehensive Procurement Guidelines web site, http://https://www.epa.gov/smm/comprehensive-procurement-guideline-cpg-https://acquisition.gov/far/current/html/52_223_226.html#wp1168786 http://www.biopreferred.gov/ http://www.sam.gov/ http://acquisition.gov/far/current/html/52_223_226.html#wp1181056 https://www.epa.gov/smm/comprehensive-procurement-guideline-cpg-program
Shasta-Trinity National Forest
129AC720Q0026
program. The list of EPA-designated items is available at http://https://www.epa.gov/smm/comprehensive-procurement-guideline-cpg-program.
I.6 FAR 52.225-9 Buy American - Construction Materials (MAY 2014)
(a) Definitions. As used in this clause— “Commercially available off-the-shelf (COTS) item”—
(1) Means any item of supply (including construction material) that is—
(i) A commercial item (as defined in paragraph (1) of the definition at FAR 2.101);
(ii) Sold in substantial quantities in the commercial marketplace; and
(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and
(2) Does not include bulk cargo, as defined in 46 U.S.C. 40102(4), such as agricultural products and petroleum products.
“Component” means an article, material, or supply incorporated directly into a construction material.
“Construction material” means an article, material, or supply brought to the construction site by the
Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site. Materials purchased directly by the Government are supplies, not construction material.
“Cost of components” means—
(3) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the construction material (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or
(4) For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as described in paragraph (1) of this definition, plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the construction material.
“Domestic construction material” means—
(1) An unmanufactured construction material mined or produced in the United States;
(2) A construction material manufactured in the United States, if—
(i) The cost of its components mined, produced, or manufactured in the United States exceeds 50 percent of the cost of all its components. Components of foreign origin of the same class or kind for which nonavailability determinations have been made are treated as domestic; or
(ii) The construction material is a COTS item.
“Foreign construction material” means a construction material other than a domestic construction material.
“United States” means the 50 States, the District of Columbia, and outlying areas.
(b) Domestic preference.
(1) This clause implements 41 U.S.C. chapter 83, Buy American, by providing a preference for domestic construction material. In accordance with 41 U.S.C. 1907, the component test of the Buy American statute is waived for construction material that is a COTS item. (See FAR 12.505(a)(2)). The Contractor shall use only domestic construction material in performing this contract, except as provided in paragraphs (b)(2) and (b)(3) of this clause.
(2) This requirement does not apply to information technology that is a commercial item or to the construction…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .