12-94TZ-18-Q-0079 Water System Improvements

View the file

Other files for this federal contract opportunity

Other files attached to Water System Improvements, newest first.
File Type Posted
Wage_Determination.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1294TZ18Q0079

1. REQUEST NO.

5a. ISSUED BY

NAME

a. NAME

c. STREET ADDRESS

d. CITY

10. PLEASE FURNISH QUOTATIONS TO

THE ISSUING OFFICE IN BLOCK 5a ON

OR BEFORE CLOSE OF BUSINESS (Date)

2. DATE ISSUED 3. REQUISITION/PURCHASE REQUEST NO. 4. CERT. FOR NAT. DEF.

UNDER BDSA REG. 2

AND/OR DMS REG.1

RATING

7. DELIVERY

9. DESTINATION

a. NAME OF CONSIGNEE

b. STREET ADDRESS

PAGE OF PAGES

5b. FOR INFORMATION CALL: (No collect calls)

TELEPHONE NUMBER

AREA CODE NUMBER

8. TO:

b. COMPANY

e. STATE f. ZIP CODE

c. CITY

d. STATE e. ZIP CODE

IMPORTANT: This is a request for information, and quotations furnished are not offers. If you are unable to quote, please so indicate on this form and return it to the address in Block 5a. This request does not commit the Government to pay any costs incurred in the preparation of the submission of this quotation or to contract for supplies or services. Supplies are of domestic origin unless otherwise indicated by quoter. Any representations and/or certifications attached to this Request for Quotations must be completed by the quoter.

11. SCHEDULE (Include applicable Federal, State and local taxes)

THIS RFQ

REQUEST FOR QUOTATION

(THIS IS NOT AN ORDER)

IS IS NOT A SMALL BUSINESS SET ASIDEX

917075

1 1

6. DELIVERY BY (Date)

60 Days After Notice to Proceed

USDA FOREST SERVICE

COCONINO NATIONAL FOREST SO

1824 S THOMPSON ST

FLAGSTAFF

AZ 86004

602 225.5350DAVID WATSON

1700 ET

FOB DESTINATION

OTHER

(See Schedule)X

ITEM NO.

(a)

SUPPLIES/SERVICES

(b)

QUANTITY

(c)

UNIT

(d)

UNIT PRICE

(e)

AMOUNT

(f)

Water System Compliance Improvements

001 Water System Compliance Improvements at Blue 56000 EA Ridge Ranger Station and Happy Jack Work Center.

Delivery: 60 Days After Notice to Proceed

12. DISCOUNT FOR PROMPT PAYMENT

a. 10 CALENDAR DAYS (%) b. 20 CALENDAR DAYS (%) c. 30 CALENDAR DAYS (%) d. CALENDAR DAYS

NUMBER PERCENTAGE

NOTE: Additional provisions and representations

13. NAME AND ADDRESS OF QUOTER

b. STREET ADDRESS

c. COUNTY

d. CITY e. STATE f. ZIP CODE

14. SIGNATURE OF PERSON AUTHORIZED TO

SIGN QUOTATION

16. SIGNER

a. NAME (Type or print)

c. TITLE (Type or print)

a. NAME OF QUOTER

AREA CODE

NUMBER

15. DATE OF QUOTATION

b. TELEPHONE are are not attached

AUTHORIZED FOR LOCAL REPRODUCTION

Previous edition not usable

STANDARD FORM 18 (REV. 6-95)

Prescribed by GSA - FAR (48 CFR) 53.215-1(a)

B - Prices/Costs Schedule of Items Clauses

C - Description/Specifications/Statement of Work Clauses

E - Inspection and Acceptance Clauses

F - Deliveries or Performance Clauses

I - Contract Clauses Clauses

J - List of Documents, Exhibits, and Other Attachments List of Documents, Exhibits, and Other Attachments Clauses

K - Representations, Certifications, and Other Statementsof Offerors or Respondents Clauses

L - Instructions, Conditions, and Notices to Offerors or Respondents Clauses

B - Prices/Costs Schedule of Items

Clauses

C - Description/Specifications/Statement of Work

Clauses

E - Inspection and Acceptance

Clauses

52.246-12 Inspection of Construction. (AUG 1996)

F - Deliveries or Performance

Clauses

52.242-14 Suspension of Work. (APR 1984)

I - Contract Clauses

Clauses

52.204-7 System for Award Management. (OCT 2016)

52.209-6 Protecting the Government's Interest When Subcontracting With Contractors Debarred, Suspended, or Proposed for Debarment. (OCT 2015)

52.211-6 Brand Name or Equal (Aug 1999)

52.211-18 Variation in Estimated Quantity. (APR 1984)

52.219-27 Notice of Service-Disabled Veteran-Owned Small Business Set-Aside. (NOV 2011)

52.222-3 Convict Labor. (JUN 2003)

52.222-6 Construction Wage Rate Requirements. (MAY 2014)

52.222-7 Withholding of Funds. (MAY 2014)

52.222-8 Payrolls and Basic Records. (MAY 2014)

52.222-9 Apprentices and Trainees. (JUL 2005)

52.222-10 Compliance With Copeland Act Requirements. (FEB 1988)

52.222-11 Subcontracts (Labor Standards). (MAY 2014)

52.222-12 Contract Termination - Debarment. (MAY 2014)

52.222-13 Compliance With Construction Wage Rate Requirements and Related Regulations. (MAY 2014)

52.222-14 Disputes Concerning Labor Standards. (FEB 1988)

52.222-15 Certification of Eligibility. (MAY 2014)

52.222-21 Prohibition of segregated facilities. (APR 2015)

52.222-26 Equal Opportunity. (SEP 2016)

52.222-27 Affirmative Action Compliance Requirements for Construction. (APR 2015)

52.222-35 Equal Opportunity for Veterans. (OCT 2015)

52.222-36 Equal Opportunity for Workers with Disabilities. (JUL 2014)

52.222-37 Employment Reports on Veterans. (FEB 2016)

52.223-6 Drug-Free Workplace. (MAY 2001)

52.224-1 Privacy Act Notification. (APR 1984)

52.224-2 Privacy Act. (APR 1984)

52.225-13 Restrictions on Certain Foreign Purchases. (JUN 2008)

52.228-14 Irrevocable Letter of Credit. (NOV 2014)

52.228-15 -- Performance and Payment Bonds -- Construction

52.232-5 Payments Under Fixed-Price Construction Contracts. (MAY 2014)

52.232-27 Prompt Payment for Construction Contracts. (JAN 2017)

52.232-33 Payment by Electronic Funds Transfer - System for Award Management. (JUL 2013)

52.233-1 Disputes. (MAY 2014)

52.233-3 Protest After Award. (AUG 1996)

52.236-2 Differing Site Conditions. (APR 1984)

52.236-3 Site Investigation and Conditions Affecting the Work. (APR 1984)

52.236-5 Material and Workmanship. (APR 1984)

52.236-6 Superintendence by the Contractor. (APR 1984)

52.236-7 Permits and Responsibilities. (NOV 1991)

52.236-8 Other Contracts. (APR 1984)

52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements.

(APR 1984)

52.236-10 Operations and Storage Areas. (APR 1984)

52.236-11 Use and Possession Prior to Completion. (APR 1984)

52.236-12 Cleaning Up. (APR 1984)

52.236-13 Accident Prevention. (NOV 1991)

52.236-15 Schedules for Construction Contracts. (APR 1984)

52.236-21 Specifications and Drawings for Construction. (FEB 1997)

52.236-26 Preconstruction Conference. (FEB 1995)

52.243-5 Changes and Changed Conditions. (APR 1984)

52.244-6 Subcontracts for Commercial Items. (NOV 2017)

(a) Definitions. As used in this clause-

Commercial item and commercially available off-the-shelf item have the meanings contained in Federal Acquisition Regulation 2.101, Definitions.

Subcontract includes a transfer of commercial items between divisions, subsidiaries, or affiliates of the Contractor or subcontractor at any tier.

(b) To the maximum extent practicable, the Contractor shall incorporate, and require its subcontractors at all tiers to incorporate, commercial items or nondevelopmental items as components of items to be supplied under this contract.

(c)(1) The Contractor shall insert the following clauses in subcontracts for commercial items:

(i) 52.203-13, Contractor Code of Business Ethics and Conduct (OCT 2015) (41 U.S.C. 3509), if the subcontract exceeds $5.5 million and has a performance period of more than 120 days. In altering this clause to identify the appropriate parties, all disclosures of violation of the civil False Claims Act or of Federal criminal law shall be directed to the agency Office of the Inspector General, with a copy to the Contracting Officer.

(ii) 52.203-15, Whistleblower Protections Under the American Recovery and Reinvestment Act of 2009 (JUN 2010) (Section 1553 of Pub. L. 111-5), if the subcontract is funded under the Recovery Act.

(iii) 52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (JAN 2017).

(iv) 52.219-8, Utilization of Small Business Concerns (NOV 2016) (15 U.S.C.

637(d)(2) and (3)), if the subcontract offers further subcontracting opportunities.

(v) 52.219-8, Utilization of Small Business Concerns (OCT 2014) (15 U.S.C.

637(d)(2) and (3)), if the subcontract offers further subcontracting opportunities.

If the subcontract (except subcontracts to small business concerns) exceeds $700,000 ($1.5 million for construction of any public facility), the subcontractor must include 52.219-8 in lower tier subcontracts that offer subcontracting opportunities.

(vi) 52.222-21, Prohibition of Segregated Facilities (APR 2015).

(vii) 52.222-26, Equal Opportunity (SEP 2016) (E.O. 11246).

(viii) 52.222-35, Equal Opportunity for Veterans (OCT 2015)(38 U.S.C.

4212(a));

(ix) 52.222-36, Equal Opportunity for Workers with Disabilities (JUL 2014) (29 U.S.C. 793).

(x) 52.222-37, Employment Reports on Veterans (FEB 2016) (38 U.S.C. 4212).

(xi) 52.222-40, Notification of Employee Rights Under the National Labor Relations Act (DEC 2010) (E.O. 13496), if flow down is required in accordance with paragraph (f) of FAR clause 52.222-40.

(xii)(A) 52.222-50, Combating Trafficking in Persons (MAR 2015) (22 U.S.C.

chapter 78 and E.O. 13627).

(B) Alternate I (MAR 2015) of 52.222-50 (22 U.S.C. chapter 78 and E.O. 13627).

(xiii) 52.222-55, Minimum Wages under Executive Order 13658 (DEC 2015), if flowdown is required in accordance with paragraph (k) of FAR clause 52.222- 55.

(xiv)(A) 52.224-3, Privacy Training (JAN 2017) (5 U.S.C. 552a) if flow down is required in accordance with 52.224-3(f).

(B) Alternate I (JAN 2017) of 52.224-3, if flow down is required in accordance with 52.224-3(f) and the agency specifies that only its agency-provided training is acceptable).

(xv) 52.222-62, Paid Sick Leave Under Executive Order 13706 (JAN 2017) (E.O. 13706), if flowdown is required in accordance with paragraph (m) of FAR clause 52.222-62.

(xvi) 52.225-26, Contractors Performing Private Security Functions Outside the United States (Oct 2016) (Section 862, as amended, of the National Defense Authorization Act for Fiscal Year 2008; 10 U.S.C. 2302 Note).

(xvii) 52.232-40, Providing Accelerated Payments to Small Business Subcontractors (DEC 2013), if flow down is required in accordance with paragraph (c) of FAR clause 52.232-40.

(xviii) 52.247-64, Preference for Privately Owned U.S.-Flag Commercial Vessels (FEB 2006) (46 U.S.C. App. 1241 and 10 U.S.C. 2631), if flow down is required in accordance with paragraph (d) of FAR clause 52.247-64.

(2) While not required, the Contractor may flow down to subcontracts for commercial items a minimal number of additional clauses necessary to satisfy its contractual obligations.

(d) The Contractor shall include the terms of this clause, including this paragraph (d), in subcontracts awarded under this contract.

(End of clause)

52.246-21 Warranty of Construction. (APR 1984)

52.249-1 Termination for Convenience of the Government (Fixed-Price) (Short Form). (APR 1984)

52.249-10 Default (Fixed-Price Construction). (APR 1984)

452.232-70 Reimbursement for Bond Premiums - Fixed-Price Construction Contracts. (NOV 1996)

452.236-70 Additive or Deductive Items. (FEB 1988)

452.236-74 Control of Erosion, Sedimentation, and Pollution. (NOV 1996)

J - List of Documents, Exhibits, and Other Attachments

List of Documents, Exhibits, and Other Attachments

Attachment Number Title Date

Clauses

K - Representations, Certifications, and Other Statementsof Offerors or Respondents

Clauses

L - Instructions, Conditions, and Notices to Offerors or Respondents

Clauses

452.204-70 Inquiries. (FEB 1988)

FAR 52.212-1 Instructions to Offerors -- Commercial Items (Jan 2017)

FAR 52.212-2 Evaluation -- Commercial Items (Oct 2014)

(a) The Government will award a contract resulting from this solicitation to the responsible offeror whose offer conforming to the solicitation will be most advantageous to the Government, price and other factors considered.

The following factors shall be used to evaluate offers:

Technical Past Performance

(c) A written notice of award or acceptance of an offer, mailed or otherwise furnished to the successful offeror within the time for acceptance specified in the offer, shall result in a binding contract without further action by either party. Before the offer’s specified expiration time, the Government may accept an offer (or part of an offer), whether or not there are negotiations after its receipt, unless a written notice of withdrawal is received before award.

FAR 52.252-1 Solicitation Provisions Incorporated by Reference (FEB 1998) This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):

https://www.acquisition.gov/?q=browsefar

SECTION M--EVALUATION FACTORS FOR AWARD

A contract will be awarded to the lowest-priced technically acceptable offeror. Quotes will be evaluated for acceptability but will not be ranked using the non-cost/price factors. In order to be eligible for award, offerors must receive a rating of “acceptable” in every non-price factor. In the interest of economy and efficiency, the Government will start by evaluating the technical quote of the lowest-priced offeror and will award to that offeror if the technical quote is rated “technically acceptable”. If the lowest offeror receives a rating of “unacceptable” in any of the non-cost factors, the Government will then move on to evaluating the technical quote of the next lowest offeror and so on until a quote is rated “technically acceptable”. Therefore, the technical quote of the non-low price offerors may or may not be evaluated. The following factors will be used to determine technical acceptability:

Factor #1 – Technical Capability Technical Capability Offerors are instructed to provide information on key personnel to be used in the performance of this contract and demonstrate capability to perform janitorial services, including hiring practices, subcontracting, and the offerors plan for quality control.

Factor#2 -Past Performance Recency and relevancy of present/past performance in relation to this effort - In order to receive a rating of “acceptable” for this sub-factor, offeror must, at a minimum provide past experience on similar type contract(s). The past experience should indicate successes of the contractor in completing/meeting performance schedules and customer satisfaction. The Government considers “recent” present/past performance to be within the past 3 years. The Government considers “relevant” present/past performance to be present/past performance effort involved in similar scope and magnitude of effort and complexities this solicitation requires. The Government may also use past performance information obtained from other than the sources identified by the offeror. Information obtained from the Past Performance Information Retrieval System (PPIRS) database located at http//www.ppirs.gov is one of the sources that will be utilized. PPIRS functions as the central warehouse for performance assessment reports received from several Federal performance information collection systems and is sponsored by the DOD E-Business Office and administered by the Naval Sea Logistics Center Detachment Portsmouth.

NOTE: In accordance with FAR 15.305 (a)(2)(iv)), in the case of an offeror without a record of relevant past performance or for whom information on past performance is not available or so sparse that no meaningful past performance rating can be reasonably assigned, the offeror shall be determined to have unknown past performance. In the context of acceptability/ unacceptability, “unknown” will be considered “acceptable.” PRICE: Award will be made to the lowest priced offeror that is evaluated as “acceptable” for all non-price factors.

SITE VISIT: A site visit shall be scheduled with Tina Williams, Phone: (928) 527-3577. Contractors are strongly encouraged to visit the site prior to submitting quotes.

OFFERS ARE DUE BY: August 20, 2018, at 14:00 PM AZT. Please e-mail your quotation to David Watson davidwatson2@fs.fed.us.

Estimated price range is $25,000.00 to $100,000.00.

The Government intends to award a firm-fixed price task order.

016010(01) MOBILIZATION LSQ LS 1

033000(01) WELL SLAB- HAPPY JACK WELL #2 LSQ LS 1

22070(01) 10 MIL TAPE WELL CASING WRAP - HAPPY

JACK LSQ LS 1

22070(02) HATCH GASKET, VENT SCREEN AND

OVERFLOW SCREEN ON TANK - BLUE RIDGE LSQ LS 1

221113(01) GATE VALVE REPLACEMENT - BLUE RIDGE LSQ LS 1

221119(01) BACKFLOW PREVENTER - BLUE RIDGE LSQ LS 1

221119(02) AIR GAP - HAPPY JACK LSQ LS 1

221119(03) POST HYDRANT - HAPPY JACK LSQ LS 1

22112(01) CHLORINATOR REPLACEMENT - BLUE RIDGE LSQ LS 1

22112(02) CHLORINATOR REPLACEMENT - HAPPY JACK LSQ LS 1

32311(01) CHAIN LINK FENCE - HAPPY JACK LSQ LS 1

33210(01) PITLESS ADAPTER - HAPPY JACK LSQ LS 1

33210(02) WELL CASING CAP - HAPPY JACK LSQ LS 1

TOTAL AMOUNT = -$

BASE BID RECONSTRUCTION/ENVIRONMENTAL WORK = -$

TOTAL = -$

UNIT COST AMOUNT

BASE BID - WATER SYSTEM IMPROVEMENTS

BLUE RIDGE RANGER STATION AND HAPPY JACK ADMIN SITE

Schedule of Items

WATER SYSTEM IMPROVEMENTS

Mogollon Rim Ranger District, Coconino National Forest Blue Ridge Ranger Station and Happy Jack Admin Site

TASK DESCRIPTION MEAS UNIT QTY

DOCUMENT 000101 - PROJECT TITLE PAGE

A. Blue Ridge Ranger Station and Happy Jack Work Center Water System Improvements

B. Coconino National Forest.

C. Flagstaff AZ, 86001.

D. Phone: 928-527-3577.

DOCUMENT 000101 - PROJECT TITLE PAGE

SECTION 011000 - SUMMARY

SECTION 011030 - MEASUREMENT AND PAYMENT

SECTION 013000 - SUBMITTALS

SECTION 016010 – MOBILIZATION

SECTION 017000 - EXECUTION AND CLOSEOUT REQUIREMENTS

SECTION 024119 - SELECTIVE DEMOLITION

SECTION 033000 - CAST-IN-PLACE CONCRETE

SECTION 220700 - PLUMBING INSULATION

SECTION 221113 - FACILITY WATER DISTRIBUTION PIPING

SECTION 221119 - DOMESTIC WATER PIPING SPECIALTIES

SECTION 221123 - DOMESTIC WATER PUMPS

SECTION 323113 - CHAIN LINK FENCES AND GATES

SECTION 332100 - WATER SUPPLY WELLS

END OF DOCUMENT 000101

SECTION 011000 - SUMMARY

PART 1 - GENERAL

1.1 PROJECT INFORMATION

A. Project Identification: Blue Ridge Ranger Station and Happy Jack Work Center Sanitary Survey Corrective Actions.

1. Project Location:

a. To reach Blue Ridge Ranger Station from Flagstaff, proceed south on Coconino County Road 3 for approximately 53 miles to the intersection of State Route 87.

Turn left and proceed approximately 8 miles to the Ranger Station, which is on the south side of the road. Driving time from Flagstaff is approximately 1 hour and 30 minutes. Coordinates for the Blue Ridge Rim Ranger Station are N34.609543 W- 111.187511, and elevation is approximately 6,895 feet.

b. To reach Happy Jack WC from Flagstaff, AZ, proceed south on Coconino County Road 3 for approximately 40 miles to the work center. Driving time from Flagstaff is approximately 45 minutes. Coordinates for the Happy Jack Work Center are N34.742570 W-111.411573, and elevation is approximately 7,515 feet.

B. The Work consists of the follow for Blue Ridge Ranger Station and Happy Jack Work Center:

1. Blue Ridge Ranger Station:

a. Replace backflow preventer on tank fill-up with portable backflow preventer.

b. Replace pellet chlorinator with liquid chlorinator system with peristaltic pump.

c. Replace tank fill-up shutoff 4” valve

d. Replace air vent screen, overflow screen and gasket on hatch on top of tank.

2. Happy Jack Admin

a. Remove two pellet chlorinators and replace with one liquid chlorinator system with peristaltic pump.

b. Remove existing pump house around well #2.

c. Replace well cap with one that includes air vent on well #2 with #16 non-corrodible mesh screen.

d. Install pitless adapter 3’ below grade on well #2 and connect to existing line with

PVC.

e. Install air vent on well #1 with #16 non-corrodible mesh screen.

f. Install 10 mill tape around well #1 casing inside well house.

g. Install air gap on Tanker fill.

h. Install 6’ chain-link fence with lockable gate around well #2.

I. Replace concrete slab around well #2.

C. Site Pictures:

Blue Ridge Water Tank

Blue Ridge Tank Overflow Screen

Blue Ridge Backflow Preventer

Happy Jack Well #2 House and Slab

Happy Jack Well #1 House

1.2 WORK RESTRICTIONS

A. Contractor's Use of Premises: During construction, Contractor will have limited use of site indicated. Contractor's use of premises is limited only by Owner's right to perform work or employ other contractors on portions of Project and as follows:

1. Driveways, Walkways, and Entrances: Keep driveways, parking garage, loading areas, and entrances serving premises clear and available to Owner, Owner's employees, and emergency vehicles at all times. Do not use these areas for parking or storage of materials.

B. On-Site Work Hours: Limit work in the existing building to normal business working hours of 7 a.m. to 5 p.m., Monday through Friday, unless otherwise indicated.

1. Weekend Hours: When approved by COR.

C. Nonsmoking Building: Smoking is not permitted within the building or within 25 feet (8 m) of entrances, operable windows, or outdoor-air intakes.

D. Contractor shall at all times conduct his operations to ensure the least inconvenience to the public and employees.

E. Confine storage of materials to areas as approved by the COR.

F. Contractor shall provide adequate signing and barricades and take necessary safety measures to protect the public during all construction operations. Contractor shall minimize disturbance of all undisturbed areas.

G. Preservation of Natural Features: Confines all operations to work limits of the project. Prevent damage to natural surroundings. Restore damaged areas, repairing or replacing damaged trees and plants, at no additional expense to the Government.

1. Provide temporary barriers to protect existing trees and plants and root zones.

2. Do not remove, injure, or destroy trees or other plants without prior approval. Consult with

COR and remove agreed-on roots and branches that interfere with construction.

3. Do not fasten ropes, cables, or guys to existing trees.

4. Carefully supervise excavating, grading, filling, and other construction operations near trees to prevent damage.

H. Existing Utilities:

1. There are existing utilities that might need to be disconnected from the building prior to the removal and disposal of building components. This should be coordinated with the forest service and employees.

2. There is electricity available at this site. Contractor is responsible for providing their own connection to source of power.

3. There is water available at the sites.

4. There is sanitary services available at this site.

5. The Contractor shall ensure the safety of the employees at all times and shall provide adequate warnings of environmental and safety hazards.

1.3 Field verification

A. Bidders are encouraged to visit the sites, compare the specifications with any work in place, and inform themselves of all conditions, including other work, if any, being performed. Failure to visit sites will in no way relieve the successful bidder from the necessity of furnishing any materials or performing any work that may be required to complete work in accordance with specifications, without additional cost to the Government.

B. Information regarding the sites of the work provided in specifications is believed to be reasonably correct, but the Government does not warrant either the completeness or accuracy of such information, and it is the responsibility of the contractor to verify all information independently and to make other examinations of the conditions to be encountered during construction.

C. The contractor acknowledges that he/she has investigated and satisfied himself/herself as to the conditions affecting the work, including, but not restricted to, those bearing upon transportation, disposal, handling and storage of materials, availability of labor, water, electric power, roads, and conditions of the ground, the character of equipment and facilities needed prior to and during prosecution of the work. The contractor further acknowledges that he/she is satisfied as to the character, quality, and quantity of surface and subsurface materials or obstacles to be encountered insofar as this information is reasonably ascertainable from as inspection of the sites. Any failure by the contractor to acquaint himself/herself with the available information will not relieve him/her from the responsibility for estimating properly the difficulty or cost of successfully performing the work.

1.4 Precautionary Measures

A. Protection of Work: The Contractor shall take precautions to protect all work during the construction period. The Contractor shall provide and maintain adequate protection during severe weather conditions to prevent damage to the work, materials, and equipment. The existing elements of the buildings shall remain undamaged and structurally sound during all phases of this contract. Any damage to the buildings or their functional elements resulting from the Contractor’s work at the sites shall be immediately repaired at no additional cost to the Government.

B. Safety: The Contractor is responsible for safeguarding employees, public, existing facilities, and forest resources from his/her operations. All operations shall comply with the requirements and restrictions of OSHA, the Arizona Occupational Safety and Health Code, and the Workman’s Compensation Board. The Contractor shall erect signs and barricades to make unguarded operations safe as required. Signs and barricades shall be maintained at night and on weekends.

Precautions such as safely storing materials shall be practiced to prevent injury to others in the area.

C. Security: Security is not provided by the Government. The Contractor shall take all precautions deemed necessary to secure the worksites, improvements and equipment. This may include security fencing at the Contractor’s discretion.

1.5 Material Sources

A. All materials shall be obtained from commercial sources unless noted otherwise. Materials referred to by trade name, make, or catalog number shall be regarded as establishing a standard of quality; substitutions of equal quality can be made by submitting a data sheet of the proposed substituted item to the Contracting Officer’s Representative, for approval.

1.6 Clean up and Disposal – Non-Hazardous Waste

A. Waste accumulation in approved containers and material staging is allowed at the site. Disposal of waste material will be off National Forest Land and in compliance with local, state, and federal laws regarding disposal of construction waste. Before final acceptance of the project by the Government, the Contractor shall remove from Government land all waste materials and rubbish resulting from this work.

1.7 Applicable Codes and Standards

A. All work shall conform to the latest editions of the International Building Code, American Welding Society Code, American Water Works Association, National Electrical Code, NSF, and the American Institute of Steel Construction. All environmental codes, including RCRA and NESHAP, shall be adhered by the Contractor.

1.8 Special permits

A. For electrical work or any other permits required by County, State, or Federal laws or regulations shall be obtained by the Contractor.

PART 2 - PRODUCTS (Not Used)

PART 3 - EXECUTION (Not Used)

END OF SECTION 011000

SECTION 011030 - MEASUREMENT AND PAYMENT

PART 1 - GENERAL

1.1 Requirements

A. Measurement and payment for contract work will be made only for and under those pay items included in the SCHEDULE OF ITEMS. All other work and materials will be considered incidental to and included in the payment of the pay items in the SCHEDULE OF ITEMS.

1.2 Payment

A. One of the following methods of measurement for determining final payment is DESIGNATED on the SCHEDULE OF ITEMS for each pay item.

B. Contractor shall be paid for by the lump sum for all work once it has been accepted by the C.O.

C. Lump Sum Quantities (LSQ). These quantities denote one complete unit of work as required by or described in the contract, including necessary materials, equipment, and labor to complete the job. They will not be measured.

1.3 UNITS OF MEASUREMENTS

A. Payment will be by units defined and determined according to U.S. Standard measure.

END OF SECTION 011030

SECTION 013000 - SUBMITTALS

PART 1 - GENERAL

1.1 REQUIREMENTS

A. It will be the Contractor's responsibility to submit all items with such promptness as to cause no delay in the work. Approvals must be obtained before starting work which involves the item.

Contractor shall allow ten (10) days for processing of submittals by the Government.

B. Submittals may also be referred to as Shop Drawings.

1.2 MANUFACTURER’S LITERATURE AND SHOP DRAWINGS

A. Submit one copy to the Contracting Officer’s Representative for approval on the items required herein.

B. Submittal specifications are to be submitted in the following format:

1. The specifications and salient qualities of the item specified in the contract.

2. The specifications and salient qualities of the submittal item.

3. A listing of the differences and a comparison between the two, including but not limited to the structural qualities, operational qualities, any modifications necessary to accomplish installation of unit, and guarantee and warranty.

4. A cost comparison between the specified and submitted item(s) with the cost reduction benefit to the Government or adequate justification for a cost increase to the Government.

5. Shop drawings of submitted item(s) including wiring or layout diagrams.

C. If there are any modifications necessary to facilitate installation, a set of drawings showing installation of specified item and a set showing how the submittal item will be installed.

D. Submittals will be waived if Contractor furnishes exact item used for design when manufacturer's model, size, etc. are shown in the contract.

E. Submittals are required per the following sections:

1. 033000 – Cast-In-Place Concrete Product Data Concrete Mix Design

2. 220700 – Plumbing Insulation Product Data

3. 221113 – Facility Water Distribution Product Data

4. 221119 – Domestic Water Piping Specialties Product Data

5. 221123 – Domestic Water Pumps Product Data

6. 323113 – Chain Link Fences and Gates Product Data

7. 332100 – Water Supply Wells Product Data

END OF SECTION 013000

SECTION 016010 – MOBILIZATION

1.1 DESCRIPTION

A. The work specified herein includes all preparatory work and operations necessary for the movement of personnel, equipment, supplies, and incidentals to the project site, and for all other work and operations that must be performed or that cause costs to be incurred prior to beginning work on the various items on the project site.

PART 2 - PRODUCTS (Not Used)

PART 3 - EXECUTION (Not Used)

PART 4 – MEASUREMENTS AND PAYMENT

4.1 Progress payments will be made as follows:

A. The Contractor can request payment for performance and payment bonds. The amount of the premium, including coinsurance and reinsurance agreements, will be paid upon receipt of evidence of full payment to the surety. When separate payment for bonding cost is made, the bonding cost will be subtracted from the total contract amount for this pay item and the balance paid in accordance with the progress payment schedule outlined below.

1. When 5 percent or more of the original contract amount is earned from other pay items, 50 percent of the amount for mobilization, or 5 percent of the original contract amount, whichever is less, will be paid.

2. When 10 percent or more of the original contract amount is earned from other pay items, 100 percent of the amount for mobilization, or 10 percent of the original contract amount, whichever is less, will be paid.

3. Upon completion of all work on the project, any unpaid amount for mobilization will be paid.

B. Any bonding costs in excess of the total contract amount of this pay item will be paid under one or more other pay items under this contract as determined by the Contracting Officer. In no circumstance will the total amount of this contract be increased as a result of bonding costs exceeding the total contract amount of this pay item.

C. The total of all payments shall not exceed the original contract amount for this item.

4.2 Payment

A. Payment will be made under:

PAY ITEM DESCRIPTION PAY UNIT

016010(01) Mobilization LS

END OF SECTION 016010

SECTION 017000 - EXECUTION AND CLOSEOUT REQUIREMENTS

1.1 EXECUTION REQUIREMENTS

A. Cutting and Patching:

1. Structural Elements: When cutting and patching structural elements, notify COR of locations and details of cutting and await directions from COR before proceeding. Shore, brace, and support structural elements during cutting and patching.

2. Operational Elements: Do not cut and patch operating elements and related components in a manner that results in reducing their capacity to perform as intended or that results in increased maintenance or decreased operational life or safety.

3. Visual Elements: Do not cut and patch construction in a manner that results in visual evidence of cutting and patching. Do not cut and patch exposed construction in a manner that would, in COR's opinion, reduce the building's aesthetic qualities.

B. Manufacturer's Installation Instructions: Obtain and maintain on-site manufacturer's written recommendations and instructions for installation of products and equipment.

1.2 CLOSEOUT SUBMITTALS

A. Contractor's List of Incomplete Items: Initial submittal at Substantial Completion.

B. Certified List of Incomplete Items: Final submittal at Final Completion.

C. Operation and Maintenance Data: Submit two copies of manual.

D. PDF Electronic File: Assemble manual into a composite electronically indexed file. Submit on digital media.

E. Record Drawings: Submit one set(s) of marked-up record prints.

F. Record Digital Data Files: Submit data file and one set(s) of plots.

G. Record Product Data: Submit annotated PDF electronic files and directories of each submittal.

1.3 SUBSTANTIAL COMPLETION PROCEDURES

A. Prepare a list of items to be completed and corrected (punch list), the value of items on the list, and reasons why the Work is not complete.

B. Submittals Prior to Substantial Completion: Before requesting Substantial Completion inspection, complete the following:

1. Obtain and submit releases from authorities having jurisdiction permitting Owner unrestricted use of the Work and access to services and utilities. Include occupancy permits, operating certificates, and similar releases.

2. Submit closeout submittals specified in other sections, including project record documents, operation and maintenance manuals, property surveys, similar final record information, warranties, workmanship bonds, maintenance service agreements, final certifications, and similar documents.

3. Submit maintenance material submittals specified in other sections, including tools, spare parts, extra materials, and similar items, and deliver to location designated by COR.

4. Submit test/adjust/balance records.

5. Submit changeover information related to Owner's occupancy, use, operation, and maintenance.

C. Procedures Prior to Substantial Completion: Before requesting Substantial Completion inspection, complete the following:

1. Advise Owner of pending insurance changeover requirements.

2. Make final changeover of permanent locks and deliver keys to Owner.

3. Complete startup and testing of systems and equipment.

4. Perform preventive maintenance on equipment used prior to Substantial Completion.

5. Advise Owner of changeover in heat and other utilities.

6. Participate with Owner in conducting inspection and walkthrough with local emergency responders.

7. Remove temporary facilities and controls.

8. Complete final cleaning requirements, including touchup painting.

9. Touch up and otherwise repair and restore marred exposed finishes to eliminate visual defects.

D. Inspection: Submit a written request for inspection for Substantial Completion. On receipt of request, COR will proceed with inspection or advise Contractor of unfulfilled requirements. COR will prepare the Certificate of Substantial Completion after inspection or will advise Contractor of items that must be completed or corrected before certificate will be issued.

1.4 FINAL COMPLETION PROCEDURES

A. Submittals Prior to Final Completion: Before requesting inspection for determining final completion, complete the following:

1. Submit a final Application for Payment.

2. Submit certified copy of COR's Substantial Completion inspection list of items to be completed or corrected (punch list), endorsed and dated by COR. Certified copy of the list shall state that each item has been completed or otherwise resolved.

3. Certificate of Insurance: Submit evidence of final, continuing insurance coverage complying with insurance requirements.

4. Submit pest-control final inspection report.

B. Submit a written request for final inspection for acceptance. On receipt of request, COR will either proceed with inspection or notify Contractor of unfulfilled requirements. COR will prepare final Certificate for Payment after inspection or will advise Contractor of items that must be completed or corrected before certificate will be issued.

1. Reinspection: Request reinspection when the Work identified in previous inspections as incomplete is completed or corrected.

PART 2 - PRODUCTS

2.1 MATERIALS

A. In-Place Materials: Use materials for patching identical to in-place materials. For exposed surfaces, use materials that visually match in-place adjacent surfaces to the fullest extent possible.

B. Cleaning Agents: Use cleaning materials and agents recommended by manufacturer or fabricator of the surface to be cleaned. Do not use cleaning agents that are potentially hazardous to health or property or that might damage finished surfaces.

2.2 OPERATION AND MAINTENANCE DOCUMENTATION

A. Directory: Prepare a single, comprehensive directory of emergency, operation, and maintenance data and materials, listing items and their location to facilitate ready access to desired information.

B. Organization: Unless otherwise indicated, organize manual into separate sections for each system and subsystem, and separate sections for each piece of equipment not part of a system.

C. Organize data into three-ring binders with identification on front and spine of each binder, and envelopes for folded drawings. Include the following:

1. Manufacturer's operation and maintenance documentation.

2. Maintenance and service schedules.

3. Maintenance service contracts. Include name and telephone number of service agent.

4. Emergency instructions.

5. Spare parts list and local sources of maintenance materials.

6. Wiring diagrams.

7. Copies of warranties. Include procedures to follow and required notifications for warranty claims

PART 3 - EXECUTION

3.1 EXAMINATION AND PREPARATION

A. Existing Conditions: The existence and location of underground and other utilities and construction indicated as existing are not guaranteed. Before beginning sitework, investigate and verify the existence and location of underground utilities, mechanical and electrical systems, and other construction affecting the Work.

B. Before proceeding with each component of the Work, examine substrates, areas, and conditions, with Installer or Applicator present where indicated, for compliance with requirements for installation tolerances and other conditions affecting performance.

1. Verify compatibility with and suitability of substrates.

2. Examine roughing-in for mechanical and electrical systems.

3. Examine walls, floors, and roofs for suitable conditions.

C. Proceed with installation only after unsatisfactory conditions have been corrected.

D. Take field measurements as required to fit the Work properly. Where portions of the Work are indicated to fit to other construction, verify dimensions of other construction by field measurements before fabrication.

E. Verify space requirements and dimensions of items shown diagrammatically on Drawings.

F. Surface and Substrate Preparation: Comply with manufacturer's written recommendations for preparation of substrates to receive subsequent work.

3.2 CONSTRUCTION LAYOUT AND FIELD ENGINEERING

A. Before proceeding to lay out the Work, verify layout information shown on Drawings, in relation to the property survey and existing benchmarks.

3.3 INSTALLATION

A. Locate the Work and components of the Work accurately, in correct alignment and elevation, as indicated.

1. Make vertical work plumb and make horizontal work level.

2. Conceal pipes, ducts, and wiring in finished areas unless otherwise indicated.

B. Comply with manufacturer's written instructions and recommendations.

C. Conduct construction operations so no part of the Work is subjected to damaging operations or loading in excess of that expected during normal conditions of occupancy.

D. Templates: Obtain and distribute to the parties involved templates for work specified to be factory prepared and field installed.

E. Attachment: Provide blocking and attachment plates and anchors and fasteners of adequate size and number to securely anchor each component in place. Where size and type of attachments are not indicated, verify size and type required for load conditions.

1. Mounting Heights: Where mounting heights are not indicated, mount components at heights directed by COR.

F. Joints: Make joints of uniform width. Where joint locations in exposed work are not indicated, arrange joints for the best visual effect. Fit exposed connections together to form hairline joints.

G. Use products, cleaners, and installation materials that are not considered hazardous.

3.4 CUTTING AND PATCHING

A. Provide temporary support of work to be cut.

B. Protection: Protect in-place construction during cutting and patching to prevent damage. Provide protection from adverse weather conditions for portions of Project that might be exposed during cutting and patching operations.

C. Where existing services/systems are required to be removed, relocated, or abandoned, bypass such services/systems before cutting to minimize interruption to occupied areas.

D. Cutting: Cut in-place construction using methods least likely to damage elements retained or adjoining construction.

1. Cut holes and slots neatly to minimum size required, and with minimum disturbance of adjacent surfaces. Temporarily cover openings when not in use.

E. Patch with durable seams that are as invisible as possible. Provide materials and comply with installation requirements specified in other Sections.

1. Restore exposed finishes of patched areas and extend finish restoration into adjoining construction in a manner that will minimize evidence of patching and refinishing.

2. Where walls or partitions that are removed extend one finished area into another, patch and repair floor and wall surfaces in the new space. Provide an even surface of uniform finish, color, texture, and appearance.

3. Where patching occurs in a painted surface, prepare substrate and apply primer and intermediate paint coats appropriate for substrate over the patch, and apply final paint coat over entire unbroken surface containing the patch. Provide additional coats until patch blends with adjacent surfaces.

3.5 CLEANING

A. Clean Project site and work areas daily, including common areas. Dispose of materials lawfully.

1. Remove liquid spills promptly.

2. Where dust would impair proper execution of the Work, broom-clean or vacuum the entire work area, as appropriate.

3. Remove debris from concealed spaces before enclosing the space.

B. Complete the following cleaning operations before requesting inspection for certification of Substantial Completion:

1. Clean Project site, yard, and grounds, in areas disturbed by construction activities. Sweep paved areas; remove stains, spills, and foreign deposits. Rake grounds that are neither planted nor paved to a smooth, even-textured surface.

2. Sweep paved areas broom clean. Remove spills, stains, and other foreign deposits.

3. Remove labels that are not permanent.

4. Clean transparent materials, including mirrors. Remove excess glazing compounds.

5. Clean exposed finishes to a dust-free condition, free of stains, films, and foreign substances. Sweep concrete floors broom clean.

6. Vacuum carpeted surfaces and wax resilient flooring.

7. Wipe surfaces of mechanical and electrical equipment. Remove excess lubrication and foreign substances. Clean plumbing fixtures. Clean light fixtures, lamps, globes, and reflectors.

8. Replace disposable air filters and clean permanent air filters. Clean exposed surfaces of diffusers, registers, and grills.

3.6 OPERATION AND MAINTENANCE MANUAL PREPARATION

A. Operation and Maintenance Manuals: Assemble a complete set of operation and maintenance data indicating operation and maintenance of each system, subsystem, and piece of equipment not part of a system.

B. Manufacturers' Data: Where manuals contain manufacturers' standard printed data, include only sheets pertinent to product or component installed. Mark each sheet to identify each product or component incorporated into the Work. If data include more than one item in a tabular format, identify each item using appropriate references from the Contract Documents. Identify data applicable to the Work and delete references to information not applicable.

1. Prepare supplementary text if manufacturers' standard printed data are unavailable and where the information is necessary for proper operation and maintenance of equipment or systems.

C. Drawings: Prepare drawings supplementing manufacturers' printed data to illustrate the relationship of component parts of equipment and systems and to illustrate control sequence and flow diagrams.

END OF SECTION 017000

SECTION 024119 - SELECTIVE DEMOLITION

1.1 SECTION REQUIREMENTS

A. Items indicated to be removed and salvaged remain Owner's property. Carefully detach from existing construction, in a manner to prevent damage, and deliver to Owner. Include fasteners or brackets needed for reattachment elsewhere.

B. Predemolition Photographs: Show existing conditions of adjoining construction and site improvements. Submit before Work begins.

C. It is not expected that hazardous materials will be encountered in the Work. If hazardous materials are encountered, do not disturb; immediately notify COR. Hazardous materials will be removed by Forest Service under a separate contract.

PART 2 - PRODUCTS

2.1 PEFORMANCE REQUIREMENTS

A. Regulatory Requirements: Comply with EPA regulations and with hauling and disposal regulations of authorities having jurisdiction.

B. Standards: Comply with ANSI/ASSE A10.6 and NFPA 241.

PART 3 - EXECUTION

3.1 DEMOLITION

A. Remove existing Happy Jack well #2 house.

B. Remove Happy Jack well #2 concrete slab.

C. Maintain services/systems indicated to remain and protect them against damage during selective demolition operations. Before proceeding with demolition, provide temporary services/systems that bypass area of selective demolition and that maintain continuity of services/systems to other parts of the building.

D. Locate, identify, shut off, disconnect, and seal or cap off indicated utility services and mechanical/electrical systems serving areas to be selectively demolished.

E. Provide temporary barricades and other protection required to prevent injury to people and damage to adjacent buildings and facilities to remain.

F. Protect walls, ceilings, floors, and other existing finish work that are to remain.

G. Provide and maintain shoring, bracing, and structural supports as required to preserve stability and prevent movement, settlement, or collapse of construction and finishes to remain, and to prevent unexpected or uncontrolled movement or collapse of construction being demolished.

H. Provide temporary weather protection to prevent water leakage and damage to structure and interior areas.

I. Neatly cut openings and holes plumb, square, and true to dimensions required. Use cutting methods least likely to damage construction to remain or adjoining construction.

J. Remove demolition waste materials from Project site. Do not burn demolished materials.

K. Clean adjacent structures and improvements of dust, dirt, and debris caused by selective demolition operations. Return adjacent areas to condition existing before selective demolition operations began.

PART 4 – MEASUREMENTS AND PAYMENT

4.1 Measurement

A. There will be no separate Measurement for this section.

4.2 Payment

A. This work is incidental to other items in the contract and direct separate item payment will not be made.

END OF SECTION 024119

SECTION 033000 - CAST-IN-PLACE CONCRETE

PART 1 - GENERAL

1.1 SECTION REQUIREMENTS

A. Summary: The work specified herein includes purchase, delivery and installation of materials to replace the cracked concrete slab around Happy Jack well #2 with a new 6’x 6’ x 6” concrete slab including rebar and thickened edge. The slab must slope away from the well casing ¼” per foot.

B. Submittals: Product Data and concrete mix designs.

C. Ready-Mixed Concrete Producer Qualifications: ASTM C 94/C 94M.

PART 2 - PRODUCTS

2.1 PERFORMANCE REQUIREMENTS

A. Comply with ACI 301, "Specification for Structural Concrete," and with ACI 117, "Specifications for Tolerances for Concrete Construction and Materials."

2.2 MATERIALS

A. Reinforcing Bars: ASTM A 615/A 615M, Grade 60 (Grade 420), deformed.

B. Plain Steel Wire: ASTM A 82/A 82M, as drawn.

C. Plain-Steel Welded Wire Reinforcement: ASTM A 185/A 185M, as drawn, flat sheet.

D. Portland Cement: ASTM C 150, Type I or II.

E. Fly Ash: ASTM C 618, Class C or F.

F. Ground Granulated Blast-Furnace Slag: ASTM C 989, Grade 100 or 120.

G. Silica Fume: ASTM C 1240, amorphous silica.

H. Aggregates: ASTM C 33, Class 3S coarse aggregate or better, graded.

I. Air-Entraining Admixture: ASTM C 260.

J. Chemical Admixtures: ASTM C 494, water reducing water reducing and accelerating and water reducing and retarding. Do not use calcium chloride or admixtures containing calcium chloride.

2.3 CONCRETE MIXTURES

A. Prepare design mixtures, proportioned according to ACI 301.

1. Air Content: Maintain within range permitted by ACI 301. Do not allow air content of floor slabs to receive troweled finishes to exceed 3 percent.

B. Measure, batch, mix, and deliver concrete according to ASTM C 94/C 94M.

1. When air temperature is above 90 deg F (32 deg C), reduce mixing and delivery time to 60 minutes.

PART 3 - EXECUTION

3.1 CONCRETING

A. Construct formwork according to ACI 301 and maintain tolerances and surface irregularities within ACI 347R limits of Class A, 1/8 inch (3.2 mm) for concrete exposed to view and…