Overload_permit_letter_1_Pg.doc

DOC document 30 KB Posted

Attached to
BIG DRAW PIT CRUSH AND STOCKPILE Federal contract opportunity
Solicitation number
12-94TZ-18-B-0001
Issued by
Department of Agriculture Forest Service R3-Southwestern Region

About this file

OVERLOAD PERMIT

View the file

Other files for this federal contract opportunity

Other files attached to BIG DRAW PIT CRUSH AND STOCKPILE, newest first.
File Type Posted
Amendment_One.docx DOCX document
SF_30_Amd_One_Pg_1.rtf RTF text file
Wage_Determination_AZ180017_6_Pgs.pdf PDF
SOLICITATION_40_pgs.docx DOCX document
Maps_3_Pgs.pdf PDF
COCONINO_FIRE_PLAN_4_pgs.pdf PDF
1442_3_Pgs.pdf PDF
SOW_29_Pgs.docx DOCX document
overload_permit_form_1_Pg.doc DOC document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Coconino & Kaibab National Forest 1824 S. Thompson

Flagstaff, AZ 86001

Subject: Overload Requirements The Coconino & Kaibab National Forest would like to make contractors aware of the overload permit requirements for crossing any of our forest bridges. You will be required to complete the attached overload permit(s). It will need to be completed by a registered Arizona Professional Engineer, including a load rating for the proposed vehicle(s) and equipment. Existing information on forest bridges can be supplied to the contractor’s registered Arizona Professional Engineer as needed. The contractor’s engineer should perform their own bridge rating to base the load rating on. The overload permit and load rating then needs to be submitted to the Forest Service for review and acceptance. The contractor may need to address comments related to the load rating and inspections performed. Once all if any comments have been addressed the contractor’s engineer will need to stamp, sign and date the load rating calculations.

The contractor should provide the Forest Service with a copy of any permit’s required by the state highway department as well. The number of trips over the structure(s) should be clearly stated in any request. The contractor’s engineer should state any assumptions made, i.e., lower speed to reduce impact. It will be the contractor’s responsibility to ensure that the COR can check compliance with the overload permit, i.e., scales, speed monitoring and trip counting.

It is highly recommended that the contractor proposing an overload should have pre and post construction inspection(s) to determine if there has been any damage from the overloads. A Forest Service Representative with the COR should be present at the inspection(s) in case damage is found.

The contractor should let the forest service and COR know their proposed travel route ahead of time.

If you have any questions, please contact me at (928) 527-3524.

Sincerely, Ray Holt, P.E.

Civil Engineer and Contracting Officer’s Representative