This document is an amendment to a solicitation for sewer line repair services at Building 320 at an Agricultural Research Service facility. The amendment provides additional scope details for the project, including installing approximately 180 linear feet of new 3-inch PVC sewer piping with warning tape and tracer wire; connecting five lateral lines or extensions to existing building sewer outlets along the south side; tying into an existing property sewer pipe located at the building corner; placing the new line approximately six feet south of an abandoned southeast line; providing imported bedding material meeting local standards below and above the pipe; compacting backfill with mechanical equipment; furnishing two-way cleanouts on each lateral with government-provided water boxes; and performing static leak testing. Quotes are due no later than January 11, 2024 and must be emailed to the contracting officer at the specified address.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
12905B24Q0020 x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
ARS-12905B
ALBANY CA 94710
800 BUCHANAN STREET
USDA ARS PWA AAO ACQ/PER PROP
12/28/20230003
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
12/28/2023
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
The following scope changes are based on what were discussed at the site visit today and are incorporated into the Statement of Work for this project via this amendment.
New installations
a. Provide private utility locate.
b. Provide barriers at ends of construction site.
c. Pothole connection point. Measure difference in elevation and calculate line slope for
Government review.
Continued ...
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
LAM V. PHAM
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 2
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
12905B24Q0020/0003
d. Install approximately 180 LF of new 3" schedule 40 PVC Sewer Piping. Provide warning tape and tracer wire.
e. Connect 5 (five) laterals/extensions to existing building sewer outlets along the south side of the building. The eastern lateral does not need to be replaced if tie in is made at the lateral connection point.
f. Connect to existing property sewer pipe located at corner of the building.
g. New line will be located approximately 6 feet South of the southeast abandoned line.
h. Provide imported bedding material meeting Pima County or Tucson City standards 6¿ below pipe and
6¿ above pipe. Remove excess native material offsite. Compact backfill with mechanical equipment until unyielding.
i. Provide two-way clean outs on each lateral.
Install Government furnished water boxes over clean outs for traffic.
j. Provide static leak testing.
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)