This document contains questions and answers regarding a federal contract opportunity for a perimeter metal fencing installation project at the USDA ARS Tucson, Arizona location. The scope of work involves installing corrugated style metal fencing with a smooth finish in dark/forest green color. All existing material and vegetation must be removed from the installation area and disposed of. Engineering is not required as the fencing needs to withstand winds up to 60 mph. While bolted and welded designs may be acceptable, the framing must be fully welded.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
USDA ARS Tucson Perimeter Fence Q and A
Q1. 1. Will full engineering be required to be supplied with submittals for layout and 60 mph requirements?
A1. No Q2. If engineering is required will a soils report either preexisting or new be supplied?
A2. Engineering not required, so no soil report.
Q3. Scope calls out for fully welded framing. Is a bolted and welded hardware design acceptable?
A3. Must be fully welded framing.
Q4. What finish is required on all framework? If it is to be painted, please supply color.
A4. Dark/Forest Green
Q5. Please provide the type of panel to be used and finish required.
A5. Corrugated style like the graphic below, smooth finish.
Q6. Please confirm that all material and vegetation in the path of construction is to be removed from site and disposed of?
A6. Yes, removed and disposed of.