Amendment 0002 Answer to Contractor Questions
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 12854419Q0014.pdf | ||
| 2015_Bulk_Material_Analysis.pdf | ||
| Amendment_0001-12854419Q0014.pdf | ||
| 12854419Q0014-_amendment_0001.pdf | ||
| Construction_RFQ_FAC_2005-94-95_(2017_JAN).pdf | ||
| 12854419Q0014-Asbestos_Abatement.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions from Contractors
Wapiti Ranger Station Asbestos Remediation
Solicitation # 12854419Q0014
Questions;
Question # 1: What is the materials that need to be removed? We see in the documents that 575 needs to be removed but it does not say what it is.
Answer:
Tile flooring
Question #2: Do you have a sample analysis what is ACM and what is not?
Answer:
A sample from 2015 indicated that the tile contained 15% Chrysotile and 85% nonfibrous binder.
Question #3: Work for this project consists of removal of existing tile flooring containing asbestos in two dwellings at Wapiti Ranger Station. The structures are constructed on concrete slab foundations”.
Do you know if the mastic adhesive also contains asbestos or if it needs to be removed?
Answer:
A sample from 2015 indicated that the mastic contained 100% nonfibrous binder and Asbestos was reported as “None Detected”.
Question #4: Do you have any drawings or pictures of the areas of work?
Answer:
A picture of the outside of the building is shown here:
Question #3: Will there be any way to look at the project?
Answer: If you want to request a site visit, please contact Kimberly McBride at 307-578-5202
Question #5: Will you please provide a copy of the asbestos survey and quantities of contaminated ACM that needs to be removed (such as linear and square footage) so we can submit a competent bid for this project?
Answer: Please refer to page 5 of the solicitation. The square feet for building 3517 is 576 sf, the square feet for building 3547 is 567 sf. Please see attached Bulk Material Analysis.
Question #6: Any pictures would be helpful as well.
Answer:
See above.
Question #7: It calls for Third Party Asbestos Testing. Do we include hiring someone for this, or will the
Forest Service providing someone for this work?
Answer:
The Forest Service will be hiring someone to perform Third Party Asbestos Testing.
Question #8: Spec’s state we need to remove all furnishings and store during the flooring abatement, and then replace after abatement. Do you want us to put the furnishings on the bare concrete, or wait until after the new flooring is installed?
Answer:
Place the furnishings on the bare concrete.
Question #9: Our scope of work does not include any new flooring installation, right?
Answer: Correct.