Attachment 3-Logan District Office Roof_Specifications.pdf
PDF 258 KB Posted
- Attached to
- Logan District Office Roof Replacement Federal contract opportunity
- Solicitation number
- 1284N820Q0007
- Issued by
- Department of Agriculture Forest Service
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Site Visit Notes-final.pdf | ||
| SF30-Site Visit Notes.pdf | ||
| Site Visit Attendees-final.pdf | ||
| Attachment 1-Wage Determination- Building-Cache County.pdf | ||
| Attachment 4-Subcontractor Form SF1413.pdf | ||
| Attachment 5- Performance Bond SF25.pdf | ||
| Attachment 6- Payment Bond SF25A.pdf | ||
| Attachment 2-Logan Office Roof Replacement Drawings_signed.pdf | ||
| 1284N820Q0007 Logan District Office Roof Replacement-final.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUBMITTAL PROCEEDURES 013300-1
USDA FOREST SERVICE, R-4
LOGAN DISTRICT OFFICE ROOF REPLACEMENT
SECTION 013300 - SUBMITTAL PROCEDURES
PART 1 - GENERAL
1.1 SUMMARY
A. This Section includes administrative and procedural requirements for submitting Shop
Drawings, Product Data, Samples, and other miscellaneous submittals. See Table 013300-1 for a summary of required submittals.
B. See other specification section within this package for additional requirements on submittal.
1.2 SUBMITTAL PROCEDURES
A. Coordination: Coordinate preparation and processing of submittals with performance of construction activities.
1. Coordinate transmittal of different types of submittals for related parts of the Work so processing will not be delayed because of need to review submittals concurrently for coordination.
a. The Contracting Officer (CO) reserves the right to withhold action on a submittal requiring coordination with other submittals until related submittals are received.
B. Processing Time: Allow enough time for submittal review, including time for re-submittals, as follows. Time for review shall commence on CO's receipt of submittal.
1. Initial Review: Allow 14 days for initial review of each submittal. Allow additional time if processing must be delayed to permit coordination with subsequent submittals. CO will advise Contractor when a submittal being processed must be delayed for coordination.
2. If intermediate submittal is necessary, process it in same manner as initial submittal.
3. Allow 14 days for processing each re-submittal.
4. No extension of the Contract Time will be authorized because of failure to transmit submittals enough in advance of the Work to permit processing.
C. Identification: Place a permanent label or title block on each submittal for identification.
1. Indicate name of firm or entity that prepared each submittal on label or title block.
2. Provide a space on label or beside title block to record Contractor's review and approval markings and action taken by CO.
3. Include the following information on label for processing and recording action taken:
a. Project name.
b. Date.
c. Name and address of Contractor.
SUBMITTAL PROCEEDURES 013300-2
d. Name of manufacturer.
e. Unique identifier, including revision number.
f. Number and title of appropriate Specification Section.
g. Drawing number and detail references, as appropriate.
h. If more than one item is shown on submittal sheet, identify item.
D. Deviations: Highlight, encircle, or otherwise identify deviations from the Contract Documents on submittals.
E. Additional Copies: Unless additional copies are required for final submittal, and unless CO observes noncompliance with provisions of the Contract Documents, initial submittal may serve as final submittal.
F. Use for Construction: Use only final submittals with mark indicating action taken by CO in connection with construction.
1.3 MEASUREMENT AND PAYMENT
A. No separate measurement and/or payment will be made for this section. Payment shall be included with work shown in the schedule of items.
PART 2 - PRODUCTS
2.1 ACTION SUBMITTALS – (Submittals requiring CO approval)
A. General: Prepare and submit Action Submittals required by individual Specification Sections.
1. Number of Copies: Submit three copies of each submittal, unless otherwise indicated.
CO will return two copies. Mark up and retain one returned copy as a Project Record
Document.
B. Product Data: Collect information into a single submittal for each element of construction and type of product or equipment.
1. If information must be specially prepared for submittal because standard printed data are not suitable for use, submit as Shop Drawings, not as Product Data.
2. Mark each copy of each submittal to show which products and options are applicable.
3. Include the following information, as applicable:
a. Manufacturer's written recommendations.
b. Manufacturer's product specifications.
c. Manufacturer's installation instructions.
d. Manufacturer's catalog cuts.
e. Compliance with recognized trade association standards.
f. Compliance with recognized testing agency standards.
SUBMITTAL PROCEEDURES 013300-3
C. Contractor's Construction Schedule: The contractor shall submit a Construction Schedule, for approval by CO, in accordance with the contract provisions within 5 day of commencement of work.
D. Samples: Prepare physical units of materials or products, including the following:
1. Samples for Initial Selection: Submit manufacturer's color charts consisting of units or sections of units showing the full range of colors, textures, and patterns available.
2.2 INFORMATIONAL SUBMITTALS – (Submittals NOT requiring CO approval)
A. General: Prepare and submit Informational Submittals required by other Specification Sections.
1. Number of Copies: Submit three copies of each submittal, unless otherwise indicated.
CO will not return copies.
2. Certificates and Certifications: Certificates and certifications shall be signed by an officer or other individual authorized to sign documents on behalf of that entity.
B. Material Test Reports: Prepare reports written by a qualified testing agency, on testing agency's standard form, indicating and interpreting test results of material for compliance with requirements.
C. Field Test Reports: Prepare reports written by a qualified testing agency, on testing agency's standard form, indicating and interpreting results of field tests performed either during installation of product or after product is installed in its final location, for compliance with requirements.
PART 3 - EXECUTION
3.1 GENERAL
A. Review each submittal and check for compliance with the Contract Documents. Note corrections and field dimensions. Mark with approval stamp before submitting to CO.
B. Approval Stamp: Stamp each submittal with a uniform, approval stamp. Include Project name and location, submittal number, Specification Section title and number, name of reviewer, date of Contractor's approval, and statement certifying that submittal has been reviewed, checked, and approved for compliance with the Contract Documents.
C. CO will not review submittals that do not bear Contractor's approval stamp and will return them without action.
D. Submittals not required by the Contract Documents will not be reviewed and may be discarded.
E. Substitutions – Whenever materials, products, and equipment are listed by name or brand in the specifications and/or on the drawings, it is used as a measure of quality, utility, or standard. If the Contractor prefers to use any other brand or manufacturer of same quality, appearance and utility to that specified, he shall request substitution as provided below, not less than 30 days
SUBMITTAL PROCEEDURES 013300-4
before the planned installation of the item. The Contracting Officer will approve or disapprove the request for substitution.
F. Requests for substitutions will only be considered if contractor submits the following:
1. Complete technical data including drawings, complete performance specifications, test data, samples and performance tests of the article proposed for substitution. Submit additional information if required by Contracting Officer. All items in the above information shall be circled, tagged, or marked in some way to indicate all deviations or differences which the proposed item differs from the originally specified item.
2. Similar data as above for item originally specified. All items shall be marked to identify where/how the proposed substitution will differ.
3. A statement by the Contractor that the proposed substitution is in full compliance with the contract documents, applicable codes, and laws.
4. The Contractor shall be responsible for any effect upon related work in the project for any substitution and shall pay any additional costs generated by any substitutions.
3.2 SUBMITTAL SCHEDULE – Submittals shall be made as required by and called for in the specifications. The following table is a summary of the required submittals for the project - the table is to assist the Contractor and may not be all inclusive – additional submittals may be required by specific specifications:
TABLE 013000-1
Spec. Sec-tion Subsection Required Submittal When Required
C 1.5A Work/Camp Storage Areas After NTP
013300 2.1C Project Schedule Proposal
017320 1.4.A Landfill Records After work is complete
024100 1.2.A Landfill Records After work is complete
061000 1.3.A Product Data After NTP
073115 1.4.A Product Data After NTP
073115 1.4.B Samples After NTP
073115 1.4.C Maintenance Data After NTP
073115 1.4.D Warranty After NTP
076200 1.3.A Color Samples After NTP
END OF SECTION 013300 SEPTEMBER 2019
SELECTIVE DEMOLITION 017320-1
LOGAN DISTRICT OFFICE ROOF REPLACEMENT
SECTION 017320 - SELECTIVE DEMOLITION
PART 1 - GENERAL
1.1 SUMMARY
A. This Section includes demolition and removal of the following:
1. Selected portions of a building or structure.
2. Repair procedures for selective demolition operations.
1.2 DEFINITIONS
A. Remove: Detach items from existing construction and legally dispose of them off-site, unless indicated to be removed and salvaged or removed and reinstalled.
B. Remove and Salvage: Detach items from existing construction and deliver them to
Government.
C. Remove and Reinstall: Detach items from existing construction, prepare them for reuse, and reinstall them where indicated.
D. Existing to Remain: Existing items of construction that are not to be removed and that are not otherwise indicated to be removed, removed and salvaged, or removed and reinstalled.
1.3 MATERIALS OWNERSHIP
A. Except for items or materials indicated to be reused, salvaged, reinstalled, or otherwise indicated to remain Government property, demolished materials shall become Contractor's property and shall be removed from Project site.
1.4 SUBMITTALS
A. Landfill Records: Indicate receipt and acceptance of hazardous wastes by a landfill facility licensed to accept hazardous wastes. Submit permits required for operating a hazardous waste disposal facility, as required by IDAPA 58.01.05- Rules and Standards for Hazardous Waste.
1.5 MEASUREMENT AND PAYMENT
A. Payment for work in this section is in accordance with Facilities Job Order Contract.
1.6 PROJECT CONDITIONS
SELECTIVE DEMOLITION 017320-2
A. Government will occupy portions of building immediately adjacent to selective demolition area.
Conduct selective demolition so Government operations will not be disrupted. Provide not less than 72 hours' notice to CO of activities that will affect Government operations.
B. Maintain access to existing walkways, corridors, and other adjacent occupied or used facilities.
1. Do not close or obstruct walkways, corridors, or other occupied or used facilities without written permission from authorities having jurisdiction.
PART 2 - PRODUCTS
2.1 REPAIR MATERIALS
A. Use repair materials identical to existing materials.
1. If identical materials are unavailable or cannot be used for exposed surfaces, use materials that visually match existing adjacent surfaces to the fullest extent possible.
2. Use materials whose installed performance equals or surpasses that of existing materials.
PART 3 - EXECUTION
3.1 EXAMINATION
A. Survey existing conditions and correlate with requirements indicated to determine extent of selective demolition required.
B. Inventory and record the condition of items to be removed and reinstalled and items to be removed and salvaged.
3.2 UTILITY SERVICES
A. Existing Utilities: Maintain services indicated to remain and protect them against damage during selective demolition operations.
B. Do not interrupt existing utilities serving occupied or operating facilities unless authorized in writing by CO and authorities having jurisdiction. Provide temporary services during interruptions to existing utilities, as acceptable to CO and to authorities having jurisdiction.
1. Provide at least 72 hours' notice to CO if shutdown of service is required during changeover.
3.3 PREPARATION
A. Site Access and Temporary Controls: Conduct selective demolition and debris-removal operations to ensure minimum interference with roads, streets, walks, walkways, and other adjacent occupied and used facilities.
SELECTIVE DEMOLITION 017320-3
1. Do not close or obstruct streets, walks, walkways, or other adjacent occupied or used facilities without permission from CO and authorities having jurisdiction. Provide alternate routes around closed or obstructed traffic ways if required by governing regulations.
2. Protect existing site improvements, appurtenances, and landscaping to remain.
3.4 SELECTIVE DEMOLITION
A. General: Demolish and remove existing construction only to the extent required by new construction and as indicated. Use methods required to complete the Work within limitations of governing regulations.
1. Neatly cut openings and holes plumb, square, and true to dimensions required. Use cutting methods least likely to damage construction to remain or adjoining construction.
2. Cut or drill from the exposed or finished side into concealed surfaces to avoid marring existing finished surfaces.
B. Removed and Salvaged Items:
1. Clean salvaged items.
2. Store items in a secure area until delivery to Government.
3. Protect items from damage during transport and storage.
C. Removed and Reinstalled Items:
1. Clean and repair items to functional condition adequate for intended reuse. Paint equipment to match new equipment.
2. Protect items from damage during transport and storage.
3. Reinstall items in locations indicated. Comply with installation requirements for new materials and equipment. Provide connections, supports, and miscellaneous materials necessary to make item functional for use indicated.
D. Existing Items to Remain: Protect construction indicated to remain against damage and soiling during selective demolition. When permitted by CO, items may be removed to a suitable, protected storage location during selective demolition [and cleaned] and reinstalled in their original locations after selective demolition operations are complete.
3.5 PATCHING AND REPAIRS
A. General: Promptly repair damage to adjacent construction caused by selective demolition operations.
B. Repairs: Where repairs to existing surfaces are required, patch to produce surfaces suitable for new materials.
C. Finishes: Restore exposed finishes of patched areas and extend restoration into adjoining construction in a manner that eliminates evidence of patching and refinishing.
SELECTIVE DEMOLITION 017320-4
3.6 DISPOSAL OF DEMOLISHED MATERIALS
A. Disposal of selective demolition and waste material shall be in accordance with Section
024100, Removal and Disposal.
END OF SECTION 017320
SEPTEMBER 2019
WASTE MATERIAL REMOVAL AND DISPOSAL 024100-1
LOGAN DISTRICT OFFICE ROOF REPLACEMENT
SECTION 024100 - WASTE MATERIAL REMOVAL AND DISPOSAL
PART 1 - GENERAL
1.1 SUMMARY
A. This Section includes the loading, handling, hauling, and placing of excess excavation material, unsuitable excavation material, clearing and grubbing debris, construction debris and demolition materials.
1.2 SUBMITTALS
A. Landfill Records: Indicate receipt and acceptance of hazardous wastes by a landfill facility licensed to accept hazardous wastes. Submit permits required for operating a hazardous waste disposal facility, as required by IDAPA 58.01.05- Rules and Standards for Hazardous Waste.
1.3 MEASUREMENT AND PAYMENT
A. Payment for work in this section is in accordance with Facilities Job Order Contract.
PART 2 - PRODUCTS – NOT APPLICABLE
PART 3 - EXECUTION
3.1 Waste material to be removed:
A. All demolition materials, garbage, construction debris (i.e. asphalt, concrete, plastic, metal, painted wood, etc) and other refuse generated shall be removed from the project site.
1. Promptly dispose of demolished materials. Do not allow demolished materials to accumulate on-site.
2. The Government is not responsible for waste material upon its departure from the project site.
3.2 Disposal Area:
A. All waste material shall be hauled off National Forest System lands.
1. Transport and legally disposes of waste material. Comply with IDAPA 58.01.06 Solid
Waste Management Rules and Standards.
2. The Contractor is responsible for all costs and permits associated with landfill disposal.
END OF SECTION 024100
ROUGH CARPENTRY 061000-1
USDA FOST SERVICE, R-4
LOGAN DISTRICT OFFICE ROOF REPLACEMENT
SECTION 061000 - ROUGH CARPENTRY
PART 1 - GENERAL
1.1 SUMMARY
A. This section includes all work necessary or required for rough framing of the new floor joists, as indicated on the drawings. Such work includes, but is not necessarily limited to, framing, blocking and construction of sliding doors.
1.2 DEFINITIONS
A. Rough Carpentry: Carpentry work concealed by other construction and not specified in other
Sections.
A. Delete paragraph below if no exposed framing.
B. Lumber grading agencies, and the abbreviations used to reference them, include the following:
1. NELMA - Northeastern Lumber Manufacturers Association.
2. NLGA - National Lumber Grades Authority.
3. WCLIB - West Coast Lumber Inspection Bureau.
4. WWPA - Western Wood Products Association.
1.3 SUBMITTALS
A. Product Data: For each type of factory-fabricated product. Indicate component materials and dimensions and include construction and application details.
1.4 MEASUREMENT AND PAYMENT
A. Payment for work in this section is in accordance with Facilities Job Order Contract.
PART 2 - PRODUCTS
2.1 WOOD PRODUCTS, GENERAL
A. Lumber: DOC PS 20 and applicable rules of lumber grading agencies certified by the American
Lumber Standards Committee Board of Review.
1. Factory mark each piece of lumber with grade stamp of grading agency.
2. Delete option in subparagraph below if authorities having jurisdiction require grade stamps on all materials.
3. For exposed lumber indicated to receive a stained or natural finish, mark grade stamp on end or back of each piece.
4. Dressed sizes of green lumber are larger than dry lumber in DOC PS 20.
5. Revise first subparagraph below if rough lumber is acceptable for all work.
6. Provide dressed lumber, S4S, unless otherwise indicated.
ROUGH CARPENTRY 061000-2
7. (Sill Plates, Joists & Planks, Light Framing Members, Pressure Treated Faming) Provide dry lumber with 19 percent maximum moisture content at time of dressing, unless otherwise indicated.
8. Retain subparagraph above or below, or delete both if green lumber is acceptable. Verify availability of below. Lumber more than 2 inches nominal (38 mm actual) in thickness is typically shipped green. See Evaluations.
9. (All other Framing Members) Provide dry lumber with 15 percent maximum moisture content at time of dressing, unless otherwise indicated.
A. Wood Structural Panels:
1. Select one of two options in subparagraph below; usually retain second. DOC PS 2 is a performance-based standard that does not include requirements for grades of veneers.
10. Plywood: DOC PS 1.
11. Delete subparagraph below if oriented strand board is not used.
12. Oriented Strand Board: DOC PS 2.
13. Thickness: As needed to comply with requirements specified but not less than thickness indicated.
2.2 DIMENSION LUMBER
A. General: Provide dimension lumber of grades indicated according to the American Lumber
Standards Committee National Grading Rule provisions of the grading agency indicated.
B. Exterior Framing:
1. Species and Grade: Douglas fir-larch, Douglas fir-larch (north), or Douglas fir-south;
No. 1 grade; NLGA, WCLIB, or WWPA.
2.3 MISCELLANEOUS LUMBER
A. General: Provide lumber for support or attachment of other construction, including the following:
1. Blocking.
2. Cants.
3. Nailers.
4. Furring.
5. Grounds.
B. For items of dimension lumber size, provide Construction, Stud, or No. 2 grade lumber with 19 percent maximum moisture content and the following species:
1. Western woods; WCLIB or WWPA.
C. For concealed boards, provide lumber with 19 percent maximum moisture content and the following species and grades:
1. Western woods, Construction or No. 2 Common grade; WCLIB or WWPA.
D. For furring strips for installing plywood or hardboard paneling, select boards with no knots capable of producing bent-over nails and damage to paneling.
2.4 SHEATHING
ROUGH CARPENTRY 061000-3
A. Plywood Floor Sheathing: Tongue and Groove Exposure 1, Structural I sheathing.
1. Span Rating: Not less than 24/0.
2. Thickness: Not less than 3/4 inch
B. Oriented-Strand-Board Wall Sheathing: Exposure 1, Structural I sheathing.
1. Select one of five options in subparagraph below.
2. Span Rating: Not less than 16/0.
3. Thickness: Not less than 1/2 inch
C. Plywood Roof Sheathing: Exterior, Structural I Exterior Exposure 1 sheathing.
1. Span Rating: Not less than 32/16.
2. Nominal Thickness: Not less than ½ inch
3. Nailing Pattern: 6” OC on edge and 12” OC in the field with 8d galvanized nails.
D. Oriented-Strand-Board Roof Sheathing: Exposure 1, Structural I sheathing.
1. Span Rating: Not less than 32/16.
2. Nominal Thickness: Not less than ½ inch
3. Nailing Pattern: 6” OC on edge and 12” OC in the field with 8d galvanized nails.
2.5 FASTENERS
A. General: Provide fasteners of size and type indicated that comply with requirements specified in this Article for material and manufacture.
1. Where rough carpentry is exposed to weather, in ground contact, or in area of high relative humidity, provide fasteners with hot-dip zinc coating complying with
ASTM A 153/A 153M.
B. Nails, Brads, and Staples: ASTM F 1667.
C. Power-Driven Fasteners: CABO NER-272.
D. Wood Screws: ASME B18.6.1.
E. Screws for Fastening to Cold-Formed Metal Framing: ASTM C 954, except with wafer heads and reamer wings, length as recommended by screw manufacturer for material being fastened.
F. Lag Bolts: ASME B18.2.1.
G. Bolts: Steel bolts complying with ASTM A 307, Grade A ; with ASTM A 563 hex nuts and, where indicated, flat washers.
H. Expansion Anchors: Anchor bolt and sleeve assembly of material indicated below with capability to sustain, without failure, a load equal to 6 times the load imposed when installed in unit masonry assemblies and equal to 4 times the load imposed when installed in concrete as determined by testing per ASTM E 488 conducted by a qualified independent testing and inspecting agency.
1. Material: Stainless steel with bolts and nuts complying with ASTM F 593 and
ASTM F 594, Alloy Group 1 or 2
2.6 MISCELLANEOUS MATERIALS
ROUGH CARPENTRY 061000-4
A. Adhesives for Field Gluing Panels to Framing: Formulation complying with ASTM D 3498 that is approved for use with type of construction panel indicated by both adhesive and panel manufacturers.
PART 3 - EXECUTION
3.1 INSTALLATION, GENERAL
A. Set rough carpentry to required levels and lines, with members plumb, true to line, cut, and fitted. Fit rough carpentry to other construction; scribe and cope as needed for accurate fit.
Locate nailers, blocking, and similar supports to comply with requirements for attaching other construction.
B. Do not use materials with defects that impair quality of rough carpentry or pieces that are too small to use with minimum number of joints or optimum joint arrangement.
C. Apply field treatment complying with AWPA M4 to cut surfaces of preservative-treated lumber and plywood.
D. Securely attach rough carpentry work to substrate by anchoring and fastening as indicated, complying with the following:
1. CABO NER-272 for power-driven fasteners.
2. Published requirements of metal framing anchor manufacturer.
3. Table 23-II-B-1, "Nailing Schedule," and Table 23-II-B-2, "Wood Structural Panel Roof
Sheathing Nailing Schedule," in the Uniform Building Code.
4. Table 2305.2, "Fastening Schedule," in the BOCA National Building Code.
5. Table 2306.1, "Fastening Schedule," in the Standard Building Code.
6. Table 602.3(1), "Fastener Schedule for Structural Members," and Table 602.3(2), "Alternate Attachments," in the International One- and Two-Family Dwelling Code.
E. Use common wire nails, unless otherwise indicated. Select fasteners of size that will not fully penetrate members where opposite side will be exposed to view or will receive finish materials.
Make tight connections between members. Install fasteners without splitting wood; predrill as required.
F. Use finishing nails for exposed work, unless otherwise indicated. Countersink nail heads and fill holes with wood filler.
3.2 WOOD BLOCKING, AND NAILER INSTALLATION
A. Install where indicated and where required for attaching other work. Form to shapes indicated and cut as required for true line and level of attached work. Coordinate locations with other work involved.
B. Attach items to substrates to support applied loading. Recess bolts and nuts flush with surfaces, unless otherwise indicated. Build anchor bolts into masonry during installation of masonry work. Where possible, secure anchor bolts to formwork before concrete placement.
3.3 WOOD FRAMING INSTALLATION, GENERAL
A. Framing Standard: Comply with AFPA's "Manual for Wood Frame Construction," unless otherwise indicated.
ROUGH CARPENTRY 061000-5
B. Do not splice structural members between supports.
C. Where built-up beams or girders of 2-inch nominal- dimension lumber on edge are required, fasten together with 2 rows of 20d nails spaced not less than 32 inches o.c. Locate one row near top edge and other near bottom edge.
1. For continuous members, stagger end joints at quarter points between supports.
END OF SECTION 061000
ASPHALT SHINGLES 073110-1
LOGAN DISTRICT OFFICE ROOF REPLACEMENT
SECTION 073110 - ASPHALT SHINGLES
PART 1 - GENERAL
1.1 SUMMARY
A. This Section includes the following:
1. Asphalt shingles.
2. Felt underlayment.
3. Self-adhering sheet underlayment.
4. Ridge vents.
B. Related Sections include the following:
1. Section 06100 "Rough Carpentry" for roof deck wood structural panels.
2. Section 07620 "Sheet Metal Flashing and Trim" for metal roof penetration flashings and counter flashings not part of this Section.
1.2 DEFINITIONS
A. Roofing Terminology: Refer to ASTM D 1079 and glossary of NRCA's "The NRCA Roofing and Waterproofing Manual" for definitions of terms related to roofing work in this Section.
1.3 SUBMITTALS
A. Product Data: For each type of product indicated.
B. Sample: For each type of product indicated.
C. Maintenance Data: For asphalt shingles to include in maintenance manuals.
D. Warranties: Special warranties specified in this Section.
1.4 QUALITY ASSURANCE
A. Installer Qualifications: A firm or individual that is approved, authorized, or licensed by State for said construction.
B. Source Limitations: Obtain ridge and hip cap shingles through one source from a single asphalt shingle manufacturer.
C. Fire-Test-Response Characteristics: Provide asphalt shingle and related roofing materials with the fire-test-response characteristics indicated, as determined by testing identical products per test method below by UL or another testing and inspecting agency acceptable to authorities having jurisdiction. Identify materials with appropriate markings of applicable testing and inspecting agency.
1. Exterior Fire-Test Exposure: Class A; ASTM E 108 or UL 790, for application and roof slopes indicated.
ASPHALT SHINGLES 073110-2
1.5 DELIVERY, STORAGE, AND HANDLING
A. Store roofing materials in a dry, well-ventilated, weathertight location according to asphalt shingle manufacturer's written instructions. Store underlayment rolls on end on pallets or other raised surfaces. Do not double-stack rolls.
1. Handle, store, and place roofing materials in a manner to avoid significant or permanent damage to roof deck or structural supporting members.
B. Protect unused underlayment from weather, sunlight, and moisture when left overnight or when roofing work is not in progress.
1.6 PROJECT CONDITIONS
A. Weather Limitations: Proceed with installation only when existing and forecasted weather conditions permit asphalt shingle roofing to be performed according to manufacturer's written instructions and warranty requirements.
1. Install self-adhering sheet underlayment within the range of ambient and substrate temperatures recommended by manufacturer.
1.7 WARRANTY
A. Special Warranty: Manufacturer's standard form in which manufacturer agrees to repair or replace asphalt shingles that fail in materials within specified warranty period. Materials failures include manufacturing defects and failure of asphalt shingles to self-seal after a reasonable time.
1. Material Warranty Period: 30 years from date of Substantial Completion, prorated, with first 3 years non-prorated.
2. Wind-Speed Warranty Period: Asphalt shingles will resist blow-off or damage caused by wind speeds up to 100 mph for 5 years from date of Substantial Completion.
3. Algae-Discoloration Warranty Period: Asphalt shingles will not discolor five years from date of Substantial Completion.
4. Workmanship Warranty Period: 10 years from date of Substantial Completion.
B. Special Project Warranty: Roofing Installer's warranty, on warranty form at end of this Section, signed by roofing Installer, covering Work of this Section, in which roofing Installer agrees to repair or replace components of asphalt shingle roofing that fail in materials or workmanship within the following warranty period:
1. Warranty Period: 10 years from date of Substantial Completion.
1.8 MEASUREMENT AND PAYMENT
A. Payment for work in this section is in accordance with Facilities Job Order Contract.
PART 2 - PRODUCTS
2.1 MANUFACTURERS
A. In other Part 2 articles where titles below introduce lists, the following requirements apply to product selection:
ASPHALT SHINGLES 073110-3
1. Available Products: Subject to compliance with requirements, products that may be incorporated into the Work include, but are not limited to, products specified.
2.2 GLASS-FIBER-REINFORCED ASPHALT SHINGLES
A. Laminated-Strip Asphalt Shingles: ASTM D 3462, laminated, multi-ply overlay construction, glass-fiber reinforced, mineral-granule surfaced, and self-sealing.
1. Available Products:
a. GAF; Timberline in Barkwood.
b. CertainTeed Corporation; Landmark in Burnt Sienna.
c. Malarkey Roofing Company; Legacy XL in Heather (preferred).
d. Owens Corning; Duration Flex in Brownwood (preferred).
e. PABCO Roofing Products; Prestige in Harvest Brown.
2. Strip Size: Manufacturer's standard.
3. Algae Resistance: Granules treated to resist algae discoloration.
4. Color and Blends: As indicated by manufacturer's designations, sample submitted and approved by Contracting Officer.
B. Hip and Ridge Shingles: Manufacturer's standard units to match asphalt shingles.
2.3 UNDERLAYMENT MATERIALS
A. Felts: ASTM D 226 or ASTM D 4869, Type I asphalt-saturated organic felts, non-perforated.
B. Self-Adhering Sheet Underlayment, Polyethylene Faced: ASTM D 1970, minimum of 40-mil thick, slip-resisting, polyethylene-film-reinforced top surface laminated to SBS-modified asphalt adhesive, with release paper backing; cold applied, for installation on roof slopes of 5 in
12 maximum.
1. Available Products:
a. Carlisle Coatings & Waterproofing, Div. of Carlisle Companies Inc.; Dri-Start
"A."
b. Grace, W. R. & Co.; Grace Ice and Water Shield.
c. Henry Company; Perma-Seal PE.
d. Johns Manville International, Inc.; Roof Defender.
e. NEI Advanced Composite Technology; AC Poly Ice and StormSeal.
f. Owens Corning; WeatherLock M.
g. Polyguard Products, Inc.; Polyguard Deck Guard.
h. Protecto Wrap Company; Rainproof TM.
i. SafSeal Innovations; SafSeal 7740.
2.4 VENTS
A. Galvanized metal or aluminum preferred. Submit manufacturer’s specification sheet for approval from Contracting Officer.
2.5 ACCESSORIES
A. Asphalt Roofing Cement: ASTM D 4586, Type II, asbestos free.
ASPHALT SHINGLES 073110-4
B. Roofing Nails: ASTM F 1667; aluminum, stainless-steel, copper, or hot-dip galvanized steel wire shingle nails, minimum 0.120-inch- diameter, barbed or deformed shank, sharp-pointed, with a minimum 3/8-inch- diameter flat head and of sufficient length to penetrate 3/4 inch into solid wood decking or extend at least 1/8 inch through OSB or plywood sheathing.
1. Where nails are in contact with metal flashing, use nails made from same metal as flashing.
C. Felt Underlayment Nails: Aluminum, stainless-steel, or hot-dip galvanized steel wire with low profile capped heads or disc caps, 1-inch minimum diameter.
2.6 METAL FLASHING AND TRIM
A. Sheet Metal Flashing and Trim: Comply with requirements in Section 07620"Sheet Metal
Flashing and Trim."
1. Sheet Metal: Coil-coated aluminum or Zinc-coated (galvanized) steel.
B. Fabricate sheet metal flashing and trim to comply with recommendations in SMACNA's
"Architectural Sheet Metal Manual" that apply to design, dimensions, metal, and other characteristics of item.
1. Flashings: Fabricate with concealed flange extending a minimum of 18 inches beneath upslope asphalt shingles and 6 inches beyond each side of chimney and 6 inches above the roof plane.
2. Open Valley Flashings: Fabricate in lengths not exceeding 10 feet with 1-inch high inverted-V profile at center of valley and equal flange widths of 18 inches.
3. Drip Edges: Fabricate in lengths not exceeding 10 feet with 6-inch roof deck flange and
1-1/2-inch fascia flange with 1/2-inch drip at lower edge unless full metal fascia is required.
C. Vent Pipe Flashings: ASTM B 749, Type L51121, at least 1/16 inch thick. Provide lead sleeve sized to slip over and turn down into pipe, soldered to skirt at slope of roof and extending at least 4 inches from pipe onto roof. Alternative may be submitted for approval by Contracting
Officer.
PART 3 - EXECUTION
3.1 EXAMINATION
A. Examine substrates, areas, and conditions, with Installer present, for compliance with requirements for installation tolerances and other conditions affecting performance of work.
1. Examine roof sheathing to verify that sheathing joints are supported by framing and blocking or metal clips and that installation is within flatness tolerances.
2. Verify that substrate is sound, dry, smooth, clean, sloped for drainage, and completely anchored; and that provision has been made for flashings and penetrations through asphalt shingles.
B. Proceed with installation only after unsatisfactory conditions have been corrected.
3.2 UNDERLAYMENT INSTALLATION
ASPHALT SHINGLES 073110-5
A. Self-Adhering Sheet Underlayment: Install self-adhering sheet underlayment, wrinkle free, on roof deck. Comply with low-temperature installation restrictions of underlayment manufacturer if applicable. Install at locations indicated below, lapped in direction to shed water. Lap sides not less than 3-1/2 inches. Lap ends not less than 6 inches staggered 24 inches between courses.
Roll laps with roller. Cover underlayment within seven days.
1. Prime concrete and masonry surfaces to receive self-adhering sheet underlayment.
2. Eaves: Extend from edges of eaves 72 inches beyond interior face of exterior wall.
3. Rakes: Extend from edges of rake 36 inches beyond interior face of exterior wall.
4. Valleys: Extend from lowest to highest point 36 inches on each side.
5. Hips: Extend 36 inches on each side.
6. Ridges: Extend 36 inches on each side without obstructing continuous ridge vent slot.
7. Sidewalls: Extend beyond sidewall 36 inches and return vertically against sidewall not less than 18 inches.
8. Dormers, Chimneys, Skylights, and other Roof-Penetrating Elements: Extend beyond penetrating element 18 inches and return vertically against penetrating element not less than 12 inches.
9. Roof Slope Transitions: Extend 36 inches on each roof slope.
B. Metal-Flashed Open Valley Underlayment: Install two layers of 36-inch wide felt underlayment centered in valley. Stagger end laps between layers at least 72 inches. Lap ends of each layer at least 12 inches in direction to shed water, and seal with asphalt roofing cement. Fasten each layer to roof deck with roofing nails.
1. Lap roof deck felt underlayment over first layer of valley felt underlayment at least 6 inches.
3.3 METAL FLASHING INSTALLATION
A. General: Install metal flashings and other sheet metal to comply with requirements in Section
07620 "Sheet Metal Flashing and Trim."
1. Install metal flashings according to recommendations in ARMA's "Residential Asphalt
Roofing Manual" and asphalt shingle recommendations in NRCA's "The NRCA Roofing and Waterproofing Manual."
B. Flashings: Install against the roof-penetrating element extending concealed flange beneath upslope asphalt shingles and beyond each side.
C. Open Valley Flashings: Install centrally in valleys, lapping ends at least 8 inches in direction to shed water. Fasten upper end of each length to roof deck beneath overlap.
1. Secure hemmed flange edges into metal cleats spaced 12 inches apart and fastened to roof deck.
2. Adhere 9-inch- wide strip of self-adhering sheet to metal flanges and to self-adhering sheet underlayment.
D. Rake Drip Edges: Install rake drip edge flashings over underlayment and fasten to roof deck.
E. Eave Drip Edges: Install eave drip edge flashings below underlayment and fasten to roof sheathing.
F. Pipe Flashings: Form flashing around pipe penetrations and asphalt shingles. Fasten and seal to asphalt shingles as recommended by manufacturer.
ASPHALT SHINGLES 073110-6
3.4 ASPHALT SHINGLE INSTALLATION
A. Install asphalt shingles according to manufacturer's written instructions, recommendations in
ARMA's "Residential Asphalt Roofing Manual," and asphalt shingle recommendations in
NRCA's "The NRCA Roofing and Waterproofing Manual."
B. Install starter strip along lowest roof edge, consisting of an asphalt shingle strip at least 7 inches wide with self-sealing strip face up at roof edge.
1. Extend asphalt shingles 3/4 inch over fascia at eaves and rakes.
2. Install starter strip along rake edge.
C. For three-tab- and other multitab-strip asphalt shingles install first and remaining courses of asphalt shingles stair-stepping diagonally across roof deck with 5-inch manufacturer's recommended offset pattern at succeeding courses, maintaining uniform exposure.
D. For laminated-strip and no-cutout-strip asphalt shingles install first and remaining courses of asphalt shingles stair-stepping diagonally across roof deck with manufacturer's recommended offset pattern at succeeding courses, maintaining uniform exposure.
E. Install asphalt shingles by single-strip column or racking method (if recommended by manufacturer), maintaining uniform exposure. Install full length first course followed by cut second course, repeating alternating pattern in succeeding courses.
F. Fasten asphalt shingle strips with a minimum of five roofing nails located according to manufacturer's written instructions. Building code may require a minimum of six nails for areas subject to high winds speeds.
1. Where roof slope exceeds 20:12, seal asphalt shingles with asphalt roofing cement spots after fastening with additional roofing nails.
2. Where roof slope is less than 4:12, seal asphalt shingles with asphalt roofing cement spots.
3. When ambient temperature during installation is below 50 deg F, seal asphalt shingles with asphalt roofing cement spots.
G. Open Valleys: Cut and fit asphalt shingles at open valleys, trimming upper concealed corners of shingle strips. Maintain uniform width of exposed open valley from highest to lowest point.
1. Set valley edge of asphalt shingles in a 3-inch- wide bed of asphalt roofing cement.
2. Do not nail asphalt shingles to metal open valley flashings.
H. Ridge Vents: Install continuous ridge vents over asphalt shingles according to manufacturer's written instructions. Fasten with roofing nails of sufficient length to penetrate sheathing.
I. Ridge and Hip Cap Shingles: Maintain same exposure of cap shingles as roofing shingle exposure. Lap cap shingles at ridges to shed water away from direction of prevailing winds.
Fasten with roofing nails of sufficient length to penetrate sheathing.
1. Fasten ridge cap asphalt shingles to cover ridge vent without obstructing airflow.
3.5 ROOFING INSTALLER'S WARRANTY
A. WHEREAS <Insert name> of <Insert address>, herein called the "Roofing Installer," has performed roofing and associated work ("work") on the following project:
1. Owner: USDA Forest Service
ASPHALT SHINGLES 073110-7
2. Address: 857 W South Jordan Parkway, South Jordan, UT 84095
3. Building Name/Type: Pleasant Grove District Office
4. Address: 390 North 100 East, Pleasant Grove, Utah, 84062
5. Area of Work: <Insert information.>
6. Acceptance Date: <Insert contract acceptance date.>
7. Warranty Period: <As specified in Section 1.7, Warranty>
8. Expiration Date: <Insert date.>
B. AND WHEREAS Roofing Installer has contracted (either directly with Owner or indirectly as a subcontractor) to warrant said work against leaks and faulty or defective materials and workmanship for designated Warranty Period, C. NOW THEREFORE Roofing Installer hereby warrants, subject to terms and conditions herein set forth, that during Warranty Period he will, at his own cost and expense, make or cause to be made such repairs to or replacements of said work as are necessary to correct faulty and defective work and as are necessary to maintain said work in a watertight condition.
D. This Warranty is made subject to the following terms and conditions:
1. Specifically excluded from this Warranty are damages to work and other parts of the building, and to building contents, caused by:
a. lightning;
b. peak gust wind speed exceeding 100 mph;
c. fire;
d. failure of roofing system substrate, including cracking, settlement, excessive deflection, deterioration, and decomposition;
e. faulty construction of parapet walls, copings, chimneys, skylights, vents, equipment supports, and other edge conditions and penetrations of the work;
f. vapor condensation on bottom of roofing; and
g. activity on roofing by others, including construction contractors, maintenance personnel, other persons, and animals, whether authorized or unauthorized by
Owner.
2. When work has been damaged by any of foregoing causes, Warranty shall be null and void until such damage has been repaired by Roofing Installer and until cost and expense thereof have been paid by Owner or by another responsible party so designated.
3. Roofing Installer is responsible for damage to work covered by this Warranty but is not liable for consequential damages to building or building contents resulting from leaks or faults or defects of work.
4. During Warranty Period, if Owner allows alteration of work by anyone other than
Roofing Installer, including cutting, patching, and maintenance in connection with penetrations, attachment of other work, and positioning of anything on roof, this
Warranty shall become null and void on date of said alterations, but only to the extent said alterations affect work covered by this Warranty. If Owner engages Roofing
Installer to perform said alterations, Warranty shall not become null and void unless
Roofing Installer, before starting said work, shall have notified Owner in writing, showing reasonable cause for claim, that said alterations would likely damage or deteriorate work, thereby reasonably justifying a limitation or termination of this
Warranty.
5. During Warranty Period, if original use of roof is changed, this Warranty shall become null and void on date of said change, but only to the extent said change affects work covered by this Warranty.
ASPHALT SHINGLES 073110-8
6. Owner shall promptly notify Roofing Installer of observed, known, or suspected leaks, defects, or deterioration and shall afford reasonable opportunity for Roofing Installer to inspect work and to examine evidence of such leaks, defects, or deterioration.
7. This Warranty is recognized to be the only warranty of Roofing Installer on said work and shall not operate to restrict or cut off Owner from other remedies and resources lawfully available to Owner in cases of roofing failure. Specifically, this Warranty shall not operate to relieve Roofing Installer of responsibility for performance of original work according to requirements of the Contract Documents, regardless of whether Contract was a contract directly with Owner or a subcontract with Owner's General Contractor.
E. IN WITNESS THEREOF, this instrument has been duly executed this <Insert day> day of
<Insert month>, <Insert year>.
1. Authorized Signature: <Insert signature.>
2. Name: <Insert name.>
3. Title: <Insert title.>
END OF SECTION 073110
SHEET METAL FLASHING AND TRIM 076200-1
LOGAN DISTRICT OFFICE ROOF REPLACEMENT
SECTION 076200 - SHEET METAL FLASHING AND TRIM
PART 1 - GENERAL
1.1 SUMMARY
A. This Section includes the following sheet metal flashing and trim:
1. Formed steep-slope roof flashing and trim.
1.2 PERFORMANCE REQUIREMENTS
A. General: Install sheet metal flashing and trim to withstand wind loads, structural movement, thermally induced movement, and exposure to weather without failing, rattling, leaking, and fastener disengagement.
B. Water Infiltration: Provide sheet metal flashing and trim that does not allow water infiltration to building interior.
1.3 SUBMITTALS
A. Samples for Initial Selection: For each type of sheet metal flashing and trim indicated with factory-applied color finishes.
1. Include similar Samples of trim and accessories involving color selection.
1.4 DELIVERY, STORAGE, AND HANDLING
A. Deliver sheet metal flashing materials and fabrications undamaged. Protect sheet metal flashing and trim materials and fabrications during transportation and handling.
1.5 MEASUREMENT AND PAYMENT
A. Measurement will be as specified in Facilities Job Order Contract, negotiated and awarded.
PART 2 - PRODUCTS
2.1 SHEET METALS
A. Prepainted, Metallic-Coated Steel Sheet: Steel sheet metallic coated by the hot-dip process and prepainted by the coil-coating process to comply with ASTM A 755/A 755M.
1. Zinc-Coated (Galvanized) Steel Sheet: ASTM A 653/A 653M, coating designation;
structural quality.
2. Exposed Finishes: Apply the following coil coating:
a. Siliconized-Polyester Coating: Epoxy primer and silicone-modified, polyester-enamel topcoat; with a dry film thickness of not less than 0.2 mil for primer and
0.8 mil for topcoat.
SHEET METAL FLASHING AND TRIM 076200-2
1) Color: As selected by Contracting Officer’s Representative from manufacturer's full range.
2.2 MISCELLANEOUS MATERIALS
A. General: Provide materials and types of fasteners, solder, welding rods, protective coatings, separators, sealants, and other miscellaneous items as required for complete sheet metal flashing and trim installation.
B. Fasteners: Wood screws, annular threaded nails, self-tapping screws, and other suitable fasteners designed to withstand design loads.
1. Fasteners for Flashing and Trim: Blind fasteners or self-drilling screws, gasketed, with hex washer head.
C. Elastomeric Sealant: ASTM C 920, elastomeric silicone polymer sealant; of type, grade, class, and use classifications required to seal joints in sheet metal flashing and trim and remain watertight.
2.3 FABRICATION, GENERAL
A. General: Custom fabricate sheet metal flashing and trim to comply with recommendations in
SMACNA's "Architectural Sheet Metal Manual" that apply to design, dimensions, metal, and other characteristics of item indicated. Shop-fabricate items where practicable. Obtain field measurements for accurate fit before shop fabrication.
B. Fabricate sheet metal flashing and trim in thickness or weight needed to comply with performance requirements, but not less than that specified for each application and metal.
C. Expansion Provisions: Where lapped or bayonet-type expansion provisions in the Work cannot be used, form expansion joints of intermeshing hooked flanges, not less than 1 inch deep, filled with elastomeric sealant concealed within joints.
D. Conceal fasteners and expansion provisions where possible on exposed-to-view sheet metal flashing and trim, unless otherwise indicated.
PART 3 - EXECUTION
3.1 EXAMINATION
A. Examine substrates, areas, and conditions, with Installer present, to verify actual locations, dimensions and other conditions affecting performance of work.
1. Verify that substrate is sound, dry, smooth, clean, sloped for drainage, and securely anchored.
2. Proceed with installation only after unsatisfactory conditions have been corrected.
3.2 INSTALLATION, GENERAL
A. General: Anchor sheet metal flashing and trim and other components of the Work securely in place, with provisions for thermal and structural movement. Use fasteners, solder, welding rods, protective coatings, separators, sealants, and other miscellaneous items as required to complete sheet metal flashing and trim system.
SHEET METAL FLASHING AND TRIM 076200-3
1. Torch cutting of sheet metal flashing and trim is not permitted.
B. Install sheet metal flashing and trim true to line and levels indicated. Provide uniform, neat seams with minimum exposure of solder, welds, and elastomeric sealant.
C. Install sheet metal flashing and trim to fit substrates and to result in watertight performance.
Verify shapes and dimensions of surfaces to be covered before fabricating sheet metal.
D. Fasteners: Use fasteners of sizes that will penetrate substrate not less than 1-1/4 inches for nails and not less than 3/4 inch for wood screws.
E. Seal joints with elastomeric sealant as required for watertight construction.
3.3 ROOF TRIM INSTALLATION
A. General: Install sheet metal roof flashing and trim to comply with performance requirements and SMACNA's "Architectural Sheet Metal Manual." Provide concealed fasteners where possible, set units true to line, and level as indicated. Install work with laps, joints, and seams that will be permanently watertight.
3.4 CLEANING AND PROTECTION
A. Clean and neutralize flux materials. Clean off excess solder and sealants.
B. Remove temporary protective coverings and strippable films as sheet metal flashing and trim are installed. On completion of installation, clean finished surfaces, including removing unused fasteners, metal filings, pop rivet stems, and pieces of flashing. Maintain in a clean condition during construction.
C. Replace sheet metal flashing and trim that have been damaged or that have deteriorated beyond successful repair by finish touchup or similar minor repair procedures.
END OF SECTION 076200
AUGUST 2011
File details come from the government source that posted it. Updated .