Attachment_2-CCIFC-DWGBinder100.pdf

PDF 3 MB Posted

Attached to
HVAC Project at Color Country Interagency Fire Center (CCIFC)
Solicitation number
1284N819Q0060
Issued by

About this file

CCIFC HVAC Attachment 2- Drawings

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT LOCATION

VICINITY MAP

TRAVEL DIRECTIONS:

SHEET OF

United States Department of Agriculture

Forest Service

INDEX OF SHEETS

SHEET SHEET TITLE DATE

G0.1 COVER SHEET

M0.1

MECHANICAL LEGEND AND

SCHEDULES

M1.1 MECHANICAL FLOOR PLAN

M2.1

ENLARGED MECHANICAL PLANS AND

SECTIONS

M3.1 MECHANICAL SCHEMATICS

M5.1 MECHANICAL DETAILS

M5.2 HVAC UNIT CONTROL SCHEMATIC

M5.3

CONTROL DRAWINGS, SCHEMATICS

AND LEGEND

E0.1

ELECTRICAL LEGEND, SCHEDULES

AND DETAILS

E1.1 ELECTRICAL POWER PLAN

E7.1

ELECTRICAL PANEL SCHEDULES AND

DIAGRAMS

DIRECTIONS: FROM CEDAR CITY, UT DEPART I-15 AT EXIT 59

HEADING WEST TOWARD CEDAR CITY/AIRPORT/SOUTHERN UTAH

UNIVERSITY. TRAVEL 0.3 MILE AND TURN LEFT ONTO UT-56/W 200N.

TRAVEL 0.3 MILES AND TURN RIGHT ONTO N AIRPORT ROAD.

TRAVEL 1.0 MILES AND TURN RIGHT ONTO KITTYHAWK DRIVE.

PROCEED 0.1 MILE TO LOCATION.

ADDRESS: 1770 KITTYHAWK DR, CEDAR CITY, UT 84721.

LATITUDE AND LONGITUDE: 37.696780, -113.084400

RECOMMENDED BY:

APPROVED:

FOREST ENGINEER DATE

DIRECTOR OF ENGINEERING

DATE

FOREST SUPERVISOR DATE

4/3 0/1

9 1 6:

T

CM

IC

HA

EL

C :\U

SE

RS

\T

CM

IC

HA

EL

\B

OX

\C

DI

\O

TH

ER

\R 4\C

OL

OR

CO

FI

RE

\20

_M

EC

HM

OD

\D

W

GS

\T 1.D

W G;

CCIFC MECHANICAL MODIFICATIONS

UTAH

IRON COUNTY

DIXIE NATIONAL FOREST

R4 INTERMOUNTAIN REGION

AutoCAD SHX Text

1. DRAWINGS SHOW EXISTING MECHANICAL AND ELECTRICAL SYSTEMS DRAWINGS SHOW EXISTING MECHANICAL AND ELECTRICAL SYSTEMS AND COMPONENTS. WORK ASSOCIATED WITH THIS CONTRACT IS EITHER OUTLINED WITH RED BOXES AND/OR IDENTIFIED BY RED NOTES. ITEMS SHOWN IN BLACK ARE EXISTING. 2. EXISTING INFORMATION SHOWN ON THE DRAWINGS HAS BEEN TAKEN EXISTING INFORMATION SHOWN ON THE DRAWINGS HAS BEEN TAKEN FROM GOVERNMENT FURNISHED DRAWINGS AND/OR LIMITED FIELD OBSERVATIONS. FIELD VERIFY EXISTING CONDITIONS AND EQUIPMENT SEQUENCE OF OPERATIONS PRIOR TO BEGINNING WORK. BRING DISCREPANCIES TO THE ATTENTION OF THE CONTRACTING OFFICER. 3. PROTECT STRUCTURE AND EQUIPMENT FROM DAMAGE. IMMEDIATELY PROTECT STRUCTURE AND EQUIPMENT FROM DAMAGE. IMMEDIATELY REPLACE OR REPAIR, TO ORIGINAL CONDITION, DAMAGE CAUSED UNDER THIS CONTRACT. 4. DO NOT SHUT-OFF OR PUT-OUT OF SERVICE ANY SYSTEMS OR DO NOT SHUT-OFF OR PUT-OUT OF SERVICE ANY SYSTEMS OR SERVICE WITHOUT WRITTEN APPROVAL FROM THE CONTRACTING OFFICER.

AutoCAD SHX Text

GENERAL NOTES

tcmichael Rectangle

DRAWN

DESIGNER

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

4/3 /19

0:

T

CM

IC

HA

EL

C :\U

SE

RS

\T

CM

IC

HA

EL

\B

OX

\C

DI

\O

TH

ER

\R 4\C

OL

OR

CO

FI

RE

\20

_M

EC

HM

OD

\D

W

GS

\20

_M

EP

.D W

G;

(R4)

INTERMOUNTAIN REGION

CCIFC

MECHANICAL

MODIFICATIONS

DIXIE NATIONAL FOREST

COLOR COUNTY INTERAGENCY

FIRE CENTER

MECHANICAL LEGEND &

SCHEDULES

04/08/2019

T.MICHAEL

T.MICHAEL

S.HILL-WORTHEN

M0.1 002 011

Remove and replace hot water coil control valve actuator

Remove and replace Air Cooled Condenser and refrigerant piping.

Install new air cooled condenser and refrigerant piping.

Provide new glycol feeder 1. Remove and replace balancing valves on all hydronic coils.

2. Drain, clean, purge, and pressure test hydronic system.

3. Fill hydronic system with 30/70 glycol/water mix.

4. Test, adjust, and balance all HVAC equipment.1. All VAV boxes: Remove and replace box controller, room thermostat, and discharge air temperature sensor.

2. VAV-5: Remove and replace heating water control valve actuator.

tcmichael Callout Remove and replace Direct Expansion (DX) cooling coil with dual circuited DX cooling coil.

tcmichael Callout ADDITIVE ITEM: Remove and replace exhaust fans EF-1, EF-4, and EF-5. Reconnect to existing ductwork, electrical, and controls.

tcmichael Rectangle tcmichael Rectangle tcmichael Rectangle tcmichael Rectangle tcmichael Line tcmichael Callout ADDITIVE ITEM:Remove and replace relief fans RF-1 and RF-3. Reconnect to existing ductwork, electrical, and controls.

tcmichael Line

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

4/3 /19

0:

T

CM

IC

HA

EL

C :\U

SE

RS

\T

CM

IC

HA

EL

\B

OX

\C

DI

\O

TH

ER

\R 4\C

OL

OR

CO

FI

RE

\20

_M

EC

HM

OD

\D

W

GS

\20

_M

EP

.D W

G;

(R4)

INTERMOUNTAIN REGION

CCIFC

MECHANICAL

MODIFICATIONS

DIXIE NATIONAL FOREST

COLOR COUNTY INTERAGENCY

FIRE CENTER

MECHANICAL FLOOR

PLAN

04/08/2019

T.MICHAEL

T.MICHAEL

S.HILL-WORTHEN

M1.1 003 011

Remove and replace ACC-1 and refrigerant piping.

Install new ACC-2 and refrigerant piping.

tcmichael Rectangle tcmichael Rectangle tcmichael Callout See room 024 floor plan and sections on M2.1 for work in this area.

tcmichael Callout See room 009 floor plan on M2.1 for work in this area.

tcmichael Callout See existing and revised refrigerant piping isometrics on M5.2 tcmichael Rectangle tcmichael Rectangle tcmichael Rectangle tcmichael Callout ADDITIVE ITEM: Remove and replace exhaust fans EF-1, EF-4, and EF-5. Reconnect to existing ductwork, electrical, and controls.

tcmichael Line tcmichael Line tcmichael Rectangle tcmichael Rectangle tcmichael Callout ADDITIVE ITEM: Remove and replace relief fan RF-1. Reconnect to existing electrical and controls.

tcmichael Callout ADDITIVE ITEM: Remove and replace relief fan RF-3. Reconnect to existing ductwork, electrical and controls.

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

3/2 8/1

9 1 7:

T

CM

IC

HA

EL

C :\U

SE

RS

\T

CM

IC

HA

EL

\B

OX

\C

DI

\O

TH

ER

\R 4\C

OL

OR

CO

FI

RE

\20

_M

EC

HM

OD

\D

W

GS

\20

_M

EP

.D W

G;

(R4)

INTERMOUNTAIN REGION

CCIFC

MECHANICAL

MODIFICATIONS

DIXIE NATIONAL FOREST

COLOR COUNTY INTERAGENCY

FIRE CENTER

ENLARGED MECHANICAL

PLANS, AND SECTIONS

04/08/2019

T.MICHAEL

T.MICHAEL

S.HILL-WORTHEN

M2.1 004 011

1. Remove and replace balancing valves on all hydronic coils.

2. Drain, clean, purge, and pressure test hydronic system.

3. Fill hydronic system with 30/70 glycol/water mix.

4. Test, adjust, and balance all HVAC equipment.

Remove and replace DX cooling coil with dual circuited DX cooling coil.

Remove and replace control valve actuator.

Remove refrigerant piping. Install two sets of refrigerant piping to new condensing units.

Remove and replace DX cooling coil with dual circuited DX cooling coil.

Remove and replace control valve actuator.

Install glycol feeder.

Outside air damper fails to close at times. Service and adjust damper.

Seal supply duct between flexible connection and air handling unit

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

3/2 8/1

9 1 7:

T

CM

IC

HA

EL

C :\U

SE

RS

\T

CM

IC

HA

EL

\B

OX

\C

DI

\O

TH

ER

\R 4\C

OL

OR

CO

FI

RE

\20

_M

EC

HM

OD

\D

W

GS

\20

_M

EP

.D W

G;

(R4)

INTERMOUNTAIN REGION

CCIFC

MECHANICAL

MODIFICATIONS

DIXIE NATIONAL FOREST

COLOR COUNTY INTERAGENCY

FIRE CENTER

MECHANICAL

SCHEMATICS

04/08/2019

T.MICHAEL

T.MICHAEL

S.HILL-WORTHEN

M3.1 005 011

Install Glycol Feeder, valve and piping.

1. Remove and replace balancing valves on all hydronic coils.

2. Drain, clean, purge, and pressure test hydronic system.

3. Fill hydronic system with 30/70 glycol/water mix.

4. Test, adjust, and balance all HVAC equipment.

Remove and replace balancing valve.

Remove and replace balancing valve.

Remove and replace balancing valve.

Remove and replace balancing valve.

Remove and replace valve actuator tcmichael Callout Remove and replace valve actuator on VAV-5 only

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

4/4 /19

5:

T

CM

IC

HA

EL

C :\U

SE

RS

\T

CM

IC

HA

EL

\B

OX

\C

DI

\O

TH

ER

\R 4\C

OL

OR

CO

FI

RE

\20

_M

EC

HM

OD

\D

W

GS

\20

_M

EP

.D W

G;

(R4)

INTERMOUNTAIN REGION

CCIFC

MECHANICAL

MODIFICATIONS

DIXIE NATIONAL FOREST

COLOR COUNTY INTERAGENCY

FIRE CENTER

MECHANICAL DETAILS

04/08/2019

T.MICHAEL

T.MICHAEL

S.HILL-WORTHEN

M5.1 006 011

Remove ACC1 and refrigerant piping

Install new ACC-1, ACC-2 and associated refrigerant piping, valves, and concrete pad

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

4/4 /19

7:

T

CM

IC

HA

EL

C :\U

SE

RS

\T

CM

IC

HA

EL

\B

OX

\C

DI

\O

TH

ER

\R 4\C

OL

OR

CO

FI

RE

\20

_M

EC

HM

OD

\D

W

GS

\20

_M

EP

.D W

G;

(R4)

INTERMOUNTAIN REGION

CCIFC

MECHANICAL

MODIFICATIONS

DIXIE NATIONAL FOREST

COLOR COUNTY INTERAGENCY

FIRE CENTER

HVAC UNIT CONTROL

SCHEMATIC

04/08/2019

T.MICHAEL

T.MICHAEL

S.HILL-WORTHEN

M5.2 007 011 tcmichael Callout Replace status sensor. Verify operation.

tcmichael Callout EF-1 Fan shows alarm on graphic interface even when running. Correct control operation tcmichael Rectangle tcmichael Rectangle tcmichael Rectangle tcmichael Callout Revise control sequence for dual circuited DX coil and two condensing units.

tcmichael Text Box

1. Reconnect controls to replaced ACC-1.

2. Provide and install controls for ACC-2 tcmichael Text Box

1. Integrate new control devices with existing control system to accomplish control sequences.

2. Verify and test existing, revised, and new control components.

3. Demonstrate control operation accomplishes control sequence.

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

4/4 /19

5:

T

CM

IC

HA

EL

C :\U

SE

RS

\T

CM

IC

HA

EL

\B

OX

\C

DI

\O

TH

ER

\R 4\C

OL

OR

CO

FI

RE

\20

_M

EC

HM

OD

\D

W

GS

\20

_M

EP

.D W

G;

(R4)

INTERMOUNTAIN REGION

CCIFC

MECHANICAL

MODIFICATIONS

DIXIE NATIONAL FOREST

COLOR COUNTY INTERAGENCY

FIRE CENTER

CONTROL DRAWINGS,

SCHEMATICS AND

LEGEND

04/08/2019

T.MICHAEL

T.MICHAEL

S.HILL-WORTHEN

M5.3 008 011

Remove and replace VAV box controller, room thermostat, and discharge air sensor.

1. Integrate new control devices with existing control system to accomplish control sequences.

2. Verify and test existing, revised, and new control components.

3. Demonstrate control operation accomplishes control sequence.

Provide heating hot water controls to meet revised sequence of operation

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

3/2 8/1

9 1 7:

T

CM

IC

HA

EL

C :\U

SE

RS

\T

CM

IC

HA

EL

\B

OX

\C

DI

\O

TH

ER

\R 4\C

OL

OR

CO

FI

RE

\20

_M

EC

HM

OD

\D

W

GS

\20

_M

EP

.D W

G;

(R4)

INTERMOUNTAIN REGION

CCIFC

MECHANICAL

MODIFICATIONS

DIXIE NATIONAL FOREST

COLOR COUNTY INTERAGENCY

FIRE CENTER

ELECTRICAL LEGEND,

SCHEDULES AND

DETAILS

04/08/2019

T.MICHAEL

T.MICHAEL

S.HILL-WORTHEN

E0.1 009 011

Drawing provided for general information only.

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

4/4 /19

5:

T

CM

IC

HA

EL

C :\U

SE

RS

\T

CM

IC

HA

EL

\B

OX

\C

DI

\O

TH

ER

\R 4\C

OL

OR

CO

FI

RE

\20

_M

EC

HM

OD

\D

W

GS

\20

_M

EP

.D W

G;

(R4)

INTERMOUNTAIN REGION

CCIFC

MECHANICAL

MODIFICATIONS

DIXIE NATIONAL FOREST

COLOR COUNTY INTERAGENCY

FIRE CENTER

ELECTRICAL POWER

PLAN

04/08/2019

T.MICHAEL

T.MICHAEL

S.HILL-WORTHEN

E1.1 010 011

1, Remove ACC-1 disconnect. Install 60A-3P disconnect with 60 amp fuses. Reconnect power to ACC-1.

2. Install ACC-2 100A-3p disconnect with 80 amp fuses. Route #3 conductors with #8 ground in 1-1/4" conduit to unit and electrical panel.

Replace 125 A-3P circuit breaker with 60A-3P circuit breaker. Install new 80A-3P circuit breaker in space 79, 81, 83.

Install receptacle for glycol feeder. Extend power from existing circuit in surface mounted conduit.

Replace AHU-1 10 hp

VFD

Remove CP-1 and CP-2 heating hot water pump disconnects and starters.

Install 2 HP VFDs.

RF-1 Fan, Replace blown fuse

RF-3 Fan, trips manual starter and sounds bad during operation. Trouble shoot fan tripping and noise and correct.

EF-1 Fan continually trips manual starter and doesn't run. Verify fan current is less than or equal to nameplate rating. Trouble shoot starter tripping and correct.

EF-4 Fan doesn't run. Trouble shoot fan operation and correct tcmichael Text Box General Note:

See M5.2 for fan sensor and interface issues.

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

4/4 /19

6:

T

CM

IC

HA

EL

C :\U

SE

RS

\T

CM

IC

HA

EL

\B

OX

\C

DI

\O

TH

ER

\R 4\C

OL

OR

CO

FI

RE

\20

_M

EC

HM

OD

\D

W

GS

\20

_M

EP

.D W

G;

(R4)

INTERMOUNTAIN REGION

CCIFC

MECHANICAL

MODIFICATIONS

DIXIE NATIONAL FOREST

COLOR COUNTY INTERAGENCY

FIRE CENTER

ELECTRICAL PANEL

SCHEDULES AND

DIAGRAMS

04/08/2019

T.MICHAEL

T.MICHAEL

S.HILL-WORTHEN

E7.1 FS090523_R102013_L1-002.dwg

011 011

Remove 125A-3P breaker. Install 60A-3P breaker

Install 80A-3P breaker

2103_001
CCIFC-DWGBinder100
M01
Sheets and Views
M01
M11
Sheets and Views
M11
M21
Sheets and Views
M21
M31
Sheets and Views
M31
M51
Sheets and Views
M51
M53
Sheets and Views
M53
E01
Sheets and Views
E01
E11
Sheets and Views
E11
E71
Sheets and Views
E71
M52.pdf
Sheets and Views
M52
T1.pdf
Sheets and Views
17x11 EXPANDED

File details come from the government source that posted it.