1284M820R0005 - current A0001.pdf
PDF 1 MB Posted
- Attached to
- Facilities Maintenance/Repair MATOC Federal contract opportunity
- Solicitation number
- 1284M820R0005
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attach C TO Request Forml.xlsx | XLSX spreadsheet | |
| Attach B TO Cost Proposal.xlsx | XLSX spreadsheet | |
| 1284M820R0005 - A0001 6-24-2020.pdf | ||
| 1284M820R0005 - A0001.pdf | ||
| Q-A Facilities 1284M820R0005.docx | DOCX document | |
| 1284M820R0005 FACILITIES RFP.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
1284M820R0005 x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT
THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
84M8
OGDEN UT 84401-2399
324 25TH STREET
INTERMOUNTAIN REGION
84M8
OGDEN UT 84401
324 25TH STREET
INTERMOUNTAIN REGION
06/18/20200001
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
06/02/2020
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
The purpose of this amendment is to:
1. Extend the date for receipt of offers to 16 July 2020;
2. Incorporate Questions & Answers from the pre-award teleconference;
3. Incorporate the TO Cost Proposal (Attach B) and the TO Request(Attach C)fillable Excel forms;
4. Add the magnitude of construction range for future projects of $25K - $100K;
5. Remove Item #1-Supervision under Location Coefficients,
6. Correct #9 verbiage; Site Cleanup, and;
7. Correct the Instruction Page #1.
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
REBECCA A. MARTINEZ
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
NSN 7540-01-152-8070
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
TEL: EMAIL: 208-373-4231 rebecca.martinez@usda.gov
REGION 4 REGIONAL OFFICE AQUISTION INSTRUCTIONAL COVER SHEET
ISSUING OFFICE:
U.S. DEPARTMENT OF AGRICULTURE
FOREST SERVICE
REGION 4 ACQUISITION
1249 S VINNELL WAY, SUITE 200
BOISE, ID 83709
SOLICITATION NO. 1284M820R0005
OFFERS ARE SOLICITED FOR: Multi-Trade Facilities Construction, Repair, and Remodel (IDIQ)
IMPORTANT – NOTICE TO OFFEROR:
AT A MINIMUM, OFFEROR SHALL SUBMIT THE FOLLOWING DOCUMENTS BACK WITH THEIR RESPONSE
TO THIS SOLICITATION:
1.SF-1442 - Solicitation, Offer, and Award and attached documents: (Review, complete, date, and sign blocks 18-20c)
2.Section B - Schedule of Items: (Complete Location and Option Year Coefficients.
3.Section M - Technical Proposal: (Evaluation Factors Section)
4.Section L - Instruction to Offerors (AGAR 452.237-71 Pre-Bid/Pre-Proposal Teleconference Schedule)
5.Section K - FAR 52.209-11 & FAR52.209-13: Please complete and return with proposal.
Email proposal package to: rebecca.martinez@usda.gov
IT IS REQUIRED FOR THE SOLICITATION NO. BE CLEARLY IDENTIFIED ON ALL DOCUMENTS.
Please keep a copy of your quote for your records.
IT IS REQUIRED THAT ALL CONTRACTOR’S BE REGISTERED IN SAM (SYSTEM FOR AWARD
MANAGEMENT) DATABASE PRIOR TO AWARD UNDER THIS SOLICITATION. SEE CLAUSE
52.204-7 CENTRAL CONTRACTOR REGISTRATION FOR DETAILS ON HOW TO APPLY.
NO PAPER SOLICITATIONS SHALL BE ISSUED.
IT IS THE OFFERORS RESPONSIBILITY TO WATCH FOR ANY AND ALL AMENDMENTS TO THE
SOLICITATION.
rebeccamartinez Highlight
1284M820D0005
• Task Order Location Coefficient for each location within a National Forest. Offeror’s may submit coefficients for one or more National Forests, Offeror is required to provide pricing on all Districts within a single National Forest to be considered. Offeror is not required to submit for all National Forests. Offeror shall insert N/A on lines they do not want to be considered for. Offeror will only be considered for Task Orders on those National Forests for which coefficients are provided and contract awarded.
• Option Year Coefficient.
• Sample Project pricing using Attachments B and C.
It is anticipated that multiple awards will be made. Failure to comply with the instructions may render your proposal incomplete and ineligible for possible contract award. The Government anticipates making 2-3 three awards per Forest. The contractor may submit lower coefficients on individual task orders.
Flat Fee Schedule
a. Operation and Maintenance Manuals: The Contractor shall be allowed a flat fee of $200.00 for each manual per discipline (3 copies) if required by Task Order.
b. As-Built-Drawings: The Contractor shall be allowed a flat fee of $350.00 for each set of drawings (3 copies) as required by Task Order.
c. Permits and Fees: The Contractor shall be allowed a reimbursement fee of actual cost for any permits required by the Task Order. Contractor shall submit proof of cost for permits and fees.
Location Coefficients
The Location Coefficients are listed in THE SCHEDULE OF ITEMS and are proposed by the offeror. Due to the wide geographic distribution of potential Task Orders and the possible variability in cost based on location of the work, THE SCHEDULE is broken down into Individual Forests. Within the proposed Forest the offeror shall propose a Location Coefficient for each Ranger District within that Forest and shall cover all facilities within the Administrative Area/Boundary of that District. Information regarding National Forest Boundary maps may be found at http://www.fs.fed.us/maps/forest-maps.shtml.
The coefficients are proposed as a percentage (in decimal format) increase or decrease to the base pricing. For example, a coefficient of 1.2 would result in an additional 20 percent to the bid price; 0.9 would result in a 10 percent decrease of the bid price, and 1.00 would leave the unit price as your proposed. The offeror shall limit the Coefficients to three decimal places. The offeror shall propose an Option Year Coefficient for each option year. The offeror’s Coefficients must be all inclusive and shall include, but is not limited to, the following costs:
1. Overhead
2. Profit and risk
3. Bond premiums
4. Social security contributions
5. General insurances
6. Workman’s compensations insurance
7. State unemployment insurance
8. Federal unemployment insurance
9. Mobilization and demobilization costs
10. Site cleanup associated with demobilization http://www.fs.fed.us/maps/forest-maps.shtml
11. Supervision
12. Quality control
13. Transportation of contractor’s personnel to, from, and within the job site
14. Lodging and per-diem
15. Adjustment factors to account for small jobs
16. Incidental tools and equipment
17. Submittals (unless noted otherwise)
18. Task Order preparation costs
19. Any markups for materials and all contingencies
Work Hours
Standard Work Hours: The Contractor shall normally perform tasks during the standard working days of Monday through Friday, except for Federal Holidays, and the standard working hours of 7:30 a.m. through 4:30 p.m. The Contractor may elect, at his option, to workdays/hours other than the normal working days/hours provided that:
1. The request is submitted to the COR for approval, AND
2. The Contracting Officer approves the request.
Such hours will be considered priced as performed during standard working days/hours, unless otherwise stated in the applicable Task Order.
Non-Standard Work Hours: Non-standard workdays/hours are those days/hours not included in the definition of “Normal or Standard Work Hours” (the period from 4:30 p.m. through 7:30 a.m., Monday through Friday;
Saturday, Sunday, and Federal Holidays). Items of work to be accomplished during non-standard hours will be clearly identified in Contractor technical/cost negotiated proposals, indicating justification for the request.
Pricing Structure for individual Task Orders (See Attachment B cost proposal form).
Individual task orders have broad cost categories that shall be lump sum quantities on Attachment B. The contractor may be required to provide detailed costing information upon request of the CO on individual task orders. The task order cost proposal is broken down into the following categories and a description of what should be included in detailed costing information for each line item is included:
A. Material Costs: Costs of actual materials based to complete the task order work. Materials costs shall be broken down to include quantities and unit price. Materials shipping costs are included in this item.
B. Labor Costs: Minimum rates are determined from applicable Davis Bacon Wage Determinations.
Labor costs reflect productivity based on actual working conditions. These figures include time spent during a normal workday on tasks other than actual installation, such as material receiving and handling, mobilization at site, site movement, breaks and cleanup.
C. Equipment Costs: Include not only rental, but also operating costs for equipment under normal use.
The operating costs include parts and labor for routine servicing such as repair and replacement of pumps, filters, and worn lines. Normal operating expendables such as fuel, lubricants, tires and electricity are also included.
D. Subcontracted Costs: Subcontracted items shall be listed individually. Examples include Electrical, Plumbing, HVAC, etc. Detailed costing information shall include the items listed above upon request (material, labor, and equipment).
1284M820D0005
| Pages from 1284M820R0005 - A0001.pdf |
| Flat Fee Schedule |
| Location Coefficients |
| 1284M820R0005 FACILITIES AMENDMENT.pdf |
| CLAUSES INCORPORATED BY REFERENCE |
| SECTION J--LIST OF ATTACHMENTS |
| Attach I WD 2020.pdf |
| Sheet1 |
| Attach H TaskOrderExampleProject.pdf |
| Sheets and Views |
| JOHNSON CREEK_titlesheet-11x17 |
| JohnsonCreek_buildings_plans-SHEET 2 |
| JohnsonCreek_buildings_plans-SHEET 3 |
| JohnsonCreek_buildings_plans-SHEET 4 |
| JohnsonCreek_buildings_plans-SHEET5 |
| JohnsonCreek_buildings_plans-SHEET 6 |
| JohnsonCreek_buildings_plans-SHEET 7 |
| JohnsonCreek_buildings_plans-SHEET 8 |
| JohnsonCreek_buildings_plans-SHEET 9 |
| ROOFDWG-SHEET 4 |
| JohnsonCreek_buildings_plans-SHEET 11 |
| D01_family_units_agg_pad-SHEET12 |
| D01_family_units_agg_pad-SHEET13 |
| D01_family_units_agg_pad-SHEET14 |
| Attach F PPQ.pdf |
| Performance Rating Form |
| NAME OF COMPANY EVALUATED: |
| 3. TECHNICAL CAPABILITY |
| FOR #10, PLEASE ANSWER “Yes” or “No”, as appropriate |
| Attach E Boise StandardSpecs.pdf |
| C1 SCOPE OF CONTRACT |
| C2 PROJECT LOCATION |
| C3 SITE INFORMATION AND LIMITATIONS |
| C4 TRAFFIC CONTROL AND CONSTRUCTION SIGNING |
| C5 WORK CAMPS, STAGING AND STORAGE AREAS |
| Areas for staging operations and storage of materials shall be approved by the CO. The contractor must request in writing for approval from the CO to stage trailers (work or housing) on site. |
| Overnight camping on site will not be allowed without prior approval. |
| C6 INSPECTION OF WORKSITE |
| C7 START DATE |
| The approximate start date for the project is May 15, 2011. |
| C8 CONTRACT TIME |
| 1.1 SUMMARY |
| A. This Section includes the following: |
| 1. Work covered by this bid item. |
| 2. Use of premises. |
| 3. Work restrictions. |
| 4. Specification formats and conventions. |
| 1.2 WORK COVERED BY CONTRACT DOCUMENTS |
| A. Project Identification: BOISE NATIONAL FOREST STANDARD FACILITIES SPECIFICATIONS. |
| 1. Project Location: The project sites are located at various locations within the Boise National Forest as identified on each individual job order request. |
| 2. Owner: USDA Forest Service |
| B. The Work consists of the following: |
| 1. The Work includes: |
| 1.3 USE OF PREMISES |
| A. General: Contractor shall have full use of premises for construction operations, including use of Project site, during construction period. Contractor's use of premises is limited only by the Government’s right to perform work or to retain other co... |
| B. Use of Site: Limit use of premises to work in areas indicated. Do not disturb portions of Project site beyond areas in which the Work is indicated. |
| 1. Driveways and Entrances: Follow the requirements noted in Section C. |
| 1.4 MEASUREMENT AND PAYMENT: |
| A. Measurement and payment will be as listed in the Schedule of Items. Payment will include all items of work required to complete the Site and Buildings ready for use and complete. |
| 1. For individual construction items, longitudinal and lateral measurements for area computations shall be made horizontally or corrected to horizontal measurement unless otherwise specified. Measurements for geotextiles, netting and erosion control ... |
| 2. For excavation or embankment volumes, the average end area method shall be used to compute volumes. However, if in the judgment of the Contracting Officer (CO), the average end area method is impractical, measurement shall be made by volume in hau... |
| 3. For Structures, they shall be measured according to neat lines shown on the drawings or as altered by the CO, in writing, to fit field conditions. |
| 4. For items that are measured by the linear foot, such as pipe culverts, fencing, guardrail, piping, utilities, and underdrains, measurements shall be made parallel to the base or foundation upon which the structures are placed. |
| 5. For aggregates weighed for payment, the tonnage shall not be adjusted for moisture content, unless otherwise provided for. |
| 6. For standard manufactured items (such as fence, wire, plates, rolled shapes, pipe conduits) identified by gauge, weight, section dimensions, and so forth, such identifications shall be considered the nominal weights or dimensions. Unless controlle... |
| 1. Acre: Make longitudinal and transverse measurements for area computations horizontally. |
| 2. 50lb Bag: Measurement will be for the actual number of 50lb bags of standard bentonite grout. |
| 3. 94lb Bag: Measurement will be for the actual number of 94lb bags of standard cement or grout. |
| 4. Cubic Yard (CY): A measurement computed by one of the following methods: |
| 5. Each (EA): One complete unit, which may consist of one or more parts. |
| 6. Gallons (GAL): The quantity shall be measured by any of the following methods: |
| 7. Hour (HR): Measurement will be for the actual number of hours (or fraction thereof) ordered by the Contracting Officer and performed by the contractor. |
| 8. Linear Foot (LF): Measurement of work along its length from point-to-point; parallel to the base or foundation. Do not measure overlaps. |
| 9. Lump Sum (LS): One complete unit. |
| 10. Mile: Measured horizontally along the centerline of each roadway, approach, or ramp. |
| 11. Pound (LB): For sacked or packaged material, measurement will be the net weight as packed by the manufacturer. |
| 12. Square Foot (SF): Measured on a plane parallel to the surface being measured. |
| 13. Square Yard (SY): Measured on a plane parallel to the surface being measured. |
| 14. Ton: Measured as a short ton consisting of 2,000 pounds. |
| 1. ACTUAL QUANTITIES (AQ) - These quantities are determined from actual measurements of completed work. |
| 2. DESIGNED QUANTITIES (DQ) - These quantities denote the final number or units to be paid for under the terms of the contract. They are based upon the original design data available prior to advertising the project. Original design data include the... |
| 3. LUMP SUM QUANTITIES (LSQ) - These quantities denote one complete unit of work as required by or described in the contract, including necessary materials, equipment, and labor to complete the job. They shall not be measured. |
| 4. STAKED QUANTITIES (SQ) - These quantities are determined from staked measurements prior to construction. |
| 5. VEHICLE QUANTITIES (VQ) - These quantities are measured or weighed in hauling vehicles. |
| 1. Coordinate transmittal of different types of submittals for related parts of the Work so processing will not be delayed because of need to review submittals concurrently for coordination. |
| 1. Initial Review: Allow 14 days for initial review of each submittal. Allow additional time if processing must be delayed to permit coordination with subsequent submittals. CO will advise Contractor when a submittal being processed must be delayed... |
| 2. If intermediate submittal is necessary, process it in same manner as initial submittal. |
| 3. Allow 14 days for processing each re-submittal. |
| 4. No extension of the Contract Time will be authorized because of failure to transmit submittals enough in advance of the Work to permit processing. |
| 1. Indicate name of firm or entity that prepared each submittal on label or title block. |
| 2. Provide a space on label or beside title block to record Contractor's review and approval markings and action taken by CO. |
| 3. Include the following information on label for processing and recording action taken: |
| 1. Number of Copies: Submit three copies of each submittal, unless otherwise indicated. CO will return two copies. Mark up and retain one returned copy as a Project Record Document. |
| 1. If information must be specially prepared for submittal because standard printed data are not suitable for use, submit as Shop Drawings, not as Product Data. |
| 2. Mark each copy of each submittal to show which products and options are applicable. |
| 3. Include the following information, as applicable: |
| 1. Preparation: Include the following information, as applicable: |
| 2. Wiring Diagrams: Differentiate between manufacturer-installed and field-installed wiring. |
| 1. Samples for Initial Selection: Submit manufacturer's color charts consisting of units or sections of units showing the full range of colors, textures, and patterns available. |
| 1. Number of Copies: Submit three copies of each submittal, unless otherwise indicated. CO will not return copies. |
| 2. Certificates and Certifications: Certificates and certifications shall be signed by an officer or other individual authorized to sign documents on behalf of that entity. |
| 3. Test and Inspection Reports: Comply with requirements in Section 014100 "Quality Control." |
| 1. Complete technical data including drawings, complete performance specifications, test data, samples and performance tests of the article proposed for substitution. Submit additional information if required by Contracting Officer. All items in the... |
| 2. Similar data as above for item originally specified. All items shall be marked to identify where/how the proposed substitution will differ. |
| 3. A statement by the Contractor that the proposed substitution is in full compliance with the contract documents, applicable codes, and laws. |
| 4. The Contractor shall be responsible for any effect upon related work in the project for any substitution and shall pay any additional costs generated by any substitutions. |
| 1.1 SUMMARY |
| A. This Section includes special procedures for historic treatment for sites identified as Listed or Eligible for listing on the National Historic Register, including, but not limited to, the following: |
| 1.2 DEFINITIONS |
| A. "Repair": To stabilize, consolidate, or conserve; to retain existing materials and features while employing as little new material as possible. Repair includes patching, piecing-in, splicing, consolidating, or otherwise reinforcing or upgrading m... |
| B. "Replace": To duplicate and replace entire features with new material in kind. Replacement includes the following conditions: |
| C. "Remove": To detach items from existing construction and legally dispose of them off-site unless indicated to be removed and salvaged or removed and reinstalled. |
| D. "Existing to Remain" or "Retain": Existing items of construction that are not to be removed and that are not otherwise indicated to be removed and salvaged, or removed and reinstalled. |
| E. "Material in Kind": Material that matches existing materials, as much as possible, in species, cut, color, grain, and finish. |
| 1.3 STORAGE AND PROTECTION OF HISTORIC MATERIALS |
| A. If it is necessary to remove roof trim or components during construction to replace shingles follow the description here: |
| B. Existing Historic Materials to Remain: Protect construction indicated to remain against damage and soiling during construction. When permitted by the Contracting Officer’s Representative items may be removed to a suitable, protected storage locat... |
| C. Storage and Protection: When removed from their existing location, store historic materials within a weather tight enclosure where they are protected from wetting by rain, snow, or ground water, and temperature variations. Secure stored materials... |
| 1.4 PROJECT-SITE CONDITIONS |
| A. Exterior Repairing: |
| a. Wet Weather: Do not attempt repairs during rainy or foggy weather. Do not apply primer, paint, putty, or epoxy when the relative humidity is above 80 percent. Do not remove exterior elements of structures when rain is forecast or in progress. |
| b. Do not perform exterior wet work when the air temperature is below 40 deg F. |
| c. Do not begin cleaning, patching, or repairing when there is any likelihood of frost or freezing. |
| d. Do not begin paint removal when either the air or the surface temperature is below 45 deg F unless approved means are provided for maintaining a 45 deg F temperature of the air and materials during, and for 48 hours subsequent to cleaning. |
| 1.5 MEASUREMENT AND PAYMENT |
| A. No separate measurement and/or payment will be made for this Section. Payment for this work shall be included in items listed in the Schedule of Items. |
| PART 2 - PRODUCTS (Not Used) |
| PART 3 - EXECUTION |
| 3.1 PROTECTION, GENERAL |
| A. Comply with manufacturer's written instructions for precautions and effects of products and procedures on adjacent building materials, components, and vegetation. |
| B. Temporary Protection of Historic Materials during Construction: |
| C. Protect landscape work adjacent to or within work areas as follows: |
| 1. Testing agency will interpret tests and inspections and state in each report whether tested and inspected work complies with or deviates from the Contract Documents. |
| 2. Testing agency will re-test and re-inspect corrected work. |
| 1. If the plan requires any revisions or corrections, the Contractor shall resubmit the plan within 10 days. |
| 2. The Government reserves the right to require changes in the plan during the contract period as necessary. |
| 3. No change in the approved plan may be made without written concurrence by the Contracting Officer. |
| 4. At a minimum, the plan shall include the following: |
| 1. Date of issue. |
| 2. Project title and number. |
| 3. Name, address, and telephone number of testing agency. |
| 4. Dates and locations of samples, tests, or inspections. |
| 5. Names of individuals performing tests and inspections. |
| 6. Reference Specification Section(s). |
| 7. Complete test or inspection data. |
| 8. Test and inspection results and an interpretation of test results. |
| 9. Ambient conditions at time sample was taken, tested, or inspected. |
| 10. Comments or professional opinion on whether tested or inspected work complies with the Contract Document requirements. |
| 11. Name and signature of laboratory inspector. |
| 12. Recommendations on retesting and reinspecting. |
| 1.6 MEASUREMENT AND PAYMENT |
| A. No separate measurement and/or payment will be made for this Section. Payment for this work shall be included in items listed in the Schedule of Items. |
| 1. Selected portions of a building or structure. |
| 2. Repair procedures for selective demolition operations. |
| 1. Conditions existing at time of inspection for bidding purpose will be maintained by Government as far as practical. |
| 1. If identical materials are unavailable or cannot be used for exposed surfaces, use materials that visually match existing adjacent surfaces to the fullest extent possible. |
| 2. Use materials whose installed performance equals or surpasses that of existing materials. |
| 1. Cut off pipe or conduit in walls or partitions to be removed. Cap, valve, or plug and seal remaining portion of pipe or conduit after bypassing. |
| 1. Do not close or obstruct streets, walks, walkways, or other adjacent occupied or used facilities without permission from CO and authorities having jurisdiction. Provide alternate routes around closed or obstructed traffic ways if required by gover... |
| 2. Protect existing site improvements, appurtenances, and landscaping to remain. |
| 1. Wet mop floors to eliminate trackable dirt and wipe down walls and doors of demolition enclosure. Vacuum carpeted areas. |
| 1. Neatly cut openings and holes plumb, square, and true to dimensions required. Use cutting methods least likely to damage construction to remain or adjoining construction. |
| 2. Cut or drill from the exposed or finished side into concealed surfaces to avoid marring existing finished surfaces. |
| 3. Do not use cutting torches until work area is cleared of flammable materials. At concealed spaces, such as duct and pipe interiors, verify condition and contents of hidden space before starting flame-cutting operations. Maintain portable fire-sup... |
| 4. Locate selective demolition equipment and remove debris and materials so as not to impose excessive loads on supporting walls, floors, or framing. |
| 1. Clean salvaged items. |
| 2. Pack or crate items after cleaning. Identify contents of containers. |
| 3. Store items in a secure area until delivery to Government. |
| 1. Clean and repair items to functional condition adequate for intended reuse. Paint equipment to match new equipment. |
| 2. Pack or crate items after cleaning and repairing. Identify contents of containers. |
| 3. Protect items from damage during transport and storage. |
| 4. Reinstall items in locations indicated. Comply with installation requirements for new materials and equipment. Provide connections, supports, and miscellaneous materials necessary to make item functional for use indicated. |
| 1. Completely fill holes and depressions in existing masonry walls that are to remain with an approved masonry patching material applied according to manufacturer's written recommendations. |
| 1.1 SUMMARY |
| 1.2 DEFINITIONS |
| A. Cementitious Materials: Portland cement alone or in combination with one or more of the following: blended hydraulic cement, fly ash and other pozzolans, ground granulated blast-furnace slag, and silica fume; subject to compliance with requirements. |
| 1.3 SUBMITTALS |
| A. Product Data: For each type of product indicated. |
| B. Design Mixtures: For each concrete mixture. Indicate amounts of mixing water to be withheld for later addition at Project site. |
| C. Field quality-control test reports. |
| 1.4 MEASUREMENT AND PAYMENT |
| A. Unless otherwise noted herein, there will be no separate measurement or payment for work in this section. Payment will be included at the contract unit price for items shown on the Schedule of Items. |
| PART 2 - PRODUCTS |
| 2.1 FORM-FACING MATERIALS |
| A. Smooth-Formed Finished Concrete: Form-facing panels that will provide continuous, true, and smooth concrete surfaces. Furnish in largest practicable sizes to minimize number of joints. |
| 1. Plywood, metal, or other approved panel materials. |
| 2. Exterior-grade plywood panels, suitable for concrete forms, complying with DOC PS 1, and as follows: |
| a. Structural 1, B-B or better; mill oiled and edge sealed. |
| b. B-B (Concrete Form), Class 1 or better; mill oiled and edge sealed. |
| B. Rough-Formed Finished Concrete: Plywood, lumber, metal, or another approved material. Provide lumber dressed on at least two edges and one side for tight fit. |
| C. Forms for Cylindrical Columns, Pedestals, and Supports: Metal, glass-fiber-reinforced plastic, paper, or fiber tubes that will produce surfaces with gradual or abrupt irregularities not exceeding specified formwork surface class. Provide units wi... |
| D. Form-Release Agent: Commercially formulated form-release agent that will not bond with, stain, or adversely affect concrete surfaces and will not impair subsequent treatments of concrete surfaces. |
| E. Form Ties: Factory-fabricated, removable or snap-off metal or glass-fiber-reinforced plastic form ties designed to resist lateral pressure of fresh concrete on forms and to prevent spalling of concrete on removal. |
| 1. Furnish units that will leave no corrodible metal closer than 1 inch to the plane of exposed concrete surface. |
| 2. Furnish ties with integral water-barrier plates to walls indicated to receive dampproofing or waterproofing. |
| 2.2 STEEL REINFORCEMENT |
| A. Reinforcing Bars: ASTM A 615/A 615M, Grade 60, deformed. |
| B. Plain-Steel Wire: ASTM A 82, as drawn. |
| C. Deformed-Steel Wire: ASTM A 496. |
| 2.3 REINFORCEMENT ACCESSORIES |
| A. Joint Dowel Bars: ASTM A 615/A 615M, Grade 60, plain-steel bars, cut bars true to length with ends square and free of burrs. |
| B. Bar Supports: Bolsters, chairs, spacers, and other devices for spacing, supporting, and fastening reinforcing bars and welded wire reinforcement in place. Manufacture bar supports from steel wire, plastic, or precast concrete according to CRSI's ... |
| 1. For concrete surfaces exposed to view where legs of wire bar supports contact forms, use CRSI Class 1 plastic-protected steel wire or CRSI Class 2 stainless-steel bar supports. |
| 2.4 CONCRETE MATERIALS |
| A. Cementitious Material: Use the following cementitious materials, of the same type, brand, and source, throughout Project: |
| 1. Portland Cement: ASTM C 150, Type II. |
| B. Normal-Weight Aggregates: ASTM C 33, graded, from a single source. |
| 1. Maximum Coarse-Aggregate Size: 1 inch nominal. |
| 2. Fine Aggregate: Free of materials with deleterious reactivity to alkali in cement. |
C. Water: ASTM C 94/C 94M and potable.
| 2.5 ADMIXTURES |
| A. Air-Entraining Admixture: ASTM C 260. |
| B. Chemical Admixtures: Provide admixtures certified by manufacturer to be compatible with other admixtures and that will not contribute water-soluble chloride ions exceeding those permitted in hardened concrete. Do not use calcium chloride or admix... |
| 1. Retarding Admixture: ASTM C 494/C 494M, Type B. |
| 2.6 VAPOR RETARDERS |
| A. Plastic Vapor Retarder: ASTM E 1745, Class C, or polyethylene sheet, ASTM D 4397, not less than 10 mils thick. Include manufacturer's recommended adhesive or pressure-sensitive joint tape. |
| B. Fine-Graded Granular Material: Clean mixture of crushed stone, crushed gravel, and manufactured or natural sand; ASTM D 448, Size 10, with 100 percent passing a 3/8-inch sieve, 10 to 30 percent passing a No. 100 sieve, and at least 5 percent passi... |
| 2.7 CURING MATERIALS |
| A. Absorptive Cover: AASHTO M 182, Class 2, burlap cloth made from jute or kenaf, weighing approximately 9 oz./sq. yd. when dry. |
| B. Moisture-Retaining Cover: ASTM C 171, polyethylene film or white burlap-polyethylene sheet. |
| C. Water: Potable. |
| D. Clear, Waterborne, Membrane-Forming Curing Compound: ASTM C 309, Type 1, Class B, dissipating or nondissipating. Liquid Membrane-Forming Compounds. Material shall be certified by curing compound manufacturer to not interfere with bonding of floor... |
| 2.8 RELATED MATERIALS |
| A. Expansion- and Isolation-Joint-Filler Strips: ASTM D 1751, asphalt-saturated cellulosic fiber or ASTM D 1752, cork or self-expanding cork. |
| B. Semirigid Joint Filler: Two-component, semirigid, 100 percent solids, epoxy resin with a Type A shore durometer hardness of 80 per ASTM D 2240. |
| C. Bonding Agent: ASTM C 1059, Type II, non-redispersible, acrylic emulsion or styrene butadiene. |
| D. Epoxy Bonding Adhesive: ASTM C 881, two-component epoxy resin, capable of humid curing and bonding to damp surfaces, of class suitable for application temperature and of grade to suit requirements, and as follows: |
| 1. Types IV and V, load bearing, for bonding hardened or freshly mixed concrete to hardened concrete. |
| 2.9 CONCRETE MIXTURES, GENERAL |
| A. Prepare design mixtures for each type and strength of concrete, proportioned on the basis of laboratory trial mixture or field test data, or both, according to ACI 301. |
| 1. Use a qualified independent testing agency for preparing and reporting proposed mixture designs based on laboratory trial mixtures. |
| B. Limit water-soluble, chloride-ion content in hardened concrete to 0.06 percent by weight of cement. |
| C. Admixtures: Use admixtures according to manufacturer's written instructions. |
| 2.10 CONCRETE MIXTURES FOR CONSTRUCTED ELEMENTS |
| A. Footings: Proportion normal-weight concrete mixture as follows: |
| 1. Minimum Compressive Strength: 3000 psi at 28 days. |
| 2. Maximum Water-Cementitious Materials Ratio: 0.50. |
| 3. Slump Limit: 3-5 inch (75-125 mm), plus or minus 1 inch |
| 4. Air Content: 4 percent, plus or minus 1 percent at point of delivery for [1-inch] nominal maximum aggregate size. |
| B. Foundation Walls: Proportion normal-weight concrete mixture as follows: |
| 1. Minimum Compressive Strength: 3000 psi at 28 days. |
| 2. Maximum Water-Cementitious Materials Ratio: 0.50. |
| 3. Slump Limit: 4 inches, plus or minus 1 inch . |
| 4. Air Content: 5 percent, plus or minus 1 percent at point of delivery for 1-inch nominal maximum aggregate size. |
| 2.11 FABRICATING REINFORCEMENT |
| A. Fabricate steel reinforcement according to CRSI's "Manual of Standard Practice." |
| 2.12 CONCRETE MIXING |
| A. Ready-Mixed Concrete: Measure, batch, mix, and deliver concrete according to ASTM C 94/C 94M and ASTM C 1116, and furnish batch ticket information. Water added on site based on approval of COR |
| 1. When air temperature is between 85 and 90 deg F reduce mixing and delivery time from 1-1/2 hours to 75 minutes; when air temperature is above 90 deg F, reduce mixing and delivery time to 60 minutes. |
| B. Project-Site Mixing for small elements: Measure, batch, and mix concrete materials and concrete according to ASTM C 94/C 94M. Mix concrete materials in appropriate drum-type batch machine mixer. |
| 1. For mixer capacity of 1 cu. yd. or smaller, continue mixing at least 1-1/2 minutes, but not more than 5 minutes after ingredients are in mixer, before any part of batch is released. |
| 2. For mixer capacity larger than 1 cu. yd. increase mixing time by 15 seconds for each additional 1 cu. yd. |
| 3. Provide batch ticket for each batch discharged and used in the Work, indicating Project identification name and number, date, mixture type, mixture time, quantity, and amount of water added. Record approximate location of final deposit in structure. |
| PART 3 - EXECUTION |
| 3.1 FORMWORK |
| A. Design, erect, shore, brace, and maintain formwork, according to ACI 301, to support vertical, lateral, static, and dynamic loads, and construction loads that might be applied, until structure can support such loads. |
| B. Construct formwork so concrete members and structures are of size, shape, alignment, elevation, and position indicated, within tolerance limits of ACI 117. |
| C. Limit concrete surface irregularities, designated by ACI 347R as abrupt or gradual, as follows: |
| 1. Class A, 1/8 inch for smooth-formed finished surfaces. |
| 2. Class B, 1/4 inch for rough-formed finished surfaces. |
| D. Construct forms tight enough to prevent loss of concrete mortar. |
| E. Fabricate forms for easy removal without hammering or prying against concrete surfaces. Provide crush or wrecking plates where stripping may damage cast concrete surfaces. Provide top forms for inclined surfaces steeper than 1.5 horizontal to 1 v... |
| 1. Install keyways, reglets, recesses, and the like, for easy removal. |
| 2. Do not use rust-stained steel form-facing material. |
| F. Set edge forms, bulkheads, and intermediate screed strips for slabs to achieve required elevations and slopes in finished concrete surfaces. Provide and secure units to support screed strips; use strike-off templates or compacting-type screeds. |
| G. Provide temporary openings for cleanouts and inspection ports where interior area of formwork is inaccessible. Close openings with panels tightly fitted to forms and securely braced to prevent loss of concrete mortar. Locate temporary openings in... |
| H. Chamfer or round exterior corners and edges of permanently exposed concrete. |
| I. Form openings, chases, offsets, sinkages, keyways, reglets, blocking, screeds, and bulkheads required in the Work. Determine sizes and locations from trades providing such items. |
| J. Clean forms and adjacent surfaces to receive concrete. Remove chips, wood, sawdust, dirt, and other debris just before placing concrete. |
| K. Retighten forms and bracing before placing concrete, as required, to prevent mortar leaks and maintain proper alignment. |
| L. Coat contact surfaces of forms with form-release agent, according to manufacturer's written instructions, before placing reinforcement. |
| 3.2 EMBEDDED ITEMS |
| A. Place and secure anchorage devices and other embedded items required for adjoining work that is attached to or supported by cast-in-place concrete. Use setting drawings, templates, diagrams, instructions, and directions furnished with items to be ... |
| 1. Install anchor rods, accurately located, to elevations required and complying with tolerances in Section 7.5 of AISC's "Code of Standard Practice for Steel Buildings and Bridges." |
| 3.3 REMOVING AND REUSING FORMS |
| A. General: Formwork for sides of beams, walls, columns, and similar parts of the Work that does not support weight of concrete may be removed after cumulatively curing at not less than 50 deg F for 48 hours after placing concrete, if concrete is har... |
| 1. Leave formwork for beam soffits, joists, slabs, and other structural elements that supports weight of concrete in place until concrete has achieved at least 70 percent of its 28-day design compressive strength. |
| 2. Remove forms only if shores have been arranged to permit removal of forms without loosening or disturbing shores. |
| B. Clean and repair surfaces of forms to be reused in the Work. Split, frayed, delaminated, or otherwise damaged form-facing material will not be acceptable for exposed surfaces. Apply new form-release agent. |
| C. When forms are reused, clean surfaces, remove fins and laitance, and tighten to close joints. Align and secure joints to avoid offsets. Do not use patched forms for exposed concrete surfaces unless approved by Architect. |
| 3.4 VAPOR RETARDERS |
| A. Plastic Vapor Retarders: Place, protect, and repair vapor retarders according to ASTM E 1643 and manufacturer's written instructions. |
| 1. Lap joints 6 inches and seal with manufacturer's recommended tape. |
| 3.5 STEEL REINFORCEMENT |
| A. General: Comply with CRSI's "Manual of Standard Practice" for placing reinforcement. |
| 1. Do not cut or puncture vapor retarder. Repair damage and reseal vapor retarder before placing concrete. |
| B. Clean reinforcement of loose rust and mill scale, earth, ice, and other foreign materials that would reduce bond to concrete. |
| C. Accurately position, support, and secure reinforcement against displacement. Locate and support reinforcement with bar supports to maintain minimum concrete cover. Do not tack weld crossing reinforcing bars. |
| D. Set wire ties with ends directed into concrete, not toward exposed concrete surfaces. |
| 3.6 JOINTS |
| A. General: Construct joints true to line with faces perpendicular to surface plane of concrete. |
| B. Construction Joints: Install so strength and appearance of concrete are not impaired, at locations indicated or as approved by the Contracting Officer. |
| 1. Place joints perpendicular to main reinforcement. Continue reinforcement across construction joints, unless otherwise indicated. Do not continue reinforcement through sides of strip placements of floors and slabs. |
| 2. Space vertical joints in walls as indicated. Locate joints beside piers integral with walls, near corners, and in concealed locations where possible. |
| 3. Use a bonding agent at locations where fresh concrete is placed against hardened or partially hardened concrete surfaces. |
| C. Contraction Joints in Slabs-on-Grade: Form weakened-plane contraction joints, sectioning concrete into areas as indicated. Construct contraction joints for a depth equal to at least one-third of concrete thickness as follows: |
| 1. Grooved Joints: Form contraction joints after initial floating by grooving and finishing each edge of joint to a radius of 1/8 inch Repeat grooving of contraction joints after applying surface finishes. Eliminate groover tool marks on concrete su... |
| 2. Sawed Joints: Form contraction joints with power saws equipped with shatterproof abrasive or diamond-rimmed blades. Cut 1/8-inch-wide joints into concrete when cutting action will not tear, abrade, or otherwise damage surface and before concrete ... |
| D. Isolation Joints in Slabs-on-Grade: After removing formwork, install joint-filler strips at slab junctions with vertical surfaces, such as column pedestals, foundation walls, grade beams, and other locations, as indicated. |
| 1. Extend joint-filler strips full width and depth of joint, terminating flush with finished concrete surface, unless otherwise indicated. |
| 2. Install joint-filler strips in lengths as long as practicable. Where more than one length is required, lace or clip sections together. |
| 3.7 CONCRETE PLACEMENT |
| A. Before placing concrete, verify that installation of formwork, reinforcement, and embedded items is complete and that required inspections have been performed. |
| B. Do not add water to concrete during delivery, at Project site, or during placement unless approved by the Contracting Officers Representative. |
| C. Before test sampling and placing concrete, water may be added at Project site, subject to limitations of ACI 301. |
| D. Deposit concrete continuously in one layer or in horizontal layers of such thickness that no new concrete will be placed on concrete that has hardened enough to cause seams or planes of weakness. If a section cannot be placed continuously, provide... |
| 1. Deposit concrete in horizontal layers of depth to not exceed formwork design pressures and in a manner to avoid inclined construction joints. |
| 2. Consolidate placed concrete with mechanical vibrating equipment according to ACI 301. |
| 3. Do not use vibrators to transport concrete inside forms. Insert and withdraw vibrators vertically at uniformly spaced locations to rapidly penetrate placed layer and at least 6 inches into preceding layer. Do not insert vibrators into lower layer... |
| E. Deposit and consolidate concrete for floors and slabs in a continuous operation, within limits of construction joints, until placement of a panel or section is complete. |
| 1. Consolidate concrete during placement operations so concrete is thoroughly worked around reinforcement and other embedded items and into corners. |
| 2. Maintain reinforcement in position on chairs during concrete placement. |
| 3. Screed slab surfaces with a straightedge and strike off to correct elevations. |
| 4. Slope surfaces uniformly to drains where required. |
| 5. Begin initial floating using bull floats or darbies to form a uniform and open-textured surface plane, before excess bleedwater appears on the surface. Do not further disturb slab surfaces before starting finishing operations. |
| F. Cold-Weather Placement: Comply with ACI 306.1 and as follows. Protect concrete work from physical damage or reduced strength that could be caused by frost, freezing actions, or low temperatures. |
| 1. When average high and low temperature is expected to fall below 40 deg F for three successive days, maintain delivered concrete mixture temperature within the temperature range required by ACI 301. |
| 2. Do not use frozen materials or materials containing ice or snow. Do not place concrete on frozen subgrade or on subgrade containing frozen materials. |
| 3. Do not use calcium chloride, salt, or other materials containing antifreeze agents or chemical accelerators unless otherwise specified and approved in mixture designs. |
| G. Hot-Weather Placement: Comply with ACI 301 and as follows: |
| 1. Maintain concrete temperature below 90 deg F at time of placement. Chilled mixing water or chopped ice may be used to control temperature, provided water equivalent of ice is calculated to total amount of mixing water. Using liquid nitrogen to co... |
| 2. Fog-spray forms, steel reinforcement, and subgrade just before placing concrete. Keep subgrade uniformly moist without standing water, soft spots, or dry areas. |
| 3.8 FINISHING FORMED SURFACES |
| A. As-cast concrete texture imparted by form-facing material, arranged in an orderly and symmetrical manner with a minimum of seams. Repair and patch tie holes and defects. Remove fins and other projections that exceed specified limits on formed-sur... |
| B. Rubbed Finish: Apply the following to smooth-formed finished as-cast concrete where indicated: |
| 1. Grout-Cleaned Finish: Wet concrete surfaces and apply grout of a consistency of thick paint to coat surfaces and fill small holes. Mix one part portland cement to one and one-half parts fine sand with a 1:1 mixture of bonding admixture and water.... |
C. Related Unformed Surfaces: At tops of walls, horizontal offsets, and similar unformed surfaces adjacent to formed surfaces, strike off smooth and finish with a texture matching adjacent formed surfaces. Continue final surface treatment of formed ...
| 3.9 FINISHING SLABS |
| A. General: Comply with ACI 302.1R recommendations for screeding, restraightening, and finishing operations for concrete surfaces. Do not wet concrete surfaces. |
| B. Trowel and Fine-Broom Finish: Apply a first trowel finish to surfaces indicated. While concrete is still plastic, slightly scarify surface with a fine broom. |
| 1. Comply with flatness and levelness tolerances for trowel finished floor surfaces. |
| C. Broom Finish: Apply a broom finish to exterior concrete platforms, steps, and ramps, and elsewhere as indicated. |
| 1. Immediately after float finishing, slightly roughen trafficked surface by brooming with fiber-bristle broom perpendicular to main traffic route. Coordinate required final finish with Contracting Officer before application. |
| 3.10 MISCELLANEOUS CONCRETE ITEMS |
| A. Filling In: Fill in holes and openings left in concrete structures, unless otherwise indicated, after work of other trades is in place. Mix, place, and cure concrete, as specified, to blend with in-place construction. Provide other miscellaneous... |
| 3.11 CONCRETE PROTECTING AND CURING |
| A. General: Protect freshly placed concrete from premature drying and excessive cold or hot temperatures. Comply with ACI 306.1 for cold-weather protection and ACI 301 for hot-weather protection during curing. |
| B. Evaporation Retarder: Apply evaporation retarder to unformed concrete surfaces if hot, dry, or windy conditions cause moisture loss approaching 0.2 lb/sq. ft. x h before and during finishing operations. Apply according to manufacturer's written i... |
| C. Formed Surfaces: Cure formed concrete surfaces, including underside of beams, supported slabs, and other similar surfaces. If forms remain during curing period, moist cure after loosening forms. If removing forms before end of curing period, con... |
| D. Unformed Surfaces: Begin curing immediately after finishing concrete. Cure unformed surfaces, including floors and slabs, concrete floor toppings, and other surfaces. |
| E. Cure concrete according to ACI 308.1, by one or a combination of the following methods: |
| 1. Moisture Curing: Keep surfaces continuously moist for not less than seven days with the following materials: |
| a. Water. |
| b. Continuous water-fog spray. |
| c. Absorptive cover, water saturated, and kept continuously wet. Cover concrete surfaces and edges with 12-inch lap over adjacent absorptive covers. |
| 2. Moisture-Retaining-Cover Curing: Cover concrete surfaces with moisture-retaining cover for curing concrete, placed in widest practicable width, with sides and ends lapped at least 12 inches and sealed by waterproof tape or adhesive. Cure for not ... |
| a. Moisture cure or use moisture-retaining covers to cure concrete surfaces to receive floor coverings. |
| b. Moisture cure or use moisture-retaining covers to cure concrete surfaces to receive penetrating liquid floor treatments. |
| c. Cure concrete surfaces to receive floor coverings with either a moisture-retaining cover or a curing compound that the manufacturer certifies will not interfere with bonding of floor covering used on Project.. |
| 3. Curing Compound: Apply uniformly in continuous operation by power spray or roller according to manufacturer's written instructions. Recoat areas subjected to heavy rainfall within three hours after initial application. Maintain continuity of coa... |
| a. After curing period has elapsed, remove curing compound without damaging concrete surfaces by method recommended by curing compound manufacturer unless manufacturer certifies curing compound will not interfere with bonding of floor covering used on... |
| 3.12 FIELD QUALITY CONTROL |
| A. Testing and Inspecting: Contractor will engage a qualified independent testing and inspecting agency to perform field tests and inspections and prepare test reports. |
| B. Concrete Tests: Testing of composite samples of fresh concrete obtained according to ASTM C 172 shall be performed according to the following requirements: |
| 1. Testing Frequency: Obtain one composite sample set for each truck of concrete (or portion thereof) delivered to the project. A composite sample set consists of three compressive test cylinders, one slump test, one air entrainment test, and one te... |
| 2. Slump: ASTM C 143/C 143M; one test at point of placement for each composite sample. Perform additional tests when concrete consistency appears to change or water is added. |