Att 2 Clearing Limits - Brushing.pdf
PDF 833 KB Posted
- Solicitation number
- 1284LM24Q0071
- Issued by
-
Department of Agriculture Forest Service
About this file
The provided document is an attachment labeled "Att 2 Clearing Limits - Brushing.pdf" that details the clearing limits and methods for various trail classes under a USDA Forest Service contract for the Great American Outdoors Act (GAOA) trail maintenance project in the Flathead National Forest.
The related federal contract opportunity is for the "USDA Forest Service HHGV GAOA Trail Brushing and Clearing" solicitation, number 1284LM24Q0071. The project requires performance of trail maintenance work, including log out, brushing, and clearing on select trails both in and outside of recommended wilderness areas. The attachment provides specific clearing width and method requirements for different trail classes, with wider clearing for trails with higher use levels. Responses to this solicitation are due by May 17, 2024.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Att 1 Statement of Work.docx | DOCX document | |
| Att 5 Jewel Basin Hiking Area Regulations.pdf | ||
| Att 4 Trail Maps.pdf | ||
| Att 6 Wage Determination.pdf | ||
| 1284LM24Q0071.docx | DOCX document | |
| Att 3 Clearing Limits - Trees and Logs.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CLEARING LIMITS - BRUSHING
BRUSHING LIMITS MOWING LIMITS
TYPICAL CLEARING UPHILL DOWNHILL CLEARING UPHILL DOWNHILL DISPOSALWIDTH
ID METHOD (J)
<t
I
BRUSHING LIMITS
UPHILL
WIDTH T
BRUSHING LIMITS
DOWNHILL
WIDTH
BRUSHING
LIMIT
CLEARING
HEIGHT
CLEAR ZONE
UPHILL
LIMITS
CLEAR ZONE
DOWNHILL
LIMITS
MOWING I MOWING
LIMITS
T
LIMITS
UPHILL DOWNHILL
WIDTH WIDTH
I
NOTE:
SEE SHEET STD_912-01 FOR
CLEAR ZONE LIMITS
DEPARTMENT OF AGRICULTURE
FOREST SERVICE
PROJECT NAME & LOCATION
STANDARD TRAIL PLAN
wea r H
T W
OO
H W
H
METHOD COMMENTS
CLEARING METHOD
CLEARING CLEARING COMMENTS TYPE METHOD
C1 C2 C3
DISPOSAL METHOD
DISPOSAL DISPOSAL COMMENTS TYPE METHOD
D1 LOP AND SCATTER OUTSIDE TRAILWAY
D2 LOP AND SCATTER ON FILL SLOPE
D3 PILE AND BURN
D4 CHIP
D5 HAUL TO DISPOSAL SITE
D6
DRAWING NAME REVISION DATE
CLEARING LIMITS - BRUSHING 03/01/2024
SECTION TYPICAL ID
912 -CLEARING LIMITS CLB NO SCALE
DRAWING NO.
STD 912-02
SHEET
OF
C1 C2 C3
2 ft.
4 ft.
3 ft.
2 ft.
4 ft.
3 ft. D1 D1 D1 >35% sideslope: Column K: 2 ft. & Column J: 6 ft.
>35% sideslope: Column K: 2 ft. & Column J: 4 ft.
Trail Class 3 HIKER/PEDESTRIAN Trail Class 2 PACK AND SADDLE
Trail Class 3 PACK AND SADDLE Trails #326, #159, #106, #3, #22, #26, #113
Trail #251 Trails #71, #55
2024 HHGV TRAIL CONTRACT
10 ft.
8 ft.
8 ft.
File details come from the government source that posted it. Updated .