Att 2 Clearing Limits - Brushing.pdf

PDF 833 KB Posted

Attached to
USDA Forest Service HHGV GAOA Trail Brushing and Clearing
Solicitation number
1284LM24Q0071
Issued by

About this file

The provided document is an attachment labeled "Att 2 Clearing Limits - Brushing.pdf" that details the clearing limits and methods for various trail classes under a USDA Forest Service contract for the Great American Outdoors Act (GAOA) trail maintenance project in the Flathead National Forest.

The related federal contract opportunity is for the "USDA Forest Service HHGV GAOA Trail Brushing and Clearing" solicitation, number 1284LM24Q0071. The project requires performance of trail maintenance work, including log out, brushing, and clearing on select trails both in and outside of recommended wilderness areas. The attachment provides specific clearing width and method requirements for different trail classes, with wider clearing for trails with higher use levels. Responses to this solicitation are due by May 17, 2024.

View the file

Other files

File Type Posted
Att 1 Statement of Work.docx DOCX document
Att 5 Jewel Basin Hiking Area Regulations.pdf PDF
Att 4 Trail Maps.pdf PDF
Att 6 Wage Determination.pdf PDF
1284LM24Q0071.docx DOCX document
Att 3 Clearing Limits - Trees and Logs.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CLEARING LIMITS - BRUSHING

BRUSHING LIMITS MOWING LIMITS

TYPICAL CLEARING UPHILL DOWNHILL CLEARING UPHILL DOWNHILL DISPOSALWIDTH

ID METHOD (J)

<t

I

BRUSHING LIMITS

UPHILL

WIDTH T

BRUSHING LIMITS

DOWNHILL

WIDTH

BRUSHING

LIMIT

CLEARING

HEIGHT

CLEAR ZONE

UPHILL

LIMITS

CLEAR ZONE

DOWNHILL

LIMITS

MOWING I MOWING

LIMITS

T

LIMITS

UPHILL DOWNHILL

WIDTH WIDTH

I

NOTE:

SEE SHEET STD_912-01 FOR

CLEAR ZONE LIMITS

DEPARTMENT OF AGRICULTURE

FOREST SERVICE

PROJECT NAME & LOCATION

STANDARD TRAIL PLAN

wea r H

T W

OO

H W

H

METHOD COMMENTS

CLEARING METHOD

CLEARING CLEARING COMMENTS TYPE METHOD

C1 C2 C3

DISPOSAL METHOD

DISPOSAL DISPOSAL COMMENTS TYPE METHOD

D1 LOP AND SCATTER OUTSIDE TRAILWAY

D2 LOP AND SCATTER ON FILL SLOPE

D3 PILE AND BURN

D4 CHIP

D5 HAUL TO DISPOSAL SITE

D6

DRAWING NAME REVISION DATE

CLEARING LIMITS - BRUSHING 03/01/2024

SECTION TYPICAL ID

912 -CLEARING LIMITS CLB NO SCALE

DRAWING NO.

STD 912-02

SHEET

OF

C1 C2 C3

2 ft.

4 ft.

3 ft.

2 ft.

4 ft.

3 ft. D1 D1 D1 >35% sideslope: Column K: 2 ft. & Column J: 6 ft.

>35% sideslope: Column K: 2 ft. & Column J: 4 ft.

Trail Class 3 HIKER/PEDESTRIAN Trail Class 2 PACK AND SADDLE

Trail Class 3 PACK AND SADDLE Trails #326, #159, #106, #3, #22, #26, #113

Trail #251 Trails #71, #55

2024 HHGV TRAIL CONTRACT

10 ft.

8 ft.

8 ft.

File details come from the government source that posted it. Updated .