Amendment 0001 1284LL23Q0018 Deferred Trail Maint.pdf

PDF 5 MB Posted

Attached to
Deferred Trail Maintenance Nez Perce Clearwater NF Federal contract opportunity
Solicitation number
1284LL23Q0018
Issued by
Department of Agriculture Forest Service

View the file

Other files for this federal contract opportunity

Other files attached to Deferred Trail Maintenance Nez Perce Clearwater NF, newest first.
File Type Posted
1284LL23Q0018 A0002.pdf PDF
1284LL23Q0018_NCF_GAOA_TRAIL_DM_FIREHISTORY_MAPS.pdf PDF
1284LL23Q0018_NCF_GAOA_Deferred_Trail_Maintenance_Maps.pdf PDF
1284LL23Q0018 Attachments.pdf PDF
WD1995-0228 ID Dec22.pdf PDF
Past Performance Sheet.docx DOCX document
1284LL23Q0018 Solicitation Deferred Trail Maintenance.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

1284LL23Q0018

x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

COEUR DALENE ID 83815

3232 WEST NURSERY ROAD

SUPERVISORS OFFICE

IDAHO PANHANDLE NATIONAL FORESTS

GAOA04/14/20230001

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

04/14/2023

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Amendment 0001 for solicitation 1284LL23Q0018. The purpose of this amendment 0001 is for the following:

a) add 8 trails to the schedule that were not included in the original posting.

b) Include requirement 981 Brush cutting and 982 Logging out.

c) Upload new maps for the areas in the schedule.

As a result of this amendment the solicitation has been extend 7 days from a closing of

5/15/2023 to 5/22/2023 5pm PST.

Period of Performance: 05/01/2023 to 04/30/2028

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

DANIEL A. SZAMBELAN

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

SEE ADDENDUMIS CHECKED

CODE 18a. PAYMENT WILL BE MADE BY

CODE

FACILITYCODE

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER

OFFEROR

COEUR DALENE ID 83815

3232 WEST NURSERY ROAD

SUPERVISORS OFFICE

IDAHO PANHANDLE NATIONAL FORESTS

0278 CODE 16. ADMINISTERED BYCODE

X

X

X

115310

SIZE STANDARD:

100.00 % FOR:SET ASIDE:UNRESTRICTED OR0281

RFPIFB

10. THIS ACQUISITION ISCODE

RFQ

14. METHOD OF SOLICITATION

13b. RATING

NAICS:

SMALL BUSINESS

05/15/2023 1700 PT

04/14/2023

208-765-7318DANIEL SZAMBELAN

(No collect calls)

INFORMATION CALL:

FOR SOLICITATION 8. OFFER DUE DATE/LOCAL TIMEb. TELEPHONE NUMBERa. NAME

4. ORDER NUMBER3. AWARD/ 6. SOLICITATION

1284LL23Q0018

5. SOLICITATION NUMBER

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS 1. REQUISITION NUMBER PAGE OF

2 481082759OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30

TELEPHONE NO.

17a. CONTRACTOR/

KOOSKIA ID 83539

502 LOWRY STREET

LOCHSA RANGER DIST KOOSKIA OFFICE

USDA FOREST SERVICE

15. DELIVER TO

COEUR DALENE ID 83815

3232 WEST NURSERY ROAD

SUPERVISORS OFFICE

9. ISSUED BY

7.

2. CONTRACT NO.

EFFECTIVE DATE

$10.0

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK BELOW

ISSUE DATE

DELIVERY FOR FOB DESTINA-

TION UNLESS BLOCK IS

MARKED

11.

SEE SCHEDULE

12. DISCOUNT TERMS

THIS CONTRACT IS A

RATED ORDER UNDER

DPAS (15 CFR 700)

13a.

SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

HUBZONE SMALL

BUSINESS

8(A)

IDAHO PANHANDLE NATIONAL FORESTS

WOMEN-OWNED SMALL BUSINESS

(WOSB) ELIGIBLE UNDER THE WOMEN-OWNED

SMALL BUSINESS PROGRAM

EDWOSB

24.

AMOUNT

23.

UNIT PRICE

22.

UNIT

21.

QUANTITY

20.

SCHEDULE OF SUPPLIES/SERVICES

19.

ITEM NO.

The Nez Perce-Clearwater National Forest needs deferred trail maintenance on trails across the Forest.

The work includes logging out and brushing on non-wilderness and wilderness trails as described in the statement of work.

To submit and offer please include

1. Completed 1449 page with company UEI Number.

2. Completed Schedule of trails your company is quoting on

3. Capabilities statement

(Use Reverse and/or Attach Additional Sheets as Necessary)

HEREIN, IS ACCEPTED AS TO ITEMS:

XX

DATED

DANIEL A. SZAMBELAN

. YOUR OFFER ON SOLICITATION (BLOCK 5),

INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE SET FORTH

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DELIVER

ARE

ARE

31c. DATE SIGNED

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA

31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)

30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER (Type or print)

ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY ADDITIONAL

SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.

27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA

26. TOTAL AWARD AMOUNT (For Govt. Use Only)

OFFER

STANDARD FORM 1449 (REV. 2/2012)

Prescribed by GSA - FAR (48 CFR) 53.212

ARE NOT ATTACHED.

ARE NOT ATTACHED.

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

30b. NAME AND TITLE OF SIGNER (Type or print)

30a. SIGNATURE OF OFFEROR/CONTRACTOR

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

25. ACCOUNTING AND APPROPRIATION DATA

29. AWARD OF CONTRACT:

REF.

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE

32c. DATE 32b. SIGNATURE OF AUTHORIZED GOVERNMENT REPRESENTATIVE

ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED:

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED

40. PAID BY39. S/R VOUCHER NUMBER38. S/R ACCOUNT NUMBER

37. CHECK NUMBER

FINALPARTIAL

36. PAYMENT

FINALPARTIAL

35. AMOUNT VERIFIED

CORRECT FOR

34. VOUCHER NUMBER33. SHIP NUMBER

COMPLETE

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

42d. TOTAL CONTAINERS42c. DATE REC'D (YY/MM/DD)

42b. RECEIVED AT (Location)

42a. RECEIVED BY (Print)

41c. DATE41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT

STANDARD FORM 1449 (REV. 2/2012) BACK

24.

AMOUNT

23.

UNIT PRICE

22.

UNIT

21.

QUANTITY

20.

SCHEDULE OF SUPPLIES/SERVICES

19.

ITEM NO.

4. Past Performance

5. Reps and Certs

Email Offerors to Contracting Specialist daniel.szambelan@usda.gov

Period of Performance: Date of Award to

04/30/2028

32f. TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE

32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT REPRESENTATIVE

Part B Continuation of 1449 Price Cost Schedule

Base Period of Performance: Date of Award to 4/30/2024

Item No. Description Unit QTY Unit Price Total

1 Tr.#312 Moores, Salmon River RD Mile 12

2 Tr.#305 Gospel Creek, Salmon River RD Mile 8

3 Tr. #11, Dan Lee Ridge, North Fork RD Mile 5.3

4 Tr. #95, Isabella Creek, North Fork RD Mile 6.3

5 Tr. #106, Junction Creek, North Fork RD Mile 7.1

6 Tr.#233 St. Joe Divide, North Fork RD Mile 11.7

7 Tr.#726 Meadow Creek, Moose Creek RD Mile 20

8 Trail #191, Junction Mountain, North Fork RD Mile 13.2

9 Trail #691, Junction Lookout, North Fork RD Mile 1.0

10 Trail #674, Larch Butte, North Fork RD Mile 3.9

11 Trail #490, Bruin Hill, North Fork RD Mile 13.5

12 Trail #330, Little Van Buren, Salmon River RD Mile 4.97

13 Trail #641, Milner, Salmon River RD Mile 10.0

14 Trail #349, No Business, Salmon River RD Mile 2.75

15 Trail #401, Frank Brown, Salmon River RD Mile 10.6

Total 130.32 Options Total:

Option Year 1 Period of Performance: 05/01/2024 to 4/30/2025

Item No. Description Unit QTY Unit Price Total

1 Tr.#312 Moores Mile 12

2 Tr.#305 Gospel Creek Mile 8

3 Tr. #11, Dan Lee Ridge Mile 5.3

4 Tr. #95, Isabella Creek Mile 6.3

5 Tr. #106, Junction Creek Mile 7.1

6 Tr.#233 St. Joe Divide Mile 11.7

7 Tr.#726 Meadow Creek Mile 20

8 Trail #191, Junction Mountain, North Fork RD Mile 13.2

9 Trail #691, Junction Lookout, North Fork RD Mile 1.0

10 Trail #674, Larch Butte, North Fork RD Mile 3.9

11 Trail #490, Bruin Hill, North Fork RD Mile 13.5

12 Trail #330, Little Van Buren, Salmon River RD Mile 4.97

13 Trail #641, Milner, Salmon River RD Mile 10.0

14 Trail #349, No Business, Salmon River RD Mile 2.75

Option Year 2 Period of Performance: 05/01/2025 to 4/30/2026

2 Tr.#305 Gospel Creek Mile 8

3 Tr. #11, Dan Lee Ridge Mile 5.3

4 Tr. #95, Isabella Creek Mile 6.3

5 Tr. #106, Junction Creek Mile 7.1

6 Tr.#233 St. Joe Divide Mile 11.7

7 Tr.#726 Meadow Creek Mile 20

8 Trail #191, Junction Mountain, North Fork RD Mile 13.2

9 Trail #691, Junction Lookout, North Fork RD Mile 1.0

10 Trail #674, Larch Butte, North Fork RD Mile 3.9

11 Trail #490, Bruin Hill, North Fork RD Mile 13.5

12 Trail #330, Little Van Buren, Salmon River RD Mile 4.97

13 Trail #641, Milner, Salmon River RD Mile 10.0

14 Trail #349, No Business, Salmon River RD Mile 2.75

Option Year 3 Period of Performance: 05/01/2026 to 4/30/2027

2 Tr.#305 Gospel Creek Mile 8

3 Tr. #11, Dan Lee Ridge Mile 5.3

4 Tr. #95, Isabella Creek Mile 6.3

5 Tr. #106, Junction Creek Mile 7.1

6 Tr.#233 St. Joe Divide Mile 11.7

7 Tr.#726 Meadow Creek Mile 20

8 Trail #191, Junction Mountain, North Fork RD Mile 13.2

9 Trail #691, Junction Lookout, North Fork RD Mile 1.0

10 Trail #674, Larch Butte, North Fork RD Mile 3.9

11 Trail #490, Bruin Hill, North Fork RD Mile 13.5

12 Trail #330, Little Van Buren, Salmon River RD Mile 4.97

13 Trail #641, Milner, Salmon River RD Mile 10.0

14 Trail #349, No Business, Salmon River RD Mile 2.75

Option Year 4 Period of Performance: 05/01/2027 to 4/30/2028

2 Tr.#305 Gospel Creek Mile 8

3 Tr. #11, Dan Lee Ridge Mile 5.3

4 Tr. #95, Isabella Creek Mile 6.3

5 Tr. #106, Junction Creek Mile 7.1

6 Tr.#233 St. Joe Divide Mile 11.7

7 Tr.#726 Meadow Creek Mile 20

8 Trail #191, Junction Mountain, North Fork RD Mile 13.2

9 Trail #691, Junction Lookout, North Fork RD Mile 1.0

10 Trail #674, Larch Butte, North Fork RD Mile 3.9

11 Trail #490, Bruin Hill, North Fork RD Mile 13.5

12 Trail #330, Little Van Buren, Salmon River RD Mile 4.97

13 Trail #641, Milner, Salmon River RD Mile 10.0

14 Trail #349, No Business, Salmon River RD Mile 2.75

Base:

OY1:

OY2:

OY3:

OY4:

Total Value with all options:

For each item, please provide a price per mile.

Regular per mile work includes the following requirements: 981 – Brush Cutting, 982 – Logging Out.

NOTE: Last Maintenance Period is intended to identify the last time FS records reflect any work performed on the trail; it does not necessarily mean that all maintenance work items were performed on all miles or to full maintenance standards. Contractors are responsible for assessing trail conditions.

Work Items Include:

• 981(01)- Brush Cutting

• 982(01) - Logging Out o Refer to the logging out drawing and technical specifications for additional information.

Item #1: Work Items include: 981(01), 982(01) Tr. #312 Moores ( 12 miles) Salmon River Ranger District Starting Point: 45°27.288’, -115°56.618’ Jct. RD.#1614(Wind River Trail Head) Ending Point: 45°30.427’, -115°51.337’, Jct. Tr# 91 Last maintenance period was 2021, last brushed 2016

Power tools are not allowed (Gospel Hump Wilderness)

Item #2: Work Item include : 981(01), 982(01) Tr. #305 Gospel Creek (8 miles) Salmon River Ranger District Starting Point: 45°41.888’,-115°54.768’, Jct. Tr.#431 Ending Point:45°39.652’,-115°50.140’, Jct. Tr.#383 Last maintenance period was 2020, last brushed unknown

Power tools are not allowed (Gospel Hump Wilderness)

Item #3: Work Items include: 981(01), 982(01)

Tr. #11 Dan Lee Ridge (5.3 miles) North Fork Ranger District Starting Point: T36N R6E, Sec. 21, jct. Rd. 5145

Ending Point: T36N R7E, Sec. 7, jct. Rd. 535A at Hemlock L.O.

Last maintenance period was 2021, last brushed in 2012.

Power tools are allowed. Motorcycles are allowed

Item #4: Work Items include: 981(01), 982(01) Tr. #95 Isabella Creek (6.3 miles) North Fork Ranger District

Starting Point: T41N R7E, Sec. 20, jct. Rd. 705 Ending Point: T41N R7E, Sec. 7, jct. Tr. 399 Last maintenance period was 2021, last brushed in 2010.

Power tools are allowed. Motorcycles are not allowed

Item #5: Work Items include: 981(01), 982(01) Tr. #106 Junction Creek (7.1 miles) North Fork Ranger District

Starting Point: T39N R10E, Sec. 17, jct. Rd. 250 Ending Point: T39N R7E, Sec. 32, jct. Tr. 191

Last maintenance period was 2020, Last brushed in 2009, lower 2 miles last brushed in 2021.

Item #6: Work Items include: 981(01), 982(01)

Tr. #233 Saint Joe Divide (11.7 miles) North Fork Ranger District Starting Point: T42N R10E, Sec. 31, jct. Rd. 715

Ending Point: T42N R8E, Sec. 36, jct. Trls. 283 and 99 Last maintenance period was 2020, Last brushed in 2010, eastern 3 miles last brushed in 2018.

Item #7: Work Items include: 981(01), 982(01)

Tr. #726 Meadow Creek ( 20 miles) Moose Creek and Red River Ranger Districts Starting Point: 45°59.463’, -115°17.117’ Little Cr.

Ending Point: 45°52.883’, -115°7.092’, Jct. Tr# 513 Last maintenance period was 2021, last brushed unknown

Power tools are allowed. Motorcycles are not allowed.

Item #8: Work Items include: 981(01), 982(01) Tr. #191 Junction Mountain (13.2 miles) North Fork Ranger District Starting Point: T39N R10E, Sec. 17, jct. Tr. 106

Ending Point: T38N R10E, Sec. 15, jct. Tr. 531 Last maintenance period was 2022, last brushed in 2011.

Power Tools are allowed. Motorcycles are allowed.

Item #9: Work Items include: 981(01), 982(01)

Tr. #691 Junction Lookout (1 mile) North Fork Ranger District Starting Point: T39N R9E, Sec. 25, jct. Tr. 191

Ending Point: T39N R9E, Sec. 25, dead end at Lookout Last maintenance period was 2022, last brushed in 2011.

Power Tools are allowed. Motorcycles are allowed.

Item #10: Work Items include: 981(01), 982(01) Tr. #674 Larch Butte (3.9 miles) North Fork Ranger District Starting Point: T37N R7E, Sec.24, jct. Rd. 5226

Ending Point: T37N R8E, Sec. 17, jct. Tr. 104 Last maintenance period was 2020, Last brushed in 2010.

Power Tools are allowed. Motorcycles are allowed.

Item #11: Work Items include: 981(01), 982(01) Tr. #490 Bruin Hill (13.5 miles) North Fork Ranger District Starting Point: T39N R12E, Sec. 21, jct. Trail 567

Ending Point: T40N R12E, Sec. 12, jct. Trails 419 and 738, at Fish Lake Last maintenance period was 2022, (lower 5 miles), Last brushed in 2010.

Power Tools are allowed. Motorcycles are not allowed.

Item #12: Work Items include: 981(01), 982(01) Tr. #330 Little Van Buren ( 4.97 miles) Salmon River Ranger District Starting Point: 45°38.004’, -116°11.968’ Jct. RD.#354A Slate Creek Ending Point: 45°35.82’, -116°8.218’, Jct. RD#441A Slate Point Lookout Last maintenance period was 2022, last brushed in its entirety is unknown Power Tools are allowed. ATV 50” width or less allowed.

Item #13: Work Items include: 981(01), 982(01) Tr. #641 Milner ( 10 miles) Salmon River Ranger District Starting Point: 45°47.571’, -116°3.125’ Jct. RD #1103 Ending Point: 45°42.009’, -116°2.131’, Jct. RD #221 Last maintenance period was 2021, last brushed unknown Power Tools are allowed. ATV 50” width or less allowed.

Item #14: Work Items include: 981(01), 982(01) Tr. #349 No Business ( 2.75 miles) Salmon River Ranger District Starting Point: 45°36.737’, -116°8.657’ Jct. Tr #323 Ending Point: 45°37.926’, -116°7.047’, Jct. Tr# 330 Last maintenance period was 2022, last brushed unknown Power Tools are allowed. Motorcycles are allowed.

Item #15: Work Items include: 981(01), 982(01) Tr. #401 Frank Brown ( 10.6 miles) Salmon River Ranger District Starting Point: 45°46.963’, -115°55.553’ Jct. RD 309 Hungry Ridge Ending Point: 45°43.761’, -115°49.406’, Jct. Tr #410 Last maintenance period was 2021, last brushed unknown Power Tools are allowed. Motor vehicles are not allowed.

PURPOSE

The Nez Perce-Clearwater National Forest needs deferred trail maintenance on trails across the Forest. This project is one of the implementation projects of the Great American Outdoors Act (GAOA). The goal of the GAOA project is to reduce deferred maintenance of recreation infrastructure.

STATEMENT OF WORK

The work includes logging out and brushing on non-wilderness and wilderness trails as described in the technical specifications. Contractors shall be held responsible for all downed trees on trails within the clearing limits; there will be NO tree counting. The Contractor(s) shall furnish all labor, supervision, equipment, and materials to perform all operations necessary to accomplish the work in accordance with the contract terms, conditions, specifications, drawings, and contract attachments/exhibits.

PERFORMANCE DEADLINES

The starting dates in the table below are estimates of when work may begin on an Item;

however, not all trail segments within an Item are expected to be open on that date.

Regardless of actual starting date, all Trail Deferred Maintenance Items shall be completed no later than the dates shown in the table below for the year in which award or renewal was made.

The Contractor shall make progress at a rate that will assure completion of work by the required completion date for each Item. Award of more than one Item to a Contractor will not change the required performance period for each Item. If multiple Items are awarded to one Contractor, the respective performance times will run concurrently, not consecutively. Work may be performed on each Item in succession provided a rate of progress is maintained to ensure completion of all work by the required deadlines.

ITEM NO.

ESTIMATED

STARTING

DATE

REQUIRED

COMPLETION

DATE

#1 Tr.#312 Moores, Salmon River RD 7/01 10/01

#2 Tr.#305 Gospel Creek, Salmon River RD 7/01 10/01

#3 Tr. #11, Dan Lee Ridge, North Fork RD 7/01 10/01

#4 Tr. #95, Isabella Creek, North Fork RD 7/01 10/01

#5 Tr. #106, Junction Creek, North Fork RD 7/01 10/01

#6 Tr.#233 St. Joe Divide, North Fork RD 7/01 10/01

#7 Tr.#726 Meadow Creek, Moose Creek RD 7/01 10/01

#8 Trail #191, Junction Mountain, North Fork RD 7/01 10/01

#9 Trail #691, Junction Lookout, North Fork RD 7/01 10/01

#10 Trail #674, Larch Butte, North Fork RD 7/01 10/01

#11 Trail #490, Bruin Hill, North Fork RD 7/01 10/01

#12 Trail #330, Little Van Buren, Salmon River RD 6/01 10/01

#13 Trail #641, Milner, Salmon River RD 6/01 10/01

#14 Trail #349, No Business, Salmon River RD 6/01 10/01

#15 Trail #401, Frank Brown, Salmon River RD 7/01 10/01

Prior to commencement of work, the COR will arrange a meeting with the Contractor to discuss the contract terms and work performance requirements. Also at this meeting such things as work progress schedule and fire prevention and suppression plans shall be discussed. The Contractor may begin work under the contract when conditions are suitable and upon issuance of a Notice to Proceed (see FAR 52.211-10 Alt I).

GOVERNMENT FURNISHED PROPERTY NONE

USE OF MOTORIZED EQUIPMENT AND VEHICLES

It is the responsibility of the successful bidder to ensure that motorized equipment and/or transport/use is commensurate with the management directions for the areas in which the trails are located. The Nez Perce-Clearwater National Forest Motor Vehicle Use Map (MVUM) for the Clearwater NF and Forest Access guide for the Nez Perce NF provide information on roads and trails with motorized use restrictions. These guides are available from Nez Perce-Clearwater National Forest Supervisor’s and Ranger District Offices. All areas outside of wilderness provide for the use of chainsaws.

STOCK LIMITATIONS

In order to decrease chances for site degradation, the use of saddle and pack stock will be kept at the minimum necessary to accomplish the project. A maximum 6 head per trip addresses the initial camp and tool supply. Once tools and camp are transported into the job site, use of stock will be limited to 3 head* during the length of the project. At the end of the project and for complete camp movement during the project, stock shall not exceed 6 head. Stock not in use shall be removed from the National Forest until such time as they are required.

*Based on a 2-person crew – 2 riding and 1 pack animal. (Requests for additional stock will be submitted in writing and approved by the CO prior to use.)

CAMPING. There are a limited number of campsites in some trail areas. Campsites shall be addressed and designated at the pre-work meeting. The Contractor's campsite will be subject to weekly inspections by a Government Inspector to assure that minimum impact requirements are met.

(SEE ATTACHMENT: Minimum Impact Camping Guidelines)

CLEANUP OF WORK AND CAMP AREAS. The project area(s) shall be restored to as close to its original natural appearance as possible. The work area impact must be kept to a minimum. All debris and litter shall be removed from site. Litter shall be packed out, and the native debris shall be scattered outside the trail clearing limit. No debris shall be scattered into any stream, lake, snow pond, meadow, or other water course. (SEE ATTACHMENT: Minimum Impact Camping Guidelines)

Noxious Weed Closure Order. The contractor shall comply with the Special Order issued for all National Forest System Lands within the State of Idaho which prohibits the possession or storage of hay, straw or mulch that is not certified by an authorized official as being Noxious weed or Noxious Weed Seed Free. A Contractor possessing hay, straw or mulch in the National Forest shall present the weed free certificate upon request.

Access and Equipment Drops in Wilderness:

Use of motor vehicles (including trail motorcycles, ATV’s) and motorized/mechanized equipment (such as chainsaws, generators, or bicycles) are prohibited in designated Wilderness Areas.

Use of helicopters for equipment/supply drops or for ferrying personnel into a Wilderness area will not be allowed.

In general, storing equipment, personal property or supplies at one cache site for more than 14 consecutive days within a 45-day period is prohibited in both Wilderness and Non-Wilderness areas, subject to specific Wilderness stay limits.

MINIMUM IMPACT CAMPING GUIDELINES

INTRODUCTION: Welcome to the Clearwater and Nez Perce National Forests and to the Recreation, Trail and Wilderness resources we are proud to manage. We take protection of these resources very seriously. Please respect and protect the natural environment, especially in Wilderness. Leave the area clean and in its natural condition. The following thoughts and procedures are provided to help educate contractors and visitors about minimum impact camping and its practical application. Good luck and thanks for helping manage your National Forests.

Campsite Selection: Careful selection of your campsite is key to protecting natural resources. Choose the site thoughtfully and use it lightly. In some instances campsites will be pre-selected for you. If possible, select previously used campsites and stay within the previously impacted area to reduce vegetation loss. Select campsites in durable areas at least 200 feet from lakes, streams, and trails. Pick sites which drain well naturally. Do not construct drainage ditches, lean-to’s, or bough beds.. Self supporting tents and foam pads are alternatives to using native material.

Standing dead and live trees will not be damaged, notched, or nailed to. Shims or padding must be in place when rope is tied to trees. Green trees will not be cut without CR or representative approval.

The camp area shall be maintained to present a clean, neat, and orderly appearance. It will be kept clean and free of litter at all times, (e.g. cans, pull tabs, cigarette butts, bread closures, foil.) Firewood debris and chips will be raked weekly during camp occupation and wood kept in a stack.

1. Caching: Equipment caches are prohibited. All equipment (including stoves, tables, beds, tools, dishes, etc.) and supplies (including camp gear, food, and horse feed) will be packed out at end of the project.

2. Food/Garbage Storage: During night-time hours and when the camp is unoccupied store food, garbage and other attractants in a manner that makes them unavailable to wildlife. Only paper, wood and food scraps are considered “burnable”. Food scraps must be burned completely if disposed of in a fire ring. All other garbage (metal, glass, plastics, foils, etc.) will be packed out.

3. Toilets: Pit-type toilets with or without tent covering are mandatory at all camps. Pits will be located at least 200 feet from any water source. Holes must be dug at least to mineral soil depth (no shallower than 8 inches) and sufficient for planned use period.

Plan ahead. Length of stay may require several pits. Each pit will be filled in, either when it becomes full or by the end of the use season or project, whichever timeline arrives first.

4. Fire Rings: Use existing fire rings if they are available, but do not build new rock fire rings. Use a fire pit or fire pan to contain warming/cooking fires. Choose a site with mineral soil that will not damage existing trees, tree roots or leave black scars on boulders. Keep fires small; burn all wood to a fine ash. For extended use at one campsite, periodically scatter resulting ash, continue using the same fire pit. Burn dead and down material. If adequate dead and down material is unavailable, the COR or representative will designate snags to be felled for camp wood. Felled trees will be low-stumped at no more than 3” height from the ground level.

5. Waste Water Disposal: Waste water shall be disposed of in leach pit at least 200 feet from springs, streams or lakes. The pit shall be a minimum 2 foot x 2 foot x 2 foot and shall be filled with rock two to eight inches in diameter. The leach pit shall be covered with at least 2 feet of compacted soil when camp is closed.

6. Minimum Impact Stock Use: In order to decrease chances for site degradation, the use of saddle and pack stock shall be kept to the minimum necessary to accomplish the project. A maximum 6 head per trip is allowable for the initial camp and tool supply.

Once tools and camp are transported into the job site, use of stock will be limited to 3 head during the length of the project. At the end of the project and for complete camp movements during the project, stock will not exceed 6 head. Stock not in use shall be removed from the National Forest until such time as they are required.

Avoid tying directly to trees. Allow stock to graze loose when possible. Use hobbles, pickets, high lines, or rope hitchrails to avoid scarring trees and compacting soil. “Tree-saver” straps help avoid scarring when a rope hitchline is attached to a tree. If tree-savers are not available, use shims or padding to protect tree bark. When tying stock on highlines, tie at least 6’ from tree to protect the tree trunk and roots.

Stock handling facilities will be located at least 200 feet from any water source. Manure will be scattered to hasten decomposition.

In many areas forage is scarce. Check with the Ranger Station for current information about local conditions.

Certified Weed Seed Free Hay is required. On-site proof of certification is required.

In order to slow the spread of non-native plant species, the use of weed-seed-free feed (i.e.

pellets, grain, packaged feeds other than hay) is encouraged. Supplemental livestock feed, when needed, will be processed pellets or high quality (e.g. first cutting) alfalfa hay and/or grain. Rolled oats is required. Utilize feed bags and hay netting to contain feed and avoid introduction of non-native species.

Stock salt will be in block form and secured off the ground in a waterproof container.

Locate salt at least 200 ft away from camps, trails, and live water. Salt must be removed when livestock are removed.

When on trail, pack and saddle stock must be ridden or led and not permitted to run loose (except for short time periods when an animal becomes crippled or where safety dictates otherwise.) Avoid cutting switchbacks to prevent erosion.

Death of a horse or mule on National Forest lands shall be reported to the Forest Service as soon as practical. In general, dead stock may be left to decompose in remote backcountry areas providing they are a sufficient distance from trails, campsites, and surface water sources (approximately 300 ft. for water sources). In the event an animal is located near a trail, campsite, or water source, the contractor will provide a proposal for disposing of the animal, subject to approval by the Forest Service Representative. If the dead animal is located in a roaded, accessible area, it should be removed from National Forest lands.

7. Naturalize Campsites: Return all camp areas to their natural condition. Collect and pack out all litter, equipment and any tie lines from site before leaving. Clean out fire ring and replace topsoil and sod if it is removed for a fire pit. Fill in outhouse holes, sump holes, any ditching and any holes created by stock. Scatter any manure on site. Return logs, rocks, limbs, etc. displaced during camp set-up.

8. Wilderness Consideration: Solitude is an important part of wilderness visits. Minimize your impacts on others by camping away from other campsites. Leave pets at home.

Keep noise to a minimum. Be courteous in sharing the trail with others.

The Contractor shall perform services for the following work items in accordance with the contract requirements for trail maintenance. The following requirements are tailored from the standards from “Construction of Trails and Trail Bridges on Forest Service Projects (10/30/2014)” to meet the services required for the deferred trail maintenance on the Nez Perce-Clearwater N.F.

- Brush Cutting - Section 981

- Logging Out - Section 982

- Clearing Limits - Section 981 & 982

These specifications have been tailored to suit the services for trail maintenance and supersede the version found in the “STANDARD SPECIFICATIONS FOR

CONSTRUCTION OF TRAILS AND TRAIL BRIDGES ON FOREST SERVICE

PROJECTS, U.S. Customary Units, National Technology and Development Program, 10/30/2014,” which supersedes the 1996 Standard Specification for Construction and Maintenance of Trails. The website below is for reference only to review only:

http://www.fs.fed.us/recreation/programs/trail-management/trailplans/index.shtml http://www.fs.fed.us/recreation/programs/trail-management/trailplans/index.shtml

Section 981 – Brush Cutting Description

981.01 Work. This work consists of removing brush and trees less than 6 inches in diameter, and shrubs within the clearing limits.

Requirements

981.02 General. Remove all limbs of shrubs and trees that extend across or into the clearing limits as SHOWN ON THE DRAWINGS or 1 ft. above the top of the cut-slope of all ditches, catch basins, and trail structures, whichever is greater. Saw or cut limbs flush with the tree trunk. Make cuts in a manner that will not tear or strip bark from the trees.

Cut and remove from the clearing limits all woody plants exceeding 0.5 inches in stem diameter or one (1) foot in height. The maximum size material to be cut under this specification is 6 inches in diameter when measured at a height of 6 inches above the ground on the uphill side of the stump.

Cut all brush and small, woody plants as near flush to the ground surface as possible.

When impractical to cut plants flush, the maximum stem length shall be 2 inches.

Remove all woody material for a minimum of 3 inches below the trail tread surface. Fill holes in the trail tread caused by removing woody material with suitable material.

Scatter the clearing debris removed from the clearing limits outside and below the clearing limits. Do not place materials in stream channels, drainage ways, ditches, culvert inlets, or other locations where they would prevent the free flow of water away from the trail bed.

Measurement

981.03 Method. Determine the quantity of brush cutting units by measuring the slope distance along the trail centerline.

Payment

981.04 Basis. Make payments, for all units inspected and accepted, at the unit price

SHOWN IN THE SCHEDULE OF ITEMS.

Make payment under:

PAY ITEM PAY UNIT

981(01) Brush Cutting mile

Section 982 – Logging Out Description

982.01 Work. This work consists of removing brush, logs, and down trees from the clearing limits.

Requirements

982.02 Clearing Out. Cut and remove all logs that extend across or into the clearing limits as SHOWN ON THE DRAWINGS or 1 ft. above the top of the cut-slope of all ditches, catch basins, and trail structures, whichever is greater. This includes all previously cut logs within the defined clearing limits. All limbs from fallen trees that extend into the clearing limits must be cut flush to the bole of the tree and removed. The portions of cut logs that remain on the upper side of the trail shall be either firmly anchored to prevent sliding or rolling onto the trail way or moved across the trail to the lower side and scattered outside the clearing limits.

Fell all trees over 3 inches in diameter that are leaning into the clearing limits and that are within 10 feet above the trail bed as SHOWN ON THE DRAWINGS. Stump height of leaning trees that are cut outside the clearing limits shall be cut flush on the uphill side of the stump. Disposal and payment for the leaning trees described above will be the same as for down logs and trees.

Remove roots, root wads, and stumps from trees within the clearing limits that have been uprooted. Fill any holes within the clearing limits with suitable material and compact.

Rerouting the trail around windfalls, uprooted trees, and other obstacles will not be permitted. Repair sections of the trail tread that have been damaged by uprooted stumps as necessary to provide safe passage on the trail. Payment for such work will be incidental to the specified work item, and no extra payment will be made.

Remove sticks or wood chunks exceeding 2 inches in diameter or 1 foot in length that have fallen on to the trail bed.

Scatter the down trees on the lower side of the trail way outside the clearing limits. Do not place such materials in stream channels, drainage ways, ditches, culvert catch basins, or other locations where they would prevent the free flow of water away from the trail bed.

Measurement

982.03 Method. Determine the quantity of logging out units by measuring the slope distance along the trail centerline.

Payment

982.04 Basis Make payment, for all units inspected and accepted, at the unit prices

SHOWN IN THE SCHEDULE OF ITEMS.

Make payment under:

PAY ITEM PAY UNIT

982(01) Logging Out mile

Logging Out - Section 982

REMOVE

PART II--CONTRACT CLAUSES

SECTION I--CONTRACT CLAUSES

I-1 CLAUSES

52.252-2 Clauses Incorporated by Reference (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):

Federal Acquisition Regulation (FAR) Clauses:

https://www.acquisition.gov/browse/index/far (FAR clauses begin with 52) Department of Agriculture Acquisition Regulation (AGAR) Clauses:

https://www.acquisition.gov/agar (AGAR clauses begin with 452) Deviations to clauses may be viewed at:

https://www.dm.usda.gov/procurement/policy/FARClassDeviations.htm

52.203-16 Preventing Personal Conflicts of Interest (JUN 2020)

52.203-17 Contractor Employee Whistleblower Rights and Requirement to Inform Employees of Whistleblower Rights (JUN 2020)

52.204-4 Printed or Copied Double-Sided on Postconsumer Fiber Content Paper (MAY 2011)

52.204-13 System for Award Management Maintenance (OCT 2018)

52.212-4 Contract Terms and Conditions – Commercial Products and Commercial Services

(NOV 2021)

Addenda to 52.212-4:

(r) Compliance with laws unique to Government contracts. The Contractor agrees to comply with 31 U.S.C. 1352 relating to limitations on the use of appropriated funds to influence certain Federal contracts; 18 U.S.C 431 relating to officials not to benefit; 40 U.S.C. chapter 37, Contract Work Hours and Safety Standards; 41 U.S.C. chapter 87, Kickbacks; 41 U.S.C 4712 and 10 U.S.C 2409 10 U.S.C. 2409 relating to whistleblower protections; 49 U.S.C. 40118, Fly American; and 41 U.S.C chapter 21 relating to procurement integrity.

52.212-5 Contract Terms and Conditions Required to Implement Statutes or Executive Orders– Commercial Products and Commercial Services (MAY 2022) (DEVIATION JUL 2020) https://www.acquisition.gov/browse/index/far https://www.acquisition.gov/agar https://www.dm.usda.gov/procurement/policy/FARClassDeviations.htm

(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses, which are incorporated in this contract by reference, to implement provisions of law or Executive orders applicable to acquisitions of commercial products and commercial services:

(1) 52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (Jan 2017) (section 743 of Division E, Title VII, of the Consolidated and Further Continuing Appropriations Act, 2015 (Pub. L. 113-235) and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions)).

(2) 52.204-23, Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab and Other Covered Entities (Nov 2021) (Section 1634 of Pub. L.

115-91).

(3) 52.204-25, Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment. (Nov 2021) (Section 889(a)(1)(A) of Pub. L. 115-232).

(4) 52.209-10, Prohibition on Contracting with Inverted Domestic Corporations (Nov 2015)

(5) 52.233-3, Protest After Award (Aug 1996) (31 U.S.C. 3553).

(6) 52.233-4, Applicable Law for Breach of Contract Claim (Oct 2004) (Public Laws 108-77 and 108-78 (19 U.S.C. 3805note)).

(b) The Contractor shall comply with the FAR clauses in this paragraph (b) that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial products and commercial services:

[Contracting Officer check as appropriate.] ☐ (1) 52.203-6, Restrictions on Subcontractor Sales to the Government (June 2020), with

Alternate I (Oct 1995) (41 U.S.C. 4704 and 10 U.S.C. 2402).

☐ (2) 52.203-13, Contractor Code of Business Ethics and Conduct (Nov 2021) (41 U.S.C.

3509)).

☐ (3) 52.203-15, Whistleblower Protections under the American Recovery and Reinvestment

Act of 2009 (Jun 2010) (Section 1553 of Pub. L. 111-5). (Applies to contracts funded by the American Recovery and Reinvestment Act of 2009.)

☐ (4) 52.204-10, Reporting Executive Compensation and First-Tier Subcontract Awards (Jun 2020) (Pub. L. 109-282) (31 U.S.C. 6101 note).

☐ (5) [Reserved].

☐ (6) 52.204-14, Service Contract Reporting Requirements (Oct 2016) (Pub. L. 111-117, section

743 of Div. C).

☐ (7) 52.204-15, Service Contract Reporting Requirements for Indefinite-Delivery Contracts

(Oct 2016) (Pub. L. 111-117, section 743 of Div. C).

☒ (8) 52.209-6, Protecting the Government’s Interest When Subcontracting with Contractors

Debarred, Suspended, or Proposed for Debarment. (Nov 2021) (31 U.S.C. 6101note).

☐ (9) 52.209-9, Updates of Publicly Available Information Regarding Responsibility Matters

(Oct 2018) (41 U.S.C. 2313).

☐ (10) [Reserved].

☐ (11) (i) 52.219-3, Notice of HUBZone Set-Aside or Sole-Source Award (Sep 2021) (15

U.S.C.657a).

☐ (12) (i) 52.219-4, Notice of Price Evaluation Preference for HUBZone Small Business Concerns (Sep 2021) 15 U.S.C. 657a).

☐ (13) [Reserved] ☒ (14) (i) 52.219-6, Notice of Total Small Business Set-Aside (Nov 2020) (15 U.S.C.644).

☐ (ii) Alternate I (Mar 2020) of 52.219-6.

☐ (15) (i) 52.219-7, Notice of Partial Small Business Set-Aside (Nov 2020) (15 U.S.C. 644).

☐ (ii) Alternate I (Mar 2020) of 52.219-7.

☒ (16) 52.219-8, Utilization of Small Business Concerns (Oct 2018) (15 U.S.C. 637(d)(2) and

(3)).

☐ (17) (i) 52.219-9, Small Business Subcontracting Plan (Nov 2021) (15 U.S.C. 637(d)(4)).

☐ (ii) Alternate I (Nov 2016) of 52.219-9.

☐ (iii) Alternate II (Nov 2016) of 52.219-9.

☐ (iv) Alternate III (Jun 2020) of 52.219-9.

☐ (v) Alternate IV (Sep 2021) of 52.219-9.

☐ (18) (i) 52.219-13, Notice of Set-Aside of Orders (Mar 2020) (15 U.S.C. 644(r)).

☐ (ii) Alternate I (MAR 2020) of 52.219-13

☐ (19) 52.219-14, Limitations on Subcontracting (Sep 2021) (15 U.S.C.637s) [Contracting Officer check as appropriate.]

☐ By the end of the base term of the contract and then by the end of each subsequent option period; or ☐ By the end of the performance period for each order issued under the contract.

☐ (20) 52.219-16, Liquidated Damages-Subcontracting Plan (Sep 2021) (15 U.S.C.

637(d)(4)(F)(i)).

☐ (21) 52.219-27, Notice of Service-Disabled Veteran-Owned Small Business Set-Aside (Sep 2021) (15 U.S.C. 657f).

☐ (22) (i) 52.219-28, Post Award Small Business Program Rerepresentation (Sep 2021) (15 U.S.C. 632(a)(2)).

☐ (ii) Alternate I (MAR 2020) of 52.219-28.

☐ (23) 52.219-29, Notice of Set-Aside for, or Sole Source Award to, Economically Disadvantaged Women-Owned Small Business Concerns (Sep 2021) (15 U.S.C. 637(m)).

☐ (24) 52.219-30, Notice of Set-Aside for, or Sole Source Award to, Women-Owned Small Business Concerns Eligible Under the Women-Owned Small Business Program (Sep 2021) (15 U.S.C. 637(m)).

☐ (25) 52.219-32, Orders Issued Directly Under Small Business Reserves (Mar 2020) (15 U.S.C. 644(r)).

☐ (26) 52.219-33, Nonmanufacturer Rule (Sep 2021) (15 U.S.C. 637(a)(17)).

☒ (27) 52.222-3, Convict Labor (Jun 2003) (E.O.11755).

☐ (28) 52.222-19, Child Labor-Cooperation with Authorities and Remedies (Jan 2022)

(DEVIATION JUL 2020) (E.O.13126).

☐ (29) 52.222-21, Prohibition of Segregated Facilities (Apr 2015).

☒ (30) (i) 52.222-26, Equal Opportunity (Sep 2016) (E.O.11246).

☐ (ii) Alternate I (Feb 1999) of 52.222-26.

☒ (31) (i) 52.222-35, Equal Opportunity for Veterans (Jun 2020) (38 U.S.C. 4212).

☐ (ii) Alternate I (Jul 2014) of 52.222-35.

☒ (32) (i) 52.222-36, Equal Opportunity for Workers with Disabilities (Jun 2020) (29 U.S.C.793).

☐ (ii) Alternate I (Jul 2014) of 52.222-36.

☒ (33) 52.222-37, Employment Reports on Veterans (Jun 2020) (38 U.S.C. 4212).

☐ (34) 52.222-40, Notification of Employee Rights Under the National Labor Relations Act

(Dec 2010) (E.O. 13496).

☒ (35) (i) 52.222-50, Combating Trafficking in Persons (Nov 2021) (22 U.S.C. chapter 78 and

E.O. 13627).

☐ (ii) Alternate I (Mar 2015) of 52.222-50 (22 U.S.C. chapter78 and E.O. 13627).

☒ (36) 52.222-54, Employment Eligibility Verification (May 2022). (Executive Order 12989).

(Not applicable to the acquisition of commercially available off-the-shelf items or certain other types of commercial products or commercial services as prescribed in FAR 22.1803.)

☐ (37) (i) 52.223-9, Estimate of Percentage of Recovered Material Content for EPA–Designated Items (May 2008) (42 U.S.C. 6962(c)(3)(A)(ii)). (Not applicable to the acquisition of commercially available off-the-shelf items.)

☐ (ii) Alternate I (May 2008) of 52.223-9 (42 U.S.C. 6962(i)(2)(C)). (Not applicable to the acquisition of commercially available off-the-shelf items.)

☐ (38) 52.223-11, Ozone-Depleting Substances and High Global Warming Potential Hydrofluorocarbons (Jun 2016) (E.O. 13693).

☐ (39) 52.223-12, Maintenance, Service, Repair, or Disposal of Refrigeration Equipment and Air Conditioners (Jun 2016) (E.O. 13693).

☐ (40) (i) 52.223-13, Acquisition of EPEAT®-Registered Imaging Equipment (Jun 2014) (E.O.s 13423 and 13514).

☐ (ii) Alternate I (Oct 2015) of 52.223-13.

☐ (41) (i) 52.223-14, Acquisition of EPEAT®-Registered Televisions (Jun 2014) (E.O.s 13423 and 13514).

☐ (ii) Alternate I (Jun 2014) of 52.223-14.

☐ (42) 52.223-15, Energy Efficiency in Energy-Consuming Products (May 2020) (42 U.S.C.

8259b).

☐ (43) (i) 52.223-16, Acquisition of EPEAT®-Registered Personal Computer Products (Oct 2015) (E.O.s 13423 and 13514).

☐ (ii) Alternate I (Jun 2014) of 52.223-16.

☒ (44) 52.223-18, Encouraging Contractor Policies to Ban Text Messaging While Driving (Jun 2020) (E.O. 13513).

☐ (45) 52.223-20, Aerosols (Jun 2016) (E.O. 13693).

☐ (46) 52.223-21, Foams (Jun 2016) (E.O. 13693).

☐ (47) (i) 52.224-3 Privacy Training (Jan 2017) (5 U.S.C. 552 a).

☐ (ii) Alternate I (Jan 2017) of 52.224-3.

☐ (48) 52.225-1, Buy American-Supplies (Nov 2021) (41 U.S.C. chapter 83).

☐ (49) (i) 52.225-3, Buy American-Free Trade Agreements-Israeli Trade Act (Nov 2021) (DEVIATION JUL 2020) (41 U.S.C. chapter 83, 19 U.S.C. 3301 note, 19 U.S.C. 2112 note, 19 U.S.C. 3805 note, 19 U.S.C. 4001 note, 19 U.S.C. chapter 29 (sections 4501-4732), Pub.

L. 103-182, 108-77, 108-78, 108-286, 108-302, 109-53, 109-169, 109-283, 110-138, 112-41, 112-42, and 112-43.

(ii) Alternate I (May 2014) of 52.225-3.

☐ (iii) (ii) Alternate II (Jan 2021) (DEVIATION JUL 2020) of 52.225-3.

☐ (iv) (iii) Alternate III (Jan 2021) (DEVIATION JUL 2020) of 52.225-3.

☐ (50) 52.225-5, Trade Agreements (Oct 2019) (DEVIATION JUL 2020) (19 U.S.C. 2501, et seq., 19 U.S.C. 3301 note).

☐ (51) 52.225-13, Restrictions on Certain Foreign Purchases (FEB 2021) (E.O.’s, proclamations, and statutes administered by the Office of Foreign Assets Control of the Department of the Treasury).

☐ (52) 52.225-26, Contractors Performing Private Security Functions Outside the United States (Oct 2016) (Section 862, as amended, of the National Defense Authorization Act for Fiscal Year 2008; 10 U.S.C. 2302 Note).

☐ (53) 52.226-4, Notice of Disaster or Emergency Area Set-Aside (Nov 2007) (42 U.S.C. 5150).

☐ (54) 52.226-5, Restrictions on Subcontracting Outside Disaster or Emergency Area (Nov

2007) (42 U.S.C. 5150).

☐ (55) 52.229-12, Tax on Certain Foreign Procurements (Feb 2021).

☐ (56) 52.232-29, Terms for Financing of Purchases of Commercial Products and Commercial

Services (Nov 2021) (41 U.S.C.4505, 10 U.S.C.2307(f)).

☐ (57) 52.232-30, Installment Payments for Commercial Products and Commercial Services

(Nov 2021) (41 U.S.C.4505, 10 U.S.C.2307(f)).

☒ (58) 52.232-33, Payment by Electronic Funds Transfer-System for Award Management (Oct

2018) (31 U.S.C. 3332).

☐ (59) 52.232-34, Payment by Electronic Funds Transfer-Other than System for Award

Management (Jul 2013) (31 U.S.C.3332).

☐ (60) 52.232-36, Payment by Third Party (May 2014) (31 U.S.C.3332).

☐ (61) 52.239-1, Privacy or Security Safeguards (Aug 1996) (5 U.S.C. 552a).

☐ (62) 52.242-5, Payments to Small Business Subcontractors (Jan 2017) (15 U.S.C. 637(d)(13)).

☐ (63) (i) 52.247-64, Preference for Privately Owned U.S.-Flag Commercial Vessels (Nov

2021) (46 U.S.C. 55305 and 10 U.S.C. 2631).

☐ (ii) Alternate I (Apr 2003) of 52.247-64.

☐ (iii) Alternate II (Nov 2021) of 52.247-64.

(c) The Contractor shall comply with the FAR clauses in this paragraph (c), applicable to commercial services, that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial products and commercial services:

Contracting Officer check as appropriate.] ☒ (1) 52.222-41, Service Contract Labor Standards (Aug 2018) (41 U.S.C. chapter 67).

☒ (2) 52.222-42, Statement of Equivalent Rates for Federal Hires (May 2014) (29 U.S.C. 206 and 41 U.S.C. chapter 67).

In compliance with the Service Contract Labor Standards statute and the regulations of the Secretary of Labor (29 CFR Part 4), this clause identifies the classes of service employees expected to be employed under the contract and states the wages and fringe benefits payable to each if they were employed by the contracting agency subject to the provisions of 5 U.S.C.5341 or 5 332.

This Statement is for Information Only: It is not a Wage Determination

Employee Class

Monetary Wage-Fringe Benefits

08010 Brush/Precommercial Thinner

$19.10 an hr plus fringe

08250 General Forestry Laborer

_$11.37*** an hr plus fringe

*** **Workers in this classification may be entitled to a higher minimum wage under Executive Order 14026 ($16.20 per hour) or 13658 ($12.15 per hour).

☒ (3) 52.222-43, Fair Labor Standards Act and Service Contract Labor Standards-Price

Adjustment (Multiple Year and Option Contracts) (Aug 2018) (29 U.S.C. 206 and 41 U.S.C.

chapter 67).

☐ (4) 52.222-44, Fair Labor Standards Act and Service Contract Labor Standards-Price Adjustment (May 2014) (29 U.S.C. 206 and 41 U.S.C. chapter 67).

☐ (5) 52.222-51, Exemption from Application of the Service Contract Labor Standards to Contracts for Maintenance, Calibration, or Repair of Certain Equipment-Requirements (May 2014) (41 U.S.C. chapter 67).

☐ (6) 52.222-53, Exemption from Application of the Service Contract Labor Standards to Contracts for Certain Services-Requirements (May 2014) (41 U.S.C. chapter 67).

☒ (7) 52.222-55, Minimum Wages for Contractor Workers Under Executive Order 14026 (Jan 2022).

☒ (8) 52.222-62, Paid Sick Leave Under Executive Order 13706 (Jan 2022) (E.O. 13706).

☐ (9) 52.226-6, Promoting Excess Food Donation to Nonprofit Organizations (Jun 2020) (42

U.S.C. 1792).

(d) Comptroller General Examination of Record. The Contractor shall comply with the provisions of this paragraph (d) if this contract was awarded using other than sealed bid, is in excess of…