12837120Q0197

1. REQUEST NO.

5a. ISSUED BY

NAME

a. NAME

c. STREET ADDRESS

d. CITY

10. PLEASE FURNISH QUOTATIONS TO

THE ISSUING OFFICE IN BLOCK 5a ON

OR BEFORE CLOSE OF BUSINESS (Date)

2. DATE ISSUED 3. REQUISITION/PURCHASE REQUEST NO. 4. CERT. FOR NAT. DEF.

UNDER BDSA REG. 2

AND/OR DMS REG.1

RATING

7. DELIVERY

9. DESTINATION

a. NAME OF CONSIGNEE

b. STREET ADDRESS

PAGE OF PAGES

5b. FOR INFORMATION CALL: (No collect calls)

TELEPHONE NUMBER

AREA CODE NUMBER

8. TO:

b. COMPANY

e. STATE f. ZIP CODE

c. CITY

d. STATE e. ZIP CODE

IMPORTANT: This is a request for information, and quotations furnished are not offers. If you are unable to quote, please so indicate on this form and return it to the address in Block 5a. This request does not commit the Government to pay any costs incurred in the preparation of the submission of this quotation or to contract for supplies or services. Supplies are of domestic origin unless otherwise indicated by quoter. Any representations and/or certifications attached to this Request for Quotations must be completed by the quoter.

11. SCHEDULE (Include applicable Federal, State and local taxes)

THIS RFQ

REQUEST FOR QUOTATION

(THIS IS NOT AN ORDER)

IS IS NOT A SMALL BUSINESS SET ASIDEX

09/02/2020 1013609

1 1

333 BROADWAY SE

ALBUQUERQUE NM 87102

SOUTHWESTERN REGION 6. DELIVERY BY (Date)

21 Days After Notice to Proceed

TONTO NATIONAL FOREST

2324 E MCDOWELL ROAD

PHOENIX

AZ 85006

602 225-5350DAVID WATSON

09/09/2020 1400 PT

FOB DESTINATION

OTHER

(See Schedule)X

ITEM NO.

(a)

SUPPLIES/SERVICES

(b)

QUANTITY

(c)

UNIT

(d)

UNIT PRICE

(e)

AMOUNT

(f)

EMERGENCY Trail closure gates for public safety after Bighorn fire--BAER Interim 4

EMERGENCY Trail closure gates for public safety after Bighorn fire--BAER Interim 4

Delivery: 21 Days After Notice to Proceed

12. DISCOUNT FOR PROMPT PAYMENT

a. 10 CALENDAR DAYS (%) b. 20 CALENDAR DAYS (%) c. 30 CALENDAR DAYS (%) d. CALENDAR DAYS

NUMBER PERCENTAGE

NOTE: Additional provisions and representations

13. NAME AND ADDRESS OF QUOTER

b. STREET ADDRESS

c. COUNTY

d. CITY e. STATE f. ZIP CODE

14. SIGNATURE OF PERSON AUTHORIZED TO

SIGN QUOTATION

16. SIGNER

a. NAME (Type or print)

c. TITLE (Type or print)

a. NAME OF QUOTER

AREA CODE

NUMBER

15. DATE OF QUOTATION

b. TELEPHONE are are not attached

AUTHORIZED FOR LOCAL REPRODUCTION

Previous edition not usable

STANDARD FORM 18 (REV. 6-95)

Prescribed by GSA - FAR (48 CFR) 53.215-1(a)

BAER Gatte Installation, Santa Catalina

SCHEDULE OF ITEMS

BID ITEMS

BAER Gate Installation, Santa Catalina Method of Estimated Estimated

Pay Item Description Measure Quantity Pay Unit Unit Cost Total 1 Espereo Canyon #25 Simple Gate EA 1 EA 2 Ventana Canyon #98 Simple Gate EA 1 EA 3 Finger Rock Canyon #42 Simple Gate EA 1 EA 4 Pima Canyon 62 Simple Gate EA 1 EA 5 Romero Canyon #8 Simple Gate EA 1 EA 6 Mt. Lemmon #5 Simple Gate EA 1 EA 7 Palisade #99 Simple Gate EA 1 EA 8 Box Camp #22 Simple Gate EA 1 EA 9 Both ends of Green Mtn #21 Equestrian Gate EA 2 EA 10 Sycamore Res #39 Equestrian Gate EA 1 EA 11 Bear Canyon #29 Equestrian Gate EA 1 EA 12 Sabino Canyon #23 Equestrian Gate EA 1 EA 13 Lemmon Lookout #12 Simple Gate EA 1 EA 14 Marshal Trail #3 Simple Gate EA 1 EA 15 24"x8" FBM‐R Sign EA 8 EA 16 24"x8" FBM‐L Sign EA 8 EA 17 Post and Fence Installation AQ 590 LF

Grand Total

Below is a list of all trails to receive either an equestrian gate or a simple gate and work involved and the type of access for each trail, if no access is described that means the trail can be easily accessed.

1. Espereo Canyon #25 at Forest boundary – Simple design gate- ½ mile hiking to wilderness boundary. Install 40’ of fencing.

2. Ventana Canyon #98 at Forest boundary – Simple design gate- 1 mile of hiking to forest boundary. Tie into existing fence line. 6 Railroad ties shall be removed from forest land.

3. Finger Rock Canyon #42 at TH – Simple design gate- Install 50’ of fence, hike 200’ to site.

4. Pima Canyon #62 at existing fence line at wilderness boundary -Simple design gate- Install 10’ of fence -Hike to location. 6 Railroad ties shall be removed from forest land.

5. Romero Canyon #8 at Forest boundary – Simple design gate-Install 100’ of fence.

6. Mt. Lemmon #5 at TH - Simple design gate- Install 60’ of fence. 4x4 access.

7. Palisade #99 at TH - Simple design gate- Install 100’ of fence, hike approximately ½ mile.

8. Box Camp #22 at Spencer TH - Simple design gate- Install 100’ of fence.

9. Both ends of Green Mtn #21 - Equestrian design gate- Install 30’ of fence.

10. Sycamore Res #39 at GH TH- Equestrian design gate- install 20’ of fence. ATV access.

11. Bear Canyon #29 at TH- Equestrian design gate- install 8’ of fencing.

12. Sabino Canyon #23 at TH - Equestrian design gate- install 5’ of fencing.

13. Lemmon Lookout #12 at TH –Simple design gate- install 40’ of fencing- 4x4 access.

14. Marshal Trail #3 – Simple design gate-Install 20’ of fencing.

Costs attributable to mobilization, temporary traffic control and other incidentals shall be incorporated into the unit costs shown in the Schedule of Items at time of bid.

BAER Trail Gate, Santa Catalina STATEMENT of WORK

DESCRIPTION OF WORK

The Contractor shall furnish all labor, supervision, equipment, submittals, traffic control and materials necessary for fabrication and installation of trail gates as shown on the drawings.

Installation of fence, clips, stays, other materials and fence post as shown on drawings. Sign installation on equestrian gates. Access to some locations shall need to be hiked to, use of ATV’s or use of 4x4 high clearance vehicles, two trail sites shall have existing railroad ties that are partially buried into the ground removed from the site, at the locations indicated on the attached map(s). No staging areas will be allowed.

PROJECT LOCATION

Install a complete trail gate at the locations shown on the MAP included in the contract package. It is recommended that the contractor obtain a more detailed map from the following Internet location to be assured of the correct installation locations and the manner of accessing these locations. Specific questions about access should be addressed to the Carlos Tomas at carlos.tomas@usda.gov.

https://www.fs.usda.gov/detail/coronado/landmanagement/projects/?cid=stelprdb5371187

No temporary traffic control is anticipated to be required. However the contractor is responsible for protection of the public during the contractor’s work.

Costs attributable to mobilization, temporary traffic control and other incidentals shall be incorporated into the unit costs shown in the Schedule of Items at time of bid.

https://www.fs.usda.gov/detail/coronado/landmanagement/projects/?cid=stelprdb5371187

BAER TRAIL GATE

Santa Catalina Ranger District

Coronado National Forest

This Contract shall furnish all labor, supervision, equipment, submittals, traffic control and materials necessary for fabrication and installation of trail gates as shown on the drawings. Installation of fence, clips, stays, other materials and fence post as shown on drawings. Sign installation on equestrian gates.

Access to some locations will need to be hiked or use of ATV’s or use of 4x4 high clearance vehicles, see list of trails below for more access information. Two trail sites shall have existing railroad ties that are partially buried into the ground removed from the site, those two sites require hiking for access. Gate locations shall be flagged on the ground by COR. See map provided for locations. Prior to installation contractor shall inform COR 24 hours in advance to confirm onsite gate location.

Archeological site summary- Any Archeological sites discovered during construction shall be reported to CO or COR and all activity in the area shall cease until the problem is resolved.

1. GATE FABRICATION

1.1. DEGREASE AND REMOVE ALL DEBRIS PRIOR TO PAINTING ALL METAL.

1.2. PRIME AND PAINT ALL EXPOSED METAL, INCLUDING ALL GATE ACCESSORIES AND

ATTACHMENTS. PRIME WITH ONE COAT OF BENJAMIN MOORE RETARDO, AND PAINT TWO

COATS BENJAMIN MOORE IMPERVO, LOW LUSTRE, IN FEDERAL STANDARD COLOR 20059, OR

EQUAL.

1.2. INCLUDE ONE QUART OF PAINT FOR FIELD TOUCH UP WITH EACH GATE FABRICATION.

1.3. INCLUDE ALL HARDWARE, BRACKETS, BOLTS, ETC. FOR COMPLETE FIELD INSTALLATION.

1.4. REFERENCE ANSI/ASME B36.10M-1995 WROUGHT STEEL PIPE SEAMLESS AND WELDED AND

AMERICAN NATIONAL STANDARD SCHEDULES 40 AND 80 WELDED AND SEAMLESS STEEL PIPE.

2. GATE ORDERING

2.1. ALL GATE COMPONENETS AS SHOWN IN DRAWINGS AND ALL OTHER MISCELLANEOUS GATE

HARDWARE, REBAR, NUTS, BOLTS, ETC. SHALL BE PROVIDED AND BE INSTALLATION-READY.

3. GATE INSTALLATION

3.1. INSTALL ALL POSTS IN 3000 PSI FOOTING, WITH DIMENSIONS AS SHOWN ON DRAWINGS.

3.2. INSTALL GATE PLUMB AND LEVEL.

3.3. INSTALL 4 FBM SIGNS (MUTCD) ON EQUESTRIAN GATES.

I - SECTION I - Contract Clauses

52.204-7 System for Award Management. (OCT 2018)

52.209-6 Protecting the Government's Interest When Subcontracting With Contractors Debarred, Suspended, or Proposed for Debarment. (OCT 2015)

(a) Definition. Commercially available off-the-shelf (COTS) item, as used in this clause-

(1) Means any item of supply (including construction material) that is-

(i) A commercial item (as defined in paragraph (1) of the definition in FAR 2.101);

(ii) Sold in substantial quantities in the commercial marketplace; and

(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and

(2) Does not include bulk cargo, as defined in 46 U.S.C. 40102(4), such as agricultural products and petroleum products.

(b) The Government suspends or debars Contractors to protect the Government's interests. Other than a subcontract for a commercially available off-the-shelf item, the Contractor shall not enter into any subcontract, in excess of $35,000 with a Contractor that is debarred, suspended, or proposed for debarment by any executive agency unless there is a compelling reason to do so.

(c) The Contractor shall require each proposed subcontractor whose subcontract will exceed $35,000, other than a subcontractor providing a commercially available off-the-shelf item, to disclose to the Contractor, in writing, whether as of the time of award of the subcontract, the subcontractor, or its principals, is or is not debarred, suspended, or proposed for debarment by the Federal Government.

(d) A corporate officer or a designee of the Contractor shall notify the Contracting Officer, in writing, before entering into a subcontract with a party (other than a subcontractor providing a commercially available off-the-shelf item) that is debarred, suspended, or proposed for debarment (see FAR 9.404 for information on the System for Award Management (SAM) Exclusions). The notice must include the following:

(1) The name of the subcontractor.

(2) The Contractor's knowledge of the reasons for the subcontractor being listed with an exclusion in SAM.

(3) The compelling reason(s) for doing business with the subcontractor notwithstanding its being listed with an exclusion in SAM.

(4) The systems and procedures the Contractor has established to ensure that it is fully protecting the Government's interests when dealing with such subcontractor in view of the specific basis for the party's debarment, suspension, or proposed debarment.

(e) Subcontracts. Unless this is a contract for the acquisition of commercial items, the Contractor shall include the requirements of this clause, including this paragraph (e) (appropriately modified for the identification of the parties), in each subcontract that-

(1) Exceeds $35,000 in value; and

(2) Is not a subcontract for commercially available off-the-shelf items.

(End of clause)

52.219-6 Notice of Total Small Business Set-Aside. (MAR 2020)

52.222-3 Convict Labor. (JUN 2003)

52.222-7 Withholding of Funds. (MAY 2014)

52.222-8 Payrolls and Basic Records. (AUG 2018)

52.222-9 Apprentices and Trainees. (JUL 2005)

52.222-10 Compliance With Copeland Act Requirements. (FEB 1988)

52.222-11 Subcontracts (Labor Standards). (MAY 2014)

52.222-12 Contract Termination - Debarment. (MAY 2014)

52.222-13 Compliance With Construction Wage Rate Requirements and Related Regulations. (MAY 2014)

52.222-14 Disputes Concerning Labor Standards. (FEB 1988)

52.222-15 Certification of Eligibility. (MAY 2014)

52.222-20 Contracts for Materials, Supplies, Articles, and Equipment Exceeding $15,000. (MAY 2014)

52.222-21 Prohibition of segregated facilities. (APR 2015)

52.222-26 Equal Opportunity. (SEP 2016)

52.222-27 Affirmative Action Compliance Requirements for Construction. (APR 2015)

52.222-35 Equal Opportunity for Veterans. (OCT 2015)

(a) Definitions. As used in this clause-

"Active duty wartime or campaign badge veteran," "Armed Forces service medal veteran," "disabled veteran," "protected veteran," "qualified disabled veteran," and "recently separated veteran" have the meanings given at FAR 22.1301.

(b) Equal opportunity clause. The Contractor shall abide by the requirements of the equal opportunity clause at 41 CFR 60-300.5(a), as of March 24, 2014. This clause prohibits discrimination against qualified protected veterans, and requires affirmative action by the Contractor to employ and advance in employment qualified protected veterans.

(c) Subcontracts. The Contractor shall insert the terms of this clause in subcontracts of $150,000 or more unless exempted by rules, regulations, or orders of the Secretary of Labor. The Contractor shall act as specified by the Director, Office of Federal Contract Compliance Programs, to enforce the terms, including action for noncompliance. Such necessary changes in language may be made as shall be appropriate to identify properly the parties and their undertakings.

(End of clause)

52.222-36 Equal Opportunity for Workers with Disabilities. (JUL 2014)

(a) Equal opportunity clause. The Contractor shall abide by the requirements of the equal opportunity clause at 41 CFR 60-741.5(a), as of March 24, 2014. This clause prohibits discrimination against qualified individuals on the basis of disability, and requires affirmative action by the Contractor to employ and advance in employment qualified individuals with disabilities.

(b) Subcontracts. The Contractor shall include the terms of this clause in every subcontract or purchase order in excess of $15,000 unless exempted by rules, regulations, or orders of the Secretary, so that such provisions will be binding upon each subcontractor or vendor. The Contractor shall act as specified by the Director, Office of Federal Contract Compliance Programs of the U.S. Department of Labor, to enforce the terms, including action for noncompliance. Such necessary changes in language may be made as shall be appropriate to identify properly the parties and their undertakings.

(End of clause)

52.222-37 Employment Reports on Veterans. (FEB 2016)

52.223-2 Affirmative Procurement of Biobased Products Under Service and Construction Contracts.

(SEP 2013)

52.223-5 Pollution Prevention and Right-to-Know Information. (MAY 2011)

52.223-6 Drug-Free Workplace. (MAY 2001)

52.223-15 Energy Efficiency in Energy-Consuming Products. (DEC 2007)

52.224-1 Privacy Act Notification. (APR 1984)

52.224-2 Privacy Act. (APR 1984)

52.225-9 Buy American - Construction Materials. (MAY 2014)

(a) Definitions. As used in this clause-

Commercially available off-the-shelf (COTS) item- (1) Means any item of supply (including construction material) that is-

(i) A commercial item (as defined in paragraph (1) of the definition at FAR 2.101);

(ii) Sold in substantial quantities in the commercial marketplace; and

(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and

(2) Does not include bulk cargo, as defined in 46 U.S.C. 40102(4), such as agricultural products and petroleum products.

Construction material means an article, material, or supply brought to the construction site by the Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site. Materials purchased directly by the Government are supplies, not construction material.

Cost of components means-

(1) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the construction material (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or

(2) For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as described in paragraph

(1) of this definition, plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the construction material.

Domestic construction material means-

(1) An unmanufactured construction material mined or produced in the United States;

(2) A construction material manufactured in the United States, if-

(i) The cost of its components mined, produced, or manufactured in the United States exceeds 50 percent of the cost of all its components. Components of foreign origin of the same class or kind for which nonavailability determinations have been made are treated as domestic; or

(ii) The construction material is a COTS item.

Foreign construction material means a construction material other than a domestic construction material.

United States means the 50 States, the District of Columbia, and outlying areas.

(b) Domestic preference. (1) This clause implements 41 U.S.C. chapter 83, Buy American, by providing a preference for domestic construction material. In accordance with 41 U.S.C. 1907, the component test of the Buy American statute is waived for construction material that is a COTS item. (See FAR 12.505(a)(2)). The Contractor shall use only domestic construction material in performing this contract, except as provided in paragraphs (b)(2) and (b)(3) of this clause.

(2) This requirement does not apply to information technology that is a commercial item or to the construction materials or components listed by the Government as follows:

(3) The Contracting Officer may add other foreign construction material to the list in paragraph (b)(2) of this clause if the Government determines that-

(i) The cost of domestic construction material would be unreasonable. The cost of a particular domestic construction material subject to the requirements of the Buy American statute is unreasonable when the cost of such material exceeds the cost of foreign material by more than 6 percent;

(ii) The application of the restriction of the Buy American statute to a particular construction material would be impracticable or inconsistent with the public interest; or

(iii) The construction material is not mined, produced, or manufactured in the United States in sufficient and reasonably available commercial quantities of a satisfactory quality.

(c) Request for determination of inapplicability of the Buy American statute. (1)(i) Any Contractor request to use foreign construction material in accordance with paragraph (b)(3) of this clause shall include adequate information for Government evaluation of the request, including-

(A) A description of the foreign and domestic construction materials;

(B) Unit of measure;

(C) Quantity;

(D) Price;

(E) Time of delivery or availability;

(F) Location of the construction project;

(G) Name and address of the proposed supplier; and

(H) A detailed justification of the reason for use of foreign construction materials cited in accordance with paragraph (b)(3) of this clause.

(ii) A request based on unreasonable cost shall include a reasonable survey of the market and a completed price comparison table in the format in paragraph

(d) of this clause.

(iii) The price of construction material shall include all delivery costs to the construction site and any applicable duty (whether or not a duty-free certificate may be issued).

(iv) Any Contractor request for a determination submitted after contract award shall explain why the Contractor could not reasonably foresee the need for such determination and could not have requested the determination before contract award. If the Contractor does not submit a satisfactory explanation, the Contracting Officer need not make a determination.

(2) If the Government determines after contract award that an exception to the Buy American statute applies and the Contracting Officer and the Contractor negotiate adequate consideration, the Contracting Officer will modify the contract to allow use of the foreign construction material. However, when the basis for the exception is the unreasonable price of a domestic construction material, adequate consideration is not less than the differential established in paragraph (b)(3)(i) of this clause.

(3) Unless the Government determines that an exception to the Buy American statute applies, use of foreign construction material is noncompliant with the Buy American statute or Balance of Payments Program.

(d) Data. To permit evaluation of requests under paragraph (c) of this clause based on unreasonable cost, the Contractor shall include the following information and any applicable supporting data based on the survey of suppliers:

Foreign and Domestic Construction Materials Price Comparison

Construction material description

Unit of measure Quantity

Price (dollars)*

Item 1

Foreign construction material ________ ________ ________

Domestic construction material ________ ________ ________

Item 2

Foreign construction material ________ ________ ________

Domestic construction material ________ ________ ________

* Include all delivery costs to the construction site and any applicable duty (whether or not a duty-free entry certificate is issued).

List name, address, telephone number, and contact for suppliers surveyed. Attach copy of response; if oral, attach summary.

Include other applicable supporting information.

(End of clause)

52.225-13 Restrictions on Certain Foreign Purchases. (JUN 2008)

52.232-5 Payments Under Fixed-Price Construction Contracts. (MAY 2014)

52.232-27 Prompt Payment for Construction Contracts. (JAN 2017)

52.232-33 Payment by Electronic Funds Transfer - System for Award Management. (OCT 2018)

52.232-40 Providing Accelerated Payments to Small Business Subcontractors. (DEC 2013)

(a) Upon receipt of accelerated payments from the Government, the Contractor shall make accelerated payments to its small business subcontractors under this contract, to the maximum extent practicable and prior to when such payment is otherwise required under the applicable contract or subcontract, after receipt of a proper invoice and all other required documentation from the small business subcontractor.

(b) The acceleration of payments under this clause does not provide any new rights under the Prompt Payment Act.

(c) Include the substance of this clause, including this paragraph (c), in all subcontracts with small business concerns, including subcontracts with small business concerns for the acquisition of commercial items.

(End of clause)

52.233-1 Disputes. (MAY 2014)

52.233-3 Protest After Award. (AUG 1996)

52.233-4 Applicable Law for Breach of Contract Claim. (OCT 2004)

52.236-2 Differing Site Conditions. (APR 1984)

52.236-3 Site Investigation and Conditions Affecting the Work. (APR 1984)

52.236-5 Material and Workmanship. (APR 1984)

52.236-6 Superintendence by the Contractor. (APR 1984)

52.236-7 Permits and Responsibilities. (NOV 1991)

52.236-8 Other Contracts. (APR 1984)

52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements.

(APR 1984)

52.236-10 Operations and Storage Areas. (APR 1984)

52.236-11 Use and Possession Prior to Completion. (APR 1984)

52.236-12 Cleaning Up. (APR 1984)

52.236-13 Accident Prevention. (NOV 1991)

52.236-15 Schedules for Construction Contracts. (APR 1984)

52.236-17 Layout of Work. (APR 1984)

52.236-21 Specifications and Drawings for Construction. (FEB 1997)

52.236-26 Preconstruction Conference. (FEB 1995)

52.243-5 Changes and Changed Conditions. (APR 1984)

52.244-6 Subcontracts for Commercial Items. (AUG 2019)

(a) Definitions. As used in this clause-

Commercial item and commercially available off-the-shelf item have the meanings contained in Federal Acquisition Regulation 2.101, Definitions.

Subcontract includes a transfer of commercial items between divisions, subsidiaries, or affiliates of the Contractor or subcontractor at any tier.

(b) To the maximum extent practicable, the Contractor shall incorporate, and require its subcontractors at all tiers to incorporate, commercial items or nondevelopmental items as components of items to be supplied under this contract.

(c)(1) The Contractor shall insert the following clauses in subcontracts for commercial items:

(i) 52.203-13, Contractor Code of Business Ethics and Conduct (OCT 2015) (41 U.S.C. 3509), if the subcontract exceeds $5.5 million and has a performance period of more than 120 days. In altering this clause to identify the appropriate parties, all disclosures of violation of the civil False Claims Act or of Federal criminal law shall be directed to the agency Office of the Inspector General, with a copy to the Contracting Officer.

(ii) 52.203-15, Whistleblower Protections Under the American Recovery and Reinvestment Act of 2009 (JUN 2010) (Section 1553 of Pub. L. 111-5), if the subcontract is funded under the Recovery Act.

(iii) 52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (JAN 2017).

(iv) 52.204-21, Basic Safeguarding of Covered Contractor Information Systems (JUN 2016), other than subcontracts for commercially available off-the-shelf items, if flow down is required in accordance with paragraph (c) of FAR clause 52.204-21.

(v) 52.204-23, Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab and Other Covered Entities (JUL 2018) (Section 1634 of Pub. L. 115-91).

(vi) 52.204-25, Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment. (AUG 2019) (Section 889(a)(1)(A) of Pub. L. 115-232).

(vii) 52.219-8, Utilization of Small Business Concerns (OCT 2018) (15 U.S.C.

637(d)(2) and (3)), if the subcontract offers further subcontracting opportunities.

If the subcontract (except subcontracts to small business concerns) exceeds $700,000 ($1.5 million for construction of any public facility), the subcontractor must include 52.219-8 in lower tier subcontracts that offer subcontracting opportunities.

(viii) 52.222-21, Prohibition of Segregated Facilities (APR 2015).

(ix) 52.222-26, Equal Opportunity (SEP 2016) (E.O. 11246).

(x) 52.222-35, Equal Opportunity for Veterans (OCT 2015)(38 U.S.C. 4212(a));

(xi) 52.222-36, Equal Opportunity for Workers with Disabilities (JUL 2014) (29 U.S.C. 793).

(xii) 52.222-37, Employment Reports on Veterans (FEB 2016) (38 U.S.C.

4212).

(xiii) 52.222-40, Notification of Employee Rights Under the National Labor Relations Act (DEC 2010) (E.O. 13496), if flow down is required in accordance with paragraph (f) of FAR clause 52.222-40.

(xiv)(A) 52.222-50, Combating Trafficking in Persons (JAN 2019) (22 U.S.C.

chapter 78 and E.O. 13627).

(B) Alternate I (MAR 2015) of 52.222-50 (22 U.S.C. chapter 78 and E.O. 13627).

(xv) 52.222-55, Minimum Wages under Executive Order 13658 (DEC 2015), if flowdown is required in accordance with paragraph (k) of FAR clause 52.222- 55.

(xvi) 52.222-62, Paid Sick Leave Under Executive Order 13706 (JAN 2017) (E.O. 13706), if flowdown is required in accordance with paragraph (m) of FAR clause 52.222-62.

(xvii)(A) 52.224-3, Privacy Training (JAN 2017) (5 U.S.C. 552a) if flow down is required in accordance with 52.224-3(f).

(B) Alternate I (JAN 2017) of 52.224-3, if flow down is required in accordance with 52.224-3(f) and the agency specifies that only its agency-provided training is acceptable).

(xviii) 52.225-26, Contractors Performing Private Security Functions Outside the United States (Oct 2016) (Section 862, as amended, of the National Defense Authorization Act for Fiscal Year 2008; 10 U.S.C. 2302 Note).

(xix) 52.232-40, Providing Accelerated Payments to Small Business Subcontractors (DEC 2013), if flow down is required in accordance with paragraph (c) of FAR clause 52.232-40.

(xx) 52.247-64, Preference for Privately Owned U.S.-Flag Commercial Vessels (FEB 2006) (46 U.S.C. App. 1241 and 10 U.S.C. 2631), if flow down is required in accordance with paragraph (d) of FAR clause 52.247-64.

(2) While not required, the Contractor may flow down to subcontracts for commercial items a minimal number of additional clauses necessary to satisfy its contractual obligations.

(d) The Contractor shall include the terms of this clause, including this paragraph (d), in subcontracts awarded under this contract.

(End of clause)

52.245-1 Government Property. (JAN 2017)

52.246-21 Warranty of Construction. (MAR 1994)

52.246-21 Warranty of Construction. (APR 1984) - Alternate I (APR 1984)

52.249-10 Default (Fixed-Price Construction). (APR 1984)

52.253-1 Computer Generated Forms. (JAN 1991)

452.236-70 Additive or Deductive Items. (FEB 1988)

452.236-71 Prohibition Against the Use of Lead-Based Paint. (NOV 1996)

452.236-72 Use of Premises. (NOV 1996)

452.236-76 Samples and Certificates. (FEB 1988)

452.236-77 Emergency Response. (NOV 1996)

K - SECTION K - Representations, Certifications, and Other Statements of Offerors

52.223-1 Biobased Product Certification. (MAY 2012)

L - SECTION L - Instructions, Conditions, and Notices to Offerors or Respondents

52.216-1 Type of Contract. (APR 1984)

The Government contemplates award of a firm fixed price contract resulting from this solicitation.

(End of provision)

52.222-23 Notice of Requirement for Affirmative Action To Ensure Equal Employment Opportunity for Construction. (FEB 1999)

(a) The offeror's attention is called to the Equal Opportunity clause and the Affirmative Action Compliance Requirements for Construction clause of this solicitation.

(b) The goals for minority and female participation, expressed in percentage terms for the Contractor's aggregate workforce in each trade on all construction work in the covered area, are as follows:

Goals for minority participation for each trade

[Contracting Officer shall insert goals]

Goals for female participation for each trade

[Contracting Officer shall insert goals]

These goals are applicable to all the Contractor's construction work performed in the covered area.

If the Contractor performs construction work in a geographical area located outside of the covered area, the Contractor shall apply the goals established for the geographical area where the work is actually performed. Goals are published periodically in the Federal Register in notice form, and these notices may be obtained from any Office of Federal Contract Compliance Programs office.

(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1) its implementation of the Equal Opportunity clause, (2) specific affirmative action obligations required by the clause entitled Affirmative Action Compliance Requirements for Construction, and (3) its efforts to meet the goals. The hours of minority and female employment and training must be substantially uniform throughout the length of the contract, and in each trade. The Contractor shall make a good faith effort to employ minorities and women evenly on each of its projects. The transfer of minority or female employees or trainees from Contractor to Contractor, or from project to project, for the sole purpose of meeting the Contractor's goals shall be a violation of the contract, Executive Order 11246, as amended, and the regulations in 41 CFR 60-4. Compliance with the goals will be measured against the total work hours performed.

(d) The Contractor shall provide written notification to the Deputy Assistant Secretary for Federal Contract Compliance, U.S. Department of Labor, within 10 working days following award of any construction subcontract in excess of $10,000 at any tier for construction work under the contract resulting from this solicitation. The notification shall list the-

(1) Name, address, and telephone number of the subcontractor;

(2) Employer's identification number of the subcontractor;

(3) Estimated dollar amount of the subcontract;

(4) Estimated starting and completion dates of the subcontract; and

(5) Geographical area in which the subcontract is to be performed.

(e) As used in this Notice, and in any contract resulting from this solicitation, the covered area is [Contracting Officer shall insert description of the geographical areas where the contract is to be performed, giving the state, county, and city].

(End of provision)

52.225-10 Notice of Buy American Requirement - Construction Materials. (MAY 2014)

(a) Definitions. "Commercially available off-the-shelf (COTS) item," "construction material," "domestic construction material," and "foreign construction material," as used in this provision, are defined in the clause of this solicitation entitled "Buy American-Construction Materials" (Federal Acquisition Regulation (FAR) clause 52.225-9).

(b) Requests for determinations of inapplicability. An offeror requesting a determination regarding the inapplicability of the Buy American statute should submit the request to the Contracting Officer in time to allow a determination before submission of offers. The offeror shall include the information and applicable supporting data required by paragraphs (c) and (d) of the clause at FAR 52.225-9 in the request. If an offeror has not requested a determination regarding the inapplicability of the Buy American statute before submitting its offer, or has not received a response to a previous request, the offeror shall include the information and supporting data in the offer.

(c) Evaluation of offers. (1) The Government will evaluate an offer requesting exception to the requirements of the Buy American statute, based on claimed unreasonable cost of domestic construction material, by adding to the offered price the appropriate percentage of the cost of such foreign construction material, as specified in paragraph (b)(3)(i) of the clause at FAR 52.225-9.

(2) If evaluation results in a tie between an offeror that requested the substitution of foreign construction material based on unreasonable cost and an offeror that did not request an exception, the Contracting Officer will award to the offeror that did not request an exception based on unreasonable cost.

(d) Alternate offers. (1) When an offer includes foreign construction material not listed by the Government in this solicitation in paragraph (b)(2) of the clause at FAR 52.225-9, the offeror also may submit an alternate offer based on use of equivalent domestic construction material.

(2) If an alternate offer is submitted, the offeror shall submit a separate Standard Form 1442 for the alternate offer, and a separate price comparison table prepared in accordance with paragraphs (c) and (d) of the clause at FAR 52.225-9 for the offer that is based on the use of any foreign construction material for which the Government has not yet determined an exception applies.

(3) If the Government determines that a particular exception requested in accordance with paragraph (c) of the clause at FAR 52.225-9 does not apply, the Government will evaluate only those offers based on use of the equivalent domestic construction material, and the offeror shall be required to furnish such domestic construction material. An offer based on use of the foreign construction material for which an exception was requested-

(i) Will be rejected as nonresponsive if this acquisition is conducted by sealed bidding; or

(ii) May be accepted if revised during negotiations.

(End of provision)

52.252-1 Solicitation Provisions Incorporated by Reference. (FEB 1998)

This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es): https://www.acquisition.gov/browse/index/far

(End of provision)

452.204-70 Inquiries. (FEB 1988)

SECTION M--EVALUATION FACTORS FOR AWARD

M1.0 BASIS FOR AWARD:

LPTA (LOWEST PRICE TECHNICALLY ACCEPTABLE). Offers will be reviewed for conformance to the requirements of this RFQ. Award will be made based on the Lowest Price Technically Acceptable (LPTA) offer that meets or exceeds the acceptability standards for technical factors. Failure to provide adequate information for Technical subfactors a & b, will result in the offer not being placed in the eligibility group of technically acceptable, which will remove the offer from further consideration.

Under LPTA:

1. Evaluation factors and significant subfactors that establish the requirements of acceptability shall be set forth in the solicitation.

2. Tradeoffs are not permitted.

3. Offers are evaluated for acceptability but not ranked using non-cost/price factors.

(If the Contracting Officer elects to consider Past Performance as an additional evaluation factor, it shall be evaluated in accordance with FAR Subpart 15.305).

M2.0 TECHNICAL CAPABILITY REQUIREMENTS:

Technical Capability shall be submitted in the form of a statement or document that demonstrates the contractor’s capability to perform the work to meet or exceed the requirements of this solicitation. In order to meet the Technical Capability Requirements, offers shall address the following factors:

Factor a - tools, equipment, training, and general business practices should be developed in the statement or document to satisfy an evaluation panel that you the contractor has a level of technical capability that meets or exceeds the requirements to perform this work.

Factors b - Provide specific information to gain a better understanding of the requirements to perform fabrication and installation of trail gates, that documents and addresses your firm’s experience and capability.

You may provide your own drawings, illustrations, documents, or photos to support your capability to perform the work. Specifically address the following:

b) Fabrication and installation of trail gates as shown on the drawings. Installation of fence, clips, stays, other materials and fence post as shown on drawings. Sign installation on equestrian gates. Access to some locations shall need to be hiked to, use of ATV’s or use of 4x4 high clearance vehicles

Failure to provide adequate information for Technically Capability may result in the offer being removed from the competitive range.

M3.0 PRICES:

Competitive offers will establish price reasonableness. Therefore, when contracting on a firm-fixed-price basis, comparison of the proposed prices will satisfy the requirement to perform a price analysis (cost analysis need not be performed). Contracting Officer intends to award without discussions, offerors shall provide their best prices up front. Pricing will serve as a final determining factor for award under LPTA.

Contract price includes base bid/quote, for optional bid item propose as a firm fixed price broken davidwatson2 Highlight davidwatson2 Highlight

3'

POST AND SWING GATE FONT VIEW

SEE SHEET 2 FOR DETAILS

3'

HOLDING POST

SEE SHEET 5 FOR DETAILS

DRAWN

DESIGNER

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

8/5 /20

:5

6 C

TO

MA

S

C:

\U

SE

RS

\C

TO

MA

S\

DE

SK

TO

P\

SA

NT

A

CA

TA

LI

NA

T

RA

IL

G

AT

E\

TR

AI

L

GA

TE

.D W

G;

R3

SOUTHWEST REGION

TRAIL GATE

CORONADO NATIONAL

FOREST

SANTA CATALINA RANGER

DISTRICT

EQUESTRIAN

POST AND SWING GATE

DETAILS

07/22/2020

C.TOMAS

C.TOMAS A-01

001 6

NOTES:

1. INSIDE DIMENSIONS ARE MINIMUM CLEAR DISTANCES

REQUIRED TO MEET ACCESSIBILITY STANDARDS.

2. SIGNAGE IS REQUIRED PER EM 7100-15.

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

AutoCAD SHX Text E

8'-2

7'-11

1 4

1'-6

2'-2

6'-4

6'-8

7'-4

3'

1 4

1 4

1 4

1 2

1 2

5 8

1 4

5"

5"x5"x

" STEEL PLATE

4"x4"x

" STEEL PLATE

3'

#4 REBAR

3,000 PSI

CONCRETE

SWING GATE FRONT VIEW

POST AND SWING GATE FRONT VIEW

FRONT

FRONT

#4 REBAR

3,000 PSI CONCRETE

LEFT POST RIGHT POST

GROUND

GROUND

LOCK HOUSING

4"

1"

1 4

"x

" SLOT

4"

1 4

DRAWN

DESIGNER

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

8/5 /20

:5

6 C

TO

MA

S

C:

\U

SE

RS

\C

TO

MA

S\

DE

SK

TO

P\

SA

NT

A

CA

TA

LI

NA

T

RA

IL

G

AT

E\

TR

AI

L

GA

TE

.D W

G;

R3

SOUTHWEST REGION

TRAIL GATE

CORONADO NATIONAL

FOREST

SANTA CATALINA RANGER

DISTRICT

EQUESTRIAN

POST AND SWING GATE

DETAILS

07/22/2020

C.TOMAS

C.TOMAS A-02

002 6

10"x2.5"x

" STEEL PLATE

5"x5"x

" LOCK HOUSING

2.5"x0.5" SLOT

"Ø x

" STEEL PIPE

"Ø STEEL ROD

1 4

SWING GATE

4"x4"x

" STEEL POST

NOTES:

1. ALL POST COMPONENTS SHALL BE 4"x4"x

" STEEL.

2. ALL SWING GATE COMPONENTS SHALL BE 2"x2"x

STEEL.

3. ALL MEMBERS SHALL BE WELDED ON ALL SIDES.

"x1

"x1" STEEL PLATE

"Øx4.5" STEEL ROD

2"Øx0.5" STEEL ROD 4

1 2

1 4

LOCK TAB

10"x2.5"x

STEEL PLATE

STEEL LOCK TAB

1"

#4 REBAR ANCHOR

FOR FENCE

#4 REBAR ANCHOR

FOR FENCE

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

POST AND SWING GATE FONT VIEW

SEE SHEET 4 FOR DETAILS

HOLDING POST

SEE SHEET 5 FOR DETAILS

3'

DRAWN

DESIGNER

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

8/1 2/2

0 1 2:

C

TO

MA

S C:

\U

SE

RS

\C

TO

MA

S\

DE

SK

TO

P\

SA

NT

A

CA

TA

LI

NA

T

RA

IL

G

AT

E\

SI

NG

LE

P

OS

T

TR

AI

L

GA

TE

.D

W G;

R3

SOUTHWEST REGION

TRAIL GATE

CORONADO NATIONAL

FOREST

SANTA CATALINA RANGER

DISTRICT

SIMPLE

POST AND SWING GATE

DETAILS

07/22/2020

C.TOMAS

C.TOMAS A-03

003 6

NOTES:

1. INSIDE DIMENSIONS ARE MINIMUM CLEAR DISTANCES

REQUIRED TO MEET ACCESSIBILITY STANDARDS.

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

1 2

4'-7"

3'

3'-8"

1 4

1 4

1 4

1 2

1 2

1 4

1 4

5"

5"x5"x

" STEEL PLATE

4"x4"x

" STEEL PLATE

#4 REBAR

3,000 PSI

CONCRETE

SWING GATE FONT VIEW

POST AND SWING GATE FONT VIEW

FRONT

FRONT

#4 REBAR

3,000 PSI CONCRETE

LEFT POST RIGHT POST

GROUND

GROUND

LOCK HOUSING

4"

1"

1 4

"x

" SLOT

4"

1 4

DRAWN

DESIGNER

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

8/1 2/2

0 1 2:

C

TO

MA

S C:

\U

SE

RS

\C

TO

MA

S\

DE

SK

TO

P\

SA

NT

A

CA

TA

LI

NA

T

RA

IL

G

AT

E\

SI

NG

LE

P

OS

T

TR

AI

L

GA

TE

.D

W G;

R3

SOUTHWEST REGION

TRAIL GATE

CORONADO NATIONAL

FOREST

SANTA CATALINA RANGER

DISTRICT

SIMPLE

POST AND SWING GATE

DETAILS

07/22/2020

C.TOMAS

C.TOMAS A-04

004 6

10"x2.5"x

" STEEL PLATE

5"x5"x

" LOCK HOUSING

2.5"x0.5" SLOT

"Ø x

" STEEL PIPE

"Ø STEEL ROD

1 4

SWING GATE

4"x4"x

" STEEL POST

NOTES:

1. ALL POST COMPONENTS SHALL BE 4"x4"x

" STEEL.

2. ALL SWING GATE COMPONENTS SHALL BE 2"x2"x

STEEL.

3. ALL MEMBERS SHALL BE WELDED ON ALL SIDES.

1 4

LOCK TAB

10"x2.5"x

STEEL PLATE

STEEL LOCK TAB

1"

#4 REBAR ANCHOR

FOR FENCE

#4 REBAR ANCHOR

FOR FENCE

"x1

"x1" STEEL PLATE

"Øx4.5" STEEL ROD

2"Øx0.5" STEEL ROD

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

5 8

1 4

5"

5"x5"x

" STEEL PLATE

FRONT

HOLDING POST SIDE VIEW

GROUNDGROUND

HOLDING POST FRONT VIEW

1'-6"1'-6"

3,000 PSI CONCRETE

DRAWN

DESIGNER

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

8/5 /20

:5

6 C

TO

MA

S

C:

\U

SE

RS

\C

TO

MA

S\

DE

SK

TO

P\

SA

NT

A

CA

TA

LI

NA

T

RA

IL

G

AT

E\

TR

AI

L

GA

TE

.D W

G;

R3

SOUTHWEST REGION

TRAIL GATE

CORONADO NATIONAL

FOREST

SANTA CATALINA RANGER

DISTRICT

HOLDING POST

07/22/2020

C.TOMAS

C.TOMAS A-05

005 6

NOTES:

1. POST SHALL BE 4"x4"x

" STEEL.

2. ALL MEMBERS SHALL BE WELDED ON ALL SIDES.

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

TWISTED

STAYS

TYPICAL TYPE 1 BARBED WIRE FENCE INSTALLATION (4-WIRE)

STAY DETAIL

nts

DRAWN

DESIGNER

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

8/1 2/2

0 1 2:

C

TO

MA

S C:

\U

SE

RS

\C

TO

MA

S\

DE

SK

TO

P\

SA

NT

A

CA

TA

LI

NA

T

RA

IL

G

AT

E\

SI

NG

LE

P

OS

T

TR

AI

L

GA

TE

.D

W G;

R3

SOUTHWEST REGION

TRAIL GATE

CORONADO NATIONAL

FOREST

SANTA CATALINA RANGER

DISTRICT

BARBED WIRE FENCE

INSTALLATION

07/22/2020

C.TOMAS

C.TOMAS A-06

006 6

AutoCAD SHX Text 4'-6"

AutoCAD SHX Text

ANCHOR

AutoCAD SHX Text 7'-0"

AutoCAD SHX Text

METAL POST 6'-6" LONG

AutoCAD SHX Text

3 STRANDS OF BARBED WIRE, 1 STRANDS SMOOTH, BOTTOM

AutoCAD SHX Text 2'

AutoCAD SHX Text 10"

AutoCAD SHX Text 14"

AutoCAD SHX Text

25'-0" MAXIMUM 4-WIRE

AutoCAD SHX Text 12"

AutoCAD SHX Text 6"

AutoCAD SHX Text

UNIVERSAL STAYS

AutoCAD SHX Text

FENCE WIRES

AutoCAD SHX Text 12"

AutoCAD SHX Text 3 x 36" STAYS PER PANEL, TYP.

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

GFGF

GF

GF

GF

GF

GF

GF

GF

GF

GF

GF

GF

GF

GF

Region 3 Supervisor, Forest, and District offices

0 1 2 3 40.5 Miles

GF Proposed Trail Gate Road Arizona NST Trail 7/12 Bighorn IR Perimeter

"General Decision Number: AZ20200032 08/21/2020

Superseded General Decision Number: AZ20190032

State: Arizona

Construction Type: Building

County: Pima County in Arizona.

BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).

Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.80 for calendar year 2020 applies to all contracts subject to the Davis‐Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.80 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2020.