Amendment 0001.pdf
PDF 209 KB Posted
- Solicitation number
- 12837120Q0138
View the file
Other files
| File | Type | Posted |
|---|---|---|
| MAPS-LNF- 2020 RTRT Reforestation Project.pdf | ||
| Wage Determination.pdf | ||
| 12837120Q0138.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
12837120Q0138 x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
ALBUQUERQUE NM 87102
333 BROADWAY SE
SOUTHWESTERN REGION
06/26/20200001
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
06/26/2020
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
The Purpose of this Amendment is to post the Questions and Answers to BetaSam.gov. There will be no additional questions accepted.
The Offeror Due Date has been extended to 07/16/2020.
Period of Performance: 07/27/2020 to 09/30/2020
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
ELLENA C. SILVA
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
LNF Smokey Bear RD and Sacramento RD 2020 Planting Projects 12837120Q0138
Q&A
1. The solicitation for planting on the Lincoln NF, it refers to Easy Install shelters, description in section J. However I do not see that in the solicitation. From the specifications they will have 3 stakes incorporated in each shelter. If possible, could we get either photos, drawings, or more specific information about the shelters that will be used?
Specifications for tree shelters
Tree Shelters – Pre-assembled with three wire staking legs attached to the base which allow 8” of soil penetration for stability. The shelter will be manufactured of solid polymer material with no mesh, and sufficiently rigid to allow the shelter to be pushed into workable soil without the use of driving tools. The shelter shall be conical in shape, approximately 18 inches in height, with the base being approximately 7 inches in diameter and tapering to approximately 4 inches at the open top. The shelter shall be made of translucent materials and include design features that allow the shelter to photo-degrade over a period of 5-7 years and separate or fracture and, in the event the shelter is never removed, not constrict the developing seedling which it protects as it matures into a tree.
2. How long is the period of the contract? if I'm not mistaken the contract is for the plantation of 40,000 in 10 days?
The period of performance for the contract is approximately 07/27/2020 to 09/30/2020, which is approximately 60 days.