12837120Q0066 La Junta Bridge Answers to Questions 6.23.2020.pdf
PDF 97 KB Posted
- Attached to
- La Junta Trail Bridge
- Solicitation number
- 12837120Q0066
About this file
This document contains questions and answers regarding solicitation number 12837120Q0066 for the construction of a trail bridge in La Junta, Colorado. The contract requires the construction of a 44 foot long trail bridge over the Red River, including the bridge superstructure, alignment of the approaches, rehabilitation of one abutment and construction of another, clearing and construction of approaches, and installation of railings. Bids are due by June 26, 2020, with the agency reserving the right to issue amendments until the bid deadline. The base bid covers materials only, while optional items include reconstructing the abutments, baskets, and geocell, and construction of the bridge itself. The agency will not accept alternative bridge designs.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
12837120Q0066 La Junta Bridge 6.23.2020
Questions and Response
1) Would the USFS accept a properly engineering, manufactured, and installed FIBERGLASS bridge in place of the steel bridge?
No, the forest will not accept an alternative design.
2) Specifically, does the base bid include installation of the bridge or not? In Schedule B, item A-1 includes materials only. This seems inconsistent with the wording shown under bid item 0001 on page 3 of the solicitation form, which includes the words “construct bridge superstructure and railing.” Also, “repair and construction of abutments” appears in item 0001 (A-1) of the solicitation form and in item 0002 (A-2). It seems to us that construction of the abutments and bridge approaches (including rock gabions and timber backwalls) are critical to successful bridge installation; hence our confusion about the abutments and gabions being specified only in the Option 1 bid (item 0002, A-2). Finally, can you clarify what is included in item 0003 (or A-3)?
As for the Schedule of Items, the Base Bid Item A-1 should cover the costs of materials only. Optional Item A-2 to have them reconstruct/construct the abutments, baskets, geocell, etc. Costs to construct the bridge itself should be placed under A-3.
3) What is the last day for questions on this RFP?
Friday June 26, 2020
4) When will a final addendum/amendment be issued?
An amendment can be issued up to the last day of required bid package acceptance. However, if that should happen an extension to the solicitation will occur.