03-2020-PITMAN_General_Notes.pdf
PDF 184 KB Posted
- Attached to
- Crushing and Stockpiling of Surfacing Material
- Solicitation number
- 12837120Q0019
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Questions and Answers.pdf | ||
| Sol_12837120Q0019.pdf | ||
| Kaibab Fire Plan.pdf | ||
| 02-2020-PITMAN_Site_Plan.pdf | ||
| Forest Service Standard Specifications.docx | DOCX document | |
| 01-2020-PITMAN_Title_Page.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. WEIGHING PROCEDURES AND DEVICES ARE REQUIRED FOR
MEASUREMENT AND PAYMENT IN ACCORDANCE WITH FP-14 SECTIONS
109.03 AND SHALL BE CERTIFIED BY STATE WEIGHTS AND
MEASUREMENTS.
2. ALL OVERSIZED MATERIAL GENERATED IN THE ROCK BLASTING/ROCK
EXCAVATION OPERATIONS SHALL BE UTILIZED FOR AGGREGATE
PRODUCTION, REGARDLESS OF SIZE.
3. ALL AGGREGATE PRODUCED ON THIS CONTRACT SHALL MEET THE
REQUIREMENTS UNDER FSSS SECTION 703.05B, FOR SURFACE COURSE
AGGREGATE, GRADING G,
4. STOCKPILE SIDE SLOPES SHALL BE NO FLATTER THAN 1:1.5.
AGGREGATES AND SHALL BE STOCKPILED IN ACCORDANCE WITH FSSS
SECTION 320.
5. ALL REFUSE FROM CLEARING AND GRUBBING OPERATIONS SHALL BE
PILED IN CONSTRUCTION LIMITS DESIGNATED BY THE COR.
6. THE CONTRACTOR IS RESPONSIBLE FOR OBTAINING ALL NECESSARY
PERMITS FOR THIS TYPE OF CONSTRUCTION, INCLUDING ANY
ASSOCIATED FEES. ADEQ AIR QUALITY PERMIT AND NOI (INCLUDING A
SWPPP AND EROSION CONTROL PLAN) ARE REQUIRED.
7. THE BOTTOM OF THE PIT SHALL SLOPE A MINIMUM OF 1% IN THE
DIRECTION OF EXISTING CONTOURS. ALL SIDE SLOPES SHALL BE
APPROXIMATELY 2:1 UPON COMPLETION OF CRUSHING OPERATIONS.
8. OVERBURDEN SHALL BE PLACED IN AN ATTEMPT TO BRING PREEXISTING
PIT SLOPES TO 2:1.
9. THE CONTRACTOR IS RESPONSIBLE FOR THEIR OWN SECURITY. A
TEMPORARY GATE CAN BE INSTALLED AND REMOVED UPON
COMPLETION OF CONTRACT. THIS INCLUDES SITE SECURITY TO
PREVENT AGGREGATE THEFT UNTIL ACCEPTED BY GOVERNMENT.
10. PROPOSED PIT PLAN LOCATIONS AND DIMENSIONS ARE APPROXIMATE
AND WILL BE FURTHER IDENTIFIED IN THE FIELD.
11. THERE IS NO MOISTURE CONTENT REQUIREMENT FOR STOCKPILED
AGGREGATE.
12. THE CONTRACTOR IS ALLOWED TO CAMP AT THE SITE DURING THE
CONSTRUCTION PERIOD. THIS MAY REQUIRE A DISTRICT ISSUED
CAMPING PERMIT AT NO COST.
13. THE STANDARD SPECIFICATIONS FOR CONSTRUCTION OF ROADS AND
BRIDGES ON FEDERAL HIGHWAY PROJECTS (FP-14 U.S. CUSTOMARY
UNITS) ARE INCLUDED IN THE SPECIFICATIONS PER SECTION C.3 OF THE
BID PACKAGE.
14. NO GOVERNMENT WATER SOURCE IS AVAILABLE AT PITMAN VALLEY PIT.
WATER SOURCES ARE AVAILABLE FOR PITMAN VALLEY PIT IN PARKS,
BELLEMONT AND WILLIAMS.
15. IF FEDERALLY THREATENED/ENDANGERED SPECIES, FOREST SERVICE
SENSITIVE SPECIES, OR BALD OR GOLDEN EAGLES ARE WITHIN THE
VICINITY OF 0.5 MILES OF THE PROJECT AREA, THEN SEASONAL
CLOSURES OF OPERATIONS DURING THE BREEDING SEASON (MARCH 1
TO SEPTEMBER 30) WILL BE IMPOSED TO PREVENT NOISE-RELATED
DISTURBANCE FROM AFFECTING THE REPRODUCTIVE SUCCESS AND
SURVIVAL OF THE SPECIES OF CONCERN.
16. CONTRACTOR SHALL MAINTAIN MINIMUM 25 FT BUFFER BETWEEN NEWLY
CRUSHED STOCKPILE DEFINED PIT LIMITS AND TREELINE.
17. ALL EXISTING OVERSIZED BOULDERS SHALL BE UTILIZED FOR
AGGREGATE PRODUCTION PRIOR TO ANY ROCK BLASTING/ROCK
EXCAVATION AND OR PIT EXPANSION.
18. ALL EXISTING SLOPES AND ANY POTENTIAL NEW SLOPES CREATED
DURING OPERATIONS SHALL BE LAID AT A MINIMUM 2:1 SLOPE.
19. CLEARING AND GRUBBING MAY BE REQUIRED IF ADDITIONAL EXPANSION
FOR THE PIT DEVELOPMENT IS NECESSARY. ALL REFUSE FROM THIS
OPERATION SHALL BE PILED IN LOCATIONS DESIGNATED BY THE COR.
20. ALL OVERSIZE MATERIAL, REGARDLESS OF SIZE, SHALL BE REDUCED TO
A MAXIMUM SIZE OF 2'X2'X2' THROUGHOUT THE PROJECT SITE UPON
CONTRACT COMPLETION.
21. GRADATION G SHALL HAVE A MAXIMUM FLAT AND ELONGATED
PARTICLES OF 10 PERCENT AS MEASURED ON THE GREATER THAN OR
RETAINED ON THE 3/4-INCH SIEVE USING A 3:1 RATIO (ASTM D 4791)..
22. ADDITIONAL SOURCE FOR FINES TO MEET GRADATION REQUIREMENTS IF
NEEDED CAN BE OBTAINED THROUGH COMMERCIAL SOURCE OR WITH
APPROVAL FROM DISTRICT RANGER, THE PITMAN VALLEY PIT LOCATED
OFF I-40, AT EXIT 171. (T 22 N, R 3 E, SEC 23), SEE LOCATION MAP ON PIT
NOTES, SHEET 3.
23. CONTAINMENT: Containment of hazardous materials for the protection of the environment from contamination as well as for protection of employees who work in areas where hazardous materials ar stored and used.
Code(s) EPA CFR 264.175
(a) Container storage areas must have a containment system that is designed and operated in accordance with paragraph (b) of this section.
(b) A containment system must be designed and operated as follows:
(c) The containment system must have sufficient capacity to contain 10% of the volume of the containers or the volume of the largest container, whichever is greater. Containers that do not contain free liquids need to be considered in this determination.
DRAWING TITLE
DRAWN
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DWG SHEET NO.
OFSHEET
United States Department of Agriculture Forest Service
R03
SOUTHWESTERN REGION
PITMAN VALLEY PIT CRUSH
AND STOCKPILE 2019
KAIBAB
WILLIAMS
GENERAL NOTES
02/15/2019
L.RAIVALA
L.RAIVALA
N.WARNKE
C-03
03 03
GRADATION "G" SPECIFICATION
PERCENT PASSINGSIEVE SIZE
inch
1001 inch
97 - 100 inch inch
70 - 80 (6) inch
51 - 63 (7)
No. 4
No. 8
28 - 39 (6)
No. 16
19 - 27 (5)
No. 40
10.0 - 16.0 (4)
No. 200
( ) The value in the parenthese is the allowable deviation (±) from the target values.
If the plasticity index (PI) is greater than 0, the TV range for the No.
200 sieve size is 8 - 12 (4).
AutoCAD SHX Text
PROJECT NAME
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
AutoCAD SHX Text E
| Sheets and Views |
| GENERAL NOTES |
File details come from the government source that posted it. Updated .