1_-_Statement_of_Work_(SOW).docx
DOCX document 13 KB Posted
- Solicitation number
- 12837119R0028
About this file
Statement of Work (SOW)
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 3_-_Maps.pdf | ||
| Solicitation_-_12837119R0028.pdf | ||
| 5_-_Wage_Determination.pdf | ||
| 2_-_Schedue_of_Items_(SOI).xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
SNOW REMOVAL SERVICES
Sandia Ranger District Cibola National Forest
STATEMENT OF WORK
The contractor shall furnish all labor, supervision, materials, equipment, transportation, supplies, and incidentals necessary to perform snow removal of the identified parking facilities along the Sandia Crest Scenic Byway (State Highway 536). The project areas are located on the Sandia Ranger District in the Cibola National Forest. The performance period shall run from 01 October – 30 September.
| Areas shown on enclosed SOI/Maps | CLIN # | Approximate Square Footage | |||||
| Sandia Crest | 1 | 60,984 | |||||
| Ellis Parking Area | 2 | 22,651 | |||||
| 10K Parking Area | 3 | 20,473 | |||||
| Capulin Snow Play Area | 4 | 99,752 |
Requirements: Remove snow from areas to open parking spaces for winter use and allow for two-way traffic to pass safely on ingress and egress with two lanes. The Forest Service will designate snow disposal areas as close to the parking lots as possible. Any snow removal services required for the areas listed above will be ordered under a Blanket Purchase Agreement (BPA) resulting from this solicitation. The Forest Service will call for services after a snow storm and specify which item numbers with which to proceed. The number of calls may range from 1-10 times each season. Response time will be within 24 hours of notification. The most desirable time to plow is between midnight and 6 a.m. and before the snow depth exceeds 6 inches. This is due to the possibility of vehicles being parked in the lots after 6 a.m.
Equipment Requirements: Equipment must be capable of removing a minimum of 6 inches of snow.
Only persons authorized by the Contracting Officer will be allowed to place orders for services under any resultant contract. A Contracting Officer’s Representative will be designated after award.