12837119Q0066_Needle_Rock_Solicitation_-_Closing_9-10-2019.docx
DOCX document 2 MB Posted
- Attached to
- Construction - Pipe Rail Rehabilitation
- Solicitation number
- 12837119Q0066
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 12837119Q0066_Needle_Rock_Solicitation_-_Closing_9-10-2019_rev-a.docx | DOCX document | |
| SF-30_Amendment_12837119Q0066.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
| CONSTRUCTION RFQ Revised | 48 | Page | SOL NO: 12818019Q0003 |
| UNIT: TONTO N.F CAVE CREEK RD | ||
| PROJ NAME:REPLACE PIPE HANDRAIL |
| (THIS IS NOT AN ORDER) |
| THIS RFQ |
| |X| |
| IS |
| |_| |
| IS NOT A SMALL BUSINESS SET- ASIDE |
| 1 |
| 5 |
| 1. REQUEST NO. |
| 2. DATE ISSUED |
| 3. REQUISITION/PURCHASE REQUEST NO. |
| 4. CERT. FOR NAT.DEF. |
| RATING |
| 955700 |
| 8/19/2019 |
| 12837119Q0066 |
| UNDER BDSA REG. 2 |
AND/OR DMS REG. 1
| 5a. ISSUED BY |
| 6. DELIVER BY (Date) |
USDA FOREST SERVICE, APACHE-SITGREAVES N.F., PO BOX 640 30 S. CHIRICAHUA DR, SPRINGERVILLE, AZ 85938-0640
| 5b. FOR INFORMATION CALL (NO COLLECT CALLS) |
| 7. DELIVERY |
| |X| |
| FOB DESTINATION |
| NAME |
| TELEPHONE NUMBER |
| |_| |
| OTHER (See Schedule) |
| AREA CODE |
| NUMBER |
| 9. DESTINATION |
Apache Sitgreaves National Forest
| Michelle Bahr |
| 928 |
| 333-6278 |
| a. NAME OF CONSIGNEE |
8. TO:
| a. NAME |
| b. COMPANY |
| b. STREET ADDRESS |
30 South Chiricahua Drive
| c. STREET ADDRESS |
| c. CITY |
| Springerville |
| d. CITY |
| e. STATE |
| f. ZIP CODE |
| d. STATE |
| e. ZIP CODE |
| AZ |
| 85938 |
| 10. PLEASE FURNISH QUOTATIONS TO THE ISSUING OFFICE IN BLOCK 5A ON OR BEFORE CLOSE OF BUSINESS |
| IMPORTANT: This is a request for information, and quotations furnished are not offers. If you are unable to quote, please so indicate on this form and return it to the address in BLOCK 5a. This request does not commit the Government to pay any costs incurred in the preparation of the |
9/10/2019, 4:00 P.M.
(LOCAL TIME)
submission of this quotation or to contract for supplies or services. Supplies are of domestic origin unless otherwise indicated by quoter. Any representations and/or certifications attached to this Request for Quotations must be completed by the quoter.
11. SCHEDULE (Include applicable Federal, State and local taxes)
| ITEM NO. |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| (a) |
| (b) |
| (c) |
| (d) |
| (e) |
| (f) |
SEE ATTACHED SCHEDULE OF ITEMS
| a. 10 CALENDAR DAYS (%) |
| b. 20 CALENDAR DAYS (%) |
| c. 30 CALENDAR DAYS (%) |
| d. CALENDAR DAYS |
12. DISCOUNT FOR PROMPT PAYMENT
| NUMBER |
| PERCENTAGE |
| NOTE: Additional provisions and representations |
| |_| |
| are |
| |_| |
| are not attached. |
| 13. NAME AND ADDRESS OF QUOTER |
| 14. SIGNATURE OF PERSON AUTHORIZED TO |
| 15. DATE OF |
| a. NAME OF QUOTER |
| SIGN QUOTATION |
| QUOTATION |
| b. STREET ADDRESS |
| 16. SIGNER |
| a. NAME (Type or print) |
| b. TELEPHONE |
c. COUNTY
AREA CODE
| d. CITY |
| e. STATE |
| f. ZIP CODE |
| c. TITLE (Type or Print) |
| NUMBER |
NSN 7540-01-152-8084
Previous edition not usable
| 18-121 |
| STANDARD FORM 18 (Rev. 6-95) |
Prescribed by GSA-FAR (48 CFR) 53.215-1(a)
PART I – THE SCHEDULE—SECTION B –SCHEDULE OF ITEMS
Needle Rock Recreation Area Pipe Rail Rehabilitation
SECTION B – SCHEDULE OF ITEMS
| Pay Item |
| DESCRIPTION |
| MEAS |
| UNIT |
| QTY |
| UNIT COST* |
| AMOUNT |
| Task 1 |
| Demolition of Pipe Rail Fence and Removal of Debris |
| LSQ |
| LS |
| 1 |
| $ |
| $ |
| Task 2 |
| Pipe Rail Fence Installation Including Materials |
| LSQ |
| LS |
| 1 |
| $ |
| $ |
| Task 3 |
| Mobilization |
| LSQ |
| LS |
| 1 |
| $ |
| $ |
| Total Amount |
| $ |
* Price or total cost shall include all Federal, State, Local taxes, permits, licenses, fees that may be necessary for this project.
Designated Method of Measurement & Pay Unit:
AQ – actual quantities; LSQ – lump sum quantities; EA – each; TON – tons;
CHECKLIST OF MINIMUM REQUIREMENTS
TO RESPOND TO THIS REQUEST FOR QUOTATIONS (RFQ)
· _____ Respond with the complete RETURN PACKAGE (SEE SECTION M for Past Performance / Technical Capability)
· _____ Provide your DUNS number _______________________
· _____ Provide business email address to facilitate communications ______________________
· _____ Have active vendor record for the DUNS number above in the System for Award Management (SAM) https://www.sam.gov
· Completed offers may be scanned into electronic document and emailed to: mbahr@fs.fed.us
SECTION C – DESCRIPTION/SPECIFICATIONS/WORK STATEMENT
Needle Rock Recreation Area Pipe Rail Rehabilitation Tonto National Forest Cave Creek Ranger District
C1 – GENERAL DESCRIPTION OF WORK- The location of the parking lot presents challenges in controlling storm runoff and sediment transport driven by Camp Creek after a storm event. The goal of this project is to reduce the maintenance by removing current and damaged sections of pipe rail fencing and replacing it with a more robust design and layout.
Needle Rock Recreational Area is located on the Cave Creek Ranger District, Tonto National Forest. The site provides an access point to the Verde River that is heavily used by all recreational groups. The parking lot for the site is located at the confluence of the ephemeral Camp Creek and the Verde River. For this reason, the objectives of this project are to:
A) Remove approximately 248 Linear Feet (LF) of existing and damaged sections of pipe rail;
B) Replace the pipe rail with a new layout detailed in Appendix “A” of this document (Approximately 219 LF);
Basis for Award: The Government intends to award a contract based on Best Value -- LPTA (Lowest Price Technically Acceptable). The offeror that demonstrates that they have technical skill required and lowest price. In order to remain in the competitive range, Offerors (Contractors) shall submit the Return Package with the requirements in Section M, Evaluation Factors.
All work shall be completed in accordance with the project specifications and this document. The work includes all labor, materials, and equipment necessary to perform all operations for the work specified.
C2 – LOCATION OF PROJECT
Needle Rock Recreation Site is located 32 miles northeast of Phoenix, AZ. The project is located on the Cave Creek Ranger District, of the Tonto National Forest, T5N, R7E, Section 17, 18, 21, and 30.The site can be accessed via East Rio Verde Drive.
Technical Point of Contact:
Lonny Rollins – Design Team Leader Phone: (602) 225-5323 Cell: (602) 919-0115 E-mail: lrollins@fs.fed.us
Ernesto Maldonado – Civil Engineer Phone: (602) 225-5375 Cell: (513) 410-6007 E-mail: ernestomaldonado@fs.fed.us
C3 – SPECIFIC SCOPE OF WORK
Task 1 -- Demolition
The Contracting Officer’s Representative (COR) will delineate the boundaries of the pipe rail section to be removed at the pre-work meeting. An approximation of these boundaries is available in the appendix of this document. Complete removal of the pipe rail includes concrete footings, any scrap pipe rail damaged by the storm events, and debris obstructing the operation of the parking lot including debris adjacent to existing pipe railing. The waste shall be disposed of at a facility outside of U.S Forest Service land.
Task 2 – Pipe Rail Installation
Approximately 219 LF of new pipe rail will be installed according to the layout depicted in the appendix. The new segments will begin where the old pipe rail had been previously removed, the COR will delineate the end boundaries of the new segment at the pre-work meeting. The concrete footings shall be 6 FT of depth below grade surface (BGS).
SECTION D – PACKAGING AND MARKING
SEE SECTION H
SECTION E - INSPECTION AND ACCEPTANCE
52.246-12 INSPECTION OF CONSTRUCTION (AUG 1996)
(a) Definition. Work includes, but is not limited to, materials, workmanship, and manufacture and fabrication of components.
(b) The Contractor shall maintain an adequate inspection system and perform such inspections as will ensure that the work performed under the contract conforms to contract requirements. The Contractor shall maintain complete inspection records and make them available to the Government. All work shall be conducted under the general direction of the Contracting Officer and is subject to Government inspection and test at all places and at all reasonable times before acceptance to ensure strict compliance with the terms of the contract.
(c) Government inspections and tests are for the sole benefit of the Government and do not—
(1) Relieve the Contractor of responsibility for providing adequate quality control measures;
(2) Relieve the Contractor of responsibility for damage to or loss of the material before acceptance;
(3) Constitute or imply acceptance; or
(4) Affect the continuing rights of the Government after acceptance of the completed work under paragraph (i) of this section.
(d) The presence or absence of a Government inspector does not relieve the Contractor from any contract requirement, nor is the inspector authorized to change any term or condition of the specification without the Contracting Officer’s written authorization.
(e) The Contractor shall promptly furnish, at no increase in contract price, all facilities, labor, and material reasonably needed for performing such safe and convenient inspections and tests as may be required by the Contracting Officer. The Government may charge to the Contractor any additional cost of inspection or test when work is not ready at the time specified by the Contractor for inspection or test, or when prior rejection makes re-inspection or retest necessary. The Government shall perform all inspections and tests in a manner that will not unnecessarily delay the work. Special, full size, and performance tests shall be performed as described in the contract.
(f) The Contractor shall, without charge, replace or correct work found by the Government not to conform to contract requirements, unless in the public interest the Government consents to accept the work with an appropriate adjustment in contract price. The Contractor shall promptly segregate and remove rejected material from the premises.
(g) If the Contractor does not promptly replace or correct rejected work, the Government may—
(1) By contract or otherwise, replace or correct the work and charge the cost to the Contractor; or
(2) Terminate for default the Contractor’s right to proceed.
(h) If, before acceptance of the entire work, the Government decides to examine already completed work by removing it or tearing it out, the Contractor, on request, shall promptly furnish all necessary facilities, labor, and material. If the work is found to be defective or nonconforming in any material respect due to the fault of the Contractor or its subcontractors, the Contractor shall defray the expenses of the examination and of satisfactory reconstruction. However, if the work is found to meet contract requirements, the Contracting Officer shall make an equitable adjustment for the additional services involved in the examination and reconstruction, including, if completion of the work was thereby delayed, an extension of time.
(i) Unless otherwise specified in the contract, the Government shall accept, as promptly as practicable after completion and inspection, all work required by the contract or that portion of the work the Contracting Officer determines can be accepted separately. Acceptance shall be final and conclusive except for latent defects, fraud, gross mistakes amounting to fraud, or the Government’s rights under any warranty or guarantee.
(End of clause) 52.246-13 INSPECTION—DISMANTLING, DEMOLITION, OR REMOVAL OF IMPROVEMENTS (AUG 1996)
(a) Unless otherwise designated by the specifications, all workmanship performed under the contract is subject to Government inspection at all times and places where dismantling or demolition work is being performed. The Contractor shall furnish promptly, and at no increase in contract price, all reasonable facilities, labor, and materials necessary for safe and convenient inspection by the Government. The Government shall perform inspections in a manner that will not unduly delay the work.
(b) The Contractor is responsible for damage to property caused by defective workmanship. The Contractor shall promptly segregate and remove from the premises any unsatisfactory facilities, materials, and equipment used in contract performance, and promptly replaces them with satisfactory items. If the Contractor fails to proceed at once in a workmanlike manner with performance of the work or with the correction of defective workmanship, the Government may—
(1) By contract or otherwise, replace the facilities, materials, and equipment or correct the workmanship and charge the cost to the Contractor; and
(2) Terminate for default the Contractor’s right to proceed. The Contractor and any surety shall be liable, to the extent specified in the contract for any damage or cost of repair or replacement. (End of clause)
52.246-21 WARRANTY OF CONSTRUCTION (MAR 1994)
(a) In addition to any other warranties in this contract, the Contractor warrants, except as provided in paragraph (i) of this clause, that work performed under this contract conforms to the contract requirements and is free of any defect in equipment, material, or design furnished, or workmanship performed by the Contractor or any subcontractor or supplier at any tier.
(b) This warranty shall continue for a period of 1 year from the date of final acceptance of the work. If the Government takes possession of any part of the work before final acceptance, this warranty shall continue for a period of 1 year from the date the Government takes possession.
(c) The Contractor shall remedy at the Contractor’s expense any failure to conform, or any defect. In addition, the Contractor shall remedy at the Contractor’s expense any damage to Government-owned or controlled real or personal property, when that damage is the result of—
(1) The Contractor’s failure to conform to contract requirements; or
(2) Any defect of equipment, material, workmanship, or design furnished.
(d) The Contractor shall restore any work damaged in fulfilling the terms and conditions of this clause. The Contractor’s warranty with respect to work repaired or replaced will run for 1 year from the date of repair or replacement.
(e) The Contracting Officer shall notify the Contractor, in writing, within a reasonable time after the discovery of any failure, defect, or damage.
(f) If the Contractor fails to remedy any failure, defect, or damage within a reasonable time after receipt of notice, the Government shall have the right to replace, repair, or otherwise remedy the failure, defect, or damage at the Contractor’s expense.
(g) With respect to all warranties, express or implied, from subcontractors, manufacturers, or suppliers for work performed and materials furnished under this contract, the Contractor shall—
(1) Obtain all warranties that would be given in normal commercial practice;
(2) Require all warranties to be executed, in writing, for the benefit of the Government, if directed by the Contracting Officer; and
(3) Enforce all warranties for the benefit of the Government, if directed by the Contracting Officer.
(h) In the event the Contractor’s warranty under paragraph (b) of this clause has expired, the Government may bring suit at its expense to enforce a subcontractor’s, manufacturers, or supplier’s warranty.
(i) Unless a defect is caused by the negligence of the Contractor or subcontractor or supplier at any tier, the Contractor shall not be liable for the repair of any defects of material or design furnished by the Government nor for the repair of any damage that results from any defect in Government-furnished material or design.
(j) This warranty shall not limit the Government’s rights under the Inspection and Acceptance clause of this contract with respect to latent defects, gross mistakes, or fraud.
(End of clause)
SECTION F - DELIVERIES OR PERFORMANCE
FAR 52.211-10 Commencement, Prosecution, and Completion of Work (APR 1984)
The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives notice-to-proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 30 calendar days from issuance of notice-to-proceed. The time stated for completion shall include final cleanup of the premises.
AGAR 452.236-75 MAXIMUM WORK WEEK – CONSTRUCTION SCHEDULE (NOV 1996)
Within 5 calendar days after receipt of a written request from the Contracting Officer, the Contractor must submit the following information in writing for approval:
1. A schedule as required by FAR 52.236-15, Schedules for Construction Contracts, and
1. The hours (including the daily starting and stopping times) and days of the week the Contractor proposed to carry out the work
The maximum workweek shall be Monday through Friday, 0800 – 1600. Any change in the work schedule shall be approved in writing by the Contracting Officer prior to commencement.
SECTION G - Contract Administration Data
Government Furnished Items:
Measurement and Payment:
Refer to the Schedule of Items for Measurement and Payment.
SECTION H - SPECIAL CONTRACT REQUIREMENTS
APPENDIX A
Fig.1 Needle Rock Site Overview
APPENDIX B
Fig. 2 Pipe Rail Drawing
CSI SPECIFICATION INDEX FOR
Tonto National Forest Cave Creek Ranger District Needle Rock Pipe Rail Rehabilitation
Tonto National Forest………………………………………………………………….. 10
DIVISION 1 – GENERAL REQUIREMENTS ………………………………………… 10
| 01010 - SUMMARY OF WORK………………………………………………….…... 10 |
| 01103 - MEASUREMENT AND PAYMENT………………………………………... 12 |
| 01300 - SUBMITTALS………………………………………………………………... 13 |
DIVISION 2 – SITE WORK……………………………………………………………… 14
02071 - REMOVAL OF STRUCTURES AND OBSTRUCTIONS…………………... 14
02224 - EXCAVATION, EMBANKMENT AND BACKFILL………………………. 16
02710 - METAL PIPE RAIL………………………………………………………...… 19
DIVISION 3 – CONCRETE…………………………………………………………....…. 21
03301 - CAST IN PLACE CONCRETE…………………………………….…………. 21
DIVISION 1 - GENERAL
SUMMARY OF WORK
PART 1 - GENERAL
1.1 - Location
The project is located on the Cave Creek Ranger District, of the Tonto National Forest, T5N, R7E, Section 17, 18, 21, and 30.The site can be accessed via E. Rio Verde Drive. Needle Rock Recreation Site is located 32 miles northeast of Phoenix ,AZ.
1.2 - Site Work and Utilities
General
1. All work shall be completed in accordance with the latest edition of the Forest Service Specifications for Construction of Roads and Bridges. The work includes all labor, material, and equipment necessary to perform all the operations for the work specified.
All pay units will be converted from metric to standard English.
Any testing needed will be the responsibility of the Forest Service.
The maximum paving lift will be 3 inches.
Traffic control will meet industry standards and will be the responsbili ty of the Contractor.
Submittals shall include a Certification from the suppliers that any materials supplied meet either ADOT or MAG specifications for the type of work being performed.
2. The Forest Service will establish the location of improvements and shall be responsible for the layout survey, and for establishing and maintaining all vertical control required. Any construction control shall be provided by the Contractor.
1.3 - Government Furnished Facilities and Materials
1. A staging area will be provided for the Contractor's equipment and supplies.
2. Upon completing the work, the Contractor shall leave the staging area in a clean, neat, and orderly condition.
3. Electricity, water, and phone lines are not available. The Contractor will be responsible for all utility services.
5. The Contractor shall furnish his own sanitary facilities. Shower fac ilities are not available.
1.4 - Material Sources
All materials are available from commercial sources.
1.5 - Clean up and Disposal
Disposal of waste material will be off National Forest Land and in compliance with local laws regarding disposal of construction waste.
1.6 - Precautionary Measures
Protection of Work
The Contractor shall take precautions to protect all work during the construction period and shall provide and maintain adequate protection during severe weather conditions to prevent damage to the work and the materials.
Safety
The Contractor is responsible for safeguarding employees, existing facilities and forest resources from his operations. The Contractor shall barricade or otherwise make unguarded excavations safe. Signs, lights, barricades and other devices, as necessary, shall be maintained at night and on weekends. Precautions such as lowering tractor blades and safely storing materials shall be practiced to prevent injury to others in the area.
Security
No security shall be provided by the government. The contractor shall take all precautions deemed necessary to secure the worksite, improvements and equipment. The campground area is inside a restricted area closed to the general public. All employees of the Contractor or any subcontractors may be required to prove that they are employees of of the subject companies.
END OF SPECIFICATION
MEASUREMENT AND PAYMENT - 01103
PART 1 - GENERAL
1.1 – Requirements
Measurement and payment for contract work will be made only for and under those pay items included in the SCHEDULE OF ITEMS. All other work and materials will be considered incidental to and included in the payment of the pay items in the SCHEDULE OF ITEMS.
1.2 – Payment
One of the following methods of measurement for determining final payment is DESIGNATED on the SCHEDULE OF ITEMS for each pay item.
(a) Designed Quantities (DQ): These quantities denote the final number of units to be paid for under the terms of the contract. They are based upon the original design data available prior to advertising the project. Original design data include the preliminary survey information, design assumptions, calculations, drawings, and the presentation in the contract. Changes in the number of units of the originally contemplated work will not be made unless authorized under one or more of the following conditions:
(1) As a result of changes authorized by the Contracting Officer in the originally contemplated work. Minor changes to adjust balance points, etc., will not be considered changes in quantities.
(2) As a result of the Contracting Officer determining that errors exist in the original design data used to determine designed quantities, that cause a pay item to change by 15 percent.
(3) As a result of the Contractor submitting to the Contracting Officer a written request showing evidence of errors in the original design data used to determine design quantities that cause a pay item total to change by 15 percent or more. The evidence must be verifiable and consist of calculations, drawings, or other data that show how the designed quantity is believed to be in error.
(b) Actual Quantities (AQ): These quantities are determined from measurements of completed work.
Final payment will be made for the actual quantities at the unit price shown in the SCHEDULE OF ITEMS, subject to the Variation in Quantities Provision.
(c) Lump Sum Quantities (LSQ): These quantities denote one complete unit of work as required by or described in the contract, including necessary materials, equipment, and labor to complete the job. They will not be measured.
1.3 - Units of Measurement:
Payment will be by units defined and determined according to U.S. Standard measure.
END OF SPECIFICATION 01103
| CONSTRUCTION RFQ | Page | 13 | SOL NO: 12818019Q0003 |
| UNIT: TONTO N.F CAVE CREEK RD | ||
| PROJ NAME:REPLACE PIPE HANDRAIL |
01300 -
SUBMITTALS - 01300
01300 - 14
01300 - 15
PART 1 - GENERAL
1.1 - Requirements
It will be the Contractor's responsibility to submit all items with such promptness as to cause no delay in the work. Approvals must be obtained before starting work which involves the item. Contractor shall allow ten days for processing of submittals by the Government.
Submittals may also be referred to as shop drawings.
1.2 - Manufacturer's Literature and Shop Drawings
Submit three copies to the COR for approval on the items required herein.
Submittal specifications are to be submitted in the following format:
A. The specifications and salient qualities of the item specified in the contract.
B. The specifications and salient qualities of the submittal item.
C. A listing of the differences and a comparison between the two, including but not limited to the structural qualities, operational qualities, any modifications necessary to accomplish installation of unit, and guarantee and warranty.
D. A cost comparison between the specified and submitted item(s) with the cost reduction benefit to the government or adequate justification for a cost increase to the government.
01300 - 10 E. Shop drawings of submitted item(s) including wiring or layout diagrams.
If there are any modifications necessary to facilitate installation, a set of drawings showing installation of specified item and a set showing how the submittal item will be installed.
If the specified item is to be handicapped accessible the submittal item needs to show handicapped access on submitted drawings, not just state it is available as handicapped accessible.
Submittals will be waived if contractor furnishes exact item used for design when manufacturer's model, size, etc. are shown in the contract.
Submittals are required per the following sections:
01300 - 01300 - 10
9. 03301 Cast-in-Place ConcreteMix Design Admixtures Delivery Tickets
END OF SPECIFICATION 01300
DIVISION 2 - SITE WORK
REMOVAL OF STRUCTURES AND OBSTRUCTIONS - 02071
PART 1 - GENERAL
1.1 - Description
This section specifies work requiring the removal and disposal of all structures and obstructions within the project limits which have been SHOWN ON THE STATEMENT OF WORK
Existing structures and improvements which are to become an integral part of the planned improvements shall remain even though not specifically noted.
1.2 - Material Classification
Material to be excavated is unclassified.
1.3 - Related Work Specified Elsewhere
02224 - Excavation, Embankment and Backfill
PART 2 - PRODUCTS
None.
PART 3 - EXECUTION
3.1 – Removal of Obstructions
Remove all obstructions shown on STATEMENT OF WORK. Removal shall include all associated footings or foundations to a depth of no less than 2 feet unless otherwise SHOWN ON THE DRAWINGS OR NOTED IN THE SPECIFICATIONS.
3.2 – Removal of Vault Toilets
Work shall consist of pumping out toilet vault and removing the building structure, toilet vault, concrete pad, and all debris associated with the toilet. Prior to removing the vault after being pumped, contractor to apply sufficient lime to adsorb the remaining material in the vault. The vault shall be pumped by a licensed septic tank contractor prior to removal.
3.3 – Backfill and Disposal
All voids left after removal, not being incorporated into the work, shall be backfilled and compacted in accordance with Section 02224.
All materials removed and designated for disposal AS SHOWN ON THE STATEMENT OF WORK OR NOTED IN THE SPECIFICATIONS shall be removed from National Forest Lands and disposed of in accordance with local regulations regarding disposal of construction waste.
PART 4 - MEASUREMENT AND PAYMENT
4.1 - Measurement
Measurement will be one existing vault toilet building and vault, eight concrete tables, and six 4x4 concrete structures, completed and accepted, including removal, backfill, and disposal AS SHOWN ON THE STATEMENT OF WORK.
4.2 - Payment
The accepted quantities will be paid for at the contract unit price for each item listed in the SCHEDULE OF ITEMS.
All work required for the complete removal and disposal of items SHOWN ON THE DRAWINGS or listed in the Specifications is included. Separate payment will not be made under other items.
Payment will be made under:
Pay Item Description Pay Unit
02071 (01) Removal of Structure and Obstructions..……….. LS
END OF SPECIFICATION 02071
DIVISION 2 - SITE WORK
EXCAVATION, EMBANKMENT AND BACKFILL - 02224
PART 1 - GENERAL
1.1 - Description
This section specifies excavation, embankment, backfill, delivery and placement of imported fill material, watering, compaction, disposal of excess or unsuitable excavated material, and final grading.
1.2 - Material Classification
Material to be excavated is unclassified. Contractor may expect to encounter boulders of varying size during any excavation below existing grade.
1.3 - Related Work Specified Elsewhere
02071 – Removal of Structures and Obstructions
1.4 - Submittals
None
PART 2 - PRODUCTS
2.1 - Backfill and Imported Fill Material
Backfill and Imported Fill Material shall be processed natural material in accordance with MAG Specification 702. – Base Materials; subsection 702.3.
2.2 - Water
Water shall be reasonably clean and free of hazardous substances. Water is not available at the site. Water shall be obtained from a commercial source.
PART 3 - EXECUTION
3.1 - Excavation
All suitable excavated materials shall be used in construction of embankments, slopes, and backfill.
No excavated material shall be placed in lakes or live streams.
Rocks too large to be incorporated into embankments shall be broken for incorporation into the embankment or removed from National Forest Lands and disposed of in accordance with local regulations regarding disposal of construction waste.
3.2 - Backfill
General backfill shall be placed in horizontal layers not exceeding 12 inches (loose measure) and compacted. Each embankment layer shall be leveled and smoothed before compaction and placement of subsequent layers. Compaction shall be as shown in Section 3.7.
Finished surfaces shall be reasonably smooth, compacted, and shall drain without ponding.
Backfilling Adjacent to Concrete: Remove all forms and clean the excavated area of all debris. Remove any standing water from excavation. Obtain approval from CO prior to placement of backfill. Do not backfill until concrete has been in place for a minimum of 7 days and has attained sufficient strength to withstand imposed loads.
3.3 - Embankment
Embankment shall be placed in horizontal layers not exceeding 12 inches (loose measure) and compacted.
Bring all embankments to suitable elevations above grade to provide for anticipated settlement, shrinkage, and required compaction.
Embankment material shall not be dropped on any structure.
3.4 - Grading
All areas covered by the project including excavation and embankment areas and adjacent transition areas, shall be uniformly graded so that finished surfaces are at elevations indicated and approved by the CO. Slope grade away from structures a minimum of ¼-inch per foot unless otherwise indicated to provide drainage away from structures.
3.5 - Excess Excavated Material
Excess excavated material shall be placed where needed by other parts of the contract AS SHOWN ON THE DRAWINGS or removed from National Forest Lands and disposed of in accordance with local regulations regarding disposal of construction waste.
| 3.6 - Haul | |
| Haul within the project site is incidental to excavation. |
3.7 - Compaction
Backfill, embankments, and the top 1 foot of excavation sections shall be compacted to at least 95 percent of the maximum density as determined by AASHTO T 99, Method C or D. The material shall have the moisture content needed for effective compaction.
Backfill adjacent to concrete shall be compacted to at least 95 percent of the maximum density as determined by AASHTO T 99, Method C or D. Compaction shall be done with mechanical tampers only.
The density of the embankment material shall be determined during the progress of the work in accordance with AASHTO T 191, T 205 or T 238; T 217, T 239, T 255; and T 224.
3.8 - Testing
No testing will be required.
PART 4 - MEASUREMENT AND PAYMENT
4.1 - Measurement
Measurement is for the tonnage of imported fill material delivered and placed AS SHOWN ON THE DRAWINGS.
Measurement for onsite grading, excavation, backfill and embankment is incidental to other pay items in this specification.
4.2 – Payment
The accepted quantities will be paid for at the contract unit price for each item listed in the SCHEDULE OF ITEMS.
Payment will be made under:
Pay Item Description Pay Unit
02224 (01) Imported Fill Material..…………………………TON
END OF SPECIFICATION 02224
DIVISION 2 SITE WORK
| CONSTRUCTION RFQ | Page | 26 | SOL NO: 12818019Q0003 |
| UNIT: TONTO N.F CAVE CREEK RD | ||
| PROJ NAME:REPLACE PIPE HANDRAIL |
PIPE RAIL AND BEACH RAIL - 02710
05520 -
05520 - 7
PART 1 - GENERAL
05520 - 3
1.1 - Description
This section specifies construction and installation of metal barrier – pipe rail fence. The work shall consist of furnishing all materials including concrete for footings, and all installation including welding fabrication. Pipe rail fence shall be fabricated and installed in accordance with the details SHOWN ON THE DRAWINGS.
1.2 - Related Work Specified Elsewhere
02224 – Excavation, Embankment, and Backfill 03301 – Cast-in-Place Concrete 05500 – Structural Metal 05500 – Metal Fabrication
PART 2 - PRODUCTS
05520 - 05520 - 7
NONE
PART 3 - EXECUTION
3.1 - Fabrication
05520 - 05520 - 7 Posts and railings shall be constructed of used steel well casing, seamed or seamless, and free of bends or gouges greater than 1/32”. The thickness may be either 0.216” or 0.333”. The diameter shall be AS SHOWN ON THE DRAWING.
End caps for railings shall be seamless and made of steel. No screw-on caps shall be allowed. End caps shall be 0.250” thick plate steel and shall be welded to the end of the railings. The diameter of the end caps shall match the outer diameter of the railings. All end cap welds shall be ground smooth.
Installation of pipe rail fence shall be smooth and continuous. Posts shall be constructed of single un-spliced lengths of pipe. All splices on railings shall be centered on posts and shall be ground smooth. Railings shall fit snugly into the semicircular cradle cut within the top portion of each post as SHOWN ON THE DRAWINGS.
05520 - 14 Pipe rail fence shall be fabricated from welded or seamless members of the size and thickness AS SHOWN ON THE DRAWINGS. Steel members shall conform to the requirements of ASTM A-53. Grade B structural steel conforming to ASTM A-36, or tubular sections of hot rolled mild steel as shown.
Welding shall be performed by the electric arc process and shall be done in conformance with Specifications for Welded Highway and Railway Bridges of the AWS. All butt welds on exposed surfaces shall be ground flush with adjacent surfaces.
For structures on curves, either horizontal or vertical, the barrier shall conform to the curvature of the structure.
3.2 - Erection
The barrier shall be erected, true to line and grade. Posts shall be vertical, parallel with and deviate from the vertical for the full height not exceeding 1/8 inch.
3.3 - Painting
The barrier will not be painted or primed.
PART 4 - MEASUREMENT AND PAYMENT
4.1 - Measurement
Length of Pipe Rail and Beach Rail will be measured along the line and grade of the railing from end to end of the rail and shall not include spaces between sections. Walk Throughs will be paid as part of the overall length of Beach Rail, not as separate items.
Measurement shall be for each section of pipe rail fence fabricated, installed, and finished.
4.2 - Payment
Payment will be made under:
Pay Item Description Pay Unit
02710(01) Pipe Rail. . . . . . . . . . . . . . . . . . . . . . . . ………… LF 02710(02) Beach Rail. . . . . . . . . . . . . . . . . . . . . . ………… LF
END OF SPECIFICATION 02710
DIVISION 3 - CONCRETE
CAST-IN-PLACE CONCRETE - 03301
PART 1 - GENERAL
1.1 - Description
This section specifies concrete to be used for cast-in-place concrete construction.
1.2 - Related Work Specified Elsewhere
02224 – Excavation, Embankment and Backfill 03100 – Concrete Formwork 03201 – Concrete Reinforcement 03251 – Expansion and Contraction Joints 03345 – Concrete Finishing
1.3 - Submittals
(a) Mix Design: A mix design showing the proposed weights of aggregate, water, cement and other components per cubic yard of concrete shall be furnished to the CO a minimum of 72 hours prior to the placement of concrete. No concrete shall be placed without prior approval of this mix design.
(b) Admixtures: Complete information on proposed admixtures, as specified herein, shall be submitted for the CO's approval a minimum of 72 hours prior to the placement of concrete.
(c) Deliver Tickets: Provide CO with a delivery ticket in accordance with ASTM C-94 for each load of concrete.
PART 2 - PRODUCTS
2.1 - Cement
Type I or Type II Portland cement unless otherwise specified - ASTM C-150. Only one brand of cement shall be used.
2.2 - Aggregate
Aggregate shall meet the requirements of ASTM C 33, "Specifications for Concrete Aggregate". Coarse aggregate shall be Size Number 67 as specified therein.
2.3 - Admixtures for Concrete
(a) Air Entrainment: Air-entraining admixtures shall meet the requirements of ASTM C-260.
(b) Water Reducers: Water-reducing, set-retarding, and set-accelerating admixtures shall meet the requirements of ASTM C 494.
(c) Submittals: Furnish the following information to the CO for approval:
1. Brand name of the admixture
2. Amount of admixture to be used per cubic yard of concrete.
3. Reason for requesting the use of the admixture.
2.4 - Curing Materials
Curing materials shall meet the following requirements:
(a) Burlap cloth made from jute or kenaf. . . . AASHTO M 182
(b) Sheet materials for curing concrete . . . . . ASTM C 171
(c) Membrane-forming curing compounds. . ASTM C-309, Type 1 or 1-D
2.5 - Water
Potable water shall be used for mixing, curing, or other applications.
2.6 - Joint Filler
(a) Poured filler: Poured filler for joints shall meet the requirements of ASTM D 1190.
(b) Preformed filler: Preformed filler for joints shall meet the requirements of ASTM D 994, ASTM D 1751, or ASTM D 1752 and shall be punched to admit dowels as necessary. The filler for each joint shall be furnished in a single piece according to the depth and width required for the joint. When the use of more than one piece is authorized for a joint, the abutting ends shall be fastened securely and held in position by stapling or other positive fastening approved by the CO.
2.7 - Proportioning Concrete
Minimum compressive strength of concrete shall be 3000 psi. Proportion concrete to meet MAG A requirements.
2.8 - Proportioning Concrete for Cold Weather
For concrete placed under "Cold Weather Concreting and Curing" conditions, the Contractor may elect to alter the required proportions in one of the following ways:
Type III Cement: Type III cement may be substituted in equal quantities for Type I or II cement.
Additional Cement: An additional sack per cubic yard of Type I or Type II cement may be added.
2.9 - Temperature Limits for Cold Weather Concrete
Provide concrete having a minimum temperature of 50 degrees F and a maximum temperature of 90 degrees F at the time of placing. The temperature of the mixing water shall not exceed 140 degrees F. If aggregates are heated, heat uniformly with steam or water coil. Aggregate temperature shall not exceed 95 degrees F. Aggregate water mix temperature shall not exceed 80 degrees F. Do not use materials containing frost or icy lumps.
2.10 - Temperature Limits for Hot Weather Concrete
Provide concrete having a maximum temperature of 90 degrees F at time of placing. If the ambient temperature is above 90 degrees F, the forms, reinforcing steel, steel beam flanges, and other surfaces which will come in contact with the mix shall be cooled to below 90 degrees F by means of a water spray or other approved methods. Water reducing admixtures shall be used so the maximum amount of water or slump is not exceeded. The mixing of the concrete and the time between mixing and placing shall be kept to a minimum. Chipped or crushed ice may be substituted for a portion of the mixing water on a pound-for-pound basis. If ice is used, all ice shall be entirely melted at the completion of the mixing period. If concrete temperature exceeds 75 degrees F, concrete shall be in accordance with ACI 305.
2.11 - Mixing
(a) Plant Batched and Transit Mixed:
1. Batch at a central plant and mix enroute to the project in transit mix trucks in compliance with ASTM C-94. (ASTM C 94 Sections 3 and 17 shall not apply).
2. Place concrete within a maximum of 1-1/2 hours or before the drum has revolved 300 revolutions, whichever comes first after the introduction of cement into the batch. In hot weather or due to other contributing factors, a time less than 1-1/2 hours may be required by the CO.
3. Time interval between placement of batches shall not exceed 30 minutes.
(b) Hand Mixed:
Hand mixing will not be allowed.
2.12 - Mix Adjustments
(a) Water: Water may be added once for purposes of acquiring minimum slump, provided the specified water-cement ratio is not exceeded. For all project mixed concrete, water shall not be added later than 15 minutes from start of mixing. For transit-mixed or agitated concrete, such water may be added upon arrival at the job site. Adding water beyond these conditions constitutes re-tempering which will not be allowed. When water is added, an additional 20 revolutions at mixing speed is required.
(b) Admixtures: Air-entraining admixtures shall not be added after the start of mixing.
PART 3 - EXECUTION
3.1 - Construction
(a) Excavation: Excavation shall be made to the required dimensions to permit the installation and bracing of the forms. The foundation shall be compacted to a firm even surface. All soft, yielding material shall be removed and replaced with acceptable material.
(b) Forms: Forms shall meet the requirements of Specification 03100 - Concrete Formwork.
(c) Contraction Joints: Contraction joints shall meet the requirements of Specification 03251 – Expansion and Contraction Joints.
(d) Expansion Joints: Expansion joints shall meet the requirements of Specification 03251 – Expansion and Contraction Joints.
(e) Mixing and Placing: The concrete shall be struck off to the cross section SHOWN ON THE DRAWINGS, after which it shall be finished to a smooth and even surface.
(f) Reinforcement: All reinforcing steel shall meet the requirements of Specification 03201 – Concrete Reinforcement.
(g) Placement: Concrete shall be discharged into the forms within 1-1/2 hours after the introduction of the cement to the aggregate. Re-tempering concrete shall not be permitted. The cement shall be added to the mixer at the jobsite whenever this condition cannot be met.
(h) Temperature: Concrete shall not be mixed or placed when the daily minimum atmospheric temperature is, or is expected to be, less than 40 degrees F unless adequate provisions are made to protect the concrete. No concrete shall be placed when the concrete temperature reaches 90 degrees F.
(i) Consolidation: Concrete shall be placed to avoid segregation. High-frequency internal vibrators shall be used for consolidating concrete in the forms. Vibrators shall be operated to produce concrete free of voids, but shall not be held so long in one place as to result in segregation or formation of laitance on the surface.
(j) Handling: The use of aluminum pipe, conduit, or troughs for transporting concrete will not be permitted. When concrete is pumped, sampling shall be from the discharge stream at the point of placement.
(k) Finishing: For the purpose of matching adjacent concrete finishes or for other reasons, the CO may permit other methods of finishing than those specified. No plastering will be permitted.
(l) Concrete Placement: Notify the CO a minimum of 24 hours prior to placement.
Place concrete in the forms as near final position as practical in a manner which will prevent segregation or loss of materials.
Place concrete in maximum 18" horizontal layers.
Immediately after placing, thoroughly compact concrete with mechanical vibrators. Provide minimum of two vibrators. Provide minimum of two power sources unless commercial power is available at site. Hand tamping, when permitted, will be approved in writing by the CO.
Place each concrete section in a continuous operation, such as slab, footing, columns.
Do not drop concrete freely more than 4 feet.
Do not place concrete in water or allow water to rise over freshly placed concrete until a set is sufficient to prevent damage.
(m) Backfilling: After the concrete has set sufficiently, it shall be backfilled to the required elevation with selected material placed in horizontal layers, not over 6 inches (loose measure) in depth, to the level of the original ground surface. Backfill shall be readily compactable material free of frozen lumps, chunks of highly plastic clay, or other objectionable material. Rocks larger than 3 inches in diameter shall not be used within 1 foot of the structure.
(n) Protection from Rainfall: Protect flat work during rainy periods with adequate waterproof covering. Support covering so that finishing may be performed and initial set obtained without damage. Dragging of tarpaulins or other covering across unset concrete will not be permitted.
(o) Curing: Commence curing and protection of concrete immediately after completion of the finishing. Cure Type I and Type II cement for 7 days continuously. The work shall be moistened and kept moist during this time, or curing shall be accomplished by the use of membrane-forming curing compound.
(p) Cold Weather Concreting and Curing: When the descending air temperature at the project falls below 40 degrees F the Contractor shall cease placing concrete unless the procedures described below are followed. Normal concreting operations may resume when the ascending temperature at the site exceeds 40 degrees F.
Provide cover and heating equipment sufficient to maintain the temperature of the concrete at not less than 50 degrees F for a period of period of 3 days for Type I and Type II cement. Maintain the temperature at not less than 50 degrees F for a period of 2 days for Type III cement or when one additional sack of Type I or Type II cement is added.
Provide additional protection to prevent the concrete temperature from dropping more than 40 degrees F in the 24 hour period following the required protection period.
Keep concrete and forms wet. Remove and replace any concrete damaged by frost or freezing when directed by the CO.
(q) Hot Weather Concreting and Curing: If curing temperatures as placed are expected to exceed 75 degrees F, placing and curing shall be in accordance with ACI 305.
PART 4 - MEASUREMENT AND PAYMENT
4.1 - Measurement
Measurement will include total volume of cast-in-place concrete for aprons, dumpster pads, sidewalks, and sidewalk ramps placed and finished.
4.2 - Payment
The accepted quantities will be paid for at the contract unit price for each item listed in the SCHEDULE OF ITEMS.
Payment will be made under:
Pay Item Description Pay Unit
03301(01) Concrete ......................................................... CY
END OF SPECIFICATION 03301
Questions and answers:
1. Where is the site location This is in the vicinity of Cave Creek. In our Recreation area called Needle Rock along the Verde River. Use Google Maps for Needle Rock and you will find it.
1. What vegetation removal if any is required? Are the trees and bushes in the area of work considered the debris?
Only vegetation removal for debris and anything growing in the alignment of the pipe rail when it is reinstalled.
1. Wil there need to be any site grading? More specifically where the new access area is going to be and where the rail near the entrance is being removed?
Site grading only to the affect to not leave any holes or mounds created during the removal and installation process.
1. Will the parking lot be closed during construction time frame of project?
The parking lot will be closed during the project but will hopefully only take a week for each phase so it can be open on weekends.
1. Is there any fire or hot work permits needed for any onsite welding or cutting?
The tonto fire plan requires there to be a fire “kit” and water since you are welding. I will have to confirm if we are in fire restrictions when the project starts too.
1. When dealing with any potential water encounters during drilling of post footings will we be allowed to dewater as we pour concrete? Allowing for it to push its self out?
Yes you can dewater if necessary.
1. Is there any access to a water source on or near site we can use?
Water from the river is not able to be used for construction purposes.
1. In regards to solicitation number: 12818019Q0003 is the only scope of work asking to be performed stated on pages 2 (tasks1,2,and3) and page 3 (section a and b) which is demolition of pipe rail and pipe rail fence installation? Because on page 14 there is mention of Removal of toilet. Just want to make sure that the RFQ is only for the pipe rail and beach rail.
Only the items listed (see chart below) are to be bid on, there is not a toilet to be removed however, the removal of any debris that is in the way would be included.
| Pay Item |
| DESCRIPTION |
| MEAS |
| UNIT |
| QTY |
| UNIT COST* |
| AMOUNT |
| Task 1 |
| Demolition of Pipe Rail Fence and Removal of Debris |
| LSQ |
| LS |
| 1 |
| $ |
| $ |
| Task 2 |
| Pipe Rail Fence Installation Including Materials |
| LSQ |
| LS |
| 1 |
| $ |
| $ |
| Task 3 |
| Mobilization (Including Bonding Costs) |
| LSQ |
| LS |
| 1 |
| $ |
| $ |
| Total Amount |
| $ |
1. It also states remove footings of existing post. Do you have a soils report for this project? I didn’t see one.
Riverbed. Lots of sand. You will need sonotubes to form the new footings. Old ones will just come right out.
03301-6
PART II – SECTION I - CONTRACT CLAUSES
FAR 52.252-2 Clauses Incorporated by Reference (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):
http://farsite.hill.af.mil/vffara.htm http://farsite.hill.af.mil/vfagara.htm
FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES
| 52.202-1 | Definitions (NOV 2013) | |
| 52.203-3 | Gratuities (APR 1984) | |
| 52.203-5 | Covenant Against Contingent Fees (MAY 2014) | |
| 52.203-6 | Restrictions on Subcontractor Sales to the Government (SEP 2006) | |
| 52.203-7 | Anti-Kickback Procedures (MAY 2014) | |
| 52.203-8 | Cancellation, Rescission, and Recovery of Funds for Illegal or Improper Activity (MAY 2014) | |
| 52.203-10 | Price or Fee Adjustment for Illegal or Improper Activity (MAY 2014) | |
| 52.203-12 | Limitation on Payments to Influence Certain Federal Transactions (OCT 2010) | |
| 52.204-4 | Printed or Copied Double-Sided on Recycled Paper (MAY 2011) |
52.209-6 Protecting the Government’s Interest when Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment (OCT 2015)
| 52.211-18 | Variation in Estimated Quantity (APR 1984) | |
| 52.215-2 | Audit and Records -- Negotiation (OCT 2010) | |
| 52.219-6 | Notice of Total Small Business Set-Aside (NOV 2011) (Deviation 2019-O0003) | |
| 52.219-8 | Utilization of Small Business Concerns (OCT 2018) | |
| 52.219-14 | Limitations on Subcontracting (NOV 2011) (Deviation 2019-O0003) | |
| 52.222-3 | Convict Labor (JUN 2003) | |
| 52.222-4 | Contract Work Hours and Safety Standards Act -- Overtime Compensation (MAY 2014) | |
| 52.222-6 | Construction Wage Rate Requirements (MAY 2014) | |
| 52.222-7 | Withholding of Funds (MAY 2014) | |
| 52.222-8 | Payrolls and Basic Records (MAY 2014) | |
| 52.222-9 | Apprentices and Trainees (JUL 2005) |