R2_CSE_IDIQ.pdf
PDF 568 KB Posted
- Solicitation number
- 1282X918R0004
About this file
Full Solicitation Pckage
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Q&A.pdf | ||
| Food_storage_Exhibit9.pdf | ||
| Exhibits_Combined.pdf | ||
| Attach_3_WD.pdf | ||
| Attach_1_Past_Performance_Info.docx | DOCX document | |
| R2_CSE_IDIQ.doc | DOC document | |
| Attach_2_Experience_Questionnaire_.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION, OFFER AND AWARD 1.THIS CONTRACT IS A RATED ORDER RATING PAGE OF PAGES
UNDER DPAS (15 CFR 700) 1 60
2. CONTRACT NUMBER 3. SOLICITATION NUMBER 4. TYPE OF SOLICITATION 5. DATE ISSUED 6. REQUISITION/PURCHASE
1282X918R0004 SEALED BID (IFB) Feb 6, 2018 NUMBER
NEGOTIATED (RFP)
7. ISSUED BY CODE 67T0 8. ADDRESS OFFER TO (If other than Item 7) USDA Forest Service, RO AQM Dept.
1617 Cole Blvd. Lakewood, CO 80401
See Block 7
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
SOLICITATION
9. Sealed offers in original and 1 copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in Front Desk until 0900 MST local time March 8, 2018
(Hour) (Date) CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.
10. FOR
INFORMATION A. NAME B. TELEPHONE NO. (NO COLLECT
CALLS)Area Code/Number/Extension C. E-MAIL ADDRESS
CALL: Kim Luft (303) 275-5405 kluft@fs.fed.us
11. TABLE OF CONTENTS
(X) SEC. DESCRIPTION PAGE(S) (X) SEC. DESCRIPTION PAGE(S)
PART I - THE SCHEDULE PART II - CONTRACT CLAUSES
X A SOLICITATION/CONTRACT FORM 1 X I CONTRACT CLAUSES 44-47
X B SUPPLIES OR SERVICES AND PRICES/COSTS 2-12 PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACH.
X C DESCRIPTION/SPECS./WORK STATEMENT 13-31 X J LIST OF ATTACHMENTS 48
D PACKAGING AND MARKING 31- PART IV - REPRESENTATIONS AND INSTRUCTIONS
X E INSPECTION AND ACCEPTANCE 31-33 X K REPRESENTATIONS, CERTIFICATIONS AND
49-53X F DELIVERIES OR PERFORMANCE 34 OTHER STATEMENTS OF OFFERORS
X G CONTRACT ADMINISTRATION DATA 35-40 X L INSTRS., CONDS., AND NOTICES TO OFFERORS 53-56
X H SPECIAL CONTRACT REQUIREMENTS 41-43 X M EVALUATION FACTORS FOR AWARD 57-59
OFFER (Must be fully completed by offeror) NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
12. In compliance with the above, the undersigned agrees, if this offer is accepted within 90 calendar days (60 calendar days unless a different period is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.
13. DISCOUNT FOR PROMPT PAYMENT 10 CALENDAR DAYS 20 CALENDAR DAYS 30 CALENDAR DAYS CALENDAR DAYS (See Section I, Clause No. 52-232-8) % % % %
14. ACKNOWLEDGMENT OF AMENDMENTS AMENDMENT NO. DATE AMENDMENT NO. DATE
(The offeror acknowledges receipt of amend-ments to the SOLICITATION for offerors and related documents numbered and dated):
15A.
NAME AND
ADDRESS
OF OFFEROR
CODE FACILITY 16. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN
OFFER (Type or Print)
15B. TELEPHONE NO. (Include area code and extension)
15C. CHECK IF REMITTANCE ADDRESS
17. SIGNATURE 18. OFFER DATEIS DIFFERENT FROM ABOVE - ENTER
SUCH ADDRESS IN SCHEDULE.
AWARD (To be completed by Government)
19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION
22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN
COMPETITION 23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
10 U.S.C. 2304 (c) ( ) 41 U.S.C. 253(c) ( ) (4 copies unless otherwise specified)
24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE
26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE
(Signature of Contracting Officer) IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.
AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 33 (REV.9-97)
Prescribed by GSA - FAR (48 CFR) 53.214(c)
1282X918R0004 Stand Exam IDIQ
Rocky Mountain Region
PART I – THE SCHEDULE
SECTION B - SCHEDULE OF ITEMS
Base Year (May 1, 2018 to April 30, 2019)
Work Item Sub item/Description Unit of measure Max Price Zone(s) Bid
On
Option A * Quick Plot Stand Exam Services Plot $________________
Option B*
CFLR Stand Exam Services
Stage 1 data collection
Stage 2 data collection
Plot
Plot
Option C Intensive Stand Exam Services Plot $________________
Option D Extensive Stand Exam Services Plot $________________
Option E Down woody form Plot $________________
Option F Vegetation Comp form Plot $________________
Option G Lynx Cover Board Measurements Plot $________________
Option H Lynx Cover Board Photos Plot $________________
Option I Digital plot photos Plot $________________
Option J Fuels Transects Plot $________________
Option K R2 FSVeg Spatial Polygon Attributes Form Stand $________________
Option L** Additional cost per plot for walk in plots beyond ½ mile from motorized access
Plot per ½ mile $_______________
* Includes all work items specified in the performance work statement ** This price will double for 1 mile, quadruple for 2 miles etc.
Rocky Mountain Region
Option Year 1 (May 1, 2019 to April 30, 2020)
Work Item Sub item/Description Unit of measure Max Price Zone(s) Bid
On
Option A * Quick Plot Stand Exam Services Plot $________________
Option B*
CFLR Stand Exam Services
Stage 1 data collection
Stage 2 data collection
Plot
Option C Intensive Stand Exam Services Plot $________________
Option D Extensive Stand Exam Services Plot $________________
Option E Down woody form Plot $________________
Option F Vegetation Comp form Plot $________________
Option G Lynx Cover Board Measurements Plot $________________
Option H Lynx Cover Board Photos Plot $________________
Option I Digital plot photos Plot $________________
Option J Fuels Transects Plot $________________
Option K R2 FSVeg Spatial Polygon Attributes Form Stand $________________
Option L** Additional cost per plot for walk in plots beyond ½ mile from motorized access
Plot per ½ mile $_______________
Option Year 2 (May 1, 2020 to April 30, 2021) measure Max Price Zone(s) Bid
On
Option A * Quick Plot Stand Exam Services Plot $________________
Option B*
CFLR Stand Exam Services
Option E Down woody form Plot $________________
Option F Vegetation Comp form Plot $________________
Option G Lynx Cover Board Photos Plot $________________
Option H Lynx Cover Board Measurements Plot $________________
Option I Digital plot photos Plot $________________
Option J Fuels Transects Plot $________________
Option K R2 FSVeg Spatial Polygon Attributes Form Stand $________________
Option L** Additional cost per plot for walk in plots beyond ½ mile from motorized access
Option Year 3 (May 1, 2021 to April 30, 2022) measure Max Price Zone(s) Bid
On
Option A * Quick Plot Stand Exam Services Plot $________________
Option B*
CFLR Stand Exam Services
Option E Down woody form Plot $________________
Option F Vegetation Comp form Plot $________________
Option G Lynx Cover Board Photos Plot $________________
Option H Lynx Cover Board Measurements Plot $________________
Option I Digital plot photos Plot $________________
Option J Fuels Transects Plot $________________
Option K R2 FSVeg Spatial Polygon Attributes Form Stand $________________
Option L** Additional cost per plot for walk in plots beyond ½ mile from motorized access
Option Year 4 (May 1, 2022 to April 30, 2023) measure Max Price Zone(s) Bid
On
Option A * Quick Plot Stand Exam Services Plot $________________
Option B*
CFLR Stand Exam Services
Option E Down woody form Plot $________________
Option F Vegetation Comp form Plot $________________
Option G Lynx Cover Board Measurements Plot $________________
Option H Lynx Cover Board Photos Plot $________________
Option I Digital plot photos Plot $________________
Option J Fuels Transects Plot $________________
Option K R2 FSVeg Spatial Polygon Attributes Form Stand $________________
Option L** Additional cost per plot for walk in plots beyond ½ mile from motorized access
B.1. SCHEDULE OF ITEMS
The proposed Schedule of Items will be used to determine the maximum price of each item number. Task Orders shall be issued and firms may bid only for line items of work which were awarded as a result of the technical evaluation of the proposal submitted.
The Contractor shall provide all labor, supervision, transportation, materials, and equipment necessary to perform the work as described.
See Zone Map for Zones available for bid. Contractor does not need to bid on all zones to be considered for award. Contractor has option to bid one zone or multiple zones to be considered as a responsive offer. The Government will award to the zones that are of best value to the Government.
Proposals shall be valid for 60 days after the date of receipt for the solicitation. If additional time is needed, an extension will be requested. Refer to Section L for instructions on preparing your proposal and pricing.
B.2. ESTIMATED QUANTITY
All quantities listed in the contract schedule are estimates only and do not reflect actual quantities to be surveyed over the life of the contract. Actual quantities to be surveyed in any given year are dependent on the needs of the Forest, weather conditions and/or availability of funds. Only certain bid items may be included on a task order in any given year. The number of acres to be surveyed, the maximum dollar limits, or a combination of such will be used to determine maximum survey limits on any given task order.
It is anticipated that more than one contract may result from this solicitation. This is an indefinite delivery, indefinite quantity contract. The bid total will be determined for evaluation by taking the quantity times the maximum unit price. This contract has four options which may be exercised by the Government. Reference FAR 52.216-18, FAR 52.216-19, FAR 52.216-22, and AGAR 452.216-72.
Travel charges including travel, per diem, or other mobilization costs for each round trip to each Forest listed are to be included in the unit prices.
For additional information on location of project sites, see Section C.1.2.
Prices provided are to be the maximum price a contractor can bid for those tasks on a task order. Individual task orders will be competitively issued between contractors awarded under this program in accordance Section G.1. Orders may be issued by fascimile or by electronic commerce methods (email).
Notes:
1. Unit prices prevail.
2. Each successful contractor will be guaranteed the stated minimum amount or an award of a task order equaling or exceeding guaranteed minimum amount during the base year only as listed in B.2. ($5,000.00).
Option Year renewals do not carry the guaranteed minimum.
3. All contractors being awarded a contract under this multiple award IDIQ solicitation will be given a fair opportunity to competitively quote on individual task orders within the Zones Bid On. See section G.1 for information on issuance of task orders.
4. Base and Option year dates are identified on the schedule of items in the title. (Also Reference FAR 52.216-
18 ORDERING (OCT 1995))
Non Discrimination Statement
The U.S. Department of Agriculture (USDA) prohibits discrimination in all its programs and activities on the basis of race, color, national origin, age, disability, and where applicable sex, marital status, familial status, parental status, religion, sexual orientation, genetic information, political beliefs, reprisal, or because all or part of an individual’s income is derived from any public assistance program. (Not all prohibited bases apply to all programs.) Persons with disabilities who require alternative means of communication of program information (Braille, large print, audiotape, etc.) should contact USDA’s TARGET Center at (202) 720-2600 (voice and TDD). To file a complaint, write to USDA, Director, Office of Civil Rights, 1400 Independence Avenue, S.W., Washington, D.C 20250-9410, or call (800) 795-3272 (voice) or (202) 720-6382 (TDD). USDA is an equal opportunity provider and employer.
B.3 AGAR 452.216-73 MINIMUM AND MAXIMUM CONTRACT AMOUNTS (FEB 1988)
During the period specified in FAR clause 52.216-18, ORDERING, the Government shall place orders totaling a minimum of $5,000.00, but not in excess of $5,000,000.00 collectively between all awarded contracts for the full duration of the contracts. This statement applies to the overall contract min/max and not individual task orders.
B.4 AUTHORIZED ORDERING ACTIVITIES: SEE G.1. ISSUANCE OF TASK ORDERS
SECTION C - PERFORMANCE STATEMENT OF WORK (PWS)
Indefinite Delivery Indefinite Quantity (IDIQ) Common Stand Exam (CSE)
Data Collection
C.1. GENERAL
C.1.1. SCOPE OF WORK
This statement of work provides for stand examination and related data collection activities on the Pike, San Isabel, Rio Grande, Grand Mesa, Gunnison, Uncompahgre, Shoshone, Black Hills, Arapaho-Roosevelt, White River, Nebraska, Bighorn, Medicine Bow-Routt and San Juan National Forests and Cimarron- Comanche, Buffalo Gap, Fort Pierre, Oglala, Thunder Basin and Pawnee National Grasslands. The Contractor shall furnish all labor, equipment, transportation, supervision, supplies (except those designated as Government-furnished), incidentals, and perform all work necessary to conduct stand examinations in compliance with terms, specifications, conditions, and provisions of this solicitation.
C.1.1.1. PERIOD OF PERFORMANCE: Each task order shall identify a desired completion date for the project. No additional time shall be granted for weather delays.
C.1.1.2. LOCATION DESCRIPTION: Specific locations, maps, type of exam and number of plots per stand and other site specific information will be provided with the task order.
C.1.1.3. LEVEL OF INTENSITY: The level of exam intensity will be determined by the government and stated with each order issued. The estimated number of plots to be examined each year range from a minimum of 100 plots to a maximum of 30,000 plots across the entire Region and across multiple task orders. The performance period will typically be from approximately March to November annually.
C.1.1.4. ACCESSIBILITY: Specific site maps identifying Locations, Sites, and Plots as well as access roads will be provided with each order issued.
C.2. GOVERNMENT FURNISHED PROPERTY
The property and services that will be provided by the Government, unless otherwise specified in the task order, are as follows:
Item # Item Description Where, When, How
3.1 General Area Map Maps of stands with access
roads identified.
Provided with task order.
3.2 NAIP imagery and
digital map file
A map displaying color aerial photography of the work area and a .shp or geodatabase file
Provided at pre-work conference or provided electronically
3.3 Common Stand
Exam User’s Guide, appendices, and data collection forms
The USDA Forest Service’s Common Stand Exam User’s Guide, appendices, and data collection forms.
Available from the internet website https://www.fs.fed.us/nrm/fs veg/index.shtml or shared electronically https://www.fs.fed.us/nrm/fsveg/index.shtml
3.5 Topo maps
A topo maps covering the areas to be sampled.
Provided at pre-work conference or shared electronically
3.6 Publications One copy of each publication
needed to determine Plant Associations or Habitat Types.
Provided at pre-work conference or shared electronically
3.7 Aids to Determining
Fuel Models for Estimating Fire Behavior: GTR-
INT122
One copy of the publication Provided at pre-work conference if required or shared electronically.
3.8 Forest Visitor’s
Map and/or transportation map
One copy of map Provided at pre-work conference.
3.9 Use of Premises
permit
Permit to occupy the national forest in excess of time limits imposed in standard orders.
Provided when needed.
Section H
3.10 Common Stand
Exam Inspection Form
One copy of inspection form Provided at pre-work meeting or Exhibit 7.
3.11 Portable Data
Recorder software for CSE (Exams
PDR)
One copy on CD or can be downloaded from the internet site:
www.fs.fed.us/nrm/fsveg/inde x.shtml
Provided at pre-work conference or shared electronically.
3.12 PC-based CSE data
entry software (MS Windows 2000 or later operating system required) Exams PC
One copy on compact disk or can be downloaded from the internet site at https://www.fs.fed.us/nrm/fsve g/index.shtml conference.
3.13 VEGCOV program PC-based software for entering
FSVEG Spatial Polygon Attribute form data
Provided at pre-work conference or electronically
3.14 VEGCOV User
Guide
One hard copy and one electronic copy of VEGCOV Data Entry and Loading User Guide
Provided at pre-work conference or shared electronically
3.15 GPS technical
specifications
GPS datum and waypoints provided to plot centers
Provided at pre-work conference
3.16 Gate combinations
or keys
Yale keys or combinations for locks
Provided at pre-work conference
3.17 Species List One copy of a list of species
that shall be recorded in the vegetation composition forms when present
Provided at pre-work conference or shared electronically http://www.fs.fed.us/nrm/fsveg/index.shtml http://www.fs.fed.us/nrm/fsveg/index.shtml
3.18 R2 Supplement to
the FSVEG Spatial User Guide and associated data collection form
One hard copy and one electronic copy of the R2 Supplement to the FSVEG Spatial User Guide including the data collection form.
Provided at pre-work conference.
Form is in Exhibit 6
3.19 FSVeg Spatial
Polygon Attributing Inspection Form
One copy of inspection form Exhibit 7
3.20 Lynx amendment
implementation guide for habitat monitoring
Northern or Southern Rocky Mountain Lynx amendment for habitat monitoring for data collection methods for horizontal cover
Provided electronically or at pre-work conference
3.21 Aluminum Nails
and Metal Tree Tags
Nails and metal tags used to establish bearing trees to assist in relocating plot center on CFLR plots.
Provided at pre-work conference if needed
3.22 Cover Boards for
lynx habitat photos
Section of canvas/cloth approximately 6.5 feet tall divided into red and white squares.
conference, if needed.
Use of Premises permits may be required for contractor’s camp if it exceeds local occupation time limit. All maps, aerial photos, and other unused Government-furnished items shall be returned to the Government upon completion of the job or upon request of the Contracting Officer. Replacement cost for any lost, damaged, or unused Government property that is not returned, shall be deducted from the Contractor’s final payment.
C.3. CONTRACTOR WORK REQUIREMENTS AND STANDARDS
C.3.1. General Specifications.
C.3.1.1. Accessibility: The Contractor shall be responsible for obtaining all necessary permission to gain access to sample locations. If the Contractor cannot obtain permission to access a sample location, the Contractor must notify the Government in writing.
Accessibility may be determined from maps and digital orthoquads which will be furnished by the Forest Service. Contractor shall be responsible for adhering to the USDA Forest Service travel management plan, including yearlong or seasonal closures to motor vehicles, unless authorization is obtained. Maps and photos may indicate that a road goes to the stand; however, vehicle access may be difficult or restricted. Stand locations may necessitate that Contractor walk to the stand or acquire some other means of travel.
Most roads are typically accessible between the months of May through October, though high clearance vehicles may be necessary on some roads. A four-wheel drive, high clearance vehicle is recommended. The Government assumes no responsibility to maintain roads in a passable condition.
C.3.1.2. Resource Protection Conditions: Contractors are expected to respond to sensitive resource conditions, i.e. walk to plots where road conditions are poor/wet.
C.3.1.3 Work Plan and schedule: The Contractor shall prepare a work plan and schedule that demonstrates that work will be completed within the performance period described in Section F.
The Contractor shall provide a general plan with the technical proposal. A supplementary plan and schedule shall be provided after the issuance of a task order, but before work starts.
C.3.1.3.1 The Contractor shall advise the Contracting Officer of any periods that the Contractor will not be working, not specified in the accepted Work Plan.
C.3.1.3.2 The Contractor may update the work plan when work is in progress and submit for approval to the Contracting Officer.
C.3.1.4 Standards: Each task order shall specify the version of the Common Stand Exam User’s Guide and appendices that shall be used. The specified version shall dictate the standards of data collection except when specified otherwise in this contract. In addition, the R2 Supplement to the FSVEG Spatial User Guide shall be used.
C.3.2 Technical Specifications
C.3.2.1. Locating Plots
C.3.2.1.1. Plot Location Determination. An electronic file that include the latitude and longitude UTMs of the plot locations for each stand will be provided for each task order. The contractor shall use a global position system (GPS) to locate the plots on the ground with datum and waypoint information provided by the government.
1. For standard data collection, a recreation grade GPS (e.g. Garmin, Magellan, etc.) is sufficient.
2. The COR may authorize moving plot locations in the field as appropriate (e.g. plot is in road or on a cliff). If plots are moved, the contractor will document and GPS the new location and provide new location to the COR.
3. For Collaborative Forest Landscape Restoration (CFLR) data collection, the Contractor must use a sub-meter accuracy resource grade GPS or equivalent as required in the task order to locate plot center.
C.3.2.1.2. Maps. Sample plot locations to be measured within each stand will be marked on one of the provided topographical maps. Plot numbers will be pre-assigned for each plot in each stand. Electronic files of plot locations and polygons will be provided to the contractor.
C.3.2.1.3. Locating Plot Center. Upon arrival at the specified coordinates, the Contractor shall check the map or electronic file to confirm that he/she is at the correct sample plot location.
Installing plots in the wrong stand shall result in rejection of data.
1. If this is the initial plot survey, the Contractor shall identify the sample plot location on the ground.
2. If this is a return visit for re-measurement, the Contractor shall locate the plot center monument or relocate the exact plot center using a combination of GPS and bearing trees, then re-monument.
C.3.2.1.4. Non-functioning GPS.
1. For standard data collection, the contractor may elect to use traditional methods of plot location if the GPS is unable to acquire the necessary resolution to execute the traverse from waypoint data. In either case, the contractor must navigate to the location provided.
2. For CFLR data collection, the contractor must use a sub-meter accuracy resource grade GPS or equivalent as specified in the task order to locate or relocate the sample points provided in Exhibit 1. Traditional methods are not acceptable.
C.3.2.2. Plot Center Identification/Flagging
For standard data collection, the Contractor shall identify sample plot centers with a marker that can be either a wire flag, wooden stake, or other marker as agreed upon at the pre-work conference or as specified in the task order. Sample plot center markers shall be firmly driven into the ground.
The location, stand, and plot number shall be written legibly on the plot center markers using a waterproof marker. For example: "060609 Site 3 Pt 04”. If Brown’s transects are conducted, the azimuth of transect shall be written as well.
To facilitate relocation of plots a piece of colored flagging at least 12” long shall be hung vertically at eye height as near as possible to plot center (to be determined per each task order).
For the CFLR data collection, plot center shall be located and recorded using a resource grade GPS with sub-meter accuracy. The center shall be monumented with a wooden or metal stake. The location of the stake shall also be recorded by triangulating, using the three largest nearby trees (species, DBH, distance and bearing of the trees shall be recorded in the remarks section of the plot from). The trees used for triangulation, shall be physically identified with 1 inch metal washers nailed to the base of the tree bole and a large X-shaped bark score at eye level. Metal stakes shall also be established to monument the ends of the two (2) fifty-foot Brown’s transects.
Upon inspection, the center point of the marker where it intersects the ground shall be used as plot center. If the marker is not a wire flag, flagging shall be tied to the marker so that it is visible above the plot center.
Latitude and longitude of plot center needs to be recorded in the PDR in the Exams PDR program.
It is preferable if the PDR has GPS capabilities to take the GPS coordinates on site. If not, then the data collector needs to input the latitude and longitude in degrees, minutes, seconds(decimal seconds) in the appropriate lat and long fields in the plot form.
C.3.2.3. Survey Technique
Plots shall be located using waypoint navigation with a GPS unit. During the initial establishment of the plot, the plot center monument may vary +/- 30 feet from the true plot location listed in Exhibit 1, unless otherwise specified in individual task order. Recurring errors in the location of sample plots greater than the acceptable error shall make the stand survey unsatisfactory; relocation of sample plots and remeasurement shall be required.
For CFLR data collection, the coordinates recorded on the plot form, must have an accuracy of ≤ 10 feet. Plot center stakes established at a distance greater than 10 feet shall make the stand survey unsatisfactory requiring the relocation and remeasurment of sample plots.
In cases where government provided photo plot location differs from GPS location found on the ground the GPS location will prevail.
C.3.2.4. Recording Requirements
The data fields to be collected and recorded are enumerated in sections C.4.3. and C.4.3.1. Each task order shall specifiy which of the following methods shall be used for electronic data collection:
• ExamsCE program. The ExamsCE program runs on several types of PDR style computers with the Windows operating system.
• ExamsPC program. The ExamsPC data entry program runs on computers with Windows operating system. This may require data to be recorded on paper forms in the field and then entered into the ExamsPC program at a later time.
• Government provided VEGCOV program for recording and entering the setting level R2 FSVeg Spatial Polygon Attribute (Walkthrough) Form (FV) data. Runs on computers with DOS or Windows operating systems
• Government provided DHC Excel Workbook for recording and entering lynx coverboard data.
• The contractor is responsible for providing the computer hardware necessary for running the software program/s and for installing, maintaining and trouble shooting the most recent version of the required software.
C.3.2.5. Qualifications
The success of this field inventory is dependent primarily on the Contractor's professionalism and expertise. It is necessary that the Contractor's staff meet certain standards. A crew can consist of one or more individuals. Minimum technical qualifications are specifically defined as follows:
1. Each crew must have a crew leader with undergraduate courses in mensuration, tree identification, plant identification, silviculture, and ecology and three months prior experience collecting data for Forest inventory or vegetation classification.
2. Each crew leader must also have the additional following minimum qualifications:
a. Proficient in the interpretation of aerial photography and associated maps.
b. Ability to distinguish between stand types both in the field, on original or photocopied aerial photographs and on DOQs.
c. Knowledge in the use of hand held compass, data recorders, pacing, GPS equipments and map measurements.
d. Ability to accurately identify necessary tree, shrub, forb, and grass species needed for identifying local habitat types.
e. Ability to complete vegetation attribute and composition forms.
f. Knowledge of rating tree defects and parasitic plants.
g. Knowledge of common forest insect pests and diseases.
h. Familiar with habitat typing.
i. Proficient in the use of forest measurement equipment.
j. Proficient in the use of GPS equipment and data recorders.
k. Experience with data entry and using PC Exams
Specific technical experience may be substituted for a given educational requirement.
The Contractor shall designate crew leaders for each crew. The crew leader shall be the individual responsible for ensuring plot measurements are taken in accordance with the accuracy standards. The contractor will inform the Government who will be working on each task order.
The Contractor, by signing an offer, agrees to use only personnel meeting these qualifications for performance of the work specified herein. The Government reserves the right to make determinations of employees' or subcontractor’s qualifications; any employee or subcontractor who does not meet the above described qualifications may be requested to leave the worksite with the Contractor responsible for the re-collection and resubmittal of any data supplied by that person. The Government may also request the removal of an employee or subcontractor with unsatisfactory past performance.
C.3.2.6. Work Plan and Progress Schedule.
For each task order, the Contractor shall prepare a work plan and progress schedule that demonstrates that work will be completed within the performance period of the task order. The Contractor shall provide a plan with the technical proposal for the task order(s) (See instructions in section L). The Contract time shall not exceed the negotiated completion date. The Contractor shall maintain progress at a rate that will assure completion and acceptance of work for each task order within the performance period. The minimum acceptable rate of progress will be calculated by dividing the total units of work for each item by performance time specified.
The Contractor shall advise the Contracting Officer of any periods that the Contractor will not be working that are not specified in the accepted Work Plan.
The Contractor shall provide a supplementary plan and schedule as needed to update the work plan when work is in progress. The Contracting Officer may accept the updated work plan.
C.3.3. Data Collection Specifications – Common Stand Exam (CSE)
This section describes the data collection forms and the fields on each form to be completed.
Detailed information and lists of valid codes for each of the following data forms are found in the Common Stand Exam (CSE) User Guide, Regional Supplements to the CSE User Guide (i.e. R2 Supplement to the FSVeg User Guide) and Appendices (see Government Furnished Property). If the following contract specifications differ from the provided Common Stand Exam User Guide and Appendices listed in C.4.4 below, the contract specifications shall have precedent. Individual task orders may require less information than is required below. Each task order will specify what will be required for that particular task order.
C.3.3.1. Setting Form
A setting is normally a stand in which the stand exam is being done. Following is a list of data fields required for each setting. If specified in the task order, Stand Sketch & Notes will be used to record reference point (RP) description, traverse information and a general stand sketch. Project name (Field 1) will be supplied by the government.
The contractor shall be responsible for collecting and filling out the Setting Form for all data items that are set to “YES” in the Required column: Additional items may be required in individual task orders.
Field Number
Field Description
Required Data Source
Comments
1 Project Name YES Government Assigned during pre-work conference
2 Region YES Government Always “02” 3 Proclaimed
Forest YES Government Provided with task order or at pre-work conference 4 District YES Government Provided with task order or at pre-work conference 5 Location/Waters hed Alias YES Site List Survey Stand List
6 Stand YES Site List Survey Stand List 7 Owner YES Government Always “USFS” 8 State YES Government Provided with task order or at pre-work conference 9 County YES Government Provided with task order or at pre-work conference 10 Admin Forest YES Government Provided with task order or at pre-work conference 11 Admin Region YES Government Always “02” 12 Date YES Contractor Format is MM/DD/YYYY 13 Photo ID NO Contractor Not Collected 14 Exam Level YES Government Assigned based on task order requirements 15 Exam Purpose YES Government Provided with task order or at pre-work conference 16 Stratum N/A Not collected 17 Existing
Vegetation Optional Contractor SAF
18 Potential Veg Ref
Optional Contractor Provided with task order or at pre-work conference
19 Potential Vegetation
Optional Contractor
20 Structure Contractor
21 Capable Grow Area
NO Not collected
22 Fuel Model Optional Contractor 23 Elevation Optional Government 24 Aspect Optional Contractor Not collected 25 Slope Optional Contractor Not collected 26 Slope Position Optional Contractor Not collected 27 Acres Optional Government Survey Stand List, if required in task order 28 Radial Growth
Interval Optional Government Always “10”
29 Radial Growth Interval 2
N/A Not collected
30 Height Growth Interval
Optional Government Always “5”
31 Fuel Photo Reference
Optional Contractor GTR-INT-122and RMRS-
GTR-153
32 Precision Protocol
Optional Government Always “CSE”
33 Examiner Optional Contractor First and Last Name 34 Remarks Optional Contractor 35 Damage
Category Optional Contractor
36 Damage Agent NO Contractor 37 Damage
Severity NO Contractor
38 Species of Management Interest
NO Government Species of Management Interest
39 User Code NO If specified in Task Order 40 Sketch Map Optional if needed Contractor If GPS errors arise or specified in Task Order 41 Traverse Notes Optional if needed Contractor If GPS-related errors arise
All Setting Form fields, whether required by this contract or not, are included on the setting form provided in the exhibits. Fields not specifically required by this contract are to be skipped on the form.
C.3.3.2. Sample Design Form
Sample Designs specifications will be provided with the Task Order and Site List. Sample Designs may be Variable Plot or Fixed Plot to sample large trees (live or dead). Fixed area plots shall be used to sample small trees.
Unless specified in the Task Order, the Contractor shall determine the size of the fixed plot or which Basal Area Factor (BAF) to use to sample the large trees. To determine the BAF or fixed plot size, a minimum of 5 trees per plot (greater than 5.0 inches DBH/DRC) average must be obtained on the plots in the stand. Unless otherwise specified, allowable factors are 10, 15, 20, 30, 40, or 60. If a BAF of 10 or a 1/5th fixed plot is used, the 5 trees per plot average will be waived.
Unless specified in the Task Order, the Contractor shall determine the fixed plot size for small trees. A minimum of 5.0 trees per plot (less than 5.0 inches DBH/DRC) average must be obtained on the plots in the stand. If a 1/50 acre plots is used, the minimum of 5 small trees per plot average will be waived.
The contractor shall be responsible for collecting and filling out the Sample Design Form for all data items that are set to “YES” in the Required column. The contractor shall use the Sample Design form for all plots.
The same BAF and fixed plot sizes must be used throughout the stand.
For CFLR data collection, the Contractor shall use a BAF of 10 for all variable plots. Three -1/300 fixed radius small tree subplots shall be established as described in each Task Order. The data from the subplots shall be summed and recorded as a 1/100 acre plot.
The contractor shall be responsible for collecting and filling out the Sample Design Form for all data items that are set to “YES” in the “Required” column of the following table. The contractor shall use the Sample Design form in Exhibit 2 as the template for all plots. All sample design fields, whether required by this contract or not, are included on the design form provided in the exhibits. Fields not specifically required by this contract are to be skipped on the form.
Num
Field Description
Required
Data Source
Comments
Region YES Government Proclaimed Forest YES Government District YES Government Location/Watershed Alias YES Site List Stand Number YES Site List 1 Sample Selection Method YES Government Sample Design Form 2 Sample Expansion Factor YES Contractor or
Government Survey Stand List/Field
3 Starting Azimuth Optional Only used for Transect Line
4 Sub-pop Filter YES Government Sample Design Form 5 Selection Criteria Number YES Government Sample Design Form 6 Sub-pop Variable YES Government Sample Design Form 7 Sub-pop Minimum Value YES Government Sample Design Form 8 Sub-pop Maximum Value YES Government Sample Design Form 9 Remarks YES Contractor If specified in Task
Order
C.3.3.3. Plot Form
As specified in a Task Order, the following items are required to be recorded at each plot on the Plot form. Detailed information and lists of valid codes for each data item are found in the Common Stand Exam Users Guide and Appendices (see Government Furnished Property). The contractor shall be responsible for collecting and filling out the Plot Data Form for all data items that are set to “YES” in the required column of the table below. All plot data fields, whether required by this contract or not, are included on the plot data form provided in the exhibits. Fields not specifically required by this contract are to be skipped on the form.
The Plot Number field in PC Exams (C.4.3.C.1) shall correspond to the assigned plot number in each task order for any given plot location.
Amend Common Stand Exam User Guide, Chapter 4, Plot Data with the following:
Capable Grow Area Percent. Based on a 1/10th acre plot, ocular estimate and record the percent of the area that can support tree growth. If the plot has no trees present and is not capable of supporting tree growth (nonstockable), record a 0 percent. If a portion of the plot is capable of supporting trees (stockable), record the percent of the plot area that is capable of supporting trees.
Num
Field Description Required for all Plots
Required for Intensive
Exam Only
Data Source
Comments
Region YES Government Always “02” Proclaimed Forest YES Government Provided at pre-work conference District YES Government Provided at pre-work conference Location/Watershed
Alias YES Site List See Exhibit 1 – Survey
Stand List Stand Number YES Site List See Exhibit 1 – Survey
Stand List 1 Plot Number YES Site List See Exhibit 1 – Survey
Stand List 2 Latitude Optional YES Contractor GPS - format dd mm ss.s 3 Longitude Optional YES Contractor GPS - format dd mm ss.s 4 Capable Grow Area Optional YES Contractor Measured on a 1/10 ac plot 5 Aspect Optional Contractor Optional per task order 6 Slope Optional Contractor Optional per task order 7 Slope Position Optional YES Contractor Optional per task order 8 Slope Horz Shape N/A Not collected 9 Slope Vert Shape N/A Not collected
10 Elevation Optional Contractor Optional per task order 11 Existing Vegetation N/A Not collected 12 Potential Vegetation Optional YES Contractor Guide for determining provided at pre-work conference
13 Structure Optional Contractor See Chapt 4 Table 11 14 Fuel Model Optional Derived from GTR
INT-122
15 Residual Description
Code Optional Contractor Optional per task order
16 Dist Seed Wall Optional Optional per task order 17 History Optional Contractor Optional per task order 18 History Date Optional Contractor Optional per task order 19 User Code Optional Optional per task order 20 Plot Remarks YES Contractor Borderline tree DBH
Limiting Distance or Lynx cover information
C.3.3.4. Tree Form
Begin recording standing tree data on the Tree form at azimuth 360 (North), progressing in a clockwise direction around plot center. Trees shall be recorded in the following order:
1) Growth Sample Trees located on the variable radius plot or large fixed radius plot or small fixed radius plot.
2) Live Trees and Dead Standing trees located on the variable radius plot or large fixed radius plot.
3) Small Live Trees trees located on the fixed radius plot.
4) Site trees that are located off plot.
Unless otherwise specified in the task order, during fixed plot survey, group small trees of the same species with DBH less than 5 inches into one of four diameter classes as described in the table below.
Enter an average height for the trees that fall into each category.
Diameter Class Contains trees with DBH of: Comments 0 0 Only for trees shorter than 4.5’
0.5 0.01 – 0.99 2 1.00 – 2.99 4 3.00 – 4.99
For CLFR Data Collection:
Diameter Class Contains trees with DBH of: Comments 0 0 Group by height in 2’ categories
0.5 0.01 – 0.99
1.5 1.00 – 1.99
2.5 2.00 – 2.99
3.5 3.00 – 3.99
4.5 4.00 – 4.99
Amend Common Stand Exam User Guide, Chapter 4, Tree Data with the following:
Growth Sample Tress (GST) unless otherwise specified in the task order, if only one tree species is expected to be present in the stand two large (>=5.0”DBH) GST and one small (<5.0”DBH) GST will be measured on each plot
Measure the first two live standing trees (large) and first live standing tree (small), when moving clockwise from north
Unless otherwise specified in the task order, if more than one tree species is expected to be present in the stand two large (>= 5.0”DBH) and two small (<5.0”DBH) GST will be measured on each plot. The first live standing tree, both large and small, of each species encountered moving clockwise from north, will be measured until two trees of different species are assessed
Field 8: DBH/DRC. For DRC species, standing dead and down dead trees that are grouped, the diameter breakdown will be 5.0”-6.9” = 5.0”, 7.0”-8.9”= 7.0”, 9.0”-10.9”=9.0”, etc. Saplings (trees that are greater than 4.5’ with a diameter of 0.1” – 4.9”) may be grouped into 1.0” diameter classes.
Field 9: Height. Heights will be required for all trees recorded. For saplings, DRC species, and standing dead trees that are grouped, heights can be averaged as long as averaged height is within 10% of actual height.
Field 21,22,24 : Damage. The presence or absence of Dwarf mistletoe will be checked on all pine species and Douglas Fir. Always record if present regardless of what other damages have been recorded. For all other damages record only those significant damages that are most affecting tree growth and/or longevity. For all trees, a maximum of 3 damages will be recorded. If a tree has no significant damage, record no damages for that tree.
The table below shows the maximum amount tree data fields that may be collected for each type of exam. Unless otherwise specified in individual task orders the contractor shall be responsible for collecting and filling out the Tree Data Form for all data items that are set to “X” in the Required column for the specified exam level as listed in the table below. See the Common Stand Exam Users Guide for accuracy standards for each type of exam. All tree data fields, whether required by this contract or not, are included on the Tree Data Form provided in the exhibits. Fields not specifically required by this contract are to be skipped on the form.
Detailed information and lists of valid codes for each data field are found in the Common Stand Exam User Guide and Appendices (see Government Furnished Property).
Number
Field Description
Required by Exam Level Data Source
Required for: Intensive Extensive Quick
Pl Location/Watershed Alias
X X X Site List
Stand Number X X X Site List 1 Plot Number X X X Government 2 Tag ID X X Contractor 3 Tree Status X X X Contractor 4 Tree Class Contractor 5 Site/GST Site &
Growth Site trees Contractor
6 Species X X X Contractor 7 Tree Count X X X Contractor 8 DRC Number
Stems X X X Contractor DRC species only
9 DBH/DRC X X X Contractor Trees > 4.5’ tall.
10 Height X X X Contractor All trees 11 Height to Crown X X Contractor All live trees > than 4.5’ in height
12 Radial Growth X Contractor Growth sample trees >3+inches DBH or DRC
13 Radial Grow 2 N/A N/A N/A Not collected 14 Height Growth X Contractor Growth sample trees < 3 inches DBH/DRC or
< 4.5’ in height 15 Age Site &
Growth Site Trees Contractor Site & growth sample trees
16 Crown Ratio X X Contractor All live trees > than 4.5’ in height
17 Crown Class X Contractor All live trees > than 4.5’ in height
18 Crown Width X Contractor All live trees > than 4.5’ in height
19 Wildlife Use X X Contractor All trees 20 Log/Snag Decay X Standing Dead
Only Contractor Task order requires standing and/or down dead 21 Cone Serotiny X Contractor Lodgepole pine trees 1+ inches DBH
22 Damage Category X X Contractor All trees with damage.
Record 3 most severe.
23 Damage Agent X Contractor Required if damage category is not blank
24 Damage Part X Contractor 25 Damage Severity X X Contractor Required if damage category is not blank
26 Tree Remarks X Contractor When applicable 27 User Determined X X Contractor If specified in Task Order
For CFLR data collection, Field 27: User defined. Each tree shall be classified and recorded as OLD (old), MOD (transitional), or YNG (young) as described in the report RMRS-GTR-110.
C.3.3.5. Vegetation Composition Form
Unless otherwise required by a specific Task Order, Vegetation Composition forms 1-4 may be collected on a plot size of 1/10 acre (37.2 foot radius) Form 4 (ground surface cover) shall be collected on 1/100 acre (11.8 foot radius) plot.
Record the cover percent of all species that occupy 1% or more of a lifeform/layer combination.
For Form 4, the sum of all ground cover types must equal 100%; foliar canopy cover above the soil surface plane is not considered ground surface cover.
Form 4: The sum of all ground cover types must equal 100%. Foliar canopy cover above the soil surface plane is not considered ground surface cover.
Exam Level
Interested in Obtaining
Species to record
Sub-pop.
Min.
Sub-pop.
Max.
Form 1 Form 2 Form 3 Form 4
Quick
Estimate
Life form only 1% 100 Yes NO Task Order Task Order
TES, NOX,
and/or the dominant four species
Only specific species
See Task Order
100 Yes Yes Task Order Task Order
3 All species All species to a specified %
See Task Order
100 Yes Yes Task Order Task Order
All species, including TES and NOX to trace
All species to a specified %, but species on a list to trace
See Task Order
100 Yes Yes Task Order Task Order
For CFLR Data Collection, Unless otherwise specified in the task order, vegetation composition forms 3 and 4 will be collected on five – 1/750 acre subplots (4.3 foot radius), the data from which shall be averaged for each form and entered as a 1/150 acre plot. The subplots shall be distributed around plot center as described in each Task Order.
For CLFR Data Collection, unless otherwise specified in the task order, Form 3: Record the canopy cover percent of all species of management interest that are present in the subplots to the nearest 1%.
Use 0.1% for species present but less than 1%. No species may exceed 100% but total cover for all species may exceed 100% if crowns overlap The following items are required at each plot, detailed information and lists of valid codes for each data item are found in the Common Stand Exam Users Guide and Appendices:
Field Description Form Type Data
Remarks
Form 1 Form 2 Form 3 Form 4 Region Yes Yes Yes Yes Government Proclaimed Forest Yes Yes Yes Yes Government District Yes Yes Yes Yes Government Location/Watershed Alias Yes Yes Yes Yes Site List Stand Number Yes Yes Yes Yes Site List
Plot Num Yes Yes Yes Yes Contractor Life Form Yes Yes Yes NA Contractor Layer Yes Yes No NA Contractor Layer Code Yes Yes No NA Contractor Species Na Yes Yes NA Contractor Canopy cover Yes Yes Yes NA Contractor Predominant height Yes Yes No NA Contractor For Trees only Predominant dbh/drc Yes Yes No NA Contractor For Trees only Predominant age NA No No NA Contractor Maturity NA No No NA Contractor Shrub Form NA No No NA Contractor For Shrubs only User defined data No No No NO Contractor Remarks No No No NO Contractor Surface Cover Type NA NA NA Yes Contractor Cover % NA NA NA Yes Contractor
All vegetation composition data, whether required by this contract or not, are included on the vegetation composition form provided in each Task Order. Fields not specifically required by the Task Order are to be skipped on the form. All ground surface cover data, whether required by this contract or not, are included on the Ground Surface Cover Form provided in each Task Order. Fields not specifically required by this contract are to be skipped on the form.
C.3.3.6 Down Woody Form
Down woody material data may be collected by either a piece count on a fixed area plot (method 1B, Common Stand Exam Users Guide) or by Brown’s Protocol, as specified for individual Task Orders.
Piece Count on Fixed Area Plot: Plot size may either be selected by the Government or the Contractor, depending on the Task Order. Minimum diameter and piece length will be specified in the Sample Design in the Task Order. See Chapter 4 of the Common Stand Exam User Guide for detail on methods.
Brown’sPlanar Intercept Method - See Chapter 4 of the Common Stand Exam User Guide for detailed information and valid codes for each data field. Transect lengths will be provided with the Sample Design for each Task Order.
Collect Brown’s Planar Intercept data along a 360 degree azimuth. (0 ft. is at the 0 degree and 50ft point along transect-end point of transect being at 360 degree). If landscape features make this impossible (e.g. cliff edge), then collect transect data along a 180 degree azimuth. Record the azimuth of the transect on the plot center marker.
For CFLR Data Collection- At each plot, collect Brown’s Planar Intercept data along two- 50 foot transects as described in each Task Order. (One transect along a 180 or 360 degree azimuth and the second transect at along a 90 or 270 degree azimuth with plot center being the 25 ft. point along both transects or transects intersecting one another at the 25 ft. point on each transect). Data from each transect will be summed and recorded.
Field Number Field Description Required Data
Comments
Region YES Government Proclaimed Forest YES Government District YES Government Location/Watershed Alias YES Site…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.