1282FT20R0016AME0001.pdf
PDF 390 KB Posted
- Attached to
- IPIF Perimeter Fence Installation Federal contract opportunity
- Solicitation number
- 1282FT20R0016
- Issued by
- Department of Agriculture Forest Service
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment 2 - Drawings.pdf | ||
| Attachment 3 - Wage Determination.pdf | ||
| Attachment 1 - Specifications.pdf | ||
| Solicitation 1282FT20R0016.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
1282FT20R0016
x x copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
82FT
FORT COLLINS CO 80526
240 W PROSPECT STREET
ROCKY MOUNTAIN RESEARCH STATION
USDA FOREST SERVICE
06/18/20200001
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
06/18/2020
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
IPIF Perimeter Fence Installation
Amendment 0001 is as follows:
Update drawings that properly reflect the gate widths, change the period of performance end date to 12/16/2020, provide questions and answers as of 07/06/2020, and change the solicitation due date in beta.SAM to 07/20/2020 to reflect the SF-1442.
Period of Performance: 08/03/2020 to 12/16/2020
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
ANTHONY O. SALAS
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
X
X
X
X
X
X
X
X
X
X X X
X
X
X
X
X
X
XXXXXXXXXXXXX
X
X
N
SITE PLAN
Scale: 1" = 30'
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture
Forest Service
F
M C
A R
T H
U R
C
U
S E
R S
F
M C
A R
T H
U R
B
O X
P
S W
E
N G
I N
E E
R I N
G
I P
I
P
R
I M
E T
R
N
C
G
A T
E
I N
S T
A L L A
T I O
N D
R A
W I N
G S
C
S
I T
E
P
L A
N D
W G
(S27)
PSW
IPIF
PERIMETER
FENCE
PACIFIC
SOUTHWEST
RESEARCH STATION
INSTITUTE FOR PACIFIC
ISLANDS FORESTRY
SITE PLAN
04/27/2020
F.MCARTHUR
F.MCARTHUR
X.XXX
C-01
002 006
Gate Dimension Corrections
7/6/2020
AutoCAD SHX Text 6 foot personnel Gate
AutoCAD SHX Text 6 foot personnel Gate
AutoCAD SHX Text Double Leaf Gate 8 foot Leaf's
AutoCAD SHX Text 25 foot Pivot Vehicle Gate
AutoCAD SHX Text 5 foot Personnel Gate
AutoCAD SHX Text 6 foot High Fence
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
AutoCAD SHX Text
Questions and Answers 07/06/2020
Q1: - The last 100' of the SE corner fence line is in thick brush as well as roughly 30' of south fence line. Is it the intent to clear and level that area before erecting the fence.
A1: The contractor is responsible for all clearing necessary to install the fence along these lines. The fence should follow along the contour of the ground. Leveling can occur between post in order to keep the fencing close to the ground.
Q2 - The entire west fence line currently has large blue rock boulders. Are we to remove them or push them out of the way to erect the fence.
A2: Just push them out of the way as necessary to install the fence.
Q3 - At the pivot gate location. There is currently ground cover landscaping that will need to be ripped up to install new footing. Do we need to re-landscape that area or just smooth out.
A3: Just smooth out the area after the installation
Q4: Are you going to have the property surveyed prior to the fence work?
A4: No we are not going to have the property surveyed.
Q5: Who will be responsible to tone the fence line for utilities? Especially for the utilities that are unknown.
A5: Contractor is responsible to call for locates of utilities.
Q6: Can the vertical gate be substituted for a slide gate? The plans are calling out for a 16’ Wide gate but the actual opening is 25’ Wide. I feel a 25’ vertical gate is going to be too heavy.
A6: The plans shown wrong width new drawings with correct width to be provided. Gate will be 25’ wide as defined in the specifications for vertical gate operator. Vertical gate is required as there is no room for sliding gate. That is why we specified the provider we did.
Q7: Can we install a 25’ Wide Slide gate on the ocean side? Is domestic steel product required for this project?
A7: Vendors can propose a sliding gate, but that would need to be done as an alternate with still a proposal for. As for the steel, the product needs to meet the buy American requirements.
Q8: Will the boundaries be marked for the fence line?
A8: We will mark the boundary on the west side but the south and east boundaries are significantly away from the fence location. Amendment 0001 provides an updated drawings that properly reflect the gate widths.
| SF-30 |
| C201 Site Plan_Revision 1 |
| Sheets and Views |
| PLOT |
| OLE1 |
Questions and Answers 070620
File details come from the government source that posted it. Updated .