Attach 01_Specifications Page 1 of 5 Cimarron Water Wells

CIM Water Well Drilling The purpose is to drill a new well hole, installing well casing and grouting bore hole. This will be a replacement well for the water well used by livestock currently located at this location.

The well driller must be licensed by the State of Kansas.

Location and Description The base project is located on the Cimarron National Grassland approximately 13.5 miles north Elkhart, Kansas in the Greenwood Allotment.

Optional Item-2 is located approximately 8 miles east of Elkhart, Kansas on the Santa Fe Allotment.

Optional Item-3 is located approximately 6 miles east of Rolla, Kansas on the Wilburton Allotment.

Description of Work The project consists of drilling a new water well - 6 inches in diameter; installing SDR 21 casing; and grouting the bore hole. The actual depth for the well is an estimate, and may be more or less, depending upon depth to water and/or red bed. This work includes well casing, gravel pack, grout, rig mobilization and well development.

Status Report Provided an onsite visit has not occurred during the period, the contractor is required to report status of work when any special situations or problems are encountered or once per week (whichever is less). These reports may be made by telephone to the GTM/COR.

In the event of extreme weather such as heavier than normal rains, the Contracting Officer will determine the best course of action based on comments from both the Contractor and GTM/COR.

Project Description/Specifications:

Scope of the contract: The requirements in this contract are for drilling a new water well hole, 6 inches in diameter; installing SDR 21 casing; and grouting the bore hole. This work includes well casing, gravel pack, grout, rig mobilization and well development.

Location and Description: The project is located on the Cimarron National Grassland in the Greenwood Allotment, T33S R42W Section 16 SE ¼ of the NW ¼. Maps showing the proposed areas to be treated are attached. All work is located approximately 13.5 miles north of Elkhart, Kansas. Before the start of this project, an initial walk-through of the proposed project area will be conducted. This meeting will include the Contractor, the COR and the GTM. If all parties are in agreement then the actual implementation of the contracted work will begin at this time.

Technical Specifications:

Construction regulations for all wells

(a) Each water well shall be so located as to minimize the potential for contamination of the delivered or obtained groundwater and to protect the groundwater aquifers from pollution and contamination.

(b) Grouting:

(1) Construction or reconstructed wells shall be sealed by grouting the annular space between the casing and the well bore from ground level to a minimum of 20 feet or to a minimum of five feet into the first clay or shale layer, if one is present, whichever is greater. If a pitless well adapter or unit is being installed, the grouting shall start below the junction of the pitless well adapter or unit where it attaches to the well casing and shall continue a minimum of 20 feet below this point, or to a minimum of five feet into the first clay or shale layer, whichever is greater.

(2) To facilitate grouting, the grouted interval of the well bore shall be drilled to a minimum diameter at least three inches greater than the maximum outside diameter of the well casing. If a pitless well adapter or unit is being installed on the well’s casing, the well bore shall be a minimum diameter of at least three inches greater than the outside maximum diameter of the well casing through the grouted interval below the point where the pitless well adapter or unit attaches to the well casing.

(c) If groundwater is encountered at a depth less than the minimum grouting requirement, the grouting requirement may be modified to meet local conditions if approved by the department.

(d) Waters from two or more separate aquifers shall be separated from each other in the bore hole by sealing the bore hole between the aquifers with grout.

(e) The well casing shall terminate not less than one foot above the finishing ground surface. No casing shall be cut off below the ground surface except to install a pitless well adapter unit, which shall extend at least 12 inches above the ground surface. No opening shall be made through the well casing except for installation of a pitless well adapter designed and fabricated to prevent soil, subsurface and surface water from entering the well.

(f) Well vents shall be used and shall terminate not less than one foot above the ground surface and shall be screened with brass, bronze, copper screen or other screen materials approved by the department which are 16-mesh or greater and turned down in a full 180 degree return bend so as to prevent the entrance of contaminated materials.

(g) Prior to completion of a constructed or reconstructed well, the well shall be cleaned of mud, drill cuttings and other foreign matter so as to make it suitable for pump installations.

(h) Casing. All wells shall have durable watertight casing from at least one foot above the finished ground surface to the top of the producing zone of the aquifer. The watertight casing shall extend not less than 20 feet below the ground level. Exceptions to either of the above requirements may be granted by the department if warranted by local conditions. The casing shall be cleaned and serviceable and of a type to guarantee reasonable life so as to insure adequate protection to the aquifer or aquifers supplying the groundwaters. Used, reclaimed, rejected, or contaminated pipe shall not be used for casing any well. All water well casing shall be approved by the department.

(i) All wells, when unattended during construction, reconstruction, treatment or repair, or during use as cased test holes, observation or monitoring wells, shall have the top of the well casing securely capped in a watertight manner to prevent contaminating or polluting materials from gaining access to the groundwater aquifer.

(j) During construction, reconstruction, treatment or repair and prior to its first use, all wells producing water for human consumption or food processing, shall be disinfected according to K.A.R. 28-30-10.

(k) The top of the well casing shall be sealed by installing a sanitary well seal.

(l) All groundwater producing zones that are known or suspected to contain natural or manmade pollutants shall be adequately cased and grouted off during construction of the well to prevent the movement of the polluted groundwater to either overlying or underlying fresh groundwater zones.

(m) Toxic materials shall not be used in the construction, reconstruction, and treatment or plugging of a water well unless those materials are thoroughly flushed from the well prior to use.

(n) Any pump pit shall be constructed at least two feet away from the water well. The pipe from the pump or pressure tank in the pump pit to the water well shall be sealed in a watertight manner where it passes through the wall of the pump pit.

(o) Water wells shall not be constructed in pits, basements, garages, or crawl spaces. Existing water wells which are reconstructed, abandoned and plugged in basements shall conform to these rules and regulations except that the finished grade of the basement floor shall be considered ground level.

(p) All drilling waters used during the construction or reconstruction of any water well shall be initially disinfected by mixing with the water enough sodium hypochlorite to produce at least 100 milligrams per liter, mg/l, of available chlorine.

(q) Natural organic or nutrient producing material shall not be used during the construction, reconstruction or treatment of a well unless it is thoroughly flushed from the well and the groundwater aquifer or aquifers before the well is completed. Natural organic or nutrient producing material shall not be added to a grout mix used to grout the well=s annular space.

(r) Pump mounting.

(1) All pumps installed directly over the well casing shall be so installed that an airtight and watertight seal is made between the top of the well casing and the gear or pump head, pump foundation or pump stand.

(2) When the pump is not mounted directly over the well casing and the pump column pipe or pump suction pipe emerges from the top of the well casing, a sanitary well seal shall be installed between the pump column pipe and pump suction pipe and the well casing. An airtight and watertight seal shall be provided for the cable conduit when submersible pumps are used.

(s) Construction of sand point or well point water wells. Sand point or well point water wells shall be constructed by drilling or boring a pilot hole to a minimum depth of three feet below ground surface. The pilot hole shall be a minimum of three inches greater in diameter than the drive pipe or point wells shall only be completed by using the casing method or the drive pipe method as described in paragraphs (1) and (2) below or other methods as described in paragraph (3) below. Sand point wells constructed prior to the effective date of this regulation shall not be required to meet these requirements. All sand point wells that are replaced, constructed, reconstructed or plugged after the effective date of this regulation shall meet these regulations.

(1) Casing method. Approved, durable, watertight well casing shall be set from a minimum of three feet below the ground surface to at least one foot above the ground surface. The casing shall be sealed between the casing and the pilot hole with approved grouting material from the bottom of the casing to ground surface. The drive pipe shall be considered the pump drop pipe. For underground discharge completions, a AT@ joint shall be used. The drive pipe shall be caped with a solid cap at the AT@ joint when the casing method is used. An approved sanitary well seal and a well vent shall be installed on the top of the well casing in accordance with K.A.R. 28- 30-6 (f) and (k).

(2) Drive pipe method. Sand point wells may be installed without a casing for above ground discharge completions only. In such completions, the drive pipe shall terminate at least one foot above finished ground level. The annular space between the drive pipe and the pilot hole shall be sealed with approved grouting material from the bottom of the pilot hole to ground surface. The top of the drive pipe shall be sealed airtight and watertight with a solid cap of the same material as the drive pipe. A well vent shall not be required for the drive pipe method.

(3) Other methods. Other methods may be specifically approved by the department on a case-by-case basis by using the appeal procedure included in K.A.R. 28-30-9.

(4) Abandonment of sand point wells. Upon abandonment of a sand point well, the contractor or landowner shall either pull the drive pipe or leave it in place. If the drive pipe is left in place, the sand point well shall be plugged from the bottom of the well to three feet below the ground surface with approved grouting material. The drive pipe well shall be cut off three feet below the ground surface and the remaining three foot deep hole shall be backfilled with surface soil. If the drive pipe is completely pulled, the remaining hole shall be plugged with approved grouting material from the bottom of the remaining hole to three feet below the ground surface. The hole shall be backfilled with surface soil from 3 feet to ground surface.

A Water Well Record (see attached example) will be filled out by the driller and submitted to the Kansas Department of Health and Environment, Bureau of Water, Geology Section in Topeka, Kansas. The water well owner will be listed as the USDA Forest Service, PO Box 300, Elkhart, KS 67950.