This file is a set of detailed engineering drawings for the Pineview Reservoir Recreation Complex Reconstruction - Phase 2 Trailhead project, located in the Uinta-Wasatch-Cache National Forest, Ogden Ranger District in Utah. The drawings cover comprehensive site development plans, including removal of existing structures, site grading, storm drainage improvements, concrete work, comfort station construction, parking lot development, rockery walls, sidewalks, trails, beach access, and pavilion structures.
The project scope involves multiple technical aspects such as constructing concrete stairs, precast concrete vault comfort stations, trailer parking, sidewalks, trails, and shade structures with picnic and utility tables. The drawings include detailed civil engineering specifications, special inspection forms, code analysis, utility notes, erosion control plans, and a comprehensive schedule of items. The project is part of a federal contract opportunity under the Department of Agriculture Forest Service, with work to be performed in the Pineview Reservoir area near Huntsville, Utah, indicating a significant infrastructure and recreational facility reconstruction effort.
View the file
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SHEET OF
United States Department of Agriculture Forest Service
1 50
FOREST ENGINEER
DISTRICT RANGER DATE
DATE
DIRECTOR OF ENGINEERING DATE
FOREST SUPERVISOR DATE
/7/
:1 4M
AC
KE
LL
E.
HE
ND
RI
X
Q:
\!2
2\U
T-
-2
2 P
IN
EV
IE
W R
EC
RE
AT
IO
N
SI
TE
S\
PR
OJ
EC
T
DA
TA
\S
HE
ET
_F
IL
ES
\_P
IN
EV
IE
W T
RA
IL
HE
AD
\E
NS
IG
N'
S
GE
NE
RA
L
SH
EE
TS
\G 1 C
OV
ER
S
HE
ET
.D
W G;
UTAH
WEBER
R04 INTERMOUNTAIN REGION
UINTA-WASATCH-CACHE NATIONAL FOREST
OGDEN RANGER DISTRICT
VICINITY MAP
GAOA PINEVIEW RESERVOIR
RECREATION COMPLEX
RECONSTRUCTION - PHASE 2
PINEVIEW TRAILHEAD
FOREST LOCATION
RECOMMENDED BY:
APPROVED BY:STRUCTURAL ENGINEER:
CODY SANTOS
CIVIL ENGINEER:
TREVOR PRICE
LANDSCAPE ARCHITECT:
JAY BOLLWINKEL
TRAVEL DIRECTIONS:
FROM THE NATIONAL FOREST SERVICE OGDEN RANGER STATION, TRAVEL EAST ON 100 SOUTH/MAIN STREET TOWARDS 6700 EAST. TURN RIGHT ONTO UT-39 W. TURN RIGHT ONTO SR-158 (FOREST ROAD 039, PINEVIEW DRIVE) TO CROSS PINEVIEW DAM AND CONTINUE FOR APPROXIMATELY 1.6 MILES TO
THE PINEVIEW TRAILHEAD.
I-15 AND
1200 WEST
PINEVIEW TRAILHEAD
9803098-2202
PRICE
U
PR
OF
ESSIONAL ENGINEER
TO F
A H
ETATS
TREVOR N.
12/07/23 NO. 108570
BOLLWINKEL
JAY
Licensed Landscape A r chi t e c t
ST A TE OF UT AH
12/06/2023
RYAN STONE
Digitally signed by RYAN STONE Date: 2024.05.30 10:35:42 -06'00'
SEAN HARWOOD
Digitally signed by SEAN
HARWOOD
Date: 2024.05.31 07:41:01 -06'00'
DAVID WHITTEKIEND
Digitally signed by DAVID
WHITTEKIEND
Date: 2024.05.31 10:01:51 -06'00'
Kevin W Bourne Digitally signed by Kevin W Bourne Date: 2024.06.03 17:37:42 -06'00'
Revision 1 6/9/2025 Change page 10 quantity changes on item 321210
DATENO.
REVISION / ISSUE
/4/
:2 3 Z
AC
H.
SC
OT
T Q:
\!2
2\U T-
-2 2 P
IN
EV
IE
W
R
EC
RE
AT
IO
N
SI
TE
S\
PR
OJ
EC
T
DA
TA
\S
HE
ET
_F
IL
ES
\_P
IN
EV
IE
W
T
RA
IL
HE
AD
\E
NS
IG
N' S
GE
NE
RA
L
SH
EE
TS
\G
2-
LE
GE
ND
A
ND
A
BB
RE
VI
AT
IO
NS
.D
W G;
INDEX OF SHEETS
12/7/2023
G2
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
/4/
:2 3 Z
AC
H.
SC
OT
T Q:
\!2
2\U T-
-2 2 P
IN
EV
IE
W
R
EC
RE
AT
IO
N
SI
TE
S\
PR
OJ
EC
T
DA
TA
\S
HE
ET
_F
IL
ES
\_P
IN
EV
IE
W
T
RA
IL
HE
AD
\E
NS
IG
N' S
GE
NE
RA
L
SH
EE
TS
\G
2-
LE
GE
ND
A
ND
A
BB
RE
VI
AT
IO
NS
.D
W G;
(R04)
INTERMOUNTAIN
UINTA-WASATCH-CACHE
NATIONAL FOREST
OGDEN RANGER DISTRICT
R. ROUSSELLE
GH/CD/MS
RR/FD
PENDING
FS090523_R102013_L1-002.dwg
PINEVIEW RESERVOIR
RECREATION COMPLEX
RECONSTRUCTION
-PHASE 2
PINEVIEW TRAILHEAD
INDEX OF SHEETS
Page # DWG SHEET TITLE
1 G1 COVER SHEET
2 G2 INDEX OF SHEETS
3 G3 ABBREVIATIONS AND LABELS
4 G4 GENERAL NOTES
5 G5 GENERAL NOTES
6 G6 CIVIL FORMS
7 G7 CIVIL FORMS
8 G8 SPECIAL INSPECTION FORMS
9 G9 SPECIAL INSPECTION FORMS
10 G10 SCHEDULE OF ITEMS AND DESCRIPTION OF WORK
11 C1 OVERALL HORIZONTAL CONTROL
12 C1.1 OVERALL HORIZONTAL CONTROL
13 C2 HORIZONTAL CONTROL
14 C3 DEMOLITION PLAN
15 C4 OVERALL SITE AND UTILITY PLAN
16 C5 PAVEMENT PLAN
17 C6 SITE & UTILITY PLAN
18 C7 OVERALL GRADING PLAN
19 C8 GRADING PLAN
20 C9 GRADING PLAN
21 C9.1 GRADING PLAN
22 C10 PLAN & PROFILE
23 C11 PLAN & PROFILE
24 C12 PLAN & PROFILE
25 C13 SIGNING & STRIPING
26 C14 EROSION CONTROL
27 D1 TYPICAL PAVEMENT SECTIONS
28 D2 ADA RAMP DETAILS
29 D3 CURB AND GUTTER DETAILS
30 D4 STORM DRAIN PIPE AND END SECTION DETAILS
31 D5 STORM DRAIN STRUCTURE AND LID DETAILS
32 D6 TRASH ENCLOSURE DETAILS
33 D7 COMFORT STATION DETAILS
34 D8 POST AND ROPE RAILING DETAILS
35 D9 PRESSURE TREATED POST AND RAIL FENCE DETAILS
36 D10 STEEL FRAME WITH WIRE MESH INFILL PANEL GUARDRAIL DETAIL
37 D11 SITE FURNITURE AND PAVILLION DETAILS
38 D12 SITE BOULDERS AND ROCKERY WALL DETAILS
39 D13 EROSION CONTROL DETAILS
40 D14 EROSION CONTROL DETAILS
41 D15 SIGNAGE DETAILS
42 D16 SIGNAGE DETAILS
43 D17 INFORMATION HUB LAYOUTS
44 D18 SHORE PROTECTION DETAILS
45 D19 BEACH ACCESS DETAILS
46 D20 PAY STATION DETAIL
47 D21 KIOSK DETAILS
48 D22 STORM WATER SEPARATORS DETAIL
49 L1 TREE DEMOLITION AND PROTECTION PLAN
50 L2 TREE DEMOLITION AND PROTECTION PLAN
9803098-2202
PRICE
U
PR
OF
ESSIONAL ENGINEER
TO F
A H
ETATS
TREVOR N.
12/07/23
@ AT
Ø DIAMETER
% PERCENTAGE
' FEET
“ INCHES
3PH THREE PHASE POWER
AB ANCHOR BOLT
ABUT ABUTMENT
AC ASBESTOS CEMENT PIPE OR ASPHALT
CONCRETE
ADT AVERAGE DAILY TRAFFIC
APPROX APPROXIMATELY
APWA AMERICAN PUBLIC WORKS ASSOCIATION
AL AIR LINE
ALUM ALUMINUM
AR ACCESSIBLE ROUTE
ASPH ASPHALT
ASTM AMERICAN SOCIETY FOR TESTING AND
MATERIALS
AWWA AMERICAN WATER WORKS ASSOCIATION
AZ AZIMUTH
BAL BALANCE
BEG BEGINNING / BEGIN
BFC BACK FACE OF CURB
BLD FLG BLIND FLANGE
BLDG BUILDING
BLM BUREAU OF LAND MANAGEMENT
BM BENCHMARK
BLK BLOCK
BOD BIOCHEMICAL OXYGEN DEMAND
BOS BOTTOM OF STEP
BOT BOTTOM
BRG BEARING
BSMT BASEMENT
BTWN BETWEEN
BVC BEGIN VERTICAL CURVE
C CURVE
C&G CURB AND GUTTER
CALC CALCULATED
CB CATCH BASIN
C-C CENTER TO CENTER
CCW COUNTER CLOCKWISE
CF CURB FACE
CFS CUBIC FEET PER SECOND
CIP CAST IRON PIPE
CJ CONSTRUCTION JOINT
CL CENTER LINE
CLR CLEARANCE
CMP CORRUGATED METAL PIPE
CMP-A CORRUGATED METAL PIPE - ARCH
CO CLEAN OUT
COB CLEAN OUT BOX
COL COLUMN
COMM COMMUNICATION
CONC CONCRETE
CONN CONNECT
CONT CONTINUOUS
COR CORNER
CTR CENTER
CU FT CUBIC FEET
CU YD CUBIC YARD
CULV CULVERT
CW CLOCKWISE
D DEGREE
DET DETAIL
DIA DIAMETER
DIP DUCTILE IRON PIPE
DIST DISTANCE
DL DRAIN LINE
DMH DRAINAGE MANHOLE
DN DOWN
DW DRINKING WATER
DWG DRAWINGS
DWV DRAIN WASTE VENT
E EAST
EA EACH
EB ELECTRICAL BOX
EG EDGE OF GRAVEL
ELEC ELECTRIC / ELECTRICAL
ELEV ELEVATION
EMB EMBANKMENT
EMH ELECTRICAL MANHOLE
ENGR ENGINEER
ENT ENTRANCE
EO EDGE OF OIL
EOA EDGE OF ASPHALT
EQUIP EQUIPMENT
ES EDGE OF SHOULDER
EST ESTIMATE
EVC END OF VERTICAL CURVE
EW EACH WAY
EXC EXCAVATION
EX EXISTING
EXIST EXISTING
FD FLOOR DRAIN
FDN FOUNDATION
FEN COR FENCE CORNER
FE FIRE EXTINGUISHER
FF FINISH FLOOR
FFC FRONT FACE OF CURB
FG FINISH GRADE
FH FIRE HYDRANT
FIN FINISH
FL FLOW LINE / FLANGE
FLR FLOOR
FRP FIBERGLASS REINFORCED PIPE
FT FEET
FTG FOOTING
G GAS
GA GAGE / GAUGE
GALV GALVANIZED
GB GRADE BREAK
GEN GENERAL
GF GARAGE FLOOR
GLB GLUED LAMINATED BEAM
GM GAS METER
GSP GALVANIZED STEEL PIPE
GV GATE VALVE
HC HANDICAP / HYPOCHLORITE
HDG HOT DIPPED GALVANIZED
HDWL HEADWALL
H&T HUB & TACK
HORIZ HORIZONTAL
HP HIGH POINT
HSS HOLLOW STRUCTURAL SECTION
HWL HIGH WATER LEVEL
HWY HIGHWAY
HX HEAT EXCHANGER
HYD HYDRANT
ID INSIDE DIAMETER
IE INVERT ELEVATION
IJ ISOLATION JOINT
IN INCH
INFO INFORMATION
INV INVERT
IRR IRRIGATION
JCT JUNCTION
K RATE OF VERTICAL CURVATURE
L LENGTH
LB POUND
LD LAND DRAIN
LF LINEAR FEET
LIC LICENSE
LIN LINEAR / LINEAL
LP LOW POINT / LIGHT POLE
LS LAND SURVEYOR
LT LEFT
LWL LOW WATER LEVEL
MAG MAGNETIC
MAINT MAINTENANCE
MATL MATERIAL
MAX MAXIMUM
MB MACHINE BOLT
MH MANHOLE
MI MILE
MIN MINIMUM
MISC MISCELLANEOUS
MJ MECHANICAL JOINT
MKR MARKER
ML MATCH LINE
MON MONUMENT
MPH MILES PER HOUR
N NORTH
NG NATURAL GROUND
NIC NOT IN CONTRACT
NPW NON-POTABLE WATER
NO OR # NUMBER
NTS NOT TO SCALE
OC ON CENTER
OCEW ON CENTER EACH WAY
OD OUTSIDE DIAMETER
OFF REV OFFICE REVISION
O-O OUTSIDE TO OUTSIDE
OHP OVERHEAD POWER
ORIG ORIGINAL
OSB ORIENTED STRAND BOARD
PC POINT OF CURVATURE / PRESSURE CLASS
PCC POINT OF COMPOUND CURVATURE
PD POND EFFLUENT
PE PLANT EFFLUENT
PERT PERFORATED
PI POINT OF INTERSECTION / PRIMARY
INFLUENT
PIV POST INDICATOR VALVE
PL PROPERTY LINE
PLCS PLACES
POB POINT OF BEGINNING
POC POINT ON CURVATURE
PP POWER POLE
PRC POINT OF REVERSE CURVATURE
PRO PROPOSED
PROJ PROJECT
PROP PROPERTY
PS PUMP STATION
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PT POINT OF TANGENCY
PVC POINT OF VERTICAL CURVATURE /
POLYVINYL CHLORINE
PVI POINT OF VERTICAL INTERSECTION
PVMT PAVEMENT
PVT POINT OF VERTICAL TANGENCY
PW POTABLE WATER
QTY QUANTITY
R RADIUS / RANGE
RAS RETURN ACTIVATED SLUDGE
RCP REINFORCED CONCRETE PIPE
RCCP REINFORCED CONCRETE CYLINDER PIPE
RD ROOF DRAIN
REF REFERENCE
REINF REINFORCED
REQ'D REQUIRED
REV REVISION
ROW RIGHT OF WAY
RP REFERENCE POINT
RR RAILROAD
RT RIGHT / ROUTE
R/W RIGHT OF WAY
S SLOPE / SOUTH
SAN SANITARY
SAN SWR SANITARY SEWER
SCH SCHEDULE
SD STORM DRAIN
SE SECONDARY EFFLUENT
SEC SECONDARY
SEC COR SECTION CORNER
SHT SHEET
SJ SAWED JOINT
SKT SOCKET
SL SOLIDS LINE
SOVFL SURFACE OVERFLOW
SPECS SPECIFICATIONS
SQ SQUARE
SQ FT SQUARE FEET
SQ YD SQUARE YARDS
SS SANITARY SEWER / STAINLESS STEEL
ST STREET
STA STATION
STD STANDARD
STL STEEL
STN STL STAINLESS STEEL
STRUCT STRUCTURE
SW SIDEWALK
SWR SEWER
SWL SECONDARY WATER LINE
T TOWNSHIP / TELEPHONE
TAN TANGENT
TBC TOP BACK OF CURB
TEMP TEMPORARY
TELE TELEPHONE / TELEGRAM
THD THREADED
THK THICK
TKN TOTAL KJELDAHL NITROGEN
TOA TOP OF ASPHALT
TOC TOP OF CONCRETE
TOF TOP OF FOUNDATION / TOP OF FOOTING
TOG TOP OF GRATE / TOP OF GRAVEL
TOP TOP OF PIER
TOW TOP OF WALL
TOS TOP OF STEP / TOP OF SLAB
TSS TOTAL SUSPENDED SOLIDS
TYP TYPICAL
UB UTILITY BOX
UG UNDERGROUND
UNO UNLESS NOTED OTHERWISE
UW UTILITY WATER
VC VERTICAL CURVE
VERT VERTICAL
VIC VIC COUPLING
VOL VOLUME
VPI VERTICAL POINT OF INTERSECTION
VPC VERTICAL POINT OF CURVE
VPT VERTICAL POINT OF TANGENCY
VSS VOLATILE SUSPENDED SOLIDS
W WEST / WATER
WAS WASTE ACTIVATED SLUDGE
WIV WALL INDICATOR VALVE
WL WATER LINE
WM WATER METER
WO WEIR OVERFLOW
W/ WITH
W/O WITHOUT
XING CROSSING
X-SEC CROSS SECTION
YH YARD HYDRANT
ABBREVIATIONS
EXISTING BUILDING
EXISTING FIBER OPTIC LINE
EXISTING IRRIGATION LINE
EXISTING LIGHT
EXISTING GAS LINE
EXISTING POWER POLE
EXISTING SIGN
EXISTING BURIED POWER LINE
EXISTING OVERHEAD POWER LINE
EXISTING EDGE OF ASPHALT
ROADWAY CENTERLINE
EDGE OF GRAVEL ROAD
RIGHT OF WAY
TOPOGRAPHIC BREAKLINE
EXISTING CONCRETE
EXISTING EDGE OF DIRT
DRAINAGE SWALE
EXISTING FENCE
US ARMY CORPS ENGINEERING BOUNDARY (ELEV: 4902.00)
EXISTING STRIPING
EXISTING TOE OF SLOPE
EXISTING TOP OF SLOPE
EXISTING EDGE OF TREE LINE
EXISTING WALL
WETLANDS BOUNDARY
EXISTING STORM DRAIN PIPE
SECTION LINE
EXISTING WATER SPIGOT
EXISTING WATER PIPE
EXISTING STORM DRAIN CULVERT
EXISTING WATER VALVE
EXISTING WATER METER
EXISTING WATER MANHOLE
FOUND REBAR WITH CAP
EXISTING COMMUNICATIONS BOX
EXISTING MAILBOX
EXISTING CONIFEROUS TREE
SECTION CORNER
RIGHT OF WAY MARKER
LEGEND
PROPOSED STORM DRAIN MANHOLE
PROPOSED STORM DRAIN CATCH BASIN
PROPOSED STORM DRAIN CATCH BASIN
PROPOSED SEWER MANHOLE
PROPOSED SEWER CLEANOUT
S
D
PROPOSED STORM DRAIN PIPE
PROPOSED SEWER PIPE
PROPOSED WATER LINE PIPE
PROPOSED ELECTRICAL CONDUIT
PROPOSED GAS LINE
PROPOSED FIREHYDRANT
PROPOSED WATER VALVE
EXISTING CONTOUR - MAJOR
EXISTING CONTOUR - MINOR
PROPOSED CONTOUR - MAJOR
PROPOSED CONTOUR - MINOR
PROPOSED WATER LINE FITTING W/ THRUST BLOCK
PROPOSED TIMBER POST AND RAIL
DATENO.
REVISION / ISSUE
/4/
:2 3 Z
AC
H.
SC
OT
T Q:
\!2
2\U T-
-2 2 P
IN
EV
IE
W
R
EC
RE
AT
IO
N
SI
TE
S\
PR
OJ
EC
T
DA
TA
\S
HE
ET
_F
IL
ES
\_P
IN
EV
IE
W
T
RA
IL
HE
AD
\E
NS
IG
N' S
GE
NE
RA
L
SH
EE
TS
\G
2-
LE
GE
ND
A
ND
A
BB
RE
VI
AT
IO
NS
.D
W G;
LEGEND AND
ABBREVIATIONS
12/7/2023
G3
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
/4/
:2 3 Z
AC
H.
SC
OT
T Q:
\!2
2\U T-
-2 2 P
IN
EV
IE
W
R
EC
RE
AT
IO
N
SI
TE
S\
PR
OJ
EC
T
DA
TA
\S
HE
ET
_F
IL
ES
\_P
IN
EV
IE
W
T
RA
IL
HE
AD
\E
NS
IG
N' S
GE
NE
RA
L
SH
EE
TS
\G
2-
LE
GE
ND
A
ND
A
BB
RE
VI
AT
IO
NS
.D
W G;
(R04)
INTERMOUNTAIN
UINTA-WASATCH-CACHE
NATIONAL FOREST
OGDEN RANGER DISTRICT
R. ROUSSELLE
GH/CD/MS
RR/FD
PENDING
FS090523_R102013_L1-002.dwg
PINEVIEW RESERVOIR
RECREATION COMPLEX
RECONSTRUCTION
-PHASE 2
PINEVIEW TRAILHEAD
9803098-2202
PRICE
U
PR
OF
ESSIONAL ENGINEER
TO F
A H
ETATS
GENERAL NOTES
1. ALL CONSTRUCTION MUST STRICTLY FOLLOW THE STANDARDS AND
SPECIFICATIONS SET FORTH BY: DESIGN ENGINEER, US FOREST SERVICE,
WEBER COUNTY, LOCAL AGENCY JURISDICTION, THE MANUAL ON UNIFORM
TRAFFIC CONTROL DEVICES (M.U.T.C.D.), AND OTHER REGULATORY
AGENCIES EXERCISING AUTHORITY OVER ANY PORTION OF THE WORK
WHERE APPLICABLE. THE ORDER LISTED ABOVE IS ARRANGED BY
SENIORITY. THE LATEST EDITION OF ALL STANDARDS AND SPECIFICATIONS
MUST BE ADHERED TO. IF A CONSTRUCTION PRACTICE IS NOT SPECIFIED
BY ANY OF THE LISTED SOURCES, CONTRACTOR MUST CONTACT DESIGN
ENGINEER FOR DIRECTION.
2. ALL CONSTRUCTION AND MATERIALS SHALL BE IN ACCORDANCE WITH
THESE CONTRACT DOCUMENTS, LOCAL JURISDICTION OF AUTHORITY,
FEDERAL REQUIREMENTS, AND STATE REQUIREMENTS AND THE MOST
RECENT EDITIONS OF THE FOLLOWING: INTERNATIONAL PLUMBING CODE,
INTERNATIONAL BUILDING CODE, UTAH DIVISION OF DRINKING WATER
REGULATIONS, US FOREST SERVICE REQUIREMENTS, AND WEBER COUNTY
CODE. THE CONTRACTOR IS REQUIRED TO ADHERE TO ALL OF THE
ABOVE-MENTIONED DOCUMENTS UNLESS OTHERWISE NOTED AND
APPROVED BY THE ENGINEER.
3. SPECIFIC NOTES AND DETAILS SHALL TAKE PRECEDENCE OVER
GENERAL NOTES, TYPICAL DETAILS, AND SPECIFICATIONS.
4. THE CONTRACTOR SHALL REFER TO THE TECHNICAL PROVISIONS FOR
INFORMATION NOT COVERED BY THESE GENERAL NOTES OR DRAWINGS.
5. THE CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS BEFORE
SUBMITTING A BID OR PRICE TO THE OWNER AND SHALL NOTIFY OWNER OF
ANY DISCREPANCIES OR CONFLICTS BEFORE PROCEEDING WITH THE WORK
OR SUBMITTING THE BID.
6. PRIOR TO STARTING CONSTRUCTION, THE CONTRACTOR SHALL BE
RESPONSIBLE FOR VERIFYING THAT ALL REQUIRED PERMITS AND
APPROVALS HAVE BEEN OBTAINED. NO CONSTRUCTION OR FABRICATION
SHALL BEGIN UNTIL THE CONTRACTOR HAS RECEIVED AND THOROUGHLY
REVIEWED ALL PLANS AND OTHER DOCUMENTS APPROVED BY ALL OF THE
PERMITTING AUTHORITIES.
7. ALL DIMENSIONS, GRADES, AND UTILITY DESIGN SHOWN ON THE
PLANS SHALL BE VERIFIED BY THE CONTRACTOR PRIOR TO CONSTRUCTION.
CONTRACTOR SHALL NOTIFY THE ENGINEER IF ANY DISCREPANCIES EXIST
BETWEEN THE ACTUAL CONDITIONS AND INFORMATION SHOWN ON THE
DRAWINGS, PRIOR TO PROCEEDING WITH CONSTRUCTION FOR NECESSARY
PLAN OR GRADE CHANGES. NO EXTRA COMPENSATION SHALL BE PAID TO
THE CONTRACTOR FOR WORK HAVING TO BE REDONE DUE TO THE
DIMENSIONS OR GRADES SHOWN INCORRECTLY ON THESE PLANS, IF SUCH
NOTIFICATION HAS NOT BEEN GIVEN.
8. CONTRACTOR SHALL PROVIDE A CONSTRUCTION SCHEDULE IN
ACCORDANCE WITH LOCAL AGENCY JURISDICTION, FEDERAL, STATE, OR
COUNTY REGULATIONS FOR WORKING IN THE PUBLIC WAY.
9. THE CONTRACTOR SHALL PROVIDE AND BE RESPONSIBLE FOR THE
TEMPORARY ERECTION OF BRACING AND SHORING AS REQUIRED FOR
STABILITY OF STRUCTURES AND EXCAVATIONS DURING ALL PHASES OF
CONSTRUCTION. THE CONTRACTOR IS SOLELY RESPONSIBLE FOR
CONFORMING TO LOCAL AND FEDERAL CODES GOVERNING SHORING AND
BRACING OF EXCAVATIONS AND TRENCHES AND FOR THE PROTECTION OF
WORKERS.
10. THE CONTRACTOR IS REQUIRED TO KEEP ALL CONSTRUCTION
ACTIVITIES WITHIN THE APPROVED PROJECT LIMITS. THIS INCLUDES, BUT IS
NOT LIMITED TO VEHICLE AND EQUIPMENT STAGING, MATERIAL STORAGE
AND LIMITS OF TRENCH EXCAVATION. IT IS THE CONTRACTOR'S
RESPONSIBILITY TO OBTAIN PERMISSION AND/OR EASEMENTS FROM THE
APPROPRIATE GOVERNING ENTITY AND/OR INDIVIDUAL PROPERTY
OWNER(S) FOR WORK OR STAGING OUTSIDE OF THE PROJECT LIMITS.
11. PROJECT HORIZONTAL AND VERTICAL DATUM ARE SHOWN ON SHEET
C1.
12. CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE TO
ADJACENT SURFACE IMPROVEMENTS.
13. CONTRACTOR SHALL BE RESPONSIBLE FOR CORRECTING ANY
SETTLEMENT OF OR DAMAGE TO EXISTING UTILITIES.
14. THE CONTRACTOR IS RESPONSIBLE TO FURNISH ALL MATERIALS TO
COMPLETE THE PROJECT, UNLESS OTHERWISE NOTED ON THE PROJECT
DOCUMENTS.
15. THE LOCATIONS OF UNDERGROUND FACILITIES SHOWN ON THESE
PLANS ARE BASED ON FIELD SURVEYS AND LOCAL UTILITY COMPANY
RECORDS. IT SHALL BE THE CONTRACTOR'S FULL RESPONSIBILITY TO
CONTACT THE VARIOUS UTILITY COMPANIES TO LOCATE THEIR FACILITIES
PRIOR TO PROCEEDING WITH CONSTRUCTION. NO ADDITIONAL
COMPENSATION SHALL BE PAID TO THE CONTRACTOR FOR DAMAGE AND
REPAIR TO THESE FACILITIES CAUSED BY THEIR WORK FORCE.
CONTRACTOR SHALL START INSTALLATION AT LOW POINT OF ALL NEW
GRAVITY UTILITY LINES.
16. NO CHANGE IN DESIGN LOCATION OR GRADE WILL BE MADE BY THE
CONTRACTOR WITHOUT THE WRITTEN APPROVAL OF THE PROJECT
ENGINEER.
17. NATURAL VEGETATION AND SOIL COVER SHALL NOT BE DISTURBED
PRIOR TO ACTUAL CONSTRUCTION OF A REQUIRED FACILITY OR
IMPROVEMENT. MASS CLEARING OF THE SITE IN ANTICIPATION OF
CONSTRUCTION SHALL BE AVOIDED.
18. CONTRACTOR SHALL BE RESPONSIBLE FOR FURNISHING,
MAINTAINING, OR RESTORING ALL MONUMENTS AND MONUMENT
REFERENCE MARKS WITHIN THE PROJECT SITE. CONTACT THE COUNTY
SURVEYOR FOR MONUMENT LOCATIONS AND CONSTRUCTION DETAILS.
19. CONTRACTOR TO LAYOUT AND POTHOLE FOR ALL POTENTIAL
CONFLICTS WITH UTILITY LINES ON- OR OFF-SITE AS REQUIRED PRIOR TO
ANY CONSTRUCTION, AND THE CONTRACTOR WILL VERIFY DEPTHS OF
UTILITIES IN THE FIELD BY POTHOLING A MINIMUM OF 300 FEET AHEAD OF
PIPELINE CONSTRUCTION TO AVOID CONFLICTS WITH DESIGNED PIPELINE
GRADE AND ALIGNMENT. IF A CONFLICT ARISES RESULTING FROM THE
CONTRACTOR'S NEGLIGENCE TO POTHOLE UTILITIES, THE CONTRACTOR
WILL BE REQUIRED TO RESOLVE THE CONFLICT WITHOUT ADDITIONAL COST
OR CLAIM TO THE OWNER OR ENGINEER.
20. ANY AREA OUTSIDE THE LIMIT OF WORK THAT IS DISTURBED SHALL BE
RESTORED TO ITS ORIGINAL CONDITION AT NO COST TO OWNER.
21. CONSULT ALL OF THE DRAWINGS AND SPECIFICATIONS FOR
COORDINATION REQUIREMENTS BEFORE COMMENCING CONSTRUCTION.
22. AT ALL LOCATIONS WHERE EXISTING PAVEMENT ABUTS NEW
CONSTRUCTION, THE EDGE OF THE EXISTING PAVEMENT SHALL BE SAWCUT
TO A CLEAN, SMOOTH EDGE.
23. ALL CONSTRUCTION AND MATERIALS SHALL BE IN ACCORDANCE WITH
THE MOST RECENT, ADOPTED EDITION OF FSORAG AND ABAAS GUIDELINES
AND ANY ADDITIONAL US FOREST SERVICE ACCESSIBILITY REQUIREMENTS.
24. CONTRACTOR SHALL, AT THE TIME OF BIDDING AND THROUGHOUT
THE PERIOD OF THE CONTRACT, BE LICENSED IN THE STATE OF UTAH AND
SHALL BE BONDABLE FOR AN AMOUNT REQUIRED BY THE OWNER.
25. CONTRACTOR SHALL BE RESPONSIBLE TO PROVIDE ALL WATER,
POWER, SANITARY FACILITIES AND TELEPHONE SERVICES AS REQUIRED
FOR THE CONTRACTOR'S USE DURING CONSTRUCTION.
26. CONTRACTOR SHALL BE RESPONSIBLE FOR ADEQUATELY
SCHEDULING INSPECTION AND TESTING OF ALL FACILITIES CONSTRUCTED
UNDER THIS CONTRACT. ALL TESTING SHALL CONFORM TO THE
REGULATORY AGENCY'S STANDARD SPECIFICATIONS. ALL RE-TESTING
AND/OR RE-INSPECTION SHALL BE PAID FOR BY THE CONTRACTOR.
27. IF EXISTING IMPROVEMENTS NEED TO BE DISTURBED AND/OR
REMOVED FOR THE PROPER PLACEMENT OF IMPROVEMENTS TO BE
CONSTRUCTED BY THESE PLANS, THE CONTRACTOR SHALL BE
RESPONSIBLE FOR PROTECTING EXISTING IMPROVEMENTS FROM DAMAGE.
COST OF REPLACING OR REPAIRING EXISTING IMPROVEMENTS SHALL BE
INCLUDED IN THE UNIT PRICE BID FOR ITEMS REQUIRING REMOVAL AND/OR
REPLACEMENT. THERE WILL BE NO EXTRA COST DUE TO THE CONTRACTOR
FOR REPLACING OR REPAIRING EXISTING IMPROVEMENTS.
28. WHENEVER EXISTING FACILITIES ARE REMOVED, DAMAGED, BROKEN,
OR CUT IN THE INSTALLATION OF THE WORK COVERED BY THESE PLANS OR
SPECIFICATIONS, SAID FACILITIES SHALL BE REPLACED AT THE
CONTRACTOR'S EXPENSE WITH MATERIALS EQUAL TO OR BETTER THAN THE
MATERIALS USED IN THE ORIGINAL EXISTING FACILITIES. THE FINISHED
PRODUCT SHALL BE SUBJECT TO THE APPROVAL OF THE OWNER, THE
ENGINEER, AND THE RESPECTIVE REGULATORY AGENCY.
29. CONTRACTOR SHALL MAINTAIN A NEATLY MARKED SET OF FULL-SIZE
RECORD DRAWINGS SHOWING THE FINAL LOCATION AND LAYOUT OF ALL
STRUCTURES AND OTHER FACILITIES. RECORD DRAWINGS SHALL REFLECT
CHANGE ORDERS, ACCOMMODATIONS, AND ADJUSTMENTS TO ALL
IMPROVEMENTS CONSTRUCTED. WHERE NECESSARY, SUPPLEMENTAL
DRAWINGS SHALL BE PREPARED AND SUBMITTED BY THE CONTRACTOR.
PRIOR TO ACCEPTANCE OF THE PROJECT, THE CONTRACTOR SHALL
DELIVER TO THE ENGINEER ONE SET OF NEATLY MARKED RECORD
DRAWINGS SHOWING THE INFORMATION REQUIRED ABOVE. RECORD
DRAWINGS SHALL BE REVIEWED AND THE COMPLETE RECORD DRAWING
SET SHALL BE CURRENT WITH ALL CHANGES AND DEVIATIONS REDLINED AS
A PRECONDITION TO THE FINAL PROGRESS PAYMENT APPROVAL AND/OR
FINAL ACCEPTANCE.
30. WHERE THE PLANS OR SPECIFICATIONS DESCRIBE PORTIONS OF THE
WORK IN GENERAL TERMS BUT NOT IN COMPLETE DETAIL, IT IS
UNDERSTOOD THAT ONLY THE BEST GENERAL PRACTICE IS TO PREVAIL
AND THAT ONLY MATERIALS AND WORKMANSHIP OF THE FIRST QUALITY ARE
TO BE USED.
31. ALL EXISTING GATES AND FENCES TO REMAIN UNLESS OTHERWISE
NOTED ON PLANS. PROTECT ALL GATES AND FENCES FROM DAMAGE.
32. ALL EXISTING TREES ARE TO REMAIN UNLESS OTHERWISE NOTED ON
PLANS. PROTECT ALL TREES FROM DAMAGE.
33. CONTRACTORS ARE RESPONSIBLE FOR ALL OSHA REQUIREMENTS ON
THE PROJECT SITE.
34. CONTRACTOR SHALL BE RESPONSIBLE TO PROVIDE AND MAINTAIN
ANY EQUIPMENT NECESSARY TO DEWATER EXCAVATIONS AS NOTED ON
THE PROJECT DRAWINGS.
35. CONTRACTOR SHALL NOTIFY BLUESTAKES 1-800-662-4111 48 HOURS
PRIOR TO BEGINNING EXCAVATION. CONTRACTOR SHALL LOCATE EXISTING
WATER LINE AND OTHER UTILITIES BOTH VERTICALLY AND HORIZONTALLY.
IF DISCREPANCIES, CONFLICTS OR UNFORESEEN CONDITIONS ARE
DISCOVERED, CONTRACTOR SHALL IMMEDIATELY CONTACT ENGINEER FOR
RESOLUTION.
36. ALL CONSTRUCTION SHALL CONFORM TO APPLICABLE SECTIONS OF
THE UTAH DIVISION OF DRINKING WATER SERIES 500 RULES, DRINKING
WATER FACILITY CONSTRUCTION, DESIGN AND OPERATION.
UTILITY NOTES
1. PRIOR TO COMMENCING ANY WORK, IT SHALL BE THE CONTRACTOR'S
RESPONSIBILITY TO HAVE EACH UTILITY COMPANY LOCATE, IN THE FIELD,
THEIR MAIN AND SERVICE LINES. THE CONTRACTOR SHALL NOTIFY BLUE
STAKES AT 1-800-662-4111 48 HOURS IN ADVANCE OF PERFORMING ANY
EXCAVATION WORK. THE CONTRACTOR SHALL RECORD THE BLUE STAKES
ORDER NUMBER AND FURNISH ORDER NUMBER TO OWNER AND ENGINEER
PRIOR TO ANY EXCAVATION. IT WILL BE THE CONTRACTOR'S SOLE
RESPONSIBILITY TO DIRECTLY CONTACT ANY OTHER UTILITY COMPANIES
THAT ARE NOT MEMBERS OF BLUE STAKES. IT SHALL BE THE
CONTRACTOR'S SOLE RESPONSIBILITY TO PROTECT ALL EXISTING UTILITIES
SO THAT NO DAMAGE RESULTS TO THEM DURING THE PERFORMANCE OF
THIS CONTRACT. ANY REPAIRS NECESSARY TO DAMAGED UTILITIES SHALL
BE PAID FOR BY THE CONTRACTOR. THE CONTRACTOR SHALL BE REQUIRED
TO COOPERATE WITH OTHER CONTRACTORS AND UTILITY COMPANIES
INSTALLING NEW STRUCTURES, UTILITIES AND SERVICE TO THE PROJECT.
2. CARE SHOULD BE TAKEN IN ALL EXCAVATIONS DUE TO POSSIBLE
EXISTENCE OF UNRECORDED UTILITY LINES. EXCAVATION REQUIRED
WITHIN PROXIMITY OF EXISTING UTILITY LINES SHALL BE DONE BY HAND.
CONTRACTOR SHALL REPAIR ANY DAMAGE TO EXISTING UTILITY LINES OR
STRUCTURES INCURRED DURING CONSTRUCTION OPERATIONS AT
CONTRACTOR'S EXPENSE.
3. TRENCH BACKFILL MATERIAL AND COMPACTION TESTS PER
SPECIFICATION, SECTION 02221 - BACKFILLING TRENCHES. NO NATIVE
MATERIALS ARE ALLOWED IN THE PIPE ZONE. THE MAXIMUM LIFT FOR
BACKFILLING EXCAVATIONS IS 8-INCHES.
4. THE CONTRACTOR IS RESPONSIBLE FOR REPAIRING ANY DAMAGE,
CAUSED BY ANY CONDITION INCLUDING SETTLEMENT, TO EXISTING
UTILITIES FROM WORK PERFORMED AT OR NEAR EXISTING UTILITIES. THE
CONTRACTOR SHALL TAKE ALL MEASURES NECESSARY TO PROTECT ALL
EXISTING PUBLIC AND PRIVATE ROADWAY AND UTILITY FACILITIES. DAMAGE
TO EXISTING FACILITIES CAUSED BY THE CONTRACTOR MUST BE REPAIRED
BY THE CONTRACTOR AT THEIR EXPENSE TO THE SATISFACTION OF THE
OWNER OF SAID FACILITIES.
5. ALL WATER LINE AND SEWER LINE INSTALLATION AND TESTING TO BE
IN ACCORDANCE WITH LOCAL GOVERNING AGENCY'S OR APWA STANDARDS
AND SPECIFICATIONS.
6. ALL MANHOLES, HYDRANTS, VALVES, CLEANOUT BOXES, CATCH
BASINS, METERS, ETC. MUST BE RAISED OR LOWERED TO FINAL GRADE PER
APWA (LATEST EDITION) STANDARDS AND INSPECTOR REQUIREMENTS.
CONCRETE COLLARS MUST BE CONSTRUCTED ON ALL MANHOLES,
CLEANOUT BOXES, CATCH BASINS, AND VALVES PER APWA STANDARDS.
ALL MANHOLE, CATCH BASIN, OR CLEANOUT BOX CONNECTIONS MUST BE
MADE WITH THE PIPE CUT FLUSH WITH THE INSIDE OF THE BOX AND
GROUTED OR SEALED.
7. CONTRACTOR SHALL NOT ALLOW ANY GROUNDWATER OR DEBRIS TO
ENTER THE NEW OR EXISTING PIPE DURING CONSTRUCTION.
8. SILT AND DEBRIS ARE TO BE CLEANED OUT OF ALL STORM DRAIN
BOXES. CATCH BASINS ARE TO BE MAINTAINED IN A CLEANED CONDITION
AS NEEDED UNTIL AFTER THE FINAL BOND RELEASE INSPECTION.
9. CONTRACTOR SHALL CLEAN ASPHALT, TAR OR OTHER ADHESIVES OFF
OF ALL MANHOLE LIDS AND INLET GRATES TO ALLOW ACCESS.
10. EACH TRENCH SHALL BE EXCAVATED SO THAT THE PIPE CAN BE LAID
TO THE ALIGNMENT AND GRADE AS REQUIRED. THE TRENCH WALL SHALL
BE SO BRACED THAT THE WORKMEN MAY WORK SAFELY AND EFFICIENTLY.
ALL TRENCHES SHALL BE DRAINED SO THE PIPE LAYING MAY TAKE PLACE IN
DEWATERED CONDITIONS.
11. CONTRACTOR SHALL PROVIDE AND MAINTAIN AT ALL TIMES AMPLE
MEANS AND DEVICES WITH WHICH TO REMOVE PROMPTLY AND TO
PROPERLY DISPOSE OF ALL WATER ENTERING THE TRENCH EXCAVATION.
12. UTAH STATE REGULATIONS ON THE SEPARATION OF DRINKING
WATER AND SEWER LINES SHALL BE FOLLOWED. THESE ARE LISTED UNDER
UAC R317-3-2.9.B TO UAC R309-550-7.
13. ALL DUCTILE IRON PIPE SHALL BE PRESSURE CLASS OR SPECIAL
THICKNESS CLASS CONFORMING TO ANSI/AWWA C150/A21.50 & C151/A21.51
AND AWWA C600 WITH 8 MIL. POLYETHYLENE WRAP FOR BURIED
INSTALLATIONS.
14. ALL DUCTILE IRON FITTINGS SHALL BE RATED FOR WORKING
PRESSURES AS SPECIFIED ON THE DRAWINGS.
15. POLYVINYL CHLORINE PIPE SHALL CONFORM TO AWWA C900 WITH A
DIMENSION RATION (DR) OF 18 OR LESS AND CONFORM TO ASTM D2774 AND
AWWA M23.
16. ALL GATE VALVES SHALL BE RESILIENT WEDGE GATE VALVES AND
SHALL CONFORM TO AWWA C-509 OR C-515. GATE VALVES INSTALLED IN
VAULTS SHALL BE FURNISHED WITH HANDWHEEL OPERATORS. VALVES
INSTALLED IN DIRECT BURY APPLICATIONS SHALL BE FURNISHED WITH A
TWO-INCH SQUARE OPERATING NUT AND SLIP TYPE, CAST IRON VALVE BOX.
17. ALL BUTTERFLY VALVES FOR STANDARD PRESSURE APPLICATIONS
SHALL BE TIGHT-CLOSING RUBBER SEAT BUTTERFLY VALVES AND SHALL
MEET THE REQUIREMENTS OF AWWA C-504 FOR CLASS 150 B VALVES AND
RATED FOR WORKING PRESSURE OF 150 PSI. HIGH PRESSURE BUTTERFLY
VALVES SHALL BE RATED FOR WORKING PRESSURES AS SPECIFIED ON THE
DRAWINGS.
18. ALL BOLTS FOR DIRECT BURY FITTINGS SHALL BE COATED WITH FM
GREASE, AND THE ENTIRE FITTING SHALL BE WRAPPED WITH 8 MIL.
POLYETHYLENE PRIOR TO BACKFILLING.
19. CONTRACTOR SHALL INSTALL TRACER WIRE AND MAGNETIC
LOCATING TAPE CONTINUOUSLY OVER ALL PIPE UNLESS NOTED ON THE
DRAWINGS.
20. ALL DRINKING WATER LINES, TANKS, WELLS, FITTINGS AND
APPURTENANCES SHALL BE INSTALLED, TESTED, AND DISINFECTED PER
R309-500 THRU 550 PUBLIC DRINKING WATER FACILITY DESIGN AND
OPERATION RULES. ALL MATERIAL THAT MAY CONTACT DRINKING WATER,
INCLUDING PIPES, GASKETS, LUBRICANTS, O-RINGS, SHALL BE CERTIFIED
PER ANSI/NSF 61, CERTIFIED DRINKING WATER SYSTEM COMPONENTS -
HEALTH EFFECTS. TO PERMIT FIELD VERIFICATION OF THIS COMPLIANCE,
ALL SUCH COMPONENTS SHALL BE APPROPRIATELY STAMPED WITH THE
NSF LOGO. FLUSHING AND DISINFECTION OF DRINKING WATER LINES,
TANKS, WELLS, FITTINGS AND APPURTENANCES SHALL BE IN ACCORDANCE
WITH AWWA STANDARD C651. PRESSURE AND LEAK TESTING SHALL COMPLY
WITH AWWA C600.
21. ALL BURIED MECHANICAL JOINTS SHALL BE RESTRAINED
22. ALL OPEN ENDS OF PIPE SHALL BE EFFECTIVELY SEALED AT THE END
OF THE DAY'S WORK AND PIPE SHALL NOT BE DROPPED INTO TRENCH.
23. PVC PIPE SHALL BE PRESSURE TESTED ACCORDING TO AWWA C605.
24. WATER LINE TO BE LAID WITHOUT HIGH POINTS OR LOW POINTS,
EXCEPT WHERE SHOWN ON THE PLAN AND PROFILE SHEETS.
25. DRINKING WATER LINES TO BE INSTALLED WITH MINIMUM OF
60-INCHES OF COVER.
26. HIGH DENSITY POLYETHYLENE PIPE (HDPE) SHALL CONFORM TO
AWWA M55 AND ASTM D2774.
27. ALL ELBOWS, TEES, CROSSES, CAPPED ENDS, VALVES AND OTHER
APPURTENANCES SHALL BE FULLY RESTRAINED USING THRUST BLOCKS
AND RESTRAINED JOINTS OR OTHER ACCEPTED METHODS UNLESS NOTED
ON THE PROJECT DRAWINGS. CONTRACTOR SHALL NOTIFY ENGINEER IF A
THRUST BLOCK CANNOT BE POURED FOR A FITTING.
28. ENGINEER WILL PROVIDE ELECTRONIC FILE SHOWING PIPELINE
ALIGNMENT IN COORDINATES TO USE FOR PIPELINE STAKING.
29. CONTRACTOR SHALL COORDINATE ALL RESTORATION EFFORTS WITH
THE OWNER AND AGENCIES HAVING JURISDICTION.
30. CONTRACTOR SHALL COORDINATE LOCATION OF NEW "DRY UTILITIES"
WITH THE APPROPRIATE UTILITY COMPANY, INCLUDING BUT NOT LIMITED
TO: TELEPHONE & INTERNET SERVICE, GAS SERVICE, CABLE, AND POWER.
31. ALL UNDERGROUND UTILITIES SHALL BE IN PLACE PRIOR TO
INSTALLATION OF CURB, GUTTER, SIDEWALK AND PAVING.
DATENO.
REVISION / ISSUE
/3/
:5 6 D
AX
EN
.S
MI
TH
Q
\U
T-
-2
2 P
IN
EV
IE
W R
EC
RE
AT
IO
N
SI
TE
S\
PR
OJ
EC
T
DA
TA
\S
HE
ET
_F
IL
ES
\_P
IN
EV
IE
W T
RA
IL
HE
AD
\E
NS
IG
N'
S
GE
NE
RA
L
SH
EE
TS
\G 3 G
EN
ER
AL
N
OT
ES
.D W
G;
GENERAL NOTES
12/7/2023
G4
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
/3/
:5 6 D
AX
EN
.S
MI
TH
Q
\U
T-
-2
2 P
IN
EV
IE
W R
EC
RE
AT
IO
N
SI
TE
S\
PR
OJ
EC
T
DA
TA
\S
HE
ET
_F
IL
ES
\_P
IN
EV
IE
W T
RA
IL
HE
AD
\E
NS
IG
N'
S
GE
NE
RA
L
SH
EE
TS
\G 3 G
EN
ER
AL
N
OT
ES
.D W
G;
(R04)
INTERMOUNTAIN
UINTA-WASATCH-CACHE
NATIONAL FOREST
OGDEN RANGER DISTRICT
R. ROUSSELLE
GH/CD/MS
RR/FD
PENDING
FS090523_R102013_L1-002.dwg
PINEVIEW RESERVOIR
RECREATION COMPLEX
RECONSTRUCTION
-PHASE 2
PINEVIEW TRAILHEAD
CALL BLUESTAKES
@ 811 AT LEAST 48 HOURS
PRIOR TO THE
COMMENCEMENT OF ANY
CONSTRUCTION.Know what's below.
before you dig.Call
R
9803098-2202
PRICE
U
PR
OF
ESSIONAL ENGINEER
TO F
A H
ETATS
CONCRETE NOTES
1. UNLESS OTHERWISE NOTED, ALL ON-GRADE CONCRETE WILL BE
PLACED ON A MINIMUM 6-INCH GRAVEL BASE OVER A WELL COMPACTED
(95% DENSITY PER ASTM D-1557) SUB GRADE.
2. REFER TO GENERAL STRUCTURAL NOTES FOR ADDITIONAL CONCRETE
NOTES.
TRAFFIC CONTROL AND SAFETY NOTES
1. THE CONTRACTOR SHALL BE REQUIRED TO PROVIDE ALL FLAGGING,
BARRICADES, AND TRAFFIC CONTROL AS MAY BE NECESSARY TO ENSURE
SAFETY TO THE GENERAL PUBLIC DURING CONSTRUCTION. A TRAFFIC
CONTROL PLAN SHALL BE DEVELOPED BY THE CONTRACTOR AND
SUBMITTED TO THE AGENCIES HAVING JURISDICTION.
2. TRAFFIC CONTROL, BARRICADES, DETOURING, AND STRIPING TO
CONFORM TO THE CURRENT MANUAL OF UNIFORM TRAFFIC CONTROL
DEVICES (M.U.T.C.D.).
3. NO STREET SHALL BE CLOSED TO TRAFFIC WITHOUT WRITTEN
PERMISSION FROM THE APPROPRIATE AGENCY, EXCEPT WHEN DIRECTED
BY LAW ENFORCEMENT OR FIRE OFFICIALS.
4. THE CONTRACTOR SHALL MAKE EVERY EFFORT TO PROVIDE FOR
SMOOTH TRAFFIC FLOW AND SAFETY. ACCESS SHALL BE MAINTAINED FOR
ALL PROPERTIES ADJACENT TO THE WORK.
5. DETOURING OPERATIONS FOR A PERIOD OF SIX CONSECUTIVE
CALENDAR DAYS, OR MORE, REQUIRE THE INSTALLATION OF TEMPORARY
STREET STRIPING AND REMOVAL OF INTERFERING STRIPING BY
SANDBLASTING. THE DETOURING STRIPING PLAN OR CONSTRUCTION
TRAFFIC CONTROL PLAN MUST BE SUBMITTED TO THE CITY TRAFFIC
ENGINEER OR LOCAL JURISDICTION OF AUTHORITY FOR REVIEW AND
APPROVAL.
6. ALL TRAFFIC CONTROL DEVICES SHALL BE RESTORED TO THEIR
ORIGINAL CONDITION AT THE END OF THE WORK TO THE SATISFACTION OF
THE COUNTY TRAFFIC ENGINEER OR LOCAL JURISDICTION OF AUTHORITY.
7. TRAFFIC CONTROL DEVICES (TCDS) SHALL REMAIN VISIBLE AND
OPERATIONAL AT ALL TIMES.
8. ALL PERMANENT TCDS CALLED FOR HEREON SHALL BE IN PLACE AND
IN FINAL POSITION PRIOR TO ALLOWING ANY PUBLIC TRAFFIC ONTO THE
PORTIONS OF THE ROAD(S) BEING IMPROVED HEREUNDER, REGARDLESS OF
THE STATUS OF COMPLETION OF PAVING OR OTHER OFF-SITE
IMPROVEMENTS CALLED FOR BY THESE PLANS.
9. THE CONTRACTOR SHALL PROVIDE BARRICADES, SIGNS, FLASHERS,
OTHER EQUIPMENT AND FLAG PERSONS NECESSARY TO ENSURE THE
SAFETY OF WORKERS AND VISITORS.
GRADING AND DRAINAGE NOTES
1. SITE GRADING SHALL BE PERFORMED IN ACCORDANCE WITH THESE
PLANS AND SPECIFICATIONS AND THE RECOMMENDATIONS SET FORTH IN
THE GEOTECHNICAL REPORT AND ALL RELATED ADDENDUMS.
2. THE CONTRACTOR SHALL STRIP AND CLEAR THE TOPSOIL, MAJOR
ROOTS AND ORGANIC MATERIAL FROM ALL PROPOSED BUILDING, PIPELINES,
AND PAVEMENT AREAS PRIOR TO SITE GRADING. (THE TOPSOIL MAY BE
STOCKPILED FOR LATER USE IN LANDSCAPED AREAS.)
3. THE CONTRACTOR SHALL REMOVE ALL ORGANIC MATERIAL AND
OTHER DELETERIOUS MATERIALS PRIOR TO PLACING GRADING FILL OR
BASE COURSE. THE AREA SHOULD BE PROOF-ROLLED TO IDENTIFY ANY
SOFT AREAS. WHERE SOFT AREAS ARE ENCOUNTERED, THE CONTRACTOR
SHALL REMOVE THE SOIL AND REPLACE WITH COMPACTED FILL.
4. ALL DEBRIS PILES AND BERMS SHOULD BE REMOVED AND HAULED
AWAY FROM SITE OR USED AS GENERAL FILL IN LANDSCAPED AREAS.
5. THE CONTRACTOR SHALL CONSTRUCT THE BUILDING PAD TO THESE
DESIGN PLANS AS PART OF THE SITE GRADING CONTRACT.
6. THE CONTRACTOR SHALL BE RESPONSIBLE FOR DAMAGE AND DEBRIS
ON ADJACENT STREETS WHEN EQUIPMENT IS TRAVELING THOSE STREETS.
7. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO PERFORM
ALL NECESSARY CUTS AND FILLS WITHIN THE LIMITS OF THIS PROJECT AND
THE RELATED OFF-SITE WORK, SO AS TO GENERATE THE DESIRED
SUBGRADE, FINISH GRADES, AND SLOPES SHOWN.
8. THE CONTRACTOR IS WARNED THAT AN EARTHWORK BALANCE WAS
NOT NECESSARILY THE INTENT OF THIS PROJECT. ANY ADDITIONAL
MATERIAL REQUIRED OR LEFTOVER MATERIAL FOLLOWING EARTHWORK
OPERATIONS BECOMES THE RESPONSIBILITY OF THE CONTRACTOR AND
SHALL BE UTILIZED ONSITE AT LOCATIONS COORDINATED WITH OWNER.
9. ALL CUT AND FILL SLOPES SHALL BE PROTECTED UNTIL EFFECTIVE
EROSION CONTROL HAS BEEN ESTABLISHED.
10. THE USE OF DRINKING WATER WITHOUT A SPECIAL PERMIT FOR
BUILDING OR CONSTRUCTION PURPOSES INCLUDING CONSOLIDATION OF
BACKFILL OR DUST CONTROL IS PROHIBITED. THE CONTRACTOR SHALL
OBTAIN ALL NECESSARY PERMITS FOR CONSTRUCTION WATER FROM
GOVERNING AGENCY.
11. THE CONTRACTOR SHALL MAINTAIN THE STREETS, ROADS,
SIDEWALKS, AND ALL OTHER PUBLIC RIGHTS-OF-WAY IN A CLEAN, SAFE AND
USABLE CONDITION. ALL SPILLS OF SOIL, ROCK OR CONSTRUCTION DEBRIS
SHALL BE PROMPTLY REMOVED AND DISPOSED OF IN A LAWFUL MANNER
FROM THE PUBLICLY-OWNED PROPERTY DURING CONSTRUCTION AND UPON
COMPLETION OF THE PROJECT. ALL ADJACENT PROPERTY, PRIVATE OR
PUBLIC, SHALL BE MAINTAINED IN A CLEAN, SAFE, AND USABLE CONDITION.
12. TOPSOIL SHALL BE REPLACED AND GRADED PRIOR TO REVEGETATION.
THE CONTRACTOR IS RESPONSIBLE FOR DETERMINING THE DEPTH OF
EXISTING TOPSOIL AND REPLACING THE EXISTING TOPSOIL DEPTH.
DISTURBED AREAS SHALL BE RESEEDED USING A SEED MIX SPECIFIED ON
THE EROSION CONTROL PLAN OR LANDSCAPE PLAN AND DETAILS.
13. IMPROVEMENT ELEVATION LABELS AND ELEVATION CONTOURS
REFERENCE FINISH ELEVATIONS. REFER TO ABBREVIATIONS AND SYMBOL
LEGEND INCLUDED HEREIN.
EROSION CONTROL NOTES
1. PER UDEQ, STORM WATER GENERAL PERMIT FOR CONSTRUCTION
ACTIVITIES GENERAL PERMIT NO. UTR 300000, CONSTRUCTION ACTIVITY
INCLUDING CLEARING, GRADING, EXCAVATION, AND DEMOLITION THAT
DISTURBS ONE OR MORE ACRES OF LAND SHALL REQUIRE INCLUSION IN
THE GENERAL PERMIT AND COMPLY WITH THE REQUIREMENTS THEREIN.
2. THE TOTAL PROJECT AREA OF DISTURBANCE IS GREATER THAN 1
ACRE; THEREFORE, AN UPDES STORM WATER PERMIT IS REQUIRED.
3. THE CONTRACTOR SHALL OBTAIN A STORM WATER PERMIT FOR THIS
PROJECT, IF APPLICABLE, AND MAINTAIN A STORM WATER POLLUTION
PREVENTION PLAN (SWPPP) ON SITE DURING ALL PHASES OF
CONSTRUCTION.
4. THE PRIME CONTRACTOR SHALL ASSUME FULL RESPONSIBILITY FOR
COMPLIANCE WITH GENERAL PERMIT.
5. THE EROSION CONTROL PLAN HEREIN IS FOR PERMITTING PURPOSES
ONLY. THE CONTRACTOR SHALL REVISE THE EROSION CONTROL PLAN TO
FIT SPECIFIC SITE CONDITIONS AS REQUIRED TO MEET THE REQUIREMENTS
AND CONDITIONS OF THE PERMIT.
6. THE CONTRACTOR SHALL BE RESPONSIBLE FOR COMPLIANCE WITH
THE PERMIT THROUGHOUT CONSTRUCTION AND UNTIL THE NOTICE OF
TERMINATION (NOT) IS ISSUED BY UDEQ. THE CONTRACTOR SHALL BE
FAMILIAR WITH ALL PERMIT REQUIREMENTS.
7. MAINTAIN DUST CONTROL WITH WATER AND/OR DUST PALLIATIVE AT
ALL TIMES. PROVIDE SUFFICIENT LABOR, EQUIPMENT, AND MATERIALS
ONSITE TO MAINTAIN DUST CONTROL WHEN CONDITIONS REQUIRE.
SPECIAL INSPECTION AS PER IBC
1. REFER TO STRUCTURAL SPECIAL INSPECTION SHEETS FOR SPECIAL
INSPECTIONS REQUIRED BY THE INTERNATIONAL BUILDING CODE.
DESIGN CRITERIA
1. REFER TO GENERAL STRUCTURAL NOTES SHEETS FOR PROJECT
DESIGN CRITERIA.
DEFERRED SUBMITTALS
* PAVILION DRAWINGS AND STRUCTURAL CALCULATIONS FOR
STRUCTURES, FOOTINGS, AND ANCHOR BOLTS
* FINAL PREFABRICATED BUILDING DRAWINGS AND STRUCTURAL
CALCULATIONS FOR STRUCTURES
* HYDRODYNAMIC SEPARATOR FINAL DRAWINGS AND CALCULATIONS.
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
/3/
:5 6 D
AX
EN
.S
MI
TH
Q
\U
T-
-2
2 P
IN
EV
IE
W R
EC
RE
AT
IO
N
SI
TE
S\
PR
OJ
EC
T
DA
TA
\S
HE
ET
_F
IL
ES
\_P
IN
EV
IE
W T
RA
IL
HE
AD
\E
NS
IG
N'
S
GE
NE
RA
L
SH
EE
TS
\G 3 G
EN
ER
AL
N
OT
ES
.D W
G;
(R04)
INTERMOUNTAIN
UINTA-WASATCH-CACHE
NATIONAL FOREST
OGDEN RANGER DISTRICT
R. ROUSSELLE
GH/CD/MS
RR/FD
PENDING
FS090523_R102013_L1-002.dwg
PINEVIEW RESERVOIR
RECREATION COMPLEX
RECONSTRUCTION
-PHASE 2
PINEVIEW TRAILHEAD
CALL BLUESTAKES
@ 811 AT LEAST 48 HOURS
PRIOR TO THE
COMMENCEMENT OF ANY
CONSTRUCTION.Know what's below.
before you dig.Call
R
DATENO.
REVISION / ISSUE
/3/
:5 6 D
AX
EN
.S
MI
TH
Q
\U
T-
-2
2 P
IN
EV
IE
W R
EC
RE
AT
IO
N
SI
TE
S\
PR
OJ
EC
T
DA
TA
\S
HE
ET
_F
IL
ES
\_P
IN
EV
IE
W T
RA
IL
HE
AD
\E
NS
IG
N'
S
GE
NE
RA
L
SH
EE
TS
\G 3 G
EN
ER
AL
N
OT
ES
.D W
G;
GENERAL NOTES
12/7/2023
G5
9803098-2202
PRICE
U
PR
OF
ESSIONAL ENGINEER
TO F
A H
ETATS
REVISION / ISSUE
/7/
:1 0 M
AC
KE
LL
E.
HE
ND
RI
X
Q:
\!2
2\U
T-
-2
2 P
IN
EV
IE
W R
EC
RE
AT
IO
N
SI
TE
S\
PR
OJ
EC
T
DA
TA
\S
HE
ET
_F
IL
ES
\_P
IN
EV
IE
W T
RA
IL
HE
AD
\E
NS
IG
N'
S
GE
NE
RA
L
SH
EE
TS
\G 4 C
IV
IL
F
OR
MS
.D
W G;
CIVIL FORMS
12/7/2023
G6
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
/7/
:1 0 M
AC
KE
LL
E.
HE
ND
RI
X
Q:
\!2
2\U
T-
-2
2 P
IN
EV
IE
W R
EC
RE
AT
IO
N
SI
TE
S\
PR
OJ
EC
T
DA
TA
\S
HE
ET
_F
IL
ES
\_P
IN
EV
IE
W T
RA
IL
HE
AD
\E
NS
IG
N'
S
GE
NE
RA
L
SH
EE
TS
\G 4 C
IV
IL
F
OR
MS
.D
W G;
(R04)
INTERMOUNTAIN
UINTA-WASATCH-CACHE
NATIONAL FOREST
OGDEN RANGER DISTRICT
R. ROUSSELLE
GH/CD/MS
RR/FD
PENDING
FS090523_R102013_L1-002.dwg
PINEVIEW RESERVOIR
RECREATION COMPLEX
RECONSTRUCTION
-PHASE 2
PINEVIEW TRAILHEAD
9803098-2202
PRICE
U
PR
OF
ESSIONAL ENGINEER
TO F
A H
ETATS
REVISION / ISSUE
/7/
:1 0 M
AC
KE
LL
E.
HE
ND
RI
X
Q:
\!2
2\U
T-
-2
2 P
IN
EV
IE
W R
EC
RE
AT
IO
N
SI
TE
S\
PR
OJ
EC
T
DA
TA
\S
HE
ET
_F
IL
ES
\_P
IN
EV
IE
W T
RA
IL
HE
AD
\E
NS
IG
N'
S
GE
NE
RA
L
SH
EE
TS
\G 4 C
IV
IL
F
OR
MS
.D
W G;
CIVIL FORMS
12/7/2023
G7
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
/7/
:1 0 M
AC
KE
LL
E.
HE
ND
RI
X
Q:
\!2
2\U
T-
-2
2 P
IN
EV
IE
W R
EC
RE
AT
IO
N
SI
TE
S\
PR
OJ
EC
T
DA
TA
\S
HE
ET
_F
IL
ES
\_P
IN
EV
IE
W T
RA
IL
HE
AD
\E
NS
IG
N'
S
GE
NE
RA
L
SH
EE
TS
\G 4 C
IV
IL
F
OR
MS
.D
W G;
(R04)
INTERMOUNTAIN
UINTA-WASATCH-CACHE
NATIONAL FOREST
OGDEN RANGER DISTRICT
R. ROUSSELLE
GH/CD/MS
RR/FD
PENDING
FS090523_R102013_L1-002.dwg
PINEVIEW RESERVOIR
RECREATION COMPLEX
RECONSTRUCTION
-PHASE 2
PINEVIEW TRAILHEAD
9803098-2202
PRICE
U
PR
OF
ESSIONAL ENGINEER
TO F
A H
ETATS
REVISION / ISSUE
9/2 2/2
3 1 5:
Z
AC
K.
HU
LS
EY
Q
\U
T-
-2
2 P
IN
EV
IE
W R
EC
RE
AT
IO
N
SI
TE
S\
PR
OJ
EC
T
DA
TA
\S
HE
ET
_F
IL
ES
\_P
IN
EV
IE
W T
RA
IL
HE
AD
\E
NS
IG
N'
S
GE
NE
RA
L
SH
EE
TS
\G 5 S
PE
CI
AL
IN
SP
EC
TI
ON
F
OR
MS
.D
W G;
SPECIAL INSPECTION
FORMS
12/7/2023
G8
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
9/2 2/2
3 1 5:
Z
AC
K.
HU
LS
EY
Q
\U
T-
-2
2 P
IN
EV
IE
W R
EC
RE
AT
IO
N
SI
TE
S\
PR
OJ
EC
T
DA
TA
\S
HE
ET
_F
IL
ES
\_P
IN
EV
IE
W T
RA
IL
HE
AD
\E
NS
IG
N'
S
GE
NE
RA
L
SH
EE
TS
\G 5 S
PE
CI
AL
IN
SP
EC
TI
ON
F
OR
MS
.D
W G;
(R04)
INTERMOUNTAIN
UINTA-WASATCH-CACHE
NATIONAL FOREST
OGDEN RANGER DISTRICT
R. ROUSSELLE
GH/CD/MS
RR/FD
PENDING
FS090523_R102013_L1-002.dwg
PINEVIEW RESERVOIR
RECREATION COMPLEX
RECONSTRUCTION
-PHASE 2
PINEVIEW TRAILHEAD
9803098-2202
PRICE
U
PR
OF
ESSIONAL ENGINEER
TO F
A H
ETATS
REVISION / ISSUE
9/2 2/2
3 1 5:
Z
AC
K.
HU
LS
EY
Q
\U
T-
-2
2 P
IN
EV
IE
W R
EC
RE
AT
IO
N
SI
TE
S\
PR
OJ
EC
T
DA
TA
\S
HE
ET
_F
IL
ES
\_P
IN
EV
IE
W T
RA
IL
HE
AD
\E
NS
IG
N'
S
GE
NE
RA
L
SH
EE
TS
\G 5 S
PE
CI
AL
IN
SP
EC
TI
ON
F
OR
MS
.D
W G;
SPECIAL INSPECTION
FORMS
12/7/2023
G9
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
9/2 2/2
3 1 5:
Z
AC
K.
HU
LS
EY
Q
\U
T-
-2
2 P
IN
EV
IE
W R
EC
RE
AT
IO
N
SI
TE
S\
PR
OJ
EC
T
DA
TA
\S
HE
ET
_F
IL
ES
\_P
IN
EV
IE
W T
RA
IL
HE
AD
\E
NS
IG
N'
S
GE
NE
RA
L
SH
EE
TS
\G 5 S
PE
CI
AL
IN
SP
EC
TI
ON
F
OR
MS
.D
W G;
(R04)
INTERMOUNTAIN
UINTA-WASATCH-CACHE
NATIONAL FOREST
OGDEN RANGER DISTRICT
R. ROUSSELLE
GH/CD/MS
RR/FD
PENDING
FS090523_R102013_L1-002.dwg
PINEVIEW RESERVOIR
RECREATION COMPLEX
RECONSTRUCTION
-PHASE 2
PINEVIEW TRAILHEAD
9803098-2202
PRICE
U
PR
OF
ESSIONAL ENGINEER
TO F
A H
ETATS
SCHEDULE OF ITEMS DESCRIPTION OF WORK
THIS PROJECT INCLUDES ALL LABOR, MATERIALS AND EQUIPMENT TO CONSTRUCT THE EXISTING PINEVIEW TRAILHEAD DAY USE AREA AT PINEVIEW RESERVOIR NEAR HUNTSVILLE, UT. THE SITE IS OWNED BY THE OGDEN RANGER DISTRICT OF THE UINTA WASATCH, CACHE NATIONAL FOREST. THE
WORK INCLUDES:
- REMOVAL AND DISPOSAL OF EXISTING STRUCTURES AND SITE FURNISHINGS.
- OBLITERATING, SCARIFYING, AND REGRADING EXISTING ROADWAYS AND PATHS.
- CONSTRUCTION OF STORM DRAINAGE IMPROVEMENTS: CULVERTS, FLARED END SECTIONS,
TRASH RACKS, CATCH BASINS, TREATMENT DEVICES, AND DRAINAGE CHANNELS.
- CONSTRUCTION OF ROCK RIP RAP SLOPE PROTECTION.
- CONSTRUCTION OF CONCRETE STAIRS.
- CONSTRUCTION OF PRECAST CONCRETE VAULT COMFORT STATIONS.
- CONSTRUCTION OF A NEW PARKING LOT AREA.
- CONSTRUCTION OF TRAILER PARKING.
- CONSTRUCTION OF ROCKERY WALLS.
- CONSTRUCTION OF SIDEWALKS, TRAILS, AND BEACH ACCESS.
- CONSTRUCTION OF PAVILIONS (I.E. SHADE STRUCTURES) WITH PICNIC AND UTILITY TABLES.
ITEMS TO BE SALVAGED:
- NOT APPLICABLE
OPTIONAL WORK THAT MAY BE AWARDED INCLUDES:
- NOT APPLICABLE
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
/7/
:1 4 Z
AC
H.
SC
OT
T Q:
\!2
2\U T-
-2 2 P
IN
EV
IE
W
R
EC
RE
AT
IO
N
SI
TE
S\
PR
OJ
EC
T
DA
TA
\S
HE
ET
_F
IL
ES
\_P
IN
EV
IE
W
T
RA
IL
HE
AD
\E
NS
IG
N' S
GE
NE
RA
L
SH
EE
TS
\U
PD
AT
ED
9-
-2
3\G
S
CH
ED
UL
E
OF
IT
EM
S
AN
D
DE
SC
RI
PT
IO
N
OF
W
OR
K.
DW
G;
(R04)
INTERMOUNTAIN
UINTA-WASATCH-CACHE
NATIONAL FOREST
OGDEN RANGER DISTRICT
R. ROUSSELLE
GH/CD/MS
RR/FD
PENDING
FS090523_R102013_L1-002.dwg
PINEVIEW RESERVOIR
RECREATION COMPLEX
RECONSTRUCTION
-PHASE 2
PINEVIEW TRAILHEAD
DATENO.
REVISION / ISSUE
SCHEDULE OF ITEMS
AND DESCRIPTION OF
WORK
12/7/2023
G10
ADDENDUM #1 6-5-25
06/06/2025
| ATTACHMENT 7 - DRAWING-BASE PINEVIEW TRAILHEAD |
| Sheets and Views |
| G1 COVER SHEET |
| G2 INDEX OF SHEETS |
| G3 ABBREVIATIONS AND LABELS |
| G4 GENERAL NOTES |
| G5 GENERAL NOTES |
| G6 CIVIL FORMS |
| G7 CIVIL FORMS |
| G8 SPECIAL INSPECTION FORMS |
| G9 SPECIAL INSPECTION FORMS |
| G10 SCHEDULE OF ITEMS AND DESCRIPTION OF WORK |
File details come from the government source that posted it. Updated .