A0003 SOI for GAOA East Animas DM.xlsx
XLSX spreadsheet 14 KB Posted
- Attached to
- GAOA East Animas Bunkhouses Deferred Maintenance
- Solicitation number
- 1282B124R0042
- Issued by
-
Department of Agriculture Forest Service
About this file
This document is a Schedule of Items (SOI) for the GAOA East Animas Bunkhouses Deferred Maintenance project. The SOI lists the base items and optional items for this project, which includes work on the bunkhouses, modular buildings, and site. The base items cover roof replacement, toilet replacement, exterior staining, deck repair, and plumbing/electrical work on the bunkhouses, as well as roof maintenance, flooring replacement, and shower unit replacements on the modular buildings. The optional items include parking lot resurfacing, lighting upgrades, and installation of instant hot water heaters.
The related federal contract opportunity is a pre-solicitation notice for the GAOA East Animas Bunkhouses Deferred Maintenance project. The anticipated contract is a firm fixed price contract, with a total small business set-aside. The work needs to be completed during the off-season before the first snow. The anticipated magnitude of the project is between $100,000 and $250,000. Interested small businesses are encouraged to submit a Statement of Capability to the Contracting Officer within 15 days of the synopsis posting.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| A0003.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WORK ITEMS
| Schedule of Items |
| USFS - San Juan National Forest |
PROJECT TITLE: GAOA East Animas Bunkhouses Deferred Maintenance Contractor: SAM ID#:
| SCHEDULE OF ITEMS | ||||||
| ITEM | ||||||
| NUMBER | DESCRIPTION | PAY UNIT | EST QTY | UNIT COST | TOTAL | |
| BASE ITEMS | ||||||
| 1 | Mobilization & Bonds | LS | ||||
| 2 | Profit and overhead | LS | ||||
| SITE ITEMS-BASE | ||||||
| 3 | 5025 gallon underground water tank | LS | 1 | |||
| 4 | Underground water tank install and plumbing costs | LS | 1 | |||
| EA BUNKHOUSE ITEMS-BASE | ||||||
| 5 | Bunkhouse roof replacement | LS | 1 | |||
| 6 | Toilet replacement | LS | 1 | |||
| 7 | Exterior staining | LS | 1 | |||
| 8 | Deck repair and refinishing | LS | 1 | |||
| 9 | Filter plumbing/electrical | LS | 1 | |||
| EA MODULAR ITEMS-BASE | ||||||
| 10 | Roof maintenance | LS | 1 | |||
| 11 | Toilet replacement | LS | 1 | |||
| 12 | Vinyl tile and trim replacement | LS | 1 | |||
| 13 | Carpet flooring replacement | LS | 1 | |||
| 14 | Broken shower unit replacements | LS | 1 | |||
| OPTIONAL ITEMS | ||||||
| SITE ITEMS- OPTIONAL | ||||||
| 15 | Mobilization | LS | 1 | |||
| 16 | Parking lot resurfacing | LS | 1 | |||
| EA BUNKHOUSE ITEMS- OPTIONAL | ||||||
| 17 | Mobilization | LS | 1 | |||
| 18 | Removal and install of recessed lighting/emergency signs | LS | 1 | |||
| 19 | Installation of instant hot water heaters | LS | 1 | |||
| EA MODULAR ITEMS- OPTIONAL | ||||||
| 20 | Mobilization | LS | 1 | |||
| 21 | Upgrade Ceramic tile install instead of Vinyl tile | LS | 1 | ` | ||
| 22 | Removal and install of recessed lighting/emergency signs | LS | 1 | |||
| 23 | Installation of instant hot water heaters | LS | 1 | |||
| 24 | Extra shower unit replacements | LS | 1 |
| Total WITHOUT optional items |
| Total WITH ALL optional items |