A0002_1282B123R0008_Final_S.pdf

PDF 228 KB Posted

Attached to
Forest Wide Toilet Replacements, Helena-Lewis & Clark Nat Forest
Solicitation number
1282B123R0008
Issued by

About this file

This document is an amendment to a solicitation for replacing eight concrete vault toilets across seven locations on the Helena-Lewis and Clark National Forest. The amendment extends the proposal due date to March 2nd, 2023 at 1200 Eastern Time. It also provides responses to additional questions from offerors. The contractor will be responsible for removing existing toilets, including pumping existing vaults, and installing new vault toilets. Tree removal will be allowed if necessary for removal with approval from the contracting officer. Pricing and payment for tree removal is considered incidental to the toilet installation. All other terms and conditions of the solicitation remain unchanged.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

1282B123R0008 x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

82B1

WASHINGTON DC 20250-0001

1400 INDEPENDENCE AVE SW MS-1138

SPOC INTERMOUNTAIN

USDA FOREST SERVICE

BIL_GAOA02/07/20230002

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

01/25/2023

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Amendment POC: Lucas Dahlman/Contracting Officer Email: lucas.dahlman@usda.gov

The Purpose of this Amendment is to:

1. Extend the Proposal Due date to March 2nd, 2023 at 1200 Eastern Time

2. Provide responses to the additional questions.

3. All other terms and conditions remain unchanged.

See Summary of Changes

Continued ...

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

LUCAS J. DAHLMAN

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

2-7-2023

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

2 3

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

1282B123R0008/0002

Period of Performance: 07/01/2023 to 09/30/2024

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

Summary of Changes

1. Extend proposal due date to March 2nd, 2023 at 1200 ET

2. Respond to additional Questions and provide answers as stated below:

Question: It looks like all but one have an existing vault underneath. Will we be responsible for pumping the vault prior to removal?

Answer Yes

Question: One toilet looks to be a pit toilet; will it need to be over excavated and have the remaining soil tested for contamination?

Answer No

Question: Where the existing toilets are removed and reclaimed, will we be responsible for grass seed and weed control?

Answer No

Question: How will the presence of rock be addressed when the new toilet is not being installed in the same location as the existing as these sites are also currently snow covered and no geotechnical reports were provided?

Answer The presence of rocks is likely but we have not experienced sites that have been too rocky for an excavator. If bedrock is encounter it will be addressed at the time of its discovery.

Question: Will tree removal be allowed to facilitate the removal of the existing toilets in locations such as the forest lake cabin site and if so how will the removals of trees be paid?

Answer Tree removal will be allowed if required and upon approval of the CO. Tree removal shall be incidental to the toilet installation.

3. All other terms and conditions remain unchanged.

1282B123R0008
Summary of Changes
2023-02-07T14:12:56-0600
LUCAS DAHLMAN