J.14_ProposalReChklst_1282AT19R0003.docx
DOCX document 27 KB Posted
- Attached to
- BRD Toilet Pumping IDIQ 2019 Federal contract opportunity
- Solicitation number
- 1282AT19R0003
About this file
J.14_Proposal Response Checklist (Attachments)
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 0._1282AT19R0003-0002,_SF30.pdf | ||
| J.1_SectB_-_SOI_1282AT19R0003-0001_Fill-In.xlsx | XLSX spreadsheet | |
| 0._Sections_B-M,_1282AT19R0003-0001.pdf | ||
| 0._1282AT19R0003-0001,_SF30.pdf | ||
| J.6_Photos_SourdoughTH.pdf | ||
| J.12_DesofReps.doc | DOC document | |
| J.1_SectB_-_SOI_1282AT19R0003_Fill-In.xlsx | XLSX spreadsheet | |
| J.3_Photos_BrainardGatewayTH.pdf | ||
| J.9_Photos_SouthSt.VrainPicnic.pdf | ||
| J.2_MAP_BRDToiletPumpingMxs2019.pdf | ||
| J.10_WD_15-5415,_v9,_12262018.pdf | ||
| J.11_FS_6300-27,_Experience_Questionnaire.docx | DOCX document | |
| J.16_SubkApproval_fs_6300-11.docx | DOCX document | |
| J.4_Photos_ForsytheCanyonTH.pdf | ||
| J.7_Photos_RainbowTH.pdf | ||
| J.5_Photos_EastPortalTH.pdf | ||
| 0._1282AT19R0003,_SF1449_and_Terms.pdf | ||
| J.13_Biobased_Statement_Letter.docx | DOCX document | |
| J.8_Photos_MeekerParkPG.pdf | ||
| J.15_SOL._TITLE_PAGE(s)_1282AT19R0003.docx | DOCX document |
Show all 20
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Proposal Response Checklist Project Title: BRD Toilet Pumping IDIQ 2019 Solicitation No. 1282AT19R0003
In accordance with Section L of the solicitation, the following items are required for the Offeror to be determined responsive. This checklist should be completed (check the boxes and complete the company information) showing that all the proposal elements have been addressed are contained within the proposal package. Return this checklist with the proposal package.
| Item No. |
| Proposal Element Title / |
Responsive RequirementsType Here
All Actions Complete for Element
| 0. |
| Contractor Proposal Response Checklist Company Name:___________________________________________ |
Type Here
POC Name: _______________________________________________ Type Here
POC Email: ______________________________________________
| 1. |
| Standard Form 1449 |
☐ Item 17(a) Includes: Company Name, Company Address, Company Phone No., Company DUNS No., POC Name, Email and Phone (if Different from Company Number).
☐ Items 30 a – c (Must be completed by signatory with the authority to commit the contractor to this work for the Federal Government.)
☐ A title page is required for this proposal element. It can be provided separate but this proposal element must be labeled in accordance with its sequence number under Section L.1.3.1 of the solicitation terms.
| 2. |
| SOI_1282AT19R0003 (Fill-In) |
☐ Contractor Name in Top Right Corner of the Excel Spreadsheet ☐ Unit Pricing filled in on Excel.
☐ A title page is required for this proposal element. The Excel Spreadsheet in xls. format is required to be considered responsive to this solicitation.
| 3a. |
| Experience Questionnaire (Form 6300-27) |
☐ Complete the ENTIRE form (items 1-12). The following information is for clarification, as these are the areas that cause offerors to be non-responsive.
· DO NOT exceed the space given in any area of the form.
· NO other form or attachments to the form will be accepted or considered.
· Items 6 a-d. This section is applicable to company projects that are complete or still in progress. DO NOT exceed 5 projects. The projects must be within the last three (3) years and must be relevant to the work being contracted for this solicitation. For projects still in progress, input the project end date in accordance with the active contract.
· Items 7 a-f. This section will ONLY reflect the company’s OPEN project(s) that are running concurrently with the work contemplated for this solicitation and could conflict with the Offeror’s ability to perform this work.
· Items 10a-d. Persons on this form must be anticipated to have a role under the work required for this solicitation. At a minimum, the Key Personnel (identified under Section H and Proposal Element 3b) must be named in this section of the Questionnaire.
· 14a-c. Ensure this area is certified, including a signature and date.
Form 6300-11 will need to be included ONLY if the Offeror is using Subcontractors that will need to physically go onto the project site. Check box below if form is included.
| 3b. |
| Designation of Representative Form |
☐ Complete the ENTIRE form.
· DO NOT exceed the space given in any area of the form.
· NO other form or attachments to the form will be accepted or considered.
· Click in the red font “Type Here” areas to input the required information.
| 3c. |
| Bio Based/Sustainable Products Letter |
☐ Complete the ENTIRE form ONLY in the areas that apply.
· Only one box can apply under the Sustainable Products Statement of Intent Section. Click the box that applies. Additional information on the form is required if the utilization of non-designated products or biobased products will be utilized is checked.
· DO NOT exceed the space given in any area of the form.
· Click in the red font “Type Here” areas to input the required information.
| 3d. |
| Representations, Certifications and Other Statements |
☐ SAM Report OR ☐ Section K (complete and return only this Section) AND SAM Active Status (provide a print screen that shows the current status. Includes a memo stating when SAM credentials were entered and the anticipated active status)
Solicitation Title Page (Template/Example)
· Title pages are required for elements 1 through 3 of this proposal. Reference the example/template provided for that is required for this solicitation. If the offeror has their own, title pages, that is acceptable to the Government as long as it includes the minimum required information (Company Name, Solicitation No. and Title and Element No. and Title).
File details come from the government source that posted it.