Amendment 002 Request for Information 10 01 2020.pdf

PDF 243 KB Posted

Attached to
Angell Job Corps Center Wind Generator Systems Removal Federal contract opportunity
Solicitation number
1282A720Q0127
Issued by
Department of Agriculture Forest Service

View the file

Other files for this federal contract opportunity

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Amendment 002 Solicitation # 1282A720Q0127

Angell Job Corps Center Wind Generator Systems Removal

Request for Information 10/01/2020

1. Is the wind turbine a Xzeres Series 42 or 442 like in the link https://www.xzeres.com/?page_id=352 ?

The turbines are the 442 series, per Section 010150 of the SOW.

2. Are drawings of the poles available?

The center has the O&M manual that includes drawings of the poles and other installation details that is available during site visits and will be available to the successful offeror. Amendment 001 issued to provide electronic copy of O&M Manual.

3. What is the approximate weight of each 90’ pole?

Unknown. Amendment 001, O&M Manual indicates the approximate weights of the turbine components, but does not indicate the tower weight.

4. Are guy lines or other pole supports present?

There are no guy lines or other support present for the poles

5. Is the housing of the Xzeres turbine unit capable of holding the pole for a crane lift?

Refer to Amendment 001 , O&M Manual for allowable installation/removal procedures.

6. The concrete foundations stay. Is the contractor responsible for cutting the anchors flush on the concrete?

No.

7. The use of premises section 1.5.C says to keep driveways, parking areas, loading areas and entrances to buildings clear and available. Will the contractor be able to have a crane on the paved sections next to each pole?

The contractor will be allowed to have the crane on the paved section. Notification to the center needs to be made a day or two prior to the crane arrival so center staff can be notified to remain clear of the area.

8. Who owns the utility lines next to the unit seen on page 12 of the scope?

The center owns the utility lines. The contractor will be required to work around the lines.