J-2 Drawings 1282A720Q0006 Lyndon B Johnson Job Corps Center Roof Replacement & Make Up Air Units.pdf

PDF 2 MB Posted

Attached to
Lyndon B Johnson Job Corps Center Dining Hall Roof & Welding Shop Make Up Air Unit Replacement
Solicitation number
1282A720Q0006
Issued by

About this file

This document package includes construction drawings and specifications for a roof replacement and make-up air unit installation project at the Lyndon B. Johnson Job Corps Center. The project involves replacing the roof on the dining hall building and installing new make-up air units in the dining hall and welding shop. Drawings show the existing conditions and details of the roof and mechanical system removals and replacements. Specifications include general notes, schedules, details and photos of the project areas. The solicitation is for a project with an estimated value between $100,000 and $250,000 being conducted by the US Department of Agriculture Forest Service. The point of contact listed is Kent Gibson and the deadline for questions is not provided.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

T

C M

I C

H A

E L

C

U

S E

R S

T

C M

I C

H A

E L B

O X

C

D I J C

O R

P S

L Y

N D

O N

B

J O

H N

S O

N B

L D

G S

D

I N

I N

G H

A L L

C

U L I N

A R

Y M

A U

D

W G

S T

I T

L E

S

H E

E T

T

D

W G

SHEET

OF

DESIGNER

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.

SUB SHEET NO.

JOB CORPS

NATIONAL OFFICE

ROOF REPLACEMENT

AND MAKE UP AIR

UNITS

LYNDON B. JOHNSON

JOB CORPS

CIVILIAN CONSERVATION

CENTER

NATIONAL FORESTS OF

NORTH CAROLINA

01/2019 09

F

O

R

E

S T

SE

R

V

I

C

E

D E

P

A

R

T M

E N

T

OF AGR

I C

U

L

T

U R

E

DATE

UNITED STATES

DEPARTMENT OF AGRICULTURE

FOREST SERVICE

DATENO. REVISION / ISSUE

TITLE SHEET

T.MICHAEL

L.CARROLL

T1.0

PROJECT LOCATION

PROJECT ADDRESS

3170 WAYAH ROAD

FRANKLIN, NORTH CAROLINA, 28734

UNITED STATES DEPARTMENT OF AGRICULTURE

FOREST SERVICE

EASTERN REGION

ROOF REPLACEMENT AND MAKE UP

AIR UNITS

NATIONAL FORESTS IN

NORTH CAROLINA

LYNDON B. JOHNSON JOB CORPS

CONSERVATION CENTER

MACON COUNTY, NORTH CAROLINA

INDEX

SHEET SHEET

SUB

TITLE OF SHEET

1. T1.0 TITLE SHEET GENERAL

2. G1.1 CAMPUS PLAN AND PHOTOGRAPHS GENERAL

3. A1.1 ROOF PLAN DINING HALL

4. ME0.1 GENERAL REMOVAL NOTES, LEGENDS, GENERAL

AND EQUIPMENT SCHEDULES

5. ME1.1 MECHANICAL/ELECTRICAL PLAN DINING HALL

6. ME1.2 MECHANICAL/ELECTRICAL ROOF PLAN DINING HALL

7. ME1.3 PHOTOGRAPHS AND DETAILS DINING HALL

8. ME2.1 MECHANICAL/ELECTRICAL PLAN WELDING

9. ME2.2 PHOTOGRAPHS WELDING

PROJECT LOCATION

PROJECT LOCATION

BUILDING

74 - PICNIC PAVILION

10 - WASHINGTON HALL DORM

12 - KING HALL DORM

14 - JACKSON HALL DORM

16 - MCNAIR HALL DORM

18 - SCOTT HALL DORM

19 - STUDENT SUPPORT SERVICES

22 - GYMNASIUM

23 - DINING HALL

25 - SUPPLY WATER TREATMENT

28 - POOL WATER TREATMENT

30 - BUSINESS TECHNOLOGIES

34 - BRICK MASONRY

36 - CTP

46 - ADMINISTRATION

47 - WELLNESS

48 - FIRE CACHE

50 - SUPPLY WAREHOUSE

51 - LAUNDRY

54 - PAINT SHOP

58 - WELDING

61 - BRICK STORAGE

62 - DUTY OFFICE

55 - CONCRETE FINISHING

70 - VOCATIONAL OFFICE

BUILDINGS

STRUCTURES

SITE FEATURES

A - BASKETBALL COURT

71 - HAZMAT STORAGE

73 - POLESHED STORAGE

75 - GAZEBO

76 - GAZEBO

77 - GAZEBO

78 - GAZEBO

79 - GAZEBO

A

72 - STORAGE SHED

D

52- CARPENTRY

53 - FACILITY MAINTENANCE AND

80 - STUDENT LAUNDRY

D - VOLLEYBALL COURT

11 - DORMITORY

13 - CPP

15 - DORMITORY

17 - DORMITORY

24 - ADMIN/ACAD EDUC/STORAGE

CONSTRUCTION

81 - MALE DORMITORY

31 - RESIDENTIAL LIVING STORAGE

82 - SHELTER

CAMPUS PLAN

M

I C

H A

E L

C

U

S E

R S

T

C M

I C

H A

E L B

O X

C

D I J C

O R

P S

L Y

N D

O N

B

J O

H N

S O

N B

L D

G S

D

I N

I N

G H

A L L

C

U L I N

A R

Y M

A U

D

W G

S T

I T

L E

S

H E

E T

T

D

W G

SHEET

OF

DESIGNER

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.

SUB SHEET NO.

JOB CORPS

NATIONAL OFFICE

ROOF REPLACEMENT

AND MAKE UP AIR

UNITS

LYNDON B. JOHNSON

JOB CORPS

CIVILIAN CONSERVATION

CENTER

NATIONAL FORESTS OF

NORTH CAROLINA

01/2019 09

F

O

R

E

S T

SE

R

V

I

C

E

D E

P

A

R

T M

E N

T

OF AGR

I C

U

L

T

U R

E

DATE

UNITED STATES

DEPARTMENT OF AGRICULTURE

FOREST SERVICE

DATENO. REVISION / ISSUE

CAMPUS PLAN

AND

PHOTOGRAPHS

T.MICHAEL

L.CARROLL

G1.1

DINING

WELDING

PH1

A1.1

DINING ROOF AND EQUIPMENT

PH2

A1.1

DINING ROOF AND EQUIPMENT

PH3

A1.1

DINING ROOF AND EQUIPMENT

PH4

A1.1

DINING ROOF AND EQUIPMENT

PH5

A1.1

DINING ROOF AND EQUIPMENT

PH6

A1.1

DINING ROOF AND EQUIPMENT

GENERAL NOTES

1. PHOTOS SHOW EXISTING CONDITIONS SURROUNDING THE AREAS FOR NEW WORK. FIELD VERIFY CONDITIONS

PRIOR TO BEGINNING WORK. COORDINATE EQUIPMENT REMOVAL WITH MECHANICAL AND ELECTRICAL

DIVISION.

PH8

A1.1

DINING BUILDING

PH7

A1.1

DINING ROOF AND EQUIPMENT

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

MUA-1

LP

L P

L P

LP

LP

EXISTING FELT

EXISTING ASPHALT

SHINGLES

EXISTING SHEATHING

INSULATION

WOOD NAILERS

EDGE METAL, HOOK OVER CLEAT,

NAIL AT TOP TO BLOCKING

WIND CLEAT TO

HOLD EDGE

METAL

APRON FLASHING

HIP ROOF FLASHING DETAIL

ROOF REMOVAL PLAN

KEY NOTES

8 0 8 16

SCALE OF FEET

1/8" = 1'-0"

M

I C

H A

E L

C

U

S E

R S

T

C M

I C

H A

E L B

O X

C

D I J C

O R

P S

L Y

N D

O N

B

J O

H N

S O

N B

L D

G S

D

I N

I N

G H

A L L

C

U L I N

A R

Y M

A U

D

W G

S L B

J D

I N

I N

G M

E D

W G

SHEET

OF

DESIGNER

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.

SUB SHEET NO.

JOB CORPS

NATIONAL OFFICE

ROOF REPLACEMENT

AND MAKE UP AIR

UNITS

LYNDON B. JOHNSON

JOB CORPS

CIVILIAN CONSERVATION

CENTER

NATIONAL FORESTS OF

NORTH CAROLINA

01/2019 09

F

O

R

E

S T

SE

R

V

I C

E

D E

P

A

R

T M

E N

T

OF AGR

I C

U

L

T

U R

E

DATE

UNITED STATES

DEPARTMENT OF AGRICULTURE

FOREST SERVICE

DATENO. REVISION / ISSUE

ROOF PLAN

T.MICHAEL

L.CARROLL

A1.1

PH8

G1.1

PARTIAL ROOF PLAN WITH NEW MAKE UP AIR UNIT

8 0 8 16

SCALE OF FEET

1/8" = 1'-0"

EXISTING ROOF MOUNTED EQUIPMENT, TYPICAL.

EXISTING HIGH PRESSURE PROPANE GAS LINE TO EXISTING ROOFTOP HVAC UNITS.

MECHANICAL EQUIPMENT REMOVED UNDER MECHANICAL DIVISION. REMOVE ROOF

CURB.

REMOVE CAPPED ROOF CURB.

GAS PIPE AND VALVE, AND CURB REMOVED UNDER MECHANICAL DIVISION. REMOVE

ROOF CURB.

REMOVE CAPPED ROOF CURB,

COORDINATE LOCATION OF NEW MAKE-UP AIR UNIT AND CURB. FLASH AND

COUNTER FLASH CURB. NEW MAKE-UP AIR UNIT AND ROOF CURB INSTALLED

UNDER MECHANICAL DIVISION.

NEW GAS PIPE INSTALLED UNDER MECHANICAL DIVISION.

EXISTING HIP SHINGLE ROOF TO REMAIN. INSTALL WOOD BLOCKING. REMOVE AND

INSTALL NEW FLASHING BETWEEN HIP ROOF AND NEW ROOF. SEE DETAIL ON THIS

SHEET.

REMOVE BUILT-UP ROOF SYSTEM ON FLAT ROOF AREA. INSTALL RIGID INSULATION

WITH 1/8" SLOPED TAPERED INSULATION TO ACHIEVE R-30 OVERALL AVERAGE

ROOF INSULATION VALUE. INSTALL 1/4" SLOPE TAPERED INSULATION AT EQUIPMENT

FOR DRAINAGE.

EXISTING PLUMBING VENT, TYPICAL.

PH1

G1.1

PH2

G1.1

PH3

G1.1

PH4

G1.1

PH5

G1.1

PH6

G1.1

PH7

G1.1

GENERAL NOTES

1. EXISTING INFORMATION SHOWN ON THE DRAWINGS HAS BEEN TAKEN FROM LIMITED FIELD

OBSERVATIONS. FIELD VERIFY EXISTING CONDITIONS PRIOR TO BEGINNING WORK.

2. SEE PHOTOGRAPHS ON G1.1 FOR DINING ROOF AND ROOF MOUNTED EQUIPMENT.

3. COORDINATE MECHANICAL EQUIPMENT REMOVAL AND REINSTALLATION WITH MECHANICAL DIVISION.

4. PROVIDE AND INSTALL WALKWAY PADS TO ACCESS EQUIPMENT REQUIRING SERVICING. FIELD

COORDINATE ROOF ACCESS LOCATION AND WALKWAY PAD LOCATIONS WITH CONTRACTING OFFICER.

NOT TO SCALE

1. WORK INCLUDED IN THE CONTRACT IS DENOTED IN BOLD.

EXISTING CONDITIONS TO REMAIN ARE DENOTED LIGHTLY.

2. PROTECT STRUCTURE AND EQUIPMENT FROM DAMAGE.

IMMEDIATELY REPLACE OR REPAIR, TO ORIGINAL

CONDITION, DAMAGE CAUSED UNDER THIS CONTRACT.

3. EXISTING INFORMATION SHOWN ON THE DRAWINGS HAS

BEEN TAKEN FROM GOVERNMENT FURNISHED DRAWINGS

AND/OR LIMITED FIELD OBSERVATIONS.

4. DO NOT SHUT-OFF OR PUT-OUT OF SERVICE ANY SYSTEMS

OR SERVICE WITHOUT WRITTEN APPROVAL FROM THE

CONTRACTING OFFICER.

5. REMOVAL DRAWINGS MAY NOT SHOW EVERY ITEM TO BE

REMOVED. PRIOR TO BEGINNING REMOVAL WORK, VERIFY

EXISTING CONDITIONS AND NOTIFY CONTRACTING

OFFICER OF ANY DISCREPANCIES.

6. REWORK EXISTING TERMINATIONS, CONNECTIONS,

CONDUIT, WIRING, ETC. TO ACCEPT NEW WORK. MAINTAIN

CIRCUIT CONTINUITY TO EXISTING CIRCUITS AND DEVICES

TO REMAIN OR BE RELOCATED.

7. REMOVE ITEMS IN THEIR ENTIRETY INCLUDING ALL WIRING

AND EXPOSED CONDUIT AND CONDUIT SUPPORTS BACK

TO POINT OF ORIGIN OR NEXT DEVICE TO REMAIN.

8. REMOVAL OF CONDUITS ROUTED IN CONCRETE FLOOR

SLABS, CONCRETE WALLS OR CONCRETE CEILINGS: CUT

BACK FLUSH WITH CONCRETE. FILL WITH GROUT TO

ACHIEVE A SMOOTH AND EVEN FINISH FLUSH WITH

CONCRETE SURFACE AFTER CONDUCTORS HAVE BEEN

REMOVED.

9. REUSE EXISTING CONDUIT WHERE CURRENT NEC AND

LOCAL CODE REQUIREMENTS ARE MAINTAINED. PROVIDE

NEW CONDUIT AND WIRE FOR NEW INSTALLATIONS AND

EXTENSION OF EXISTING INSTALLATIONS. REUSE EXISTING

CONDUIT IN PLACE, DO NOT REINSTALL EXISTING

CONDUIT. PROVIDE LABELING PER SPECIFICATIONS FOR

REUSED CONDUIT.

10. CLEAN RELOCATED EQUIPMENT AND DEVICES OF ALL

FOREIGN MATERIAL. REPLACE EQUIPMENT OR DEVICES

WHICH ARE DEFECTIVE OR DAMAGED DURING

RELOCATION.

11. REMOVAL OF DEVICES, SWITCHES, MOTOR CONNECTIONS,

ETC. FROM WALLS WHICH ARE REMAINING: PATCH WALLS

TO MATCH ORIGINAL FINISH. BLANK COVERPLATES OVER

EXISTING BOXES ARE ACCEPTABLE.

REMOVAL GENERAL NOTES:

MECHANICAL AND ELECTRICAL

BACKDRAFT DAMPER

MANUAL VOLUME DAMPER

MECHANICAL LEGEND

BDD

(NOT ALL ITEMS LISTED ARE INCLUDED IN PROJECT)

T

THERMOSTAT

WP

GFI

WEATHER PROOF COVER

FUSED DISCONNECT SWITCH

GROUND FAULT CIRCUIT INTERRUPTER

MOTOR

j

J

S

ELECTRICAL PANEL

120 VOLT JUNCTION BOX, LOCATED IN CEILING

120 VOLT JUNCTION BOX

120 VOLT FLOOR DUPLEX RECEPTACLE

120 VOLT DUPLEX RECEPTACLE

TIME CLOCK

1-WAY SWITCH

DISCONNECT SWITCH

TC

M ELECTRIC METER

ELECTRICAL LEGEND

(NOT ALL ITEMS LISTED ARE INCLUDED IN PROJECT)

PH1

ME1.4 BOTTOM # INDICATES DRAWING SHOWN ON

TOP # INDICATES PHOTOGRAPH NUMBER

PHOTOGRAPH REFERENCE

OR BACK REFERENCE

ELECTRICAL CIRCUIT, MINIMUM #12

AWG UNLESS OTHERWISE NOTED

# INDICATES PANEL AND CIRCUIT

B2

BOTTOM NUMBER CFM

TOP # IS LABEL

CEILING GRILLE

TOP # IS LABEL

R-1

200 CEILING DIFFUSER

G-1

G-1

TOP # IS LABEL

WALL GRILLE

BOTTOM NUMBER CFM

TOP # IS LABEL

REGISTER

R-1

RETURN/EXHAUST DUCT DOWN

SUPPLY DUCT DOWN

RETURN/EXHAUST DUCT UP

SUPPLY DUCT UP

RETURN/EXHAUST THRU ROOF

SUPPLY DUCT THRU ROOF

CO2

CARBON DIOXIDE SENSOR

FLEXIBLE CONNECTION

1ST # IS SIZE OF SURFACE SHOWN

DUCT SIZES ARE INSIDE DIMENSIONS

ROUND DUCT UP THRU FLOOR/ROOF

12"X8"

DAMPER

TYPE

FINISH

WHITE

SIZEFRAME

GRID

MODEL

TDCA

MANUFACTURER

TITUSD-1

TYPE

DIFFUSER, REGISTER, AND GRILLE SCHEDULE

MATERIAL

ALUMINUM

NECK: 16"Ø

LOUVERED FACE

PLAN

CODE

MAKE-UP AIR UNIT SCHEDULE

TITAN AIR

MANUFACTURER

CODE

MUA-1

PLAN

TA-118 LP HRD DA

MODEL

CONTROL

FUEL

PROPANE

CONTROL PANEL. VFD, AND EXHAUST FAN INTERLOCK

HEATING CAPACITIES

ENTERING

DOWN

DISCHARGE

10,020

CFM

1.95

SP

TOTAL

(IN WG)

AIR TEMP (F)

LEAVING

AIR TEMP (F)

HP

7.5

VOLT/PHASE

240/3

ELECTRICAL

0.41

SP

EXTERNAL

(IN WG)

INPUT

(MBH)

FACE: 24" X 24"

OPPOSED

BLADE

REMARKS

WHITE-272RLTITUSR-1 ALUMINUM

30" X 16"

WALL REGISTER

WHITEGRIDPARTITUSG-1 STEEL

PERFORATED RETURN

OPPOSED

BLADE

WHITEGRIDTDCATITUSD-2 ALUMINUM

LOUVERED FACE

FACE: 24" X 24"

OPPOSED

BLADE

TITAN AIRMUA-2 TA-118 LP HRV DA PROPANE

CONTROL PANEL, VFD, AND DIFFERENTIAL PRESSURE

VERTICAL

8,000 1.60 70 5 240/30.4 520

FLA

8.6

MATCH EXISTING DIFFUSE NECK SIZE

FACE: 24" X 24"

MATCH EXISTING GRILLE NECK SIZE

WHITEGRIDPARTITUSG-2 STEEL

PERFORATED RETURN

FACE:48" X 24"

MATCH EXISTING GRILLE NECK SIZE

45^

RECTANGULAR BRANCH TAKE-OFF DETAIL

ROUND DUCT TAKE-OFF DETAIL

W

BELL MOUTH FITTING

SPIN-IN FITTING WITH MANUAL

DAMPER, HANDLE AND LOCK NUT

EQUAL TO BRANCH

DUCT DIMENSION

L=W/4, 4" MINIMUM

1" MINIMUM ON

TOP AND BOTTOM

MAIN DUCT

SEAL ALL

AROUND

DIFFUSER CONNECTION DETAILS

22 GAUGE CLAMP, SEAL

WITH UL DUCT TAPE

MAXIMUM SAG 1/2"

PER FOOT

FLEXIBLE DUCT

MINIMUM RADIUS EQUAL

TO ONE DUCT RADIUS

TURNING VANES

SHEET METAL PLENUM WITH

1" LINING, PLENUM SIZE TO

MATCH NECK SIZE

CEILING

CEILING DIFFUSER

MAXIMUM SUPPORT

SPACING 5'-0" ON

CENTER

SUPPORT DIFFUSER

CEILING

CEILING DIFFUSER

22 GAUGE CLAMP, SEAL

WITH UL DUCT TAPE

FLEXIBLE DUCT

GAS-FIRED

DEVICE

GAS FIRED UNIT PIPING DETAIL

6" MIN.

DIRT LEG

NOT TO SCALE

G

G

M

I C

H A

E L

C

U

S E

R S

T

C M

I C

H A

E L B

O X

C

D I J C

O R

P S

L Y

N D

O N

B

J O

H N

S O

N B

L D

G S

D

I N

I N

G H

A L L

C

U L I N

A R

Y M

A U

D

W G

S T

I T

L E

S

H E

E T

T

D

W G

SHEET

OF

DESIGNER

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.

SUB SHEET NO.

JOB CORPS

NATIONAL OFFICE

ROOF REPLACEMENT

AND MAKE UP AIR

UNITS

LYNDON B. JOHNSON

JOB CORPS

CIVILIAN CONSERVATION

CENTER

NATIONAL FORESTS OF

NORTH CAROLINA

01/2019 09

F

O

R

E

S T

SE

R

V

I

C

E

D E

P

A

R

T M

E N

T

OF AGR

I C

U

L

T

U R

E

DATE

UNITED STATES

DEPARTMENT OF AGRICULTURE

FOREST SERVICE

DATENO. REVISION / ISSUE

GENERAL REMOVAL

NOTES, LEGENDS,

DETAILS,

AND EQUIPMENT

SCHEDULES

T.MICHAEL

L.CARROLL

ME0.1

AutoCAD SHX Text

AIR FLOW

AutoCAD SHX Text

NOT TO SCALE

AutoCAD SHX Text

NOT TO SCALE

NOT TO SCALE

CULINARY ARTS

R

TOILET

L L L

L

L L L L L

L

L

HOOD HOOD

HOOD

D D

H

CULINARY ARTS

R

TOILET

L L L

L

L L L L L

L

L

HOOD HOOD

HOOD

D-1

24" X 24"

24" X 24"

D-2

D-2

D-2

D-2

D-2

G-2

G-1

G-1 G-1

G-1

D D

H

D-1

D-1

D-1

D-1

D-1

D-1

D-1

D-1

D-1

D-1

D-1

KEY PLAN

MECHANICAL/ELECTRICAL PARTIAL REMOVAL PLAN

KEY NOTES

EXISTING KITCHEN HOOD, TYPICAL.

EXISTING PROPANE PIPING AND REGULATOR.

REMOVE LIGHTS, TYPICAL.

REMOVE DIFFUSER, TYPICAL.

REMOVE RETURN GRILLE, TYPICAL.

REMOVE AND SALVAGE FIRE DETECTION DEVICE, TYPICAL.

REMOVE 48" X 24" ACOUSTICAL LAY-IN CEILING GRID AND ACOUSTICAL TILES.

REMOVE ABANDONED HOOD MAKE-UP AIR CONTROL, TYPICAL.

REMOVE AND SALVAGE CEILING MOUNTED COILED RECEPTACLE, TYPICAL.

REINSTALL SALVAGED FIRE DETECTION DEVICE AND TEST, TYPICAL.

ROUTE 30"x23" DUCT UP TO MAKE-UP AIR UNIT. ROUTE BETWEEN STEEL JOISTS. TRANSITION TO DISCHARGE SIZE AND CONNECT TO

UNIT WITH FLEXIBLE CONNECTION.

INSTALL DUCTWORK ABOVE SUSPENDED CEILING, INSULATE DUCTWORK.

MAKE-UP AIR UNIT SUPPLY DIFFUSERS, INSTALL SPIN-IN FITTING, MANUAL DAMPER, AND 16"Ø FLEXIBLE DUCT. SEE DUCT AND

DIFFUSER CONNECTION DETAILS ON ME0.1, TYPICAL.

HVAC UNIT SUPPLY DIFFUSERS. RECONNECT EXISTING FLEXIBLE DUCT TO SUPPLY DIFFUSERS. VERIFY EXISTING FLEXIBLE DUCT

SIZE AND PROVIDE SUPPLY DIFFUSERS WITH NECK SIZE TO MATCH. SEE DUCT AND DIFFUSER CONNECTION DETAILS ON ME0.1, TYPICAL.

RETURN GRILLES. VERIFY EXISTING CONNECTION SIZE AND PROVIDE GRILLES WITH NECK SIZE TO MATCH. SEE DUCT AND DIFFUSER

CONNECTION DETAILS ON ME0.1, TYPICAL.

INSTALL 45 AMP 3-POLE CIRCUIT BREAKER AND 20 AMP 1-POLE CIRCUIT BREAKER IN EXISTING PANEL. EXTEND SURFACE MOUNTED

CONDUITS AND CONDUCTORS ABOVE CEILING. ROUTE TO MAKE-UP AIR UNIT DISCONNECT AND GFI RECEPTACLE.

INSTALL MAKE-UP AIR UNIT CONTROL PANEL.

INSTALL NEW 48" X 24" ACOUSTICAL LAY-IN CEILING GRID AND ACOUSTICAL CEILING TILES.

INSTALL GOVERNMENT FURNISHED GRID MOUNTED RECESSED LED LIGHT FIXTURE, TYPICAL.

REINSTALL SALVAGED CEILING MOUNTED COILED RECEPTACLE, TYPICAL.

GENERAL NOTES

1. EXISTING INFORMATION SHOWN ON THE DRAWINGS HAS BEEN TAKEN FROM LIMITED FIELD OBSERVATIONS. FIELD VERIFY EXISTING CONDITIONS

PRIOR TO BEGINNING WORK.

2. APPROXIMATELY 55" CLEAR BETWEEN BOTTOM OF CORRUGATED METAL ROOFING UNDERLAYMENT AND TOP OF SUSPENDED ACOUSTICAL TILE

CEILING, APPROXIMATELY 38" CLEAR BETWEEN BOTTOM OF STEEL BEAM AND TOP OF SUSPENDED ACOUSTICAL TILE CEILING, METAL BEAMS ARE

INSTALLED ON 48" CENTERS.

3. VERIFY EXISTING DIFFUSER AND GRILLE CONNECTION SIZES PRIOR TO ORDERING NEW DIFFUSERS AND GRILLES.

4. COORDINATE DUCT ROUTING WITH EQUIPMENT, DEVICES, LIGHTING, AND CONDUITS.

5. VERIFY FACILITY ELECTRICAL VOLTAGE AND PHASE PRIOR TO ORDERING EQUIPMENT, DESIGN BASED ON 240V, 3 PHASE POWER.

6. CULINARY ARTS CEILING IS 48" X 24" ACOUSTICAL LAY-IN GRID TYPE. REMOVE TILES AND GRID. REMOVE LIGHTS, FIRE DETECTION DEVICES AND

ALARMS, AND GRILLES AND DIFFUSERS. INSTALL NEW TILES AND GRID ONCE DUCTWORK HAS BEEN SEALED AND TESTED.

M

I C

H A

E L

C

U

S E

R S

T

C M

I C

H A

E L B

O X

C

D I J C

O R

P S

L Y

N D

O N

B

J O

H N

S O

N B

L D

G S

D

I N

I N

G H

A L L

C

U L I N

A R

Y M

A U

D

W G

S L B

J D

I N

I N

G M

E D

W G

SHEET

OF

DESIGNER

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.

SUB SHEET NO.

JOB CORPS

NATIONAL OFFICE

ROOF REPLACEMENT

AND MAKE UP AIR

UNITS

LYNDON B. JOHNSON

JOB CORPS

CIVILIAN CONSERVATION

CENTER

NATIONAL FORESTS OF

NORTH CAROLINA

01/2019 09

F

O

R

E

S T

SE

R

V

I C

E

D E

P

A

R

T M

E N

T OF AGR

I C

U

L

T

U R

E

DATE

UNITED STATES

DEPARTMENT OF AGRICULTURE

FOREST SERVICE

DATENO. REVISION / ISSUE

MECHANICAL/

ELECTRICAL FLOOR

PLAN

T.MICHAEL

L.CARROLL

ME1.1

MECHANICAL/ELECTRICAL PARTIAL PLAN

SCALE OF FEET

1/4" = 1'-0"

SCALE OF FEET

1/4" = 1'-0"

PH1

ME1.3

PH4

ME1.3

PH2

ME1.3

PH3

ME1.3

LP

L P

L P

LP

LP

GFI

MECHANICAL ROOF REMOVAL PLAN

KEY NOTES

8 0 8 16

SCALE OF FEET

1/8" = 1'-0"

M

I C

H A

E L

C

U

S E

R S

T

C M

I C

H A

E L B

O X

C

D I J C

O R

P S

L Y

N D

O N

B

J O

H N

S O

N B

L D

G S

D

I N

I N

G H

A L L

C

U L I N

A R

Y M

A U

D

W G

S L B

J D

I N

I N

G M

E D

W G

SHEET

OF

DESIGNER

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.

SUB SHEET NO.

JOB CORPS

NATIONAL OFFICE

ROOF REPLACEMENT

AND MAKE UP AIR

UNITS

LYNDON B. JOHNSON

JOB CORPS

CIVILIAN CONSERVATION

CENTER

NATIONAL FORESTS OF

NORTH CAROLINA

01/2019 09

F

O

R

E

S T

SE

R

V

I C

E

D E

P

A

R

T M

E N

T

OF AGR

I C

U

L

T

U R

E

DATE

UNITED STATES

DEPARTMENT OF AGRICULTURE

FOREST SERVICE

DATENO. REVISION / ISSUE

MECHANICAL/

ELECTRICAL

ROOF PLAN

T.MICHAEL

L.CARROLL

ME1.2

PH6

ME1.3

MECHANICAL/ELECTRICAL PARTIAL ROOF PLAN

8 0 8 16

SCALE OF FEET

1/8" = 1'-0"

EXISTING ROOF MOUNTED EQUIPMENT, TYPICAL.

EXISTING HIGH PRESSURE PROPANE GAS LINE TO EXISTING ROOFTOP HVAC UNITS.

REMOVE MECHANICAL EQUIPMENT. ROOF CURB REMOVED UNDER ARCHITECTURAL

DIVISION.

ROOF CURB REMOVED UNDER ARCHITECTURAL DIVISION.

CAP GAS PIPE BELOW ROOF. REMOVE PIPE AND VALVE. ROOF CURB REMOVED

UNDER ARCHITECTURAL DIVISION.

ROOF CURB REMOVED UNDER ARCHITECTURAL DIVISION. REUSE AND ENLARGE

ROOF OPENING FOR NEW SUPPLY DUCT DOWN.

MOUNT MAKE-UP AIR UNIT AND ROOF CURB ON ROOF. COORDINATE FLASHING AND

COUNTER FLASHING WITH ARCHITECTURAL DIVISION. LOCATE CURB AND MAKE-UP

AIR UNIT TO PERMIT SUPPLY DUCT DROP BETWEEN STEEL JOISTS. TRANSITION

EQUIPMENT DUCT CONNECTION TO 23" X 30" DUCT AND ROUTE DOWN. SEE ME1.1

FOR DUCT CONTINUATION.

1-1/4" GAS LINE TO MAKE-UP AIR UNIT. INSTALL ROOF PIPE SUPPORT TO SUPPORT

PIPE OFF ROOF. SECURE PIPE TO BLOCKING. SEE GAS PIPING CONNECTION DETAIL

ON ME1.3 FOR CONNECTION TO EQUIPMENT.

30 AMP FUSED DISCONNECT. ROUTE 4-#10 WITH #10 GROUND IN 1" CONDUIT TO NEW

CIRCUIT BREAKER MOUNTED IN PANEL. SEE ME1.1 FOR PANEL LOCATION.

GFI SERVICE OUTLET PROVIDED WITH MAKE-UP AIR UNIT. ROUTE 2-#12 WITH #12

GROUND IN 1/2" CONDUIT TO NEW CIRCUIT BREAKER MOUNTED IN PANEL. SEE ME1.1

FOR PANEL LOCATION.

GENERAL NOTES

1. EXISTING INFORMATION SHOWN ON THE DRAWINGS HAS BEEN TAKEN FROM LIMITED FIELD

OBSERVATIONS. FIELD VERIFY EXISTING CONDITIONS PRIOR TO BEGINNING WORK.

2. SEE PHOTOGRAPHS ON G1.1 FOR DINING ROOF AND ROOF MOUNTED EQUIPMENT.

3. SEE A1.1 FOR MECHANICAL WORK ASSOCIATED WITH ROOF REPLACEMENT. COORDINATE MECHANICAL

EQUIPMENT REMOVAL AND REINSTALLATION WITH ARCHITECTURAL DIVISION.

4. TEMPORARILY REMOVE AND STORE ROOF MOUNTED MECHANICAL EQUIPMENT, PIPING, PLATFORMS, ELECTRICAL, AND ASSOCIATED APPURTENANCES AND DEVICES TO PERMIT BUILT-UP ROOF

REPLACEMENT. EXTEND OR INSTALL NEW ROOF CURBS, PIPING, DUCTS, AND ELECTRICAL EQUIPMENT

TO ACCOMMODATE NEW INSULATION THICKNESS SUCH THAT CURB HEIGHT IS MINIMUM 8 INCHES

ABOVE INSULATION HEIGHT. REINSTALL ROOF MOUNTED MECHANICAL EQUIPMENT, PIPING,

PLATFORMS, ELECTRICAL, AND ASSOCIATED APPURTENANCES AND DEVICES ONCE NEW ROOF HAS

BEEN ACCEPTED. DEMONSTRATE EQUIPMENT OPERATION.

PH5

ME1.3

ABANDONED MAKE-UP UNIT CONTROLS

PH1

ME1.1

CULINARY ARTS ROOM

PH3

ME1.1

ELECTRICAL PANEL

PH4

ME1.1

GENERAL NOTES

1. PHOTOS SHOW EXISTING CONDITIONS SURROUNDING THE

AREAS FOR NEW WORK. FIELD VERIFY CONDITIONS PRIOR

TO BEGINNING WORK.

CULINARY ARTS ROOM

PH2

ME1.1

ABANDONED GAS PIPE

PH5

ME1.2

M

I C

H A

E L

C

U

S E

R S

T

C M

I C

H A

E L B

O X

C

D I J C

O R

P S

L Y

N D

O N

B

J O

H N

S O

N B

L D

G S

D

I N

I N

G H

A L L

C

U L I N

A R

Y M

A U

D

W G

S L B

J D

I N

I N

G M

E D

W G

SHEET

OF

DESIGNER

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.

SUB SHEET NO.

JOB CORPS

NATIONAL OFFICE

ROOF REPLACEMENT

AND MAKE UP AIR

UNITS

LYNDON B. JOHNSON

JOB CORPS

CIVILIAN CONSERVATION

CENTER

NATIONAL FORESTS OF

NORTH CAROLINA

01/2019 09

F

O

R

E

S T

SE

R

V

I C

E

D E

P

A

R

T M

E N

T

OF AGR

I C

U

L

T

U R

E

DATE

UNITED STATES

DEPARTMENT OF AGRICULTURE

FOREST SERVICE

DATENO. REVISION / ISSUE

PHOTOGRAPHS

T.MICHAEL

L.CARROLL

ME1.3

GAS PIPE

ME1.2

KEY NOTES

REMOVE ABANDONED KITCHEN HOOD MAKE-UP AIR CONTROL.

REMOVE ACOUSTICAL CEILING AND GRID, TYPICAL.

REPLACE HVAC UNIT SUPPLY DIFFUSER, TYPICAL.

REMOVE LIGHTS. INSTALL GOVERNMENT FURNISHED LIGHT, TYPICAL.

REPLACE RETURN GRILLE, TYPICAL.

REMOVE AND SALVAGE FIRE DETECTION DEVICE. REINSTALL IN NEW

ACOUSTICAL CEILING, TYPICAL.

EXISTING KITCHEN HOOD TO REMAIN.

REMOVE AND SALVAGE COILED CEILING MOUNTED RECEPTACLE.

REINSTALL IN NEW ACOUSTICAL CEILING. TYPICAL.

EXISTING ELECTRICAL PANEL.

CAP ABANDONED GAS PIPE BELOW CEILING. REMOVE VALVE AND PIPE

ABOVE ROOF.

CONNECT GAS PIPE FOR NEW MAKE-UP AIR UNIT TO EXISTING PROPANE

PIPE.

R-1

WELDING SHOP

MECH

W

M

ST.

ST.

ST.

OFFICE

TOOL RM

CLASSROOM

LOCKERS

EQUIPMENT

GRINDING ROOM

ST.

R-1

R

30" X 16"

R

FILTER

SECTION

HOOD

D A

M P

E R

KEY NOTES

REMOVE ABANDONED VERTICAL TRANE FURNACE, ELECTRICAL,

AND 22 X 20 SUPPLY DUCT. CAP FLUE AND GAS PIPE.

INSTALL MAKE UP AIR UNIT ON NOMINAL 6" CONCRETE PAD,

6-INCHES LARGER THAN UNIT ON ALL SIDES. INSTALL INTAKE

DAMPER, FILTER SECTION AND 45 DEGREE HOOD. INSTALL

HOOD SUPPORT.

1" PROPANE GAS PIPE. CONNECT TO EXISTING MEDIUM

PRESSURE GAS PIPE. ROUTE DOWN WALL. BURY PIPE BELOW

GRADE TO UNIT. ROUTE TO REGULATOR AND SHUTOFF VALVE.

ROUTE DUCT ABOVE LANDING. TRANSITION TO EQUIPMENT SIZE

AND CONNECT.

REMOVE DAMPER. ENLARGE EXISTING 21" X 9" OUTSIDE AIR

OPENING IN BRICK/BLOCK WALL TO 30" X 30" OPENING. ROUTE

DUCT THROUGH OPENING. INSTALL METAL ESCUTCHEON

AROUND DUCT AND SEAL OPENING WEATHERTIGHT.

ROUTE DUCT UP.

TRANSITION TO 22 X 20 AND CONNECT TO EXISTING DUCT.

CUT 30" x 16" OPENING IN BLOCK WALL. INSTALL DIFFUSER.

CONNECT TO DUCT.

REUSE EXISTING 16" X 8" REGISTER, TYPICAL.

EXISTING 120/240V 3 PHASE ELECTRICAL PANEL. INSTALL 45A-3P

BREAKER IN EMPTY SPACES.

INSTALL 30 AMP FUSED DISCONNECT WITH TIME DELAY FUSES

AND NEMA 1 MOTOR STARTER, ROUTE 4-#10 WITH #10 GROUND

IN 1" CONDUIT TO EQUIPMENT AND CIRCUIT BREAKER.

JOB CORPS TO REMOVE AND RELOCATE RAILING. COORDINATE

WITH WORK PROGRAM OFFICER.

GFI SERVICE OUTLET PROVIDED WITH MAKE-UP AIR UNIT. ROUTE

2-#12 WITH #12 GROUND IN 1/2" CONDUIT TO NEW CIRCUIT

BREAKER MOUNTED IN PANEL.

EXISTING 120/240 ELECTRICAL PANEL. INSTALL 20A-1P BREAKER

FOR RECEPTACLE IN EMPTY SPACE.

MAKE-UP AIR UNIT CONTROL PANEL. MOUNT DIFFERENTIAL

PRESSURE SENSOR NEAR PANEL.

INSTALL BALANCING DAMPER, TYPICAL.

GENERAL NOTES

1. EXISTING INFORMATION SHOWN ON THE DRAWINGS HAS BEEN TAKEN FROM LIMITED FIELD

OBSERVATIONS. FIELD VERIFY EXISTING CONDITIONS PRIOR TO BEGINNING WORK.

2. VERIFY FACILITY ELECTRICAL VOLTAGE AND PHASE PRIOR TO ORDERING EQUIPMENT, DESIGN

BASED ON 240V, 3 PHASE POWER.

3. INSTALL DOUBLE WALL DUCT WITH LINER FOR DUCTWORK LOCATED OUTSIDE THE BUILDING.

4. SEE M0.1 FOR DUCT TAKE-OFF AND GAS CONNECTION DETAILS.

M

I C

H A

E L

C

U

S E

R S

T

C M

I C

H A

E L B

O X

C

D I J C

O R

P S

L Y

N D

O N

B

J O

H N

S O

N B

L D

G S

W

E L D

I N

G

M

A U

D

W G

S L B

J W

E L D

I N

G M

E D

W G

SHEET

OF

DESIGNER

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.

SUB SHEET NO.

JOB CORPS

NATIONAL OFFICE

ROOF REPLACEMENT

AND MAKE UP AIR

UNITS

LYNDON B. JOHNSON

JOB CORPS

CIVILIAN CONSERVATION

CENTER

NATIONAL FORESTS OF

NORTH CAROLINA

01/2019 09

F

O

R

E

S T

SE

R

V

I C

E

D E

P

A

R

T M

E N

T OF AGR

I C

U

L

T

U R

E

DATE

UNITED STATES

DEPARTMENT OF AGRICULTURE

FOREST SERVICE

DATENO. REVISION / ISSUE

WELDING BUILDING 58

MECHANICAL/

ELECTRICAL PLAN

T.MICHAEL

L.CARROLL

ME2.1

MECHANICAL/ELECTRICAL PLAN

SCALE OF FEET

1/4" = 1'-0"

PH1

ME2.2

PH2

ME2.2

PH3

ME2.2

PH5

ME2.2

PH4

ME2.2

PH6

ME2.2

GFI

GENERAL NOTES

1. PHOTOS SHOW EXISTING CONDITIONS SURROUNDING THE

AREAS FOR NEW WORK. FIELD VERIFY CONDITIONS PRIOR

TO BEGINNING WORK.

M

I C

H A

E L

U

S E

R S

T

C M

I C

H A

E L B

O X

C

D I J C

O R

P S

L Y

N D

O N

B

J O

H N

S O

N B

L D

G S

W

E L D

I N

G

M

A U

D

W G

S L B

J W

E L D

I N

G M

E D

W G

SHEET

OF

DESIGNER

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.

SUB SHEET NO.

JOB CORPS

NATIONAL OFFICE

ROOF REPLACEMENT

AND MAKE UP AIR

UNITS

LYNDON B. JOHNSON

JOB CORPS

CIVILIAN CONSERVATION

CENTER

NATIONAL FORESTS OF

NORTH CAROLINA

01/2019 09

F

O

R

E

S T

SE

R

V

I C

E

D E

P

A

R

T M

E N

T

OF AGR

I C

U

L

T

U R

E

DATE

UNITED STATES

DEPARTMENT OF AGRICULTURE

FOREST SERVICE

DATENO. REVISION / ISSUE

PHOTOGRAPHS

T.MICHAEL

L.CARROLL

ME2.2

KEY NOTES

PH6

ME2.1

WELDING SHOP

PH5

ME2.1

ELECTRICAL PANELS

PH4

ME2.1

WELDING SHOP

PH3

ME2.1

LANDINGPH2

ME2.1

PROPANE LINE AND STAIRS

PH1

ME2.1

FURNACE

REMOVE ABANDONED VERTICAL TRANE FURNACE, ELECTRICAL,

AND 22 X 20 SUPPLY DUCT. CAP FLUE AND GAS PIPE.

EXISTING PROPANE GAS PIPE.

JOB CORPS TO REMOVE AND REINSTALL RAILING. COORDINATE

WITH WORKS PROGRAM OFFICER.

REMOVE DAMPER. ENLARGE EXISTING 21" X 9" OUTSIDE AIR

OPENING TO 30" X 30" OPENING. ROUTE DUCT THROUGH

OPENING. INSTALL METAL ESCUTCHEON AROUND DUCT AND

SEAL OPENING WEATHERTIGHT.

REUSE EXISTING 16" X 8" REGISTER, TYPICAL.

EXISTING 120/240V 3 PHASE ELECTRICAL PANEL. INSTALL 45A-3P

BREAKER IN EMPTY SPACES.

EXISTING 120/240V ELECTRICAL PANEL. INSTALL 20A-1P

BREAKER IN EMPTY SPACE.

T10
Sheets and Views
T10
G11
Sheets and Views
G1.1
A11-ROOF
Sheets and Views
A11-ROOF
ME01
Sheets and Views
ME0.1
ME11_FLOOR
Sheets and Views
ME11_FLOOR
ME12_ROOF
Sheets and Views
ME12_ROOF
ME13_PH
Sheets and Views
ME13_PH
ME21_FLOOR
Sheets and Views
ME21_FLOOR
ME22_PH
Sheets and Views
ME22_PH
T10.pdf
Sheets and Views
T10
A11-ROOF.pdf
Sheets and Views
A11-ROOF

File details come from the government source that posted it. Updated .