EXHIBIT_3_NFSR_300_Road_Aggregate_Notes_Page.pdf
PDF 659 KB Posted
- Attached to
- CONSTRUCTION - NFSR 300 ROAD SURFACE & STABILIZATION Federal contract opportunity
- Solicitation number
- 12817319R0011
About this file
EXHIBIT 3 NOTES
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 12817319R0011_NFSR_300_Recondition_and_Stabilize.pdf | ||
| 12817319R0011_RETURN_PACKET_NFSR300.pdf | ||
| EXHIBIT_2_Const_Maint_and_Repair.pdf | ||
| EXHIBIT_4_-_31_05_16_AGGREGATES_FOR_EARTHWORK.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UNITED STATES DEPARTMENT OF AGRICULTURE FOREST SERVICE
Region 3 - Apache-Sitgreaves National Forests
Coconino County, Arizona
NFSR 300 Road Reconditioning, Aggregate Surfacing, and Road Stabilization
Construction Notes:
1. Road Reconditioning shall include blading, ripping and/ or scarifying as required to reestablish a roadbed crown of 3-5 percent, prior to placement of aggregate. Most of the route will require reshaping. The current road width, including shoulders, varies from 30 feet to 35 feet+.
2. All aggregate furnished shall meet the requirements under Exhibit 4 – 31 05 16 Aggregates for Earthwork, Table 31-2
Grading G.
3. Contractor shall pull existing shoulders and ditch line to create new shoulder and ditch line for new aggregate surface.
Maximum total roadway, including shoulders shall not exceed 24 feet.
4. Aggregate Surfacing shall be placed to a full depth of 4 inches compacted, and to a width of 22 feet. Centerline of new aggregate shall follow existing road centerline. Road Stabilization will be applied and mixed to provide uniform distribution throughout the 4 inches of aggregate. Surface course fill slopes shall be 2:1 minimum.
5. The contractor is responsible for obtaining all necessary permits for this type of construction, including any associated fees.
6. The contractor may be allowed to camp at the site during the construction period. This will require a district issued camping permit at no cost to the contractor. There are no restroom facilities in the immediate vicinity. Contractor shall provide portable facilities for their employees.
7. No government water source is available.
8. The standard specifications for construction of roads and bridges on Federal Highway projects (FP-03 U.S. Customary
Units) are included in the specification per section C.3 of the Request For Proposal (RFP) package.
U.S. DEPARTMENT OF AGRICULTURE
FOREST SERVICE
REGION 3
SOUTHWESTERN REGION
Forest
Apache-Sitgreaves National Forests
Project Name
NFSR 300 Surfacing/Stabilization
Drawn: P Gerber 04/03/19
Reviewed: C Miller 04/04/19
Sheet Title General Notes
Scale Sheet Number
N/A
File details come from the government source that posted it.