127EAY26Q0055 Attachment 2 Statement of Work.pdf
PDF 279 KB Posted
- Solicitation number
- 127EAY26Q0055
- Issued by
-
Department of Agriculture Forest Service
About this file
This is a Statement of Work for the lease, delivery, installation, and removal of a modular office building to support operations at the Plumas National Forest Quincy Helibase located in Quincy, California. The base contract period runs from June 1, 2026 through May 31, 2027, with four optional one-year renewal periods extending through May 31, 2031. Delivery and installation are estimated for June 2026.
The modular unit must measure 12' x 48' to 14' x 52' maximum and be manufactured no earlier than 2023. The unit shall include one bathroom with exhaust fan, lavatory, GFCI receptacle, instant hot water heater, lights, and a preferred window; one smaller room with lockable door; and one common room for conference use. Both rooms require windows with blinds and non-carpet flooring. The unit must be furnished with matching skirting, gutters with downspouts above exterior doors, and exterior stairs. Technical specifications include single-phase electrical service, HVAC with heating and cooling, full plumbing with sewer connection, and seismic tie downs rated for 60 psf flat roof snow load with rating documented on the Building Tag. The contractor is responsible for all management, supervision, labor, transportation, materials, equipment, and supplies necessary for delivery, setup, and demobilization, including completion of final utility connections (water, sewer, power with freeze protection on water supply), stairway and skirting installation, seismic support installation, and protection of existing Forest Service infrastructure during placement.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
127EAY26Q0055 Attachment 3 Statement of Work Quincy Heli Base Modular Office Rental Plumas NF
General Information Scope
The Government requires the lease, delivery, installation, and removal of a modular office building to support operations at the Plumas National Forest Quincy Helibase. Estimated base period: June 1, 2026- May 31, 2027, followed by up to four potential option years through 2031.
Location
Quincy Heliport 39696 Hwy 70 Quincy, CA 95971 Lat/Long: 39.973255, -120.940150
See Attachment 3 for Map/Photos/Additional Info
Estimated Schedule
Estimated delivery and installation: June 2026.
Estimated base period: 06/01/2026-05/31/2027
Option Year 1: 06/01/2027-05/31/2028
Option Year 2: 06/01/2028-05/31/2029
Option Year 3: 06/01/2029-05/31/2030
Option Year 4: 06/01/2030-05/31/2031
127EAY26Q0055 Attachment 3 Statement of Work Quincy Heli Base Modular Office Rental Plumas NF
Technical Requirements
Modular Unit Requirements:
Size: 12’x48’ to 14’x52’ max
Age: Modular shall be manufactured no earlier than 2023
Bathrooms: 1 minimum including but not limited to exhaust fan, lavatory, GFCI receptacle, instant hot water heater, & lights. A window in the restroom is preferred.
Rooms: One smaller room with door, one common room to be used as a conference area. Rooms to have windows furnished with blinds. Flooring material to be easily cleanable (no carpet).
Doors: Doors shall be lockable. 2 Keys required for each door lock.
Utilities: Electrical receptacles, lights & distribution panel (only single phase available), HVAC system including heating and cooling, Plumbing including sewer for restroom
Structural: Seismic tie downs, piers and pads required. Unit to be snow load rated for the Quincy Area (60 psf flat roof snow load). Rating shall be included on Building Tag.
Accessories: Unit shall come furnished with skirting to match exterior, gutters above exterior doors with downspouts, and stairs to access exterior door(s) from unit.
Contractor shall provide all management, supervision, labor, personnel, transportation, materials, equipment and supplies necessary to deliver, set up and demobilize the modular unit provided.
Included in setup activities are:
Completing final utilities connection including water, sewer and power o Reference A for current connection information o Water shall have freeze protection such as heat tape and insulation installed on supply line Installing stairs and skirting Installing seismic supports Protecting existing Forest Service infrastructure and utilities when placing the unit.
Demobilization activities include the reverse of set-up activities.
File details come from the government source that posted it. Updated .