SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30

1. REQUISITION NUMBER

1043201

PAGE OF

2. CONTRACT NO. 3. AWARD/

EFFECTIVE DATE

4. ORDER NUMBER 5. SOLICITATION NUMBER

127EAY21Q0081

6. SOLICITATION

ISSUE DATE

09/07/2021

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME

REBECCA WILCOX

b. TELEPHONE NUMBER

530-226-2447

(No collect calls) 8. OFFER DUE DATE/LOCAL TIME

09/21/2021 1300 PT

9. ISSUED BY CODE 7EAY 10. THIS ACQUISITION IS UNRESTRICTED OR X SET ASIDE: 100.00 % FOR:

USDA-FS CSA SOUTHWEST 1 SMALL BUSINESS

WOMEN-OWNED SMALL BUSINESS

(WOSB) ELIGIBLE UNDER THE WOMEN-OWNED

3644 AVTECH PARKWAY

REDDING CA 96002

HUBZONE SMALL

BUSINESS

SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

SMALL BUSINESS PROGRAM

EDWOSB

8(A)

NAICS:

SIZE STANDARD:

11. DELIVERY FOR FOB DESTINA-

TION UNLESS BLOCK IS

MARKED

12. DISCOUNT TERMS

13a. THIS CONTRACT IS A

RATED ORDER UNDER

13b. RATING

14. METHOD OF SOLICITATION

SEE SCHEDULE DPAS (15 CFR 700)

RFQ IFB RFP

15. DELIVER TO

PLUMAS NATIONAL FOREST

159 LAWRENCE ST

QUINCY CA 95971

CODE 9A13 16. ADMINISTERED BY

USDA-FS CSA SOUTHWEST 1

3644 AVTECH PARKWAY

REDDING CA 96002

CODE 7EAY

17a. CONTRACTOR/

OFFEROR

CODE FACILITY

CODE

18a. PAYMENT WILL BE MADE BY CODE

TELEPHONE NO.

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER 18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK BELOW

19. 20.

IS CHECKED

21.

SEE ADDENDUM

22. 23. 24.

ITEM NO. SCHEDULE OF SUPPLIES/SERVICES

Request for Quote for the Brush Creek & Big Bar

Hazmat Clean Up & Removal Project located on the

Plumas National Forest.

Delivery: 08/04/2021

Period of Performance: 10/11/2021 to 02/28/2022

QUANTITY UNIT UNIT PRICE AMOUNT

0001 Plumas National Forest

Brush Creek & Big Bar Hazmat Clean Up & Removal

(Use Reverse and/or Attach Additional Sheets as Necessary)

25. ACCOUNTING AND APPROPRIATION DATA 26. TOTAL AWARD AMOUNT (For Govt. Use Only)

27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA

ARE

ARE

ARE NOT ATTACHED.

ARE NOT ATTACHED.

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1449 (REV. 2/2012)

Prescribed by GSA - FAR (48 CFR) 53.212

X

X

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DELIVER

ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY ADDITIONAL

SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.

29. AWARD OF CONTRACT: OFFER

DATED . YOUR OFFER ON SOLICITATION (BLOCK 5),

INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE SET FORTH

HEREIN, IS ACCEPTED AS TO ITEMS:

30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)

30b. NAME AND TITLE OF SIGNER (Type or print) 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER (Type or print) 31c. DATE SIGNED

X X

RECEIVED INSPECTED ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED:

32b. SIGNATURE OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT REPRESENTATIVE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f. TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

33. SHIP NUMBER 36. PAYMENT 37. CHECK NUMBER

COMPLETE PARTIAL FINAL

PARTIAL FINAL

38. S/R ACCOUNT NUMBER 40. PAID BY

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT

41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER

42a. RECEIVED BY (Print)

42b. RECEIVED AT (Location)

42d. TOTAL CONTAINERS 42c. DATE REC'D (YY/MM/DD)

41c. DATE

39. S/R VOUCHER NUMBER

35. AMOUNT VERIFIED

CORRECT FOR

34. VOUCHER NUMBER

32c. DATE

19.

ITEM NO.

20.

SCHEDULE OF SUPPLIES/SERVICES

21.

QUANTITY

22.

UNIT

23.

UNIT PRICE

24.

AMOUNT

32a. QUANTITY IN COLUMN 21 HAS BEEN

STANDARD FORM 1449 (REV. 2/2012) BACK

SCHEDULE OF ITEMS

SUPPLIES OR SERVICES, AND PRICES/COSTS

PROJECT

Brush Creek & Big Bar Hazmat Clean Up & Removal

UNIT Plumas National Forest

SOL. # 127EAY21Q0081

ITEM NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL PRICE

1 Building 2040 LS 1. $ - $ -

2 Building 2340 & Conex Box LS 1. $ - $ -

3 Building 2640 LS 1. $ - $ -

4 Building 1044 LS 1. $ - $ -

5 Building 2140 LS 1. $ - $ -

6 Building 1040 LS 1. $ - $ -

7 Building 1500 LS 1. $ - $ -

8 Building 1316 LS 1. $ - $ -

9 Building 2369 LS 1. $ - $ -

12 Portable Hazmat Lockers & Paint Conex LS 1. $ - $ -

13 Pump Out and Dispose Diesel Fuel Tank (1000 gal) LS 1. $ - $ -

14 Pump Out and Dispose Unleaded Fuel Tank (1000 gal per tank) LS 1. $ - $ -

15 Big Bar Repeater Site LS 1. $ - $ -

16 Final Report LS 1. $ - $ -

TOTAL $ -

NOTES: See SOW for clean up descriptions on each building or site.

PRICE SUBMITTED BY:

Signature Phone

Vendor Name FAX

Address Email

2 - Clauses

52.203-17 Contractor Employee Whistleblower Rights and Requirement To Inform Employees of

Whistleblower Rights. (JUN 2020)

52.204-4 Printed or Copied Double-Sided on Postconsumer Fiber Content Paper. (MAY 2011)

52.204-13 System for Award Management Maintenance. (OCT 2018)

52.204-18 Commercial and Government Entity Code Maintenance. (AUG 2020)

52.204-21 Basic Safeguarding of Covered Contractor Information Systems. (JUN 2016)

52.204-24 Representation Regarding Certain Telecommunications and Video Surveillance Services or

Equipment. (OCT 2020)

The Offeror shall not complete the representation at paragraph (d)(1) of this provision if the Offeror has represented that it "does not provide covered telecommunications equipment or services as a part of its offered products or services to the Government in the performance of any contract, subcontract, or other contractual instrument" in paragraph (c)(1) in the provision at 52.204-26, Covered Telecommunications Equipment or Services-

Representation, or in paragraph (v)(2)(i) of the provision at 52.212-3, Offeror Representations and Certifications-

Commercial Items. The Offeror shall not complete the representation in paragraph (d)(2) of this provision if the

Offeror has represented that it "does not use covered telecommunications equipment or services, or any equipment, system, or service that uses covered telecommunications equipment or services" in paragraph (c)(2) of the provision at 52.204-26, or in paragraph (v)(2)(ii) of the provision at 52.212-3.

(a) Definitions. As used in this provision-

Backhaul, covered telecommunications equipment or services, critical technology, interconnection arrangements, reasonable inquiry, roaming, and substantial or essential component have the meanings provided in the clause

52.204-25, Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or

Equipment.

(b) Prohibition. (1) Section 889(a)(1)(A) of the John S. McCain National Defense Authorization Act for Fiscal Year

2019 (Pub. L. 115-232) prohibits the head of an executive agency on or after August 13, 2019, from procuring or obtaining, or extending or renewing a contract to procure or obtain, any equipment, system, or service that uses covered telecommunications equipment or services as a substantial or essential component of any system, or as critical technology as part of any system. Nothing in the prohibition shall be construed to-

(i) Prohibit the head of an executive agency from procuring with an entity to provide a service that connects to the facilities of a third-party, such as backhaul, roaming, or interconnection arrangements; or

(ii) Cover telecommunications equipment that cannot route or redirect user data traffic or cannot permit visibility into any user data or packets that such equipment transmits or otherwise handles.

(2) Section 889(a)(1)(B) of the John S. McCain National Defense Authorization Act for Fiscal Year 2019 (Pub. L.

115-232) prohibits the head of an executive agency on or after August 13, 2020, from entering into a contract or extending or renewing a contract with an entity that uses any equipment, system, or service that uses covered telecommunications equipment or services as a substantial or essential component of any system, or as critical technology as part of any system. This prohibition applies to the use of covered telecommunications equipment or services, regardless of whether that use is in performance of work under a Federal contract. Nothing in the prohibition shall be construed to-

(i) Prohibit the head of an executive agency from procuring with an entity to provide a service that connects to the facilities of a third-party, such as backhaul, roaming, or interconnection arrangements; or

(ii) Cover telecommunications equipment that cannot route or redirect user data traffic or cannot permit visibility into any user data or packets that such equipment transmits or otherwise handles.

(c) Procedures. The Offeror shall review the list of excluded parties in the System for Award Management (SAM)

(https://www.sam.gov) for entities excluded from receiving federal awards for "covered telecommunications equipment or services."

(d) Representations. The Offeror represents that-

(1) It [ ] will, [ ] will not provide covered telecommunications equipment or services to the Government in the performance of any contract, subcontract or other contractual instrument resulting from this solicitation. The Offeror shall provide the additional disclosure information required at paragraph (e)(1) of this section if the Offeror responds

"will" in paragraph (d)(1) of this section; and

(2) After conducting a reasonable inquiry, for purposes of this representation, the Offeror represents that-

It [ ] does, [ ] does not use covered telecommunications equipment or services, or use any equipment, system, or service that uses covered telecommunications equipment or services. The Offeror shall provide the additional disclosure information required at paragraph (e)(2) of this section if the Offeror responds "does" in paragraph (d)(2) of this section.

(e) Disclosures. (1) Disclosure for the representation in paragraph (d)(1) of this provision. If the Offeror has responded "will" in the representation in paragraph (d)(1) of this provision, the Offeror shall provide the following information as part of the offer:

(i) For covered equipment-

(A) The entity that produced the covered telecommunications equipment (include entity name, unique entity identifier, CAGE code, and whether the entity was the original equipment manufacturer (OEM) or a distributor, if known);

(B) A description of all covered telecommunications equipment offered (include brand; model number, such as

OEM number, manufacturer part number, or wholesaler number; and item description, as applicable); and

(C) Explanation of the proposed use of covered telecommunications equipment and any factors relevant to determining if such use would be permissible under the prohibition in paragraph (b)(1) of this provision.

(ii) For covered services-

(A) If the service is related to item maintenance: A description of all covered telecommunications services offered

(include on the item being maintained: Brand; model number, such as OEM number, manufacturer part number, or wholesaler number; and item description, as applicable); or

(B) If not associated with maintenance, the Product Service Code (PSC) of the service being provided; and explanation of the proposed use of covered telecommunications services and any factors relevant to determining if such use would be permissible under the prohibition in paragraph (b)(1) of this provision.

(2) Disclosure for the representation in paragraph (d)(2) of this provision. If the Offeror has responded "does" in the representation in paragraph (d)(2) of this provision, the Offeror shall provide the following information as part of the offer:

(i) For covered equipment-

(A) The entity that produced the covered telecommunications equipment (include entity name, unique entity identifier, CAGE code, and whether the entity was the OEM or a distributor, if known);

(B) A description of all covered telecommunications equipment offered (include brand; model number, such as

OEM number, manufacturer part number, or wholesaler number; and item description, as applicable); and

(C) Explanation of the proposed use of covered telecommunications equipment and any factors relevant to determining if such use would be permissible under the prohibition in paragraph (b)(2) of this provision.

(ii) For covered services-

(A) If the service is related to item maintenance: A description of all covered telecommunications services offered

(include on the item being maintained: Brand; model number, such as OEM number, manufacturer part number, or wholesaler number; and item description, as applicable); or

(B) If not associated with maintenance, the PSC of the service being provided; and explanation of the proposed use of covered telecommunications services and any factors relevant to determining if such use would be permissible under the prohibition in paragraph (b)(2) of this provision.

(End of provision)

52.212-4 Contract Terms and Conditions - Commercial Items. (OCT 2018)

Addenda to 52.212-4:

Replace paragraph (r) of clause 52.212-4 with the following as specified in DEVIATION 2017-1 (AUG 2017):

(r) Compliance with laws unique to Government contracts. The Contractor agrees to comply with 31 U.S.C. 1352 relating to limitations on the use of appropriated funds to influence certain Federal contracts; 18 U.S.C 431 relating to officials not to benefit; 40 U.S.C. chapter 37, Contract Work Hours and Safety Standards; 41 U.S.C. chapter 87, Kickbacks; 10 U.S.C. 2409 relating to whistleblower protections; 49 U.S.C. 40118, Fly American; and 41 U.S.C chapter 21 relating to procurement integrity.

52.212-5 Contract Terms and Conditions Required To Implement Statutes or Executive Orders - Commercial

Items. (JUL 2021)

(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses, which are incorporated in this contract by reference, to implement provisions of law or Executive orders applicable to acquisitions of commercial items:

(1) 52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (JAN 2017)

(section 743 of Division E, Title VII, of the Consolidated and Further Continuing Appropriations Act, 2015 (Pub. L.

113-235) and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions)).

(2) 52.204-23, Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by

Kaspersky Lab and Other Covered Entities (JUL 2018) (Section 1634 of Pub. L. 115-91).

(3) 52.204-25, Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or

Equipment. (AUG 2020) (Section 889(a)(1)(A) of Pub. L. 115-232).

(4) 52.209-10, Prohibition on Contracting with Inverted Domestic Corporations (NOV 2015).

(5) 52.233-3, Protest After Award (AUG 1996) (31 U.S.C. 3553).

(6) 52.233-4, Applicable Law for Breach of Contract Claim (OCT 2004) (Public Laws 108-77 and 108-78 (19

U.S.C. 3805 note)).

(b) The Contractor shall comply with the FAR clauses in this paragraph (b) that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial items: (Contracting Officer check as appropriate.)

[ ] (1) 52.203-6, Restrictions on Subcontractor Sales to the Government (JUN 2020), with Alternate I (OCT 1995)

(41 U.S.C. 4704 and 10 U.S.C. 2402).

[ ] (2) 52.203-13, Contractor Code of Business Ethics and Conduct (JUN 2020) (41 U.S.C. 3509).

[ ] (3) 52.203-15, Whistleblower Protections under the American Recovery and Reinvestment Act of 2009 (JUN

2010) (Section 1553 of Pub. L. 111-5). (Applies to contracts funded by the American Recovery and Reinvestment

Act of 2009.)

[X] (4) 52.204-10, Reporting Executive Compensation and First-Tier Subcontract Awards (JUN 2020) (Pub. L. 109-

282) (31 U.S.C. 6101 note).

(5) (Reserved)

[X] (6) 52.204-14, Service Contract Reporting Requirements (OCT 2016) (Pub. L. 111-117, section 743 of Div. C).

[ ] (7) 52.204-15, Service Contract Reporting Requirements for Indefinite-Delivery Contracts (OCT 2016) (Pub. L. 111-117, section

743 of Div. C).

[X] (8) 52.209-6, Protecting the Government's Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment. (JUN 2020) (31 U.S.C. 6101 note).

[ ] (9) 52.209-9, Updates of Publicly Available Information Regarding Responsibility Matters (OCT 2018) (41

U.S.C. 2313).

[ ] (10) (Reserved)

[ ] (11)(i) 52.219-3, Notice of HUBZone Set-Aside or Sole Source Award (MAR 2020) (15 U.S.C. 657a).

[ ] (ii) Alternate I (MAR 2020) of 52.219-3.

[ ] (12)(i) 52.219-4, Notice of Price Evaluation Preference for HUBZone Small Business Concerns (MAR 2020) (if the offeror elects to waive the preference, it shall so indicate in its offer) (15 U.S.C. 657a).

[ ] (ii) Alternate I (MAR 2020) of 52.219-4.

[ ] (13) (Reserved)

[X] (14)(i) 52.219-6, Notice of Total Small Business Set-Aside (NOV 2020) (15 U.S.C. 644).

[ ] (ii) Alternate I (MAR 2020) of 52.219-6.

[ ] (15)(i) 52.219-7, Notice of Partial Small Business Set-Aside (NOV 2020) (15 U.S.C. 644).

[ ] (ii) Alternate I (MAR 2020) of 52.219-7.

[ ] (16) 52.219-8, Utilization of Small Business Concerns (OCT 2018) (15 U.S.C. 637(d)(2) and (3)).

[ ] (17)(i) 52.219-9, Small Business Subcontracting Plan (JUN 2020) (15 U.S.C. 637(d)(4)).

[ ] (ii) Alternate I (NOV 2016) of 52.219-9.

[ ] (iii) Alternate II (NOV 2016) of 52.219-9.

[ ] (iv) Alternate III (JUN 2020) of 52.219-9.

[ ] (v) Alternate IV (JUN 2020) of 52.219-9.

[ ] (18)(i) 52.219-13, Notice of Set-Aside of Orders (MAR 2020) (15 U.S.C. 644(r)).

[ ] (ii) Alternate I (MAR 2020) of 52.219-13.

[ ] (19) 52.219-14, Limitations on Subcontracting (MAR 2020) (15 U.S.C. 637(a)(14)).

[ ] (20) 52.219-16, Liquidated Damages-Subcontracting Plan (JAN 1999) (15 U.S.C. 637(d)(4)(F)(i)).

[ ] (21) 52.219-27, Notice of Service-Disabled Veteran-Owned Small Business Set-Aside (MAR 2020) (15 U.S.C.

657f).

[ ] (22)(i) 52.219-28, Post-Award Small Business Program Rerepresentation (NOV 2020) (15 U.S.C. 632(a)(2)).

[ ] (ii) Alternate I (MAR 2020) of 52.219-28.

[ ] (23) 52.219-29, Notice of Set-Aside for, or Sole Source Award to, Economically Disadvantaged Women-Owned

Small Business (EDWOSB) Concerns (MAR 2020) (15 U.S.C. 637(m))

[ ] (24) 52.219-30, Notice of Set-Aside for, or Sole Source Award to, Women-Owned Small Business Concerns

Eligible Under the Women-Owned Small Business Program (MAR 2020) (15 U.S.C. 637(m)).

[ ] (25) 52.219-32, Orders Issued Directly Under Small Business Reserves (MAR 2020) (15 U.S.C. 644(r)).

[ ] (26) 52.219-33, Nonmanufacturer Rule (MAR 2020) (15 U.S.C. 637(a)(17)).

[X] (27) 52.222-3, Convict Labor (JUN 2003) (E.O. 11755).

[ ] (28) 52.222-19, Child Labor-Cooperation with Authorities and Remedies (JAN 2020) (E.O. 13126).

[X] (29) 52.222-21, Prohibition of Segregated Facilities (APR 2015).

[X] (30)(i) 52.222-26, Equal Opportunity (SEP 2016) (E.O. 11246).

[ ] (ii) Alternate I (FEB 1999) of 52.222-26.

[X] (31)(i) 52.222-35, Equal Opportunity for Veterans (JUN 2020) (38 U.S.C. 4212).

[ ] (ii) Alternate I (JUL 2014) of 52.222-35.

[X] (32)(i) 52.222-36, Equal Opportunity for Workers with Disabilities (JUN 2020) (29 U.S.C. 793).

[ ] (ii) Alternate I (JUL 2014) of 52.222-36.

[X] (33) 52.222-37, Employment Reports on Veterans (JUN 2020) (38 U.S.C. 4212).

[X] (34) 52.222-40, Notification of Employee Rights Under the National Labor Relations Act (DEC 2010) (E.O.

13496).

[X] (35)(i) 52.222-50, Combating Trafficking in Persons (OCT 2020) (22 U.S.C. chapter 78 and E.O. 13627).

[ ] (ii) Alternate I (MAR 2015) of 52.222-50 (22 U.S.C. chapter 78 and E.O. 13627).

[ ] (36) 52.222-54, Employment Eligibility Verification (OCT 2015). (E. O. 12989). (Not applicable to the acquisition of commercially available off-the-shelf items or certain other types of commercial items as prescribed in

22.1803.)

[ ] (37)(i) 52.223-9, Estimate of Percentage of Recovered Material Content for EPA-Designated Items (MAY 2008)

(42 U.S.C. 6962(c)(3)(A)(ii)). (Not applicable to the acquisition of commercially available off-the-shelf items.)

[ ] (ii) Alternate I (MAY 2008) of 52.223-9 (42 U.S.C. 6962(i)(2)(C)). (Not applicable to the acquisition of commercially available off-the-shelf items.)

[ ] (38) 52.223-11, Ozone-Depleting Substances and High Global Warming Potential Hydrofluorocarbons (JUN

2016) (E.O. 13693).

[ ] (39) 52.223-12, Maintenance, Service, Repair, or Disposal of Refrigeration Equipment and Air Conditioners

(JUN 2016) (E.O. 13693).

[ ] (40)(i) 52.223-13, Acquisition of EPEAT®-Registered Imaging Equipment (JUN 2014) (E.O.s 13423 and

13514).

[ ] (ii) Alternate I (OCT 2015) of 52.223-13.

[ ] (41)(i) 52.223-14, Acquisition of EPEAT®-Registered Televisions (JUN 2014) (E.O.s 13423 and 13514).

(ii) Alternate I (JUN 2014) of 52.223-14[ ] (42) 52.223-15, Energy Efficiency in Energy-Consuming Products (MAY 2020) (42

U.S.C. 8259b).

[ ] (43)(i) 52.223-16, Acquisition of EPEAT®-Registered Personal Computer Products (OCT 2015) (E.O.s 13423 and 13514).

[ ] (ii) Alternate I (JUN 2014) of 52.223-16.

[X] (44) 52.223-18, Encouraging Contractor Policies to Ban Text Messaging While Driving (JUN 2020) (E.O.

13513).

[ ] (45) 52.223-20, Aerosols (JUN 2016) (E.O. 13693).

[ ] (46) 52.223-21, Foams (JUN 2016) (E.O. 13693).

[ ] (47)(i) 52.224-3, Privacy Training (JAN 2017) (5 U.S.C. 552a).

[ ] (ii) Alternate I (JAN 2017) of 52.224-3.

[ ] (48) 52.225-1, Buy American-Supplies (JAN 2021) (41 U.S.C. chapter 83).

[ ] (49)(i) 52.225-3, Buy American-Free Trade Agreements-Israeli Trade Act (JAN 2021) (41 U.S.C. chapter 83, 19

U.S.C. 3301 note, 19 U.S.C. 2112 note, 19 U.S.C. 3805 note, 19 U.S.C. 4001 note, Pub. L. 103-182, 108-77, 108-

78, 108-286, 108-302, 109-53, 109-169, 109-283, 110-138, 112-41, 112-42, and 112-43.

[ ] (ii) Alternate I (JAN 2021) of 52.225-3.

[ ] (iii) Alternate II (JAN 2021) of 52.225-3.

[ ] (iv) Alternate III (JAN 2021) of 52.225-3.

[ ] (50) 52.225-5, Trade Agreements (OCT 2019) (19 U.S.C. 2501, et seq., 19 U.S.C. 3301 note).

[ ] (51) 52.225-13, Restrictions on Certain Foreign Purchases (FEB 2021) (E.O.'s, proclamations, and statutes administered by the Office of Foreign Assets Control of the Department of the Treasury).

[ ] (52) 52.225-26, Contractors Performing Private Security Functions Outside the United States (OCT 2016)

(Section 862, as amended, of the National Defense Authorization Act for Fiscal Year 2008; 10 U.S.C. 2302 Note).

[ ] (53) 52.226-4, Notice of Disaster or Emergency Area Set-Aside (NOV 2007) (42 U.S.C. 5150).

[ ] (54) 52.226-5, Restrictions on Subcontracting Outside Disaster or Emergency Area (NOV 2007) (42 U.S.C.

5150).

[ ] (55) 52.229-12, Tax on Certain Foreign Procurements (FEB 2021).

[ ] (56) 52.232-29, Terms for Financing of Purchases of Commercial Items (FEB 2002) (41 U.S.C. 4505, 10 U.S.C.

2307(f)).

[ ] (57) 52.232-30, Installment Payments for Commercial Items (JAN 2017) (41 U.S.C. 4505, 10 U.S.C. 2307(f)).

[X] (58) 52.232-33, Payment by Electronic Funds Transfer-System for Award Management (OCT 2018) (31 U.S.C.

3332).

[ ] (59) 52.232-34, Payment by Electronic Funds Transfer - Other than System for Award Management (JUL 2013)

(31 U.S.C. 3332).

[ ] (60) 52.232-36, Payment by Third Party (MAY 2014) (31 U.S.C. 3332).

[ ] (61) 52.239-1, Privacy or Security Safeguards (AUG 1996) (5 U.S.C. 552a).

[X] (62) 52.242-5, Payments to Small Business Subcontractors (JAN 2017)(15 U.S.C. 637(d)(13)).

[ ] (63)(i) 52.247-64, Preference for Privately Owned U.S.-Flag Commercial Vessels (FEB 2006) (46 U.S.C. 55305) and 10 U.S.C. 2631).

[ ] (ii) Alternate I (APR 2003) of 52.247-64.

[ ] (iii) Alternate II (FEB 2006) of 52.247-64.

(c) The Contractor shall comply with the FAR clauses in this paragraph (c), applicable to commercial services, that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial items: (Contracting Officer check as appropriate.)

[X] (1) 52.222-41, Service Contract Labor Standards (AUG 2018) (41 U.S.C. chapter 67).

[X] (2) 52.222-42, Statement of Equivalent Rates for Federal Hires (MAY 2014) (29 U.S.C. 206 and 41 U.S.C.

chapter 67).

Employee Class Monetary Wage +Fringe Benefits

23440 Heavy Equipment Operator (WG 10) $28.28

23470 Laborer (WG-2) $15.09

[ ] (3) 52.222-43, Fair Labor Standards Act and Service Contract Labor Standards-Price Adjustment (Multiple Year and Option Contracts) (AUG 2018) (29 U.S.C. 206 and 41 U.S.C. chapter 67).

[ ] (4) 52.222-44, Fair Labor Standards Act and Service Contract Labor Standards-Price Adjustment (MAY 2014)

(29 U.S.C 206 and 41 U.S.C. chapter 67).

[ ] (5) 52.222-51, Exemption from Application of the Service Contract Labor Standards to Contracts for

Maintenance, Calibration, or Repair of Certain Equipment-Requirements (MAY 2014) (41 U.S.C. chapter 67).

[ ] (6) 52.222-53, Exemption from Application of the Service Contract Labor Standards to Contracts for Certain

Services-Requirements (MAY 2014) (41 U.S.C. chapter 67).

[X] (7) 52.222-55, Minimum Wages Under Executive Order 13658 (NOV 2020).

[X] (8) 52.222-62, Paid Sick Leave Under Executive Order 13706 (JAN 2017) (E.O. 13706).

[ ] (9) 52.226-6, Promoting Excess Food Donation to Nonprofit Organizations (JUN 2020) (42 U.S.C. 1792).

(d) Comptroller General Examination of Record. The Contractor shall comply with the provisions of this paragraph

(d) if this contract was awarded using other than sealed bid, is in excess of the simplified acquisition threshold, as defined in FAR 2.101, on the date of award of this contract, and does not contain the clause at 52.215-2, Audit and

Records - Negotiation.

(1) The Comptroller General of the United States, or an authorized representative of the Comptroller General, shall have access to and right to examine any of the Contractor's directly pertinent records involving transactions related to this contract.

(2) The Contractor shall make available at its offices at all reasonable times the records, materials, and other evidence for examination, audit, or reproduction, until 3 years after final payment under this contract or for any shorter period specified in FAR Subpart 4.7, Contractor Records Retention, of the other clauses of this contract. If this contract is completely or partially terminated, the records relating to the work terminated shall be made available for 3 years after any resulting final termination settlement. Records relating to appeals under the disputes clause or to litigation or the settlement of claims arising under or relating to this contract shall be made available until such appeals, litigation, or claims are finally resolved.

(3) As used in this clause, records include books, documents, accounting procedures and practices, and other data, regardless of type and regardless of form. This does not require the Contractor to create or maintain any record that the Contractor does not maintain in the ordinary course of business or pursuant to a provision of law.

(e)(1) Notwithstanding the requirements of the clauses in paragraphs (a), (b), (c), and (d) of this clause, the

Contractor is not required to flow down any FAR clause, other than those in this paragraph (e)(1) of this paragraph in a subcontract for commercial items. Unless otherwise indicated below, the extent of the flow down shall be as required by the clause-

(i) 52.203-13, Contractor Code of Business Ethics and Conduct (JUN 2020) (41 U.S.C. 3509).

(ii) 52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (JAN 2017)

(section 743 of Division E, Title VII, of the Consolidated and Further Continuing Appropriations Act, 2015 (Pub. L.

113-235) and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions)).

(iii) 52.204-23, Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by

Kaspersky Lab and Other Covered Entities (JUL 2018) (Section 1634 of Pub. L. 115-91).

(iv) 52.204-25, Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or

Equipment. (AUG 2020) (Section 889(a)(1)(A) of Pub. L. 115-232).

(v) 52.219-8, Utilization of Small Business Concerns (OCT 2018) (15 U.S.C. 637(d)(2) and (3)), in all subcontracts that offer further subcontracting opportunities. If the subcontract (except subcontracts to small business concerns) exceeds the applicable threshold specified in FAR 19.702(a) on the date of subcontract award, the subcontractor must include 52.219-8 in lower tier subcontracts that offer subcontracting opportunities.

(vi) 52.222-21, Prohibition of Segregated Facilities (APR 2015).

(vii) 52.222-26, Equal Opportunity (SEP 2016) (E.O. 11246).

(viii) 52.222-35, Equal Opportunity for Veterans (JUN 2020) (38 U.S.C. 4212).

(ix) 52.222-36, Equal Opportunity for Workers with Disabilities (JUN 2020) (29 U.S.C. 793).

(x) 52.222-37, Employment Reports on Veterans (JUN 2020) (38 U.S.C. 4212).

(xi) 52.222-40, Notification of Employee Rights Under the National Labor Relations Act (DEC 2010) (E.O. 13496).

Flow down required in accordance with paragraph (f) of FAR clause 52.222-40.

(xii) 52.222-41, Service Contract Labor Standards (AUG 2018) (41 U.S.C. chapter 67).

(xiii) [ ] (A) 52.222-50, Combating Trafficking in Persons (OCT 2020) (22 U.S.C. chapter 78 and E.O. 13627).

[ ] (B) Alternate I (MAR 2015) of 52.222-50 (22 U.S.C. chapter 78 and E.O. 13627).

(xiv) 52.222-51, Exemption from Application of the Service Contract Labor Standards to Contracts for

Maintenance, Calibration, or Repair of Certain Equipment-Requirements (MAY 2014) (41 U.S.C. chapter 67).

(xv) 52.222-53, Exemption from Application of the Service Contract Labor Standards to Contracts for Certain

Services-Requirements (MAY 2014) (41 U.S.C. chapter 67).

(xvi) 52.222-54, Employment Eligibility Verification (OCT 2015) (E. O. 12989).

(xvii) 52.222-55, Minimum Wages Under Executive Order 13658 (NOV 2020).

(xviii) 52.222-62 Paid Sick Leave Under Executive Order 13706 (JAN 2017) (E.O. 13706).

(xix)(A) 52.224-3, Privacy Training (JAN 2017) (5 U.S.C. 552a).

(B) Alternate I (JAN 2017) of 52.224-3.

(xx) 52.225-26, Contractors Performing Private Security Functions Outside the United States (OCT 2016) (Section

862, as amended, of the National Defense Authorization Act for Fiscal Year 2008; 10 U.S.C. 2302 Note).

(xxi) 52.226-6, Promoting Excess Food Donation to Nonprofit Organizations (JUN 2020) (42 U.S.C. 1792). Flow down required in accordance with paragraph (e) of FAR clause 52.226-6.

(xxii) 52.247-64, Preference for Privately Owned U.S.-Flag Commercial Vessels (FEB 2006) (46 U.S.C. 55305 and

10 U.S.C. 2631). Flow down required in accordance with paragraph (d) of FAR clause 52.247-64.

(2) While not required, the Contractor May include in its subcontracts for commercial items a minimal number of additional clauses necessary to satisfy its contractual obligations.

(End of clause)

52.228-5 Insurance - Work on a Government Installation. (JAN 1997)

52.252-2 Clauses Incorporated by Reference. (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): https://www.acquisition.gov/browse/index/far

(End of clause)

452.215-73 Postaward Conference. (NOV 1996)

A post award conference with the successful quoter may be scheduled at a mutually agreed upon time and location.

452.228-71 Insurance Coverage. (NOV 1996)

Pursuant to FAR clause 52.228-5, Insurance-Work on a Government Installation, the Contractor will be required to present evidence to show, as a minimum, the amounts of insurance coverage indicated below:

(a) Workers Compensation and Employer's Liability. The Contractor is required to comply with applicable Federal and State workers' compensation and occupational disease statutes. If occupational diseases are not compensable under those statutes, they shall be covered under the employer's liability section of the insurance policy, except when contract operations are so commingled with a Contractor's commercial operations that it would not be practical to require this coverage. Employer's liability coverage of at least $100,000 shall be required, except in

States with exclusive or monopolistic funds that do not permit worker's compensation to be written by private carriers.

(b) General Liability. The Contractor shall have bodily injury liability insurance coverage written on a comprehensive form of policy of at least $500,000 per occurrence.

(c) Automobile Liability. The Contractor shall have automobile liability insurance written on a comprehensive form of policy. The policy shall provide for bodily injury and property damage liability covering the operation of all automobiles used in connection with performing the contract. Policies covering automobiles operated in the United

States shall provide coverage of at least $200,000 per person and $500,000 per occurrence for bodily injury and

$20,000 per occurrence for property damage or loss.

(d) Aircraft Public and Passenger Liability. When aircraft are used in connection with performing the contract, the

Contractor shall have aircraft public and passenger liability insurance. Coverage shall be at least $200,000 per person and $500,000 per occurrence for bodily injury, other than passenger injury. Coverage for passenger injury shall be at least $200,000 multiplied by the number of seats or passengers, whichever is greater.

(End of Clause) http://www.acquisition.gov/browse/index/far http://www.acquisition.gov/browse/index/far

Brush Creek and Big Bar Hazardous Material and Debris Removal

1.0 Scope of Work

The goal of this project is to remove all ash, debris and contaminated soil as described in the technical requirements below at the Plumas National Forest Brush Creek Work Center and Big Bar Repeater Site.

2.0 Background

On September 8th, 2020 the North Complex Fire traveled through the Brush Creek Work Center located at 12815 Oro Quincy Hwy, Berry Creek, California with high intensity. All but three buildings located at the Work Center were destroyed, including items not classified as buildings. Standard Phase 1

Hazardous Material removal was completed in February 2021 and a final report is included as

Attachment B for reference.

The Big Bar radio vault (placed in 1986) at the Big Bar Lookout tower was completely burned over in

2018 in the Camp Fire. Contained within the vault were 12 lead acid batteries. The batteries melted and the contents spilled throughout the vault and spilled into the surrounding soil, the vault itself is contaminated throughout. There is no Phase 1 Hazardous Material report for the Repeater Vault site.

3.0 Technical Requirements / Tasks

Remove and dispose of ash and debris (includes contaminated soil) generated as a result of the North

Complex and Camp Fire. Efforts to recycle as much debris as possible shall be undertaken during this option. This option includes but is not limited to:

a. Site Assessment and Documentation: Establish clean up goals and identify and remove any asbestos-containing materials/hazardous materials that were inadvertently overlooked during Phase 1.

b. Ash, Debris and Contaminated Soil Removal and Disposal at Brush Creek: The contractor shall be responsible for removal, transport, and proper disposal of all burnt debris, ash, and contaminated soil located at the Brush Creek Work Center. Burnt debris includes, but is not limited to destroyed vehicles, CMU, fireplace chimneys, misc. drums, roofing and electrical panels associated with each building.

The stone/concrete grill located adjacent to Building 1316 and the fireplace of 2040 and 1044 are not to be removed or destroyed. Only the forklift shall be removed from the boneyard. A site map with building numbers and additional details can be found in Attachment A. Items that can be recycled

(e.g., concrete, metal, appliances etc.) shall be recycled. After the ash and debris has been removed from the property to a level of visually clean, the contractor shall remove an additional 3 to 6 inches of soil from the impacted area.

c. Demolition and Removal of Building Foundation:

1. 5402-2040: Remove debris within the foundation and surrounding area and cap any utilities tied into foundation. Chimney and foundation shall not be removed or damaged.

2. 5402-1040: Remove debris within the foundation and surrounding area and cap any utilities tied into foundation. Foundation to be filled in with engineered and consolidated fill to ground level.

3. 5402-1044: Demolition and removal of perimeter foundation and porch steps, cap any utilities tied into foundation. Chimney shall not be removed or damaged.

4. 5402-1316: Remove debris within the foundation and surrounding area and cap any utilities tied into foundation. CMU block foundation and adjacent sidewalk shall not be removed or damaged in the debris disposal process.

5. 5402-2140: Demolition, and removal of concrete foundation and structure, cap any utilities tied through foundation. Soil under foundation shall also be removed to create a natural slope.

6. 5402-2340: Demolition and removal of concrete foundation, structures, and entrance steps, cap any utilities tied through foundation

7. 5402-2369: Demolition and removal of perimeter concrete foundation, cap any utilities tied through foundation. Surrounding asphalt shall not be removed.

8. 5402-2640: Demolition and removal of concrete foundation, cap any utilities tied through foundation

d. Debris and Contaminated Soil Removal and Disposal at the Big Bar Repeater Site: Contained within the vault were 12 lead acid batteries. The batteries melted and the contents spilled throughout the vault and spilled into the surrounding soil. The contaminated soil is estimated to be less than 1 cubic yard of material. The vault is contaminated throughout. The vault sits on a concrete slab. There is a small amount of acid on the concrete. In addition to removing the vault and the contaminated soil, the contractor shall abate the acid mixture from the concrete and salvage the concrete to the greatest extent possible.

e. Confirmation Sampling: Ash and soil located at the site is contaminated with heavy metals, dioxins, benzene, polychlorinated biphenyls in various locations. Collect soil samples from a depth of 0 to 3 inches for confirmation sampling. Results must be at or below residential cleanup goals established for the debris removal phase. The lower of the residential regulatory screening levels established by EPA or DTSC shall be used. If the background concentration is higher than the screening level, the background level will be the cleanup goal.

d. Erosion Control Measures: Implement and maintain adequate erosion control measures at the end of the debris removal process using Best Management Practices.

e. Final Inspection to Insure Clean Up Goals Obtained: The Forest Service will inspect the site to ensure that all work has been completed as specified.

f. Asbestos Abatement: Asbestos discovered during demolition that is friable or may become friable must be removed from the structures prior to demolition. Demolition work shall be discontinued if asbestos is encountered.

g. Underground Storage Tanks: The Contracting Officer shall be notified of any Underground Storage

Tanks discovered during performance of the work identified in this Statement of Work. The

Contracting Officer will provide further instructions on how to proceed.

4.0 Site Location and Access:

No site visit will be planned for this project. Offerors or quoters are urged and expected to inspect the site where services are to be performed and to satisfy themselves regarding all general and local conditions that may affect the cost of contract performance, to the extent that the information is reasonably obtainable. In no event shall failure to inspect the site constitute grounds for a claim after contract award

Site #1: Brush Creek Work Center

Physical Address: 12815 Oro Quincy Hwy, Berry Creek, CA 95916

Driving Instructions:

From Oroville: Take Oro Quicny Hwy 162 for approximately 23 miles and the workstation will be on your left

From Quincy (not open during winter): Head West on Bucks Lake Rd, for approximately 37 miles and workstation will be on the right

Site Access:

Site is accessed through a locked Forest Service Gate and access through will be coordinated with COR or site contact. The Brush Creek WS is still an active facility, but activities are confined to the standing structures and will not impact the contractors perfomance to complete the scope of work. Any hazard tree removal still ongoing when contractor arrives on site will be coordinated with COR or site contact.

Site is accessible in the winter (~November-April), but there may be weather and snow present.

Site #2: Big Bar Repeater Site

Location: Lat/Long 39.777420, -121.427880

Driving Instructions:

From Oroville via 162: Take Oro Quincy Hwy 162 for approximately 33 miles and turn left near the

Four Trees Warming Hut onto Forest Service Road 23N28. Continue on 23N28 for approximately 8 miles and turn right onto the Big Bar Mountain Spur. Repeater site is approximately ½ mile up the road.

From Oroville via 70: Take Highway 70 for approximately 25 miles and turn right onto Four Trees

Road (Note: this road has a gate that requires a Forest Service personnel to open and close). Continue on Four Trees Road for approximately 6 miles. Turn right onto 23N28 for approximately 3 miles, then turn right onto the Big Bar Mountain Spur. Repeater site is approximately ½ mile up the road.

Site Access:

Site is accessed along Forest Service Roads. The last portion of the road is natural surface and steeper.

Road is not accessible during during the winter until the snow melts (~October-May)

PERIOD OF PERFORMANCE: October 1, 2021 through February 28, 2022

5.0 Fees:

The Contractor shall, without expense to the Government, pay all Federal, State, County and Municipal fees and permits applicable to the performance of the work.

6.0 Permits:

The Contractor shall obtain all special permits and licenses and give all notices required for the performance and completion of the abatement/demolition and removal work, hauling, and disposal of debris. Demolition of structures covered under this Statement of Work may also require a permit from

Cal/OSHA if the structure to be demolished is higher than three stories or 36 feet, or the demolition work would require a 5 feet or deeper excavation into which a person needs to descend. To prevent delays in the accomplishing the work identified in this Statement of Work, the Contractor shall review the list of structures to be demolished and identify structures requiring both permits. The Contractor is responsible for obtaining all permits and requesting permit extensions.

7.0. Notifications and Inspections:

The Contractor shall be responsible for completing all notifications required to perform the activities covered in this Statement of Work.

The Contractor shall be responsible for scheduling all required inspections within the timeframe specified to prevent delays in accomplishing the activities covered in this Statement of Work.

Schedule of Work: Contractor shall coordinate a site visit with the technical contact to the site prior to commencement of work. Contractor can work 7 days a week from the hours of 5am to 5pm, unless coordinated with the site contact otherwise.

8.0 Use of Government Facilities:

a. Equipment Storage: Contractor may temporarily store equipment and vehicles at the project site at locations designated by the Contracting Officer. However, the Government will not be responsible for any damage caused to the Contractor's property.

b. Restrooms: Contractor is responsible for providing their own temporary restrooms and handwashing facilities as required.

c. Site Operations: In no case shall the Contractor or his work interfere with normal or emergency operations at the project site. (The Contractor shall not block access to active facilities at any time).

9.0 Deliverables/Schedule:

a. Work Plan

Project Specific work plans shall be submitted for Forest Service review and approval after award of the

Contract.

All workplans shall include a wet ink signature and seal by one or more of the following California

Registered professionals who have a minimum of five years’ experience in the environmental field:

• Registered Geologist,

• Certified Engineering Geologist,

• Professional Engineer,

• Certified Hydro Geologist.

A site-specific health and safety plan that includes air monitoring must be developed and submitted prior to conducting any field work. The health and safety plan must be signed by the Contractor’s

Health and Safety Manager. The health and safety plan must be updated throughout the project to reflect new site conditions.

The Work Plan shall include, but is not limited to, the following:

• A listing of personnel, including subcontractor(s), working on the project. Training, certification, and licensing requirements for personnel performing abatement and demolition. Qualifications and experience of personnel and subcontractors including the registered civil engineer that will be overseeing the work to be performed. Documentation of Hazardous Waste Operations Training, Asbestos and Lead-Based Paint Certification for on-site personnel as well as license and registration for personnel involved in transporting hazardous waste generated by activities covered under this contract.

• Detailed description of how the demolition and abatement of hazardous materials (if required) activities will be performed.

• Drawings of all structures to be demolished that includes a facility layout map identifying facility walls;

entrances/exists, floor drains and sewer drains etc.

• Site map. Pertinent landmarks/structures on-site or in the immediate vicinity including wells, storm drains. Scale, north arrow and legend. Name and address of site and date of work plan.

• Identification marking system that will be used to identify the system and whether or not the system or component is approved for removal.

• Sampling (Location of sampling points and explanation/rationale. Methods and procedures for collecting samples. Sample analytical methods including which samples will be analyzed, QA/QC, name of the certified lab and chain of custody).

• Quality Assurance and Quality Control Plan

• Equipment decontamination procedures.

• Waste storage and disposal methods.

• Site Specific Safety & Health Plan.

• Site Specific Emergency Response Plan.

• Site Specific Field Sampling Plan (FSP). The Contractor shall maximize the use of field characterization technologies such as field-portable x-ray fluorescence equipment.

• Procedures for protecting soils and vegetation during demolition and excavation.

• Specific exclusions/assumptions regarding the specific work to be performed.

• List of equipment to be used on the project.

• List of supplies to be provided.

• Permit and notification requirements.

• Utility abandonment requirements.

• Storm water pollution prevention plan and measures.

• Dust control.

• Debris Management Plan

• A hazardous material/waste management plan, which includes waste identification protocol, an explanation for reuse/disposal chosen, identification of the selected recycling facility or TSD facility.

Documentation and certification of the facility’s ability to accept hazardous materials/wastes shall be provided as an attachment to the work plan.

• Backfill and compaction of depressions caused by excavation, demolition, or removal

• Final Grading Plan

• Project Work Schedule.

• Detailed cost estimate of work to be performed.

Sampling and Analysis Plan (SAP): If required, the SAP shall include a Field Sampling Plan and a

Quality Assurance Project Plan. The Field Sampling Plan shall detail the sampling and data-gathering methods that will be used on the project. The Field Sampling Plan shall, at a minimum, include sampling objectives, sample location and frequency, sampling equipment and procedures and sampling handling and analysis.

The Quality Assurance Project Plan shall, at a minimum, describe the quality assurance and quality control protocols used.

b. Final Report:

The Contractor(s) shall provide the Government with electronic copies of the draft final report for review and comment. Upon approval from the Forest Service, the contractor shall submit a final report signed by the registered geologist or professional engineer responsible for the work, as required by the

State of California. The final report shall include, but is not limited to, the following:

• Detailed description and documentation of work performed.

• Figures documenting location of work performed.

• Hazardous material identification.

• Sampling and analytical data.

• Hazardous materials and contaminated media (soil, water) volumes and quantities.

• Destination and method of reuse, recycling, or disposal of all waste/contaminated material, including rationale for the selected disposition of said material. The name, address and EPA or State

Identification Number of the site shall be included in this section of the report.

• Method of packaging of material/waste to comply with the requirements of this statement of work and to comply with Federal and State requirements for transportation and disposal. This includes the method of transport and name, address, and EPA-Identification Number of all transporters.

• Itemized costs for handling, transport, and disposal.

• Copies of all signed manifests, land disposal restriction forms, waste profile sheets, laboratory test results, etc.

c. Schedule:

Item

No.

Deliverable Objective Due

1 Proposed

Schedule

Demonstrate project timeline to

Government

At time of bid submission

2 Proposed Project

Workplan

Define the responsibilities, timeline, milestones of contract objectives

No later than five (5) business days after contract award

Final Workplan Within 5 days of receipt of Forest Service

Comments

Draft Final Report Within 15 days following completion of site work.

3 Final Report Document required deliverables

(manifests etc.) to the Government

Within 10 days of receipt of Forest Service

Comments

10.0 General Contract…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .