This file is a Questions and Answers document for the GAOA Mesa Fall Furnace Replacement contract (CTNF 127EAX26Q0047).
The Government seeks replacement of an electric furnace with a capacity of 21.6/28.8 kW. Key specifications clarifications include: ASHRAE 193 (not AHRI 193) is the correct standard; AHRI 430 compliance requirements are disregarded; and the unit should be an electric furnace without an evaporator coil for future air conditioning. The offer due date and time is August 27, 2026 at 3:00 PM MDT. Offerors must price CLIN 0001 only, as FAR 52.217-8 is not included in the solicitation. All contractors must be registered in the System for Award Management (SAM). The existing furnace dimensions are 35 x 22 x 24.5 inches, and the electrical flex conduit size is 2 inches. The building is vacant during the 4-week equipment lead time, and no other heat sources are available. Air filters must follow the manufacturer's recommendations for the newly installed unit. The electrical panel contains a 200-amp unfused disconnect connected to three 50-amp breakers integrated into the unit, which can accommodate a 25 kW heat kit. The document does not address furnace mounting method discrepancies or existing cooling system details, leaving those questions unanswered.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GAOA Mesa Fall Furnace Replacement CTNF
127EAX26Q0047
Questions and Answers
1. Section 237313.13:
• The specification lists “AHRI 193,” but the vendor believes this should be “ASHRAE
193.” Could you please confirm the intended standard?
• The specification lists AHRI 430, but the vendor reports that it cannot find demonstrated
AHRI 430 compliance for either the basis-of-design Bryant FJ4DNXD60L00 or its proposed Coleman units. Is AHRI 430 compliance required for the proposed equipment, and if so, what documentation will be accepted?
Answer:
• ASHRAE 193 is correct.
• AHRI 430 was included in error. Disregard
2. Question:
Offer due date and time. Block 8 of the SF-1449 states offers are due 08/27/2026 at 1500 MD.
The SAM.gov notice states Aug 27, 2026 at 3:00 AM MDT. Please confirm which time governs.
Answer: Time should read 3:00 PM
3. Question:
Furnace mounting method. Specification Section 237313.13 requires the unit to be suspended from a structural steel support frame using threaded rods and spring hangers. The Typical Furnace Installation Detail on Sheet 3 of Attachment 2 depicts a floor-mounted upflow unit with primary and secondary condensate drains. Please confirm which installation method the Government requires.
Answer:
4. Question:
Existing cooling system. The Variable Speed Electric Furnace Schedule on Sheet 3 identifies heating capacity, airflow, and electrical characteristics but does not indicate a cooling function.
Please confirm whether the existing unit is served by a direct expansion cooling system, and if so, identify the refrigerant type and confirm whether reconnection of the existing evaporator coil and refrigerant piping is within the scope of this requirement.
Answer:
5. Existing cooling system. The Variable Speed Electric Furnace Schedule on Sheet 3 identifies heating capacity, airflow, and electrical characteristics but does not indicate a cooling function.
Please confirm whether the existing unit is served by a direct expansion cooling system, and if so, identify the refrigerant type and confirm whether reconnection of the existing evaporator coil and refrigerant piping is within the scope of this requirement.
6. Pricing structure. The Evaluation and Basis for Award section references pricing for the base period and all option periods, and a six month extension under FAR 52.217-8. The Schedule of Items contains a single lump sum line, CLIN 0001, and FAR 52.217-8 is not included in the clause list. Please confirm that offerors are to price CLIN 0001 only.
Answer: FAR 52.217-8 is not included in the solicitation documents
5. Is 52.204-13 applicable to this solicitation?
Answer: Yes, all contractors shall be registered in SAM.
6. Is Guardian bran an acceptable equivalent?
Answer:
7. The unit tag shows the existing furnace is a 10kw capacity. Can this be verified?
Answer: photo of Sticker attached. Appears to be 21.6/28.8 kW
8. What is the existing supply power to the furnace and breaker ampacity to the circuit?
9. What size is the electrical flex conduit going into the existing furnace?
Answer: 2”
10. There is conflicting information on page 3 of 3.
a. The schedule is calling for 80% AFUE. Confirm we you want an electric furnace?
Answer: Confirmed, electric furnace
b. Is new air filter required a 4” thick filter with a merv 10 rating acceptable or will a 2” thick merv 10 work?
Answer: Follow manufacturers’ recommendation for the newly installed unit.
c. Do you want the new electric furnace with an evaporator coil for potential future A/C or no evaporator coil?
Answer: No
d. As of this moment equipment has a 4-week lead time from date of order which could run into cooler temperatures. Does the building have other sources of heat to compensate during the equipment changeout?
Answer: No, but building is vacant
e. Can someone on site get us the dimensions of the current furnace, particularly the length?
Answer: 35 x 22 x 24.5
11. Can the panel handle a 25kw heat kit?
Answer: There is a 200 amp unfused disconnect that connects to three 50 amp breakers integrated into the unit. Pictures attached.