Attachment 1 - SOW Luna Fire Recovery Road Work.docx
DOCX document 54 KB Posted
- Attached to
- 1120116 - Luna Fire Recovery Road Work Federal contract opportunity
- Solicitation number
- 127EAX24R0012
- Issued by
- Department of Agriculture Forest Service
About this file
This document is a Statement of Work (SOW) for a federal contract opportunity related to the Luna Fire Recovery Road Work project. The base contract involves construction and maintenance activities on four National Forest Service System Roads, including road grading, drainage maintenance, culvert removal and replacement, gate installation, and cattle guard maintenance and replacement. Two option items in the contract provide for furnishing, hauling, and placing aggregate spot surfacing along the routes in the base contract. The work must be completed within a 120-day period for the base contract and a 60-day period for the option items. Key contractor requirements include providing a traffic control plan, equipment inspection, and notification to the Contracting Officer's Representative prior to commencement of work. Deliverables include various plans and schedules to be submitted within 10 business days of contract award. The related federal contract opportunity has a solicitation number of 127EAX24R0012 and is a pre-solicitation for the Luna Fire Recovery Road Work project.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment 5 - BioPreferred.pdf | ||
| Attachment 4 - Environmental Assessment.pdf | ||
| Attachment 3 - FIRE PLAN.pdf | ||
| Attachment 6 - WD NM20240037.pdf | ||
| Attachment 2 - Drawings.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
US Department of Agriculture (USDA)
Statement of Work
Contents
| Project | 3 |
| General Information | 3 |
| 1.0 Scope of Work | 3 |
| 2.0 Background | 3 |
| 3.0 Technical Requirements / Tasks | 4 |
| 4.0 Government Furnished | 4 |
| 5.0 Deliverables / Schedule | 5 |
| 6.0 Travel | 5 |
| 7.0 Contractor’s Key Personnel | 5 |
Project Luna Fire Recovery Road Work
General Information
1.0 Scope of Work
This Project includes a base contract in addition to two option items. The base contract involves construction and maintenance activities such as road grading with ditch/drainage maintenance; drainage dip construction; culvert removal and replacement; new culvert installation; new gate installation; cattle guard maintenance and wingwall replacement; and cattleguard removal and replacement. The base contract involves four National Forest Service System Roads (NFSRs). The road details are as follows:
· NFSR 76
· 29.7 miles total
· Maintenance level 3, double lane: miles 0.00-9.65
· Maintenance level 2, single lane: miles 9.65-29.70
· Road needs include reconditioning (with ditch and drainage structure maintenance), cattle guard removal/replacement, cattleguard maintain and replace wingwalls, culvert installation.
· NFSR 17
· 4 miles total
· Maintenance level 2, single lane: miles 0.00-4.00
· Road needs include reconditioning (with ditch and drainage structure maintenance), culvert/fish barrier installation.
· NFSR 440
· 10.55 miles total
· Maintenance level 3, single lane: miles 0.00-10.55
· Road needs include reconditioning (with ditch and drainage structure maintenance), culvert removal and replacement.
· NFSR 440M
· 1.94 miles total
· Maintenance level 2, single lane: miles 0.00-1.94
· Road needs include reconditioning (with ditch and drainage structure maintenance), excavation and embankment (drain dip construction).
Option items #1 and #2 contain furnishing, hauling, and placing with compaction of aggregate spot surfacing along the routes listed in the base contract. Spot surfacing sections will be flagged by Forest Service representatives. All culverts, gates, and cattleguards to be removed are to be disposed of off forest land.
The contractor shall have a Traffic Control Plan submitted to the CO for approval a minimum ten (10) days prior to commencing operations. A Traffic Control Plan shall be approved prior to beginning any work, see Specifications for more details. If road closure is needed, coordination with COR is required fourteen (14) days before intended closure.
The contractor is responsible for utility locates. Damages to any utilities shall be the responsibility of the contractor. Locates are available by calling 811.
The contractor for this work shall furnish all materials, supplies, equipment, transportation, labor, quality control, and supervision necessary to complete these tasks.
2.0 Background
N/A
Contractor Requirements
3.0 Technical Requirements
All equipment shall be pressure washed prior to entering Forest Service land to ensure it is clean of seeds and other debris for weed control, subject to inspection. A 48 hour notice shall be given to COR to inspect equipment prior to mobilization onto NFS lands. No fuel storage on site is permitted. Fuel trucks must be equipped with spill containment kits and portable berms that meet all state and federal regulations.
The following video may be viewed to enhance the contractor’s knowledge of Forest Service roads and expectations for this contract.
https://www.youtube.com/watch?v=nTEfXsDqdUg.
All work in the base contract shall be accomplished within one-hundred twenty (120) days of the issuance of the initial base contract Notice-to-Proceed.
All work in the option item(s) shall be completed within 60 days of the issuance of the option item Notice-to-Proceed.
The contractor should receive CO approval of work schedule at least fourteen (14) days prior to starting work. Contractor shall notify CO seven (7) days prior to work commencing and pre-construction meeting is required.
TRAFFIC CONTROL
The Contractor shall provide, erect and maintain all necessary barricades, suitable and sufficient lights, danger signals, signs, and other traffic control devices, and shall take all necessary precautions for the protection of the work and safety of the public. Roads closed to traffic shall be protected by effective barricades, and obstructions shall be illuminated during the hours of darkness. Suitable warning signs shall be provided to properly control and direct traffic.
The Contractor shall erect warning signs in advance to any place on the project where operations may interfere with the use of the road or trail by traffic and at all intermediate points where the new work crosses or coincides with an existing road or trail. All road barricades, warning signs, lights, temporary signals, flagman and operators and equipment, and other protective devices, except for special devices, shall conform with Part VI of the Manual on Uniform Traffic Control Devices for Streets and Highways, published by the Federal Highway Administration and applicable safety codes.
4.0 Government Furnished
None
5.0 Deliverables / Schedule
LIST OF SUBMITTALS
| Submittals |
| Referenced by Specification No. |
| Objective |
| Due |
| Traffic Control Plan |
| FSSS 156 & Traffic Control Clause |
No later than ten (10) business days after contract award
| Safety Plan |
| H-1 Safety Clause |
No later than ten (10) business days after contract award
| Hazardous Spill Plan |
| FAR 52.223-3 & FSSS 107 |
No later than ten (10) business days after contract award
| Fire Plan |
| List of Attachments |
No later than ten (10) business days after contract award
| Construction Schedule |
| 52.236-15 |
No later than ten (10) business days after contract award
| Overload Permits |
| Contractor’s use of Existing Roads |
No later than ten (10) business days after contract award
| Material Certifications |
| Referenced by Specification No. |
| Time of Government Approval After Submittal |
| Number of Sets |
| Material Certifications for Corrugated Metal Pipes |
| 707.02 |
| 2 Weeks |
| 1 |
| Aggregate Degradation |
| 703 |
| 2 weeks |
| 1 |
6.0 Travel
Mobilization/Demobilization shall be paid once for cost to mobilize and demobilize equipment to and from work site within Carson NF. Costs incurred while performing the work or traveling between locations on the Carson NF will not be paid. If a road has not been accepted by the COR prior to Contractor moving equipment to another road; the Contractor will incur any cost associated with returning equipment to road for additional items that may be required for acceptance.
7.0 Contractor’s Key Personnel
452.237-74 Key Personnel (FEB 1988)
(a) The Contractor shall assign to this contract the following key personnel: