Roof Replacement SOW.pdf
PDF 99 KB Posted
- Attached to
- PARKER CANYON LAKE WELL HOUSE ROOF REPLACEMENT
- Solicitation number
- 127EAX24Q0027
About this file
This document is a Statement of Work (SOW) for a roof replacement project on the Parker Canyon Lake Well House located in the Coronado National Forest in Cochise County, Arizona. The SOW outlines the planned work, which involves removing the existing roofing on approximately 450 square feet and replacing it with a new standing seam metal roof, new roofing materials, and appurtenances. It also includes replacing any damaged sub-roof (estimated at 30%) with new decking material and installing ice and water shields along the roof eaves.
The related federal contract opportunity, Solicitation Number 127EAX24Q0027, is for the PARKER CANYON LAKE WELL HOUSE ROOF REPLACEMENT project. The Department of Agriculture Assistant Secretary for Departmental Management is the issuing agency. The project involves the same scope of work as described in the SOW.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Wege Determination AZ20240038 Building.pdf | ||
| Schedule of Items.pdf | ||
| CORONADO FIRE PLAN.pdf | ||
| 127EAX24Q0027 Questions.docx | DOCX document | |
| SOL_127EAX24Q0027 0001.pdf | ||
| SOL_127EAX24Q0027.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PARKER CANYON LAKE WELL HOUSE ROOF REPLACEMENT
STATEMENT of WORK
Coronado National Forest March 2023 gerardo.pedrego@usda.gov
Project Location: Work shall take place at the Parker Canyon Lake Well House which is located on the Sierra Vista Ranger District of the Coronado National Forest in Cochise County, Arizona. The Well House may be accessed by using State Highway 83 which begins at Exit 281 off I-10. Travel south approximately 50 miles on AZ 83 to Parker Canyon Lake. Continue on National Forest System Road 48C through the developed campground north approximately 1 mile to a locked gate. The Well House is located approximately 1 mile beyond the locked gate on an administrative only road. Legal description: Township 23S, Range 19E, and Section 18. The coordinates for the site are Latitude: 31.437411° and the Longitude: -110.454767°.
Planned Work: The current roof on the Parker Canyon Lake Well House is in need of repair. The work associated with this project entails removing the existing roofing on approximately 450 ft2 and replacing with a new standing seam metal roof, new roofing materials and all appurtenances. Replace any damaged sub-roof (estimate 30%) with new decking material and install ice and water shields, 24" minimum width along roof eaves.
Planned Disturbance: Construction activities associated with this project will be limited to the Parker Canyon Lake Well House. Any ground disturbance shall be limited to previously disturbed areas directly adjacent the building.