CSI SPECIFICATION INDEX
FOR
Prescott National Forest
CONT0309 ENG
Bradshaw Ranger District Water Leak Repair
Contents
CSI SPECIFICATION INDEX
DIVISION 1 GENERAL REQUIREMENTS
01010 – SUMMARY OF WORK
01103 – MEASUREMENT AND PAYMENT
01300 – SUBMITTALS
01400 - QUALITY CONTROL AND QUANTITY MEASUREMENT
01601 – MOBILIZATION
01620 – STORAGE AND PROTECTION
01710 – CLEANING
01730 – OPERATIONS AND MAINTENANCE DATA
DIVISION 2 SITE WORK
02220 - STRUCTURAL EXCAVATION AND BACKFILL
02512 - CONCRETE SIDEWALKS
DIVISION 3 - CONCRETE
03100 - CONCRETE FORMWORK
03345 – CONCRETE FINISHING
SECTION 7 - THERMAL AND MOISTURE PROTECTION
07151 – LIQUID WATER PROOFING MEMBRANE
07900 – CAULKING AND SEALANTS
END OF SPECIFICATION INDEX
SUMMARY OF WORK 01010
CONT0309 Bradshaw Ranger District Water Leak Repair Specifications P a g e | 2
DIVISION 1 GENERAL REQUIREMENTS
01010 – SUMMARY OF WORK
PART 1 GENERAL
1.1 Location
The Bradshaw District Office where the work shall be performed is located at 344 S. Cortez Street, Prescott, AZ 86303 on the Prescott National Forest.
1.2 Objective
The intent of this project is to excavate soil on the east side of this administrative building exposing the exterior of the subterranean concrete wall of the basement, to fill cracks and repair the defects of this wall, attach a water proofing membrane to the wall, to backfill, to repair damage to down spouts and drains, to pour concrete up to the building, to install planters with desert plants and to install and anchor park benches.
All work shall be completed in accordance with project specifications and current building codes.
The work includes all labor, material, supervision, and equipment necessary to perform all the operations for the work specified herein.
The Contractor shall be responsible for any necessary site investigations, for detailed and accurate material lists, and all field measurements necessary to complete the construction. Sidewalk closures and building permits shall be obtained from the City of Prescott by the Contractor.
1.3 Background Information:
This building was constructed between 1947 and 1957 and was remodeled in 2020. It is currently occupied by Forest Service employees and is opened to the public. The work will need to be coordinated with the COR to provide a safe area and to reduce impacts to employees and to the public.
1.4 Utilities:
There is electricity available at this site. The Contractor is responsible for providing their own connection to source of power.
There is water and sanitary services available at the site.
The Contractor shall always ensure the safety of everyone and shall provide adequate warnings of environmental and safety hazards. Contractor shall coordinate all work activities thoroughly with the
COR.
1.5 Examination of Site:
A site visit will be scheduled, no less than 1 week, prior to the bid closing date. All questions will be submitted in writing to the Contracting Officer within 24 hours after the pre-bid site visit. Please allow 72 hours for the answers to be answered and posted in SAMS.
Specifications P a g e | 3
The Contractor acknowledges he/she has taken the necessary steps to ascertain the nature and location of work and has investigated and satisfied himself/herself as to the general and local conditions that can affect the work or its cost.
Any failure of the contractor to take the actions described and acknowledged in the paragraph will not relieve the Contractor from the responsibility of estimating properly the difficulty and cost of successfully performing the work, or for proceeding to successfully perform the work without additional cost to the Government.
1.6 Timing of Work
Work shall be limited to normal business hours of 7:30 a.m. till 5:00 p.m. Monday – Friday and shall be completed within sixty (60) days of the notice to proceed is issued by the Contracting Officer.
1.7 Government – Furnished Facilities
The administrative site has limited space for the Contractor for staging and storage during the project and will be designated by the Contracting Officer’s Representative at the beginning of the project. Any damage resulting from the Contractor’s use of the site will be repaired and/or replaced at the Contractor’s expense at the direction of the Contracting Officer’s Representative.
Transportation to and from the work site for the Contractor's personnel and materials will be provided at the Contractor's expense.
1.9 Material Sources
All materials shall be obtained from commercial sources unless noted otherwise. Materials referred to by trade name, make, or catalog number shall be regarded as establishing a standard of quality;
substitutions of equal quality can be made by submitting a data sheet of the proposed substituted item to the Contracting Officer’s Representative, for approval.
1.10 Clean up and Disposal – Non-Hazardous Waste
Waste accumulation in approved containers and material staging is allowed at the site. Disposal of waste will be off National Forest Land and in compliance with local, state, and federal laws regarding disposal of construction waste. Before final acceptance of the project by the Government, the Contractor shall remove from Government land all waste materials and rubbish resulting from this work.
1.11 Precautionary Measures
A. Protection of Work: The Contractor shall take precautions to protect all work during the construction period. The Contractor shall provide and maintain adequate protection during severe weather conditions to prevent damage to the work, materials, and equipment. The existing elements of the buildings shall remain undamaged and structurally sound during all phases of this contract. Any damage to the buildings or their functional elements resulting from the Contractor’s work at the sites shall be immediately repaired at no additional cost to the Government.
Specifications P a g e | 4
B. Safety: The Contractor is responsible for safeguarding employees, public, existing facilities, and forest resources from his/her operations. All operations shall comply with the requirements and restrictions of OSHA, the Arizona Occupational Safety and Health Code, and the Workman’s Compensation Board. The Contractor shall erect signs and barricades to make unguarded operations safe as required. Signs and barricades shall be maintained at night and on weekends.
Precautions such as safely storing materials shall be practiced to prevent injury to others in the area.
C. Security: Security is not provided by the Government. The Contractor shall take all precautions deemed necessary to secure the worksites, improvements and equipment. This may include security fencing at the Contractor’s discretion. It is therefore recommended the Contractor make every attempt to bar public access to storage during periods of construction inactivity such as nights and weekends.
1.12 Applicable Codes and Standards
All work shall conform to the latest editions of the International Building Code, American Welding Society Code, American Water Works Association, National Electrical Code, and the American Institute of Steel Construction. All environmental codes, including RCRA and NESHAP, shall be adhered by the Contractor.
1.13 Subsurface Soils and Investigations
No auger boring tests were made in the area. Under supervision of the Engineer, the Contractor shall undertake any site investigations necessary to ascertain subsurface conditions including arranging utility location services.
END OF SPECIFICATION 01010
MEASUREMENT AND PAYMENT 01103
Specifications P a g e | 5
DIVISION 1 – GENERAL REQUIREMENTS
01103 – MEASUREMENT AND PAYMENT
PART 1 GENERAL
1.1 Requirements:
Measurement and payment for contract work will be made only for and under those pay items included in the SCHEDULE OF ITEMS. All other work and materials will be considered incidental to and included in the payment of the pay items in the SCHEDULE OF ITEMS.
1.2 Measurement Terms and Definitions:
Unless otherwise specified, the following terms are defined as follows:
Each. One entire unit. The quantity is the actual number of units completed and accepted.
Linear foot. As applicable, measure the work along its length from end-to-end; parallel to the base or foundation; along the top; along the front face; or along the invert. Do not measure overlaps.
Lump sum. Do not measure directly. The bid amount is complete payment for all work described in the contract and necessary to complete the work for that item. The quantity is designated as "1."
Estimated quantities of lump sum work shown in the contract are approximate.
Square foot. 144 square inches. Longitudinal and transverse measurements for area computations will be made horizontally. No deductions from the area computation will be made for individual fixtures having area of 1 square foot or less.
1.3 Units of Measurement
Payment will be by units defined and determined according to U.S. Standard measurements.
1.4 Payment
One of the following methods of measurement for determining final payment is DESIGNATED on the SCHEDULE OF ITEMS for each pay item.
A. Designed Quantities (DQ): These quantities denote the final number of units to be paid for under the terms of the contract. They are based upon the original design data available prior to advertising the project. Changes in the number of units of the originally contemplated work will not be made unless authorized under one or more of the following conditions:
1. As a result of changes authorized by the Contracting Officer in the originally contemplated work. Minor changes to adjust balance points, etc., will not be considered changes in quantities.
2. As a result of the Contracting Officer determining that errors exist in the original design data used to determine designed quantities, that cause a pay item to change by 15 percent.
3. As a result of the Contractor submitting to the Contracting Officer a written request showing evidence of errors in the original design data used to determine design quantities that cause a
MEASUREMENT AND PAYMENT 01103
Specifications P a g e | 6 pay item total to change by 15 percent or more. The evidence must be verifiable and consist of calculations, drawings, or other data that show how the designed quantity is believed to be in error.
B. Actual Quantities (AQ): These quantities are determined from measurements of completed work.
Final payment will be made for the actual quantities at the unit price shown in the SCHEDULE OF ITEMS, subject to the Variation in Quantities Provision.
C. Lump Sum Quantities (LSQ): These quantities denote one complete unit of work as required by or described in the contract, including necessary materials, equipment, and labor to complete the job. They will not be measured.
END OF SPECIFICATION 01103
SUBMITTALS 01300
Specifications P a g e | 7
DIVISION 1 GENERAL REQUIREMENTS
01300 – SUBMITTALS
PART 1 GENERAL
1.1 Requirements
It will be the Contractor's responsibility to submit all items with such promptness as to cause no delay in the work. Approvals must be obtained before starting work which involves the item.
Contractor shall allow ten (10) days for processing of submittals by the Government.
Submittals may also be referred to as SHOP DRAWINGS.
1.2 Manufacturer's Literature and Shop
Submit one (1) copy to the Engineer for approval on the items required herein.
Submittal specifications are to be submitted in the following format:
A. The specifications and salient qualities of the item specified in the contract.
B. The specifications and salient qualities of the submittal item.
C. A listing of the differences and a comparison between the two, including but not limited to the structural qualities, operational qualities, any modifications necessary to accomplish installation of unit, and guarantee and warranty.
D. A cost comparison between the specified and submitted item(s) with the cost reduction benefit to the government or adequate justification for a cost increase to the government.
E. Submittals will be waived if Contractor furnishes exact item used for design when manufacturer's model, size, etc. are shown in the.
Submittals are required per the following sections:
1. 07151 – Liquid Water Proofing Membrane
a. Application Procedures
b. Warranty
2. 07900 – Caulking and Sealants
Other required submittals include all those as specified in the referenced Forest Service Specifications for this project.
END OF SPECIFICATION 01300
Specifications P a g e | 8
QUALITY CONTROL AND QUANTITY MEASUREMENT - 01400
DIVISION 1 GENERAL
01400 - QUALITY CONTROL AND QUANTITY MEASUREMENT
PART 1 - GENERAL
1.1 - Description
This work shall consist of providing quality control in conformance with the Inspection of Construction provisions of this contract to ensure compliance with the drawings, specifications, and provisions of the contract, and measuring the quantities of completed work in conformance with the provisions of the applicable specification. The contractor shall provide all personnel, equipment, tests, and reports necessary to meet the requirements of this specification.
1.3 - Submittals
Submittals under this section shall be furnished to the COR. Submittals include but are not limited to the items shown below and as listed in specification 01300:
Contractor's Representative - On-The-Job Superintendent Quality Control Plan Certificates of Compliance Quantity Measurements Test Results Bill of Ladings Operation and Maintenance Manuals
PART 2 - EXECUTION
3.1 - Contractor's Representative
Submit a letter to the Contracting Officer stating the name of the on-the-job superintendent or representative for the Contractor and the duties and authorities of the representative during work under this contract.
3.2 - Quality Control Plan
(a)Quality Control Plan. The contractor shall submit in writing the following:
(1) Authorities and responsibilities of inspection and testing personnel.
(2) Experience and qualifications of inspection and testing personnel to be assigned and name and location of any (for hire) testing facility to be used.
(b)Approval of Quality Control Plan. The contractor's proposed quality control plan for all items requiring quality control shall be submitted to the COR for review prior to the contractor commencing work. Within 5 days of receipt of the plan, the COR shall notify the contractor whether the plan adequately covers quality control requirements. Construction work shall not be performed prior to contractor's receipt of written approval of the proposed plan. The contractor shall submit to the COR, in writing, any proposed changes in the approved quality control plan. Proposed changes shall not be put into effect until approved in writing by the COR.
Specifications P a g e | 9
All work shall comply with local applicable codes and codes referenced in individual sections of the technical specifications.
The contractor shall provide and maintain appropriate measuring and testing devices, equipment, and supplies to accomplish the required measurement, testing, and inspection in a timely manner. Tests, measurements, and certifications shall be made as required by the drawings and/or specifications. The contractor shall take samples and perform inspections and tests necessary to achieve the quality of construction required by the contract and make required measurements of work under this contract performed onsite or offsite.
(c)Inspection and Tests. The contractor shall maintain current records of all inspections and tests performed. The following information will be acceptable to the Government:
PROJECT NAME: CONTRACT No.:
Pay Item No.:
Test Date:
Location:
Standard Results:
Test By:
(Initials):
The contractor shall engage inspection and testing agencies which are prequalified as complying with the recommendations of "Independent Laboratory Qualification" by the American Council of Independent Laboratories, and which specialize in the types of inspections and tests to be performed.
The contractor shall certify in writing that all inspections and tests were performed in accordance with specifications.
3.4 - Offsite Produced Materials
The contractor shall furnish certificates executed by the manufacturer, supplier, or vendor, stipulating that all offsite produced materials incorporated into the work meet the applicable requirements SHOWN ON THE DRAWINGS or stated in the specifications. Incidental purchases needed to remedy minor shortages of material shall be certified by the contractor. Earth, aggregate, and concrete material shall be certified and accurately completed indicating weights, volumes, and batch times where appropriate.
When the material sources are not designated as Government provided or the contractor elects not to use designated sources, the contractor shall be responsible for furnishing materials that produce an end product equivalent in performance to that originally designated and that meets contract specifications.
Quantity Measurements.
The contractor shall make all measurements for computation of quantities for all work items except those specified for payment by Designed Quantity (DQ). The contractor shall compute the quantities for periodic progress payments; the COR will compute the quantities for the final payment based on measurements taken by the contractor. All contractor measurements are subject to verification. The contractor shall submit all field notes, calculation sheets, and other data used to determine quantities. The contractor shall certify in writing as to the accuracy of the measurements and computations submitted.
Specifications P a g e | 10
The following format or one containing the following information will be acceptable to the Government:
PROJECT NAME: CONTRACT No.:
Quantity or Pay Item No.:
Date :
Measurement:
Test By:
(Initials):
The contractor shall protect construction exposed by or for quality control service activities and protect repaired construction. Upon completion of inspection and testing repair damaged construction and restore substrates and finishes to eliminate deficiencies. The contractor is responsible for repair and protection of inspected work, whether inspection is performed by the contractor or by the Government.
PART 4 - MEASUREMENT AND PAYMENT
4.1 - Measurement There will be no separate measurement for this section.
4.2 - Payment
Quality control and quantity measurements shall be incidental to other specified work.
Payment will be prorated on the percentage of work accomplished and accepted on the related pay item.
CC: Certification and/or inspection, measuring, sampling, and testing by qualified contractor, or contractor's representative.
CL: Approvals, inspections, sampling, testing or measuring under the direction of and certification by a qualified employee of a certified lab or by a Registared Professional Engineer in the State of Arizona.
The contractor shall be responsible for furnishing the Professional services.
END OF SPECIFICATION 01410
MOBILIZATION 01601
Specifications P a g e | 11
DIVISION 1-GENERAL REQUIREMENTS
01601 – MOBILIZATION
PART 1 GENERAL
1.1 Description
This work shall consist of preparatory work and operations necessary for the movement of personnel, equipment, supplies, and incidentals to the project site, and for all other work and operations that must be performed or that cause costs to be incurred prior to beginning work on the various items on the project site.
Mobilization shall include all activities and associated costs for transportation of contractor's personnel, equipment, and operating supplies to the site, establishment of mobile offices, trailers, portable toilets and other necessary general facilities for the contractor's operations at the site.
Demobilization shall include all activities and costs for transportation of personnel, equipment, and supplies not required or included in the contract from the site; including the disassembly, removal, and site cleanup or any other facilities assembled on the site specifically for this contract.
PART 2 PRODUCTS
NONE
PART 3 EXECUTION
NONE
PART 4 MEASUREMENT AND PAYMENT
4.1 Method of Measurement
Progress payments will be made as follows:
The Contractor can request payment for performance and payment bonds. The amount of the premium, including coinsurance and reinsurance agreements, will be paid upon receipt of evidence of full payment to the surety. When separate payment for bonding cost is made, the bonding cost will be subtracted from the total contract amount for this pay item and the balance paid in accordance with the progress payment schedule outlined below.
A. When 5 percent or more of the original contract amount is earned from other pay items, 50 percent of the amount for mobilization, or 5 percent of the original contract amount, whichever is less, will be paid.
B. When 10 percent or more of the original contract amount is earned from other pay items, 100 percent of the amount for mobilization, or 10 percent of the original contract amount, whichever is less, will be paid.
C. Upon completion of all work on the project, any unpaid amount for mobilization will be paid.
MOBILIZATION 01601
Specifications P a g e | 12
Any bonding costs in excess of the total contract amount of this pay item will be paid under one or more other pay items under this contract as determined by the Contracting Officer. In no circumstance will the total amount of this contract be increased as a result of bonding costs exceeding the total contract amount of this pay item.
The total of all payments shall not exceed the original contract amount for this item.
4.2 Payment
Payment will be made under:
PAY ITEM DESCRIPTION PAY UNIT
01601 Mobilization LS
END OF SPECIFICATION 01601
STORAGE AND PROTECTION 01620
Specifications P a g e | 13
01620 – STORAGE AND PROTECTION
PART 1 GENERAL
1.1 Description
This section of work covers storage and protection procedures for the products scheduled for use.
1.2 Related Work Specified Elsewhere
01300 – Submittals
PART 2 PRODUCTS
2.1 Government Items to be Salvaged - Down spouts and drainlines
PART 3 EXECUTION
3.1 Manufacturer’s Recommendations
Except as otherwise approved by the COR, determine and comply with manufacturer’s instructions on product handling, storage and protection.
3.2 Packing
Deliver products to the job site in the manufacturer’s original container, with the labels intact and legible.
A. Maintain packaged materials with seals unbroken and labels intact until time of use.
B. Promptly remove damaged material and unsuitable items from the job site, and promptly replace with material meeting the specified requirements at no additional cost to the Forest Service.
The COR may reject as non-complying such material and products that do not bear identification satisfactorily to the Forest Service as to the manufacturer, grade, quality and other pertinent information.
All product literature, warranties and operating instructions must be intact and transmitted to the Forest Service.
3.3 Protection
Protect finished surfaces, including jambs and soffits of openings used as passageways, through which equipment and materials are handled.
Provide protection for finished floor surfaces in traffic areas prior to allowing equipment and materials
STORAGE AND PROTECTION 01620
Specifications P a g e | 14 to be moved over such surfaces.
Maintain finished surfaces clean, unmarred and suitably protected until accepted by the Forest Service.
3.4 Repairs and Replacements
In event of damage, promptly make replacements and repairs to the approval of the Forest Service and at no additional cost to the Forest Service.
PART 4 MEASUREMENT AND PAYMENT
4.1 Measurement
There will be no separate measurement for this section.
4.2 Payment
This work is incidental to other items in the contract and direct separate item payment will not be made.
END OF SPECIFICATION 01620
CLEANING 01710
Specifications P a g e | 15
01710 – CLEANING
PART 1 GENERAL
1.1 Description
Throughout the construction period, maintain the construction site and facilities in an orderly and clean manner as described in this Section.
PART 2 PRODUCTS
2.1 Cleaning Materials and Equipment
Provide required personnel, equipment and materials as needed to maintain the specified standard.
2.2 Compatibility
Use only the cleaning materials and equipment, which are compatible with the surface being cleaned, as recommended by the manufacturer of the cleaning material.
PART 3 EXECUTION
3.1 Progress Cleaning
Retain stored items in an orderly arrangement allowing maximum access, not impeding traffic or drainage, and providing required protection of materials.
Do not allow accumulation of scrap, debris, waste material and other items not required for construction of this work.
At least twice each month, and more often, if necessary, completely remove all scrap, debris and waste material from the job site.
Provide adequate storage for all items awaiting removal from the job site, observing requirements for fire protection and protection of the ecology.
3.2 Site
Daily, and more often, if necessary, inspect the site and pick up all scrap, debris and waste material. Remove such items to the place designated for their storage.
At all times, maintain the site in a neat, orderly condition.
Clean mud and debris from roadways or highways adjacent to the project site daily.
3.3 Structure
CLEANING 01710
Specifications P a g e | 16
At least weekly, inspect the structures and pick up all scrap, debris and waste material and remove them to the place designated for their storage.
“Clean” for the purpose of this paragraph shall be interpreted as meaning free from material capable of being removed by reasonable effort with a handheld broom.
3.4 Final Cleaning
Prior to completion of the work, remove from the job site all tools, surplus materials, equipment, scrap, debris and waste.
Structures:
A. Exterior:
1. Visually inspect exterior surfaces and remove all traces of soil, waste materials, smudges and other foreign matter.
2. Remove all traces of splashed materials from adjacent surfaces.
3. In the event of stubborn stains not removable with water, the Forest Service may require light sandblasting or other cleaning at no additional cost to the Forest Service.
END OF SECTION 01710
OPERATIONS AND MAINTENANCE DATA 01730
Specifications P a g e | 17
DIVISION 1 – GENERAL REQUIREMENTS
01730 – OPERATIONS AND MAINTENANCE DATA
PART 1 GENERAL
A. Requirements Included
Compile product data and related information appropriate for Government's maintenance and operation of products furnished under the contract. The Contractor will warranty all parts and labor associated with the project for one year at the minimum per FAR 52.246-21.
B. Related Work Specified Elsewhere
01300 – Submittals
C. Quality Assurance
Preparation of data shall be done by personnel:
1. Trained and experienced in maintenance and operation of described products.
2. Familiar with requirements of this Specification.
3. Skilled as technical writer to the extent required to communicate essential data.
D. Form of Submittals
Prepare data in form of an instructional manual for use by Government's personnel.
1. Format:
Size: 8-1/2" x 11".
Paper: Manufacturer's original printed data, or neatly typewritten no fax paper or copies thereof.
2. List:
a. Title of Project, Year.
b. Identity of separate structure as applicable.
c. Identity of general subject matter covered in the manual.
7. Content of Manual(s)
a. Neatly typewritten table of contents for each volume, arranged in systematic order.
b. Contractor, name of responsible principal, address and telephone number.
c. List of each product required to be included, indexed to content of the volume.
List, with each product, name, address and telephone number of: Subcontractor or installer.
Maintenance Contractor, as appropriate. Identify area of responsibility of each.
Specifications P a g e | 18
Local source of supply for parts and replacement. Warranty Certificates
Identify each product by name and other identifying symbols as set forth in Contract Documents.
Product Data: Include only those sheets which are pertinent to the specific product. Annotate each sheet to:
Clearly identify specific product or part installed. Clearly identify data applicable to installation.
Delete references to inapplicable information.
Written Text: As required to supplement product data for the particular installation:
Organize in consistent format under separate headings for different procedures. Provide logical sequence of instructions for each procedure.
Copy of each warranty, bond and service contract issued. Provide information sheet for Government personnel to provide the following:
Proper warranty procedures to follow in the event of failure. Instances which might affect validity of warranties or bonds.
8. Manual for Materials and Finishes
Submit two (2) copies of each manual in final form, one (1) hard copy and one (1) electronic on a flash drive.
Content for architectural products applied materials and finishes:
Manufacturer's data, giving full information on product:
Catalog number, size, and composition.
Color and texture designations.
Information required for re-ordering special manufactured products.
Instructions for care and maintenance:
Manufacturer's recommendations for types of cleaning agents and methods.
Cautions against cleaning agents and methods which are detrimental to product.
Recommended schedule for cleaning and maintenance.
Content for moisture protection and weather exposed products:
Manufacturer's data giving full information on products.
Applicable standards.
Chemical composition.
Details of installation.
Instructions for inspection, maintenance and repair.
Additional requirements for maintenance data: Respective Sections of the Specifications.
9. Submittal Schedule
Specifications P a g e | 19
Submit one (1) copy of preliminary draft of proposed formats and outlines of contents prior to start of work.
Engineer will review draft and return one copy with comments.
Submit one (1) copy of completed data in final form at Substantial Completion of the Work for Engineer’s review.
Copy will be returned after final inspection or acceptance with comments.
Submit specified number of copies of approved data in final form at Final Inspection or acceptance.
PART 2 PRODUCTS
NONE
PART 3 EXECUTION
NONE
PART 4 MEASUREMENT AND PAYMENT
4.1 Measurement
There will be no separate measurement for this section.
4.2 Payment
This work is incidental to other items in the contract and direct separate payment will not be made.
END OF SPECIFICATION – 01730
STRUCTURAL EXCAVATION AND BACKFILL - 02220
Specifications P a g e | 20
DIVISION 2 SITE WORK
02220 - STRUCTURAL EXCAVATION AND BACKFILL
PART I - GENERAL
1.1 SITE WORK
A. The Contractor will be responsible for excavating, providing shoring, providing and installing bedding material, backfilling, and compacting around concrete structures.
1.2 CLEARING AND GRUBBING
A. The Contractor will be responsible for removing landscaping and irrigation from the structure location and for access for the contractor's equipment to get to the structure site. Areas to be cleared are to be approved by the COR prior to clearing.
PART II - PRODUCTS
2.1 BACKFILL MATERIAL
A. Material excavated from site can be reused to backfill, the Contractor shall, insure that contaminates such as trash and other organic material are removed from the soil when backfilling.
B. If additional material is required, material shall be from a contractor furnished supply.
PART III - EXECUTION
3.1 Excavation for the crack sealing, defect repairs and for the installation of the waterproofing membrane, shall be to the full depth of the subterranean wall. Stockpile of the soil excavated shall be designated by the COR.
3.2 Finish floor elevation shall be flush with the finished grade measured at the existing sidewalk and will have a minimum of a 2% sloping up towards the building unless otherwise approved by the COR.
3.3 BACKFILLING AND COMPACTION
A. Backfill around structure, use excavated material for backfill except that rocks larger than six inches in maximum dimension shall not be placed within six inches of exterior of structure wall. Stumps, roots, brush, and other vegetation shall be disposed of off Government land by the Contractor.
B. Excavation will NOT be left open or unattended. The Contractor must provide metal plates to cover excavation or must be excavations must be backfilled at the end of the work day.
3.4 TEMPORARY FENCING
A. All excavations shall be fenced unless otherwise approved in writing in advance by the COR.
PART IV - MEASUREMENT AND PAYMENT
4.1 METHOD OF MEASUREMENT
STRUCTURAL EXCAVATION AND BACKFILL - 02220
Specifications P a g e | 21
The work specified herein will not be measured for payment.
4.2 PAYMENT
Payment will be made under:
Pay Item Description Pay Unit 02512 Structural Excavation and Backfill L.S.
***END OF SECTION***
CONCRETE SIDEWALKS - 02512
Specifications P a g e | 22
DIVISION 2 SITE WORK
02512 - CONCRETE SIDEWALKS
PART 1 - GENERAL
1.1 - Description
This section shall consist of the construction of concrete sidewalks complete, including all site work, forming, reinforcing, joints, cleanup, and backfill.
1.2 - Related Work Specified Elsewhere
02220 – Structural Excavation and Backfill 03100 - Concrete Formwork 03345 - Concrete Finishing
1.3 - Submittals
Any submittals as required in related work specified elsewhere.
PART 2 - PRODUCTS
2.1 - General
All products and materials shall conform to the requirements of these specifications and those Shown on the Drawings.
PART 3 - EXECUTION
3.1 - Construction
Construct sidewalks in conformance with these specifications and as Shown on the Drawings.
PART 4 - MEASUREMENT AND PAYMENT
4.1 - Measurement
Measurement will be each unit completed and accepted, including all related construction with the exception of aggregate base. Measurement shall be outside any building limits.
4.2 - Payment
This work shall be paid at the contract unit price, which will be full compensation for all layout, excavation, grading, formwork, reinforcing, joints, concrete, finishing, backfill and cleanup to provide a complete sidewalk in accordance with these specifications and as Shown on the Drawings. Aggregate base course, if shown, shall be paid separately.
02512 Concrete Sidewalk S.F.
END OF SPECIFICATION – 02512
Specifications P a g e | 23
CONCRETE FORMWORK 03100
DIVISION 3 - CONCRETE
03100 - CONCRETE FORMWORK
PART 1 - GENERAL
1.1 – Description
This section specifies construction of formwork for concrete structures.
1.2 - Related Work Specified Elsewhere
02512 - Concrete Sidewalks 03345 – Concrete Finishes
PART 2 - PRODUCTS
2.1 - Form Materials and Appurtenances
(a) Plywood B-B Plyform.
(b) Steel Prefabricated.
(c) Lumber Standard grade, (concealed surfaces only).
(d) Form Ties and Spreaders Standard metal form clamp assembly of a type acting as spreaders and leaving no metal within one inch of the concrete face.
PART 3 - EXECUTION
3.1 - Construction
(a) Bracing and Alignment All forms shall be straight and free from warp. Bracing shall be strong enough to withstand the pressure of the concrete and the forces associated with the placement thereof without displacement or deformation. Forms shall prevent leakage of mortar.
(b) Preparation Remove all loose soil, sawdust, shavings, and other debris from within the forms before placing concrete. All forms shall be clean and coated with an approved form release agent before concrete is placed.
3.2 - Inspection
Obtain the COR's approval of forms at least 4 hours prior to placing concrete. Notify the COR at least 24 hours in advance of concrete placement that forms will be ready for inspection.
3.3 - Form Removal
Do not disturb forms until curing has been completed. Concrete shall not be subjected to any construction loads until it is ready for removal of forms.
PART 4 - MEASUREMENT AND PAYMENT
4.1 - Measurement
Concrete Formwork will not be measured for payment.
Specifications P a g e | 24
CONCRETE FORMWORK 03100
4.2 - Payment
This work is incidental to pay item 02608 and direct payment for Concrete Formwork will not be made.
END OF SPECIFICATION 03100
Specifications P a g e | 25
CONCRETE FINISHING 03345
DIVISION 3 CONCRETE
03345 – CONCRETE FINISHING
PART 1 - GENERAL
1.1 - Description
This section specifies finishing of concrete surfaces.
1.2 - Related Work Specified Elsewhere
02512 - Concrete Sidewalks 03100 – Concrete Formwork
1.3 - Locations
Provide Class 1 finishing to all concrete surfaces.
PART 2 - PRODUCTS
2.1 - Grout
Patching Grout - 1 part portland cement, 2 parts sand.
Finishing grout - equal parts portland cement and sand.
PART 3 - EXECUTION
3.1 - Class I, Ordinary Surface Finish
As soon as forms are stripped, remove to a minimum depth of 1/4 inch, any projecting wire or metal devices used in forming. Remove fins caused by form joints. Patch all holes, depressions, small rock pockets, and form tie cones by first saturating with water and packing stiff patching grout into voids.
Repair large holes, rock pockets, spalls, and honey combs by chipping away all coarse or broken material until a dense uniform surface of concrete remains; saturate with water, apply thin layer of neat cement; pack stiff patching grout, and thoroughly tamp.
Preshrink patching grout by mixing approximately 30 minutes before using.
Float patches with wooden float before initial setting; provide neat, well blended patch.
Cure patches for 12 hours by continuous wetting.
3.2 - Class 2, Rubbed Finish
After forms are stripped and all patching grout has set, start the rubbed finish as conditions permit. Rub with rubber or wood float to remove form marks and irregularities. If the float cannot produce a smooth uniform surface, grind the surface and provide a sack finish as follows:
Thoroughly wet surfaces immediately before work. Rub or grind with medium-coarse abrasive stone, Specifications P a g e | 26
CONCRETE FINISHING 03345
using small quantity of mortar.
Continue until form marks, projections, and irregularities are removed and voids filled.
Apply finishing grout with brush or burlap, completely filling pits, to provide a uniform texture and color.
3.3 - Class 3, Float Finish
Immediately after placing concrete for horizontal surfaces, vibrate, tamp, and strike off with screed, or templates if crowns are required. Hand finish to smooth, even surface with wood float. After excess moisture has dissipated but concrete is still plastic, check for proper grades, crowns, and uniformity. Fill or cut down incorrect surfaces; refloat for final finish. Use no mortar for leveling.
3.4 - Class 4, Trowel Finish
Prepare surface as in a Class 3 Float Finish. When water sheen has left surface, steel trowel to a smooth surface, free of blemishes. Trowel to a final finish after concrete has hardened sufficiently to prevent drawing moisture and fine material to surface. Trowel to produce a dense, smooth, impervious surface, free of defects and blemishes. Do not use mortar or other materials to facilitate finishing concrete.
Tool exposed edges with a slightly rounded edging tool.
Tool joints with a groover.
3.5 - Class 5, Broomed Finish
Prepare surface as in a Class 4, Trowel Finish. Lightly broom to a roughened finish of uniform pattern and texture.
Tool exposed edges with slightly rounded edging tool.
Tool joints with a groover.
PART 4 - MEASUREMENT AND PAYMENT
4.1 - Measurement
The work specified herein will not be measured for payment.
4.2 - Payment
This work is incidental to other items in this contract and direct payment will not be made.
END OF SPECIFICATION 03345
LIQUID WATER PROOFING MEMBRANE 07151
Specifications P a g e | 27
SECTION 7 - THERMAL AND MOISTURE PROTECTION
07151 – LIQUID WATER PROOFING MEMBRANE
PART 1 - GENERAL
1.1 - Scope
This section includes requirements necessary to provide and install all necessary masonry water proofing on all exposed exterior concrete faces specified herein.
1.2 - Related Work Specified Elsewhere
07900 – Caulking and Sealants
1.3 - Delivery and Storage
All materials shall be delivered and stored in a safe and dry area in accordance with the manufacturer's recommendations.
PART 2 - PRODUCTS
2.1 – Liquid Waterproofing Membrane
Seal the entirety of the concrete wall with Semco Liquid Membrane, Honey Maple or approved equal.
PART 3 - EXECUTION
3.1 - Surface Preparation
Masonry and concrete surfaces shall be free from efflorescence, excess dirt, dust, and mortar with hardened grout. Mortar smears shall be removed by sandblasting. Defective mortar joints shall be routed out, pointed with new mortar and tooled. All voids, beeholes and cracks larger than hairline shall be filled with injectable epoxy resin. A minimum of 10 day under normal weather conditions must be allowed for curing of grout and mortar and after periods of rainfall before application.
3.2 - Application
Method of application and coverage for all waterproofing shall be strictly as detailed in manufacturer's data sheets. Two (2) coats, 20 millimeters per coat shall be applied.
Applicator shall be responsible for protection of this and all adjacent work from damage during application. Concrete sidewalks must be protected from runoff by soaking with water prior to spraying adjacent walls. Overspray shall not be allowed to stand on concrete or asphalt but shall be rinsed off with water.
PART 4 - MEASUREMENT AND PAYMENT
LIQUID WATER PROOFING MEMBRANE 07151
Specifications P a g e | 28
07151 LIQUID WATER PROOFING MEMBRANE L.S.
END OF SPECIFICATION 07151
Specifications P a g e | 29
CAULKING AND SEALANTS 07900
SECTION 7 THERMAL AND MOISTURE PROTECTION
07900 – CAULKING AND SEALANTS
PART 1 - GENERAL
1.1 - Scope
Work Included: Perform all work necessary and required for construction of the project as indicated. Such work includes but is not limited to the following:
(1) Injectable epoxy resin
1.2 - Related Work Specified Elsewhere
070151 – Liquid water proofing membrane
1.3 - Product Handling
Delivery: Deliver sealants and related accessories to the job site in factory sealed, unopened containers bearing manufacturer's name and product designations.
Handling: Follow manufacturer's recommendations for handling products containing toxic materials. Keep flammable material away from heat, sparks, and open flame.
PART 2 - PRODUCTS
2.1 - Materials
General: All sealants, primers, and accessories shall be non-staining to adjacent exposed materials. Use gun consistency compounds unless otherwise required by job conditions. Colors shall be approved by the COR.
PART 3 - EXECUTION
3.1 - Condition of Surfaces
Inspect all surfaces to receive sealant material. Starting work implies acceptance of surfaces as satisfactory by Contracting Officer.
Verify that joints and spaces to be sealed are of proper width.
Apply no sealant materials in contact with surfaces contaminated with oil, grease, bituminous materials, form release agents, bond breakers, deleterious curing compounds, water repellents, and other special surface treatments.
3.2 - Preparation
Thoroughly clean all joints, removing all foreign matter such as dirt, dust, moisture, frost, rust, mill scale, paint, lacquer, and protective coatings. Blow all joints free of loose particles.
Specifications P a g e | 30
CAULKING AND SEALANTS 07900
Use no cleaning solvents which leave residue. Wipe joints free of solvent using clean, dry white cloths or white lintless paper. Do not permit solvent to air dry.
Follow manufacturer's directions for products and surfaces.
3.3 - Installation
Unless otherwise required by these specifications, install materials in strict accordance with manufacturer's specifications and recommendations using approved equipment.
3.4 - Patching
Patch or replace defective or damaged sealants as directed by the Contracting Officer. The contractor shall be responsible for damage to adjacent surfaces caused by sealant operations.
3.5 - Cleaning
Clean adjacent surfaces soiled by sealing operations. Remove wet material before it "sets".
Follow manufacturer's recommendations for cleaning procedures. Cleaning agents shall not stain or be injurious to exposed surfaces nor shall they be potentially dangerous to metal surfaces due to wash-off by rain.
PART 4 - MEASUREMENT AND PAYMENT
07900 Caulking and Sealants L.S.
END OF SPECIFICATION 07900
| CSI SPECIFICATION INDEX |
| DIVISION 1 GENERAL REQUIREMENTS |
| 01010 – SUMMARY OF WORK |
| 01103 – MEASUREMENT AND PAYMENT |
| 01300 – SUBMITTALS |
| 01400 - QUALITY CONTROL AND QUANTITY MEASUREMENT |
| 01601 – MOBILIZATION |
| 01620 – STORAGE AND PROTECTION |
| 01710 – CLEANING |
| 01730 – OPERATIONS AND MAINTENANCE DATA |
| DIVISION 2 SITE WORK |
| 02220 - STRUCTURAL EXCAVATION AND BACKFILL |
| 02512 - CONCRETE SIDEWALKS |
| DIVISION 3 - CONCRETE |
| 03100 - CONCRETE FORMWORK |
| 03345 – CONCRETE FINISHING |
| SECTION 7 - THERMAL AND MOISTURE PROTECTION |
| 07151 – LIQUID WATER PROOFING MEMBRANE |
| 07900 – CAULKING AND SEALANTS |